Method for constructing upper step middle partition wall of shallow-buried excavation tunnel

A technology of shallow burial and underground excavation and construction method, which is applied in tunnels, tunnel linings, and earth-moving drilling and mining, etc., can solve the problems of small operation space, inability to excavate two-lane tunnels, complicated procedures, etc., to achieve large construction space and avoid ground Subsidence or pipeline rupture accident, the effect of reducing installation and demolition work time
CN104612698AActive Publication Date: 2015-05-13HANGZHOU TIANHENG INVESTMENT CONSTR MANAGEMENT +1

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
HANGZHOU TIANHENG INVESTMENT CONSTR MANAGEMENT
Publication Date
2015-05-13

Smart Images

  • Figure 1
    Figure 1
Patent Text Reader

Abstract

The invention discloses a method for constructing an upper step middle partition wall of a shallow-buried excavation tunnel. The method includes the steps of advanced geology forecast, measuring and setting-out, upper step arch advanced supporting, upper step excavation with core soil reserved, upper step application primary supporting, lower step excavation with core soil reserved, upper step middle partition wall detachment, tunnel bottom excavation, temporary inverted arch detachment, inverted arch and inverted arch concrete filling, and arch wall secondary lining construction. The method simplifies construction procedures, saves temporary supporting materials, accelerates the construction progress to 45-60 meters per month, reduces labor cost, effectively shortens the construction period, reduces engineering cost, solves various problems that the number of auxiliary procedures of shallow-buried excavation tunnel construction is large, construction process is slow and structure stress is complicate, reduces influences on surrounding environments, and achieves good social and economic benefits.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention belongs to the technical field of tunnel construction, and in particular relates to a construction method for a partition wall in an upper step of a shallow-buried tunnel. Background technique

[0002] The CRD method and the double-side-wall pilot-pit method are often used in the construction of shallow-buried tunnels with weak surrounding rocks. These methods are based on the idea of ​​block excavation, and the excavation and temporary support are removed to disturb the surrounding rock many times. The process transformation is complicated and the operation Small space is not conducive to the use of large mechanical equipment, slow construction progress, long construction period, high cost, poor excavation stability and safety, and is not suitable for low rock strength, developed rock mass structural planes, rock mass endowment The excavation of the two-lane tunnel cannot be carried out due to rock formations with poor storage environmen...