A method for purifying, storing and utilizing mine water resources in desert areas
By building a desert underground reservoir in desert areas and purifying and storing mine water using the filtering characteristics of sand particles, the problem of high cost of mine water purification and storage in desert areas is solved, and the water retention capacity and vegetation irrigation effect in desert areas are improved.
Patent Information
- Application Number
- CN202410652333.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-24
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-05-24
AI Technical Summary
In desert areas, the purification and storage cost of mine water in the prior art is high, and it is difficult to effectively utilize the characteristics of the desert, and it is impossible to effectively improve the water retention capacity and vegetation irrigation conditions of the desert.
Building a desert underground reservoir in desert areas, purifying and storing mine water using the filtering characteristics of sand particles, and improving the water retention capacity of the desert area through the roof water-sealing function of the desert underground reservoir, and using the purified water for vegetation irrigation and Other uses.
It reduces the engineering and equipment costs required for mine water purification, improves the water retention capacity and vegetation irrigation effect in desert areas, and achieves efficient utilization of mine water.
Smart Images

Figure CN118515325B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mine water purification and utilization, and in particular to a method for purifying, storing and utilizing mine water resources in desert areas. Background Art
[0002] The surface of some mines in western my country is desert. Mine water is produced during mine production. Some mine water is purified by special purification equipment underground and then used in coal production. Some mine water will be discharged to the surface. The surface of the desert is full of sand, which makes it difficult to store water. If the mine water is directly discharged into the desert, it will greatly waste water resources. Therefore, in the prior art, it is necessary to establish special water storage and water purification equipment in desert areas to purify the mine water discharged from the surface and then use it to irrigate desert vegetation or transport it to other places for use.
[0003] The existing methods for treating mine water in desert areas require huge and costly projects, do not fully utilize the characteristics of the desert, and cannot improve desert water conservation or irrigation of desert vegetation. Summary of the invention
[0004] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a method for purifying, storing and utilizing mine water resources in desert areas, which fully utilizes the filtering characteristics of sand in the desert, reduces the projects and equipment required for mine water purification, and reduces costs. The top plate of the desert underground reservoir plays a certain water-isolating function, so that the sand purification area above and the surrounding desert area have a water-retaining function, thereby improving the irrigation method and effect of the vegetation above.
[0005] The technical solution of the present invention provides a method for purifying, storing and utilizing mine water resources in desert areas, comprising the following steps:
[0006] S1: constructing a desert underground reservoir around a mine in a desert area, with a sand purification area above the desert underground reservoir;
[0007] S2: transporting the mine water to the sand purification area through a pipeline, and the mine water purified by the sand purification area seeps into the desert underground reservoir for storage;
[0008] S3: Pumping out the water in the desert underground reservoir and transporting it to a designated location.
[0009] In one of the optional technical solutions, the method for constructing the desert underground reservoir comprises the following steps:
[0010] S11: Selecting a construction area around the mine;
[0011] S12: constructing an upper isolation layer below the desert surface, and fracturing the upper isolation layer;
[0012] S13: constructing a lower isolation layer below the upper isolation layer;
[0013] S14: using a sand pumping device to pump out the silt between the lower isolation layer and the upper isolation layer to form the desert underground water reservoir;
[0014] S15: adding a plurality of wood piles into the desert underground water reservoir to support the upper isolation layer;
[0015] S16: at least one water pumping pipe is laid downward from the desert surface, wherein the lower end of the water pumping pipe is located in the desert underground reservoir, and the upper end of the water pumping pipe extends above the desert surface.
[0016] In one of the optional technical solutions, at least one drainage pipe is laid downward from the desert surface, and the wall of the drainage pipe has a plurality of drainage holes;
[0017] The lower end of the drainage pipe is located above the desert underground water reservoir, and the upper end of the drainage pipe extends above the desert surface.
[0018] In one of the optional technical solutions, the step S12 includes:
[0019] Drilling a plurality of fracturing boreholes at intervals along the upper isolation layer;
[0020] A water guide pipe is arranged in the fracturing borehole, and a plurality of water guide holes are provided on the wall of the water guide pipe.
[0021] In one of the optional technical solutions, the outer diameter of the water conduit is greater than the average thickness of the upper isolation layer;
[0022] At least part of the water conduit protrudes above the upper isolation layer, and at least part of the water conduit protrudes below the upper isolation layer.
[0023] In one of the optional technical solutions, the water conduit is filled with gravel for filtering and purification.
[0024] In one of the optional technical solutions, a layer of brackets is provided in the water conduit, and the brackets extend along the axial direction of the water conduit;
[0025] One side of the support is filled with large-grained gravel, and the other side of the support is filled with small-grained gravel.
[0026] In one of the optional technical solutions, the upper isolation layer and the lower isolation layer are respectively grout-formed through grouting pipes;
[0027] The grouting pipe comprises a grouting pipe main pipe and a plurality of anchoring claws connected around the grouting pipe main pipe and having a grouting flow channel; an air bag mechanism capable of driving the anchoring claw to swing outward is connected between the anchoring claw and the grouting pipe main pipe, and the air bag mechanism is connected to the grouting flow channel of the grouting pipe main pipe;
[0028] When the airbag mechanism is in a contracted state, the anchor claw is tightened by the airbag mechanism to the side of the grouting pipe main pipe;
[0029] When slurry is injected into the airbag mechanism and the airbag mechanism is in an expanded state, the anchor claws are swung out toward the outside of the grouting pipe main pipe and inserted into the surrounding sand particles to inject grout into the sand particles.
[0030] In one of the optional technical solutions, the upper isolation layer and / or the lower isolation layer are formed as follows:
[0031] Pre-planning the preset number and preset positions of the holes to be drilled, and preparing the grouting pipes in advance;
[0032] Drilling a hole below the desert surface and laying the grouting pipe using a directional drill until the distal end of the grouting pipe main pipe is exposed above the desert surface, and closing the distal end of the grouting pipe main pipe;
[0033] Grouting is performed from the proximal end of the grouting pipe main pipe until the airbag mechanism expands the anchor claw outward, and the anchor claw is inserted into the surrounding sand grains and grouting is performed into the surrounding sand grains;
[0034] After the slurry and the surrounding sand particles solidify, the upper isolation layer and / or the lower isolation layer are formed.
[0035] In one of the optional technical solutions, after the anchor claws are stretched outward, the grouting pipe main pipe is pulled in the opposite direction of the stretching direction of the anchor claws, so that the anchor claws are inserted deeper into the surrounding sand.
[0036] The above technical solution has the following beneficial effects:
[0037] The present invention provides a method for purifying, storing and utilizing mine water resources in desert areas. By constructing a desert underground reservoir around a mine in a desert area, the water is purified using sand above the desert underground reservoir and stored in the desert underground reservoir. The water in the desert underground reservoir can be transported back to the mine for mine production, the water in the desert underground reservoir can be used for vegetation irrigation in the desert, and the water in the desert underground reservoir can be extracted and purified for factory production and domestic water use.
[0038] The present invention provides a method for purifying, storing and utilizing mine water resources in desert areas, which fully utilizes the filtering characteristics of sand in the desert, reduces the projects and equipment required for mine water purification, and reduces costs. The top plate of the desert underground reservoir plays a certain water-isolating function, so that the sand purification area above and the surrounding desert area have a water-retaining function, thereby improving the irrigation method and effect of the vegetation above. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] The disclosure of the present invention will become more easily understood with reference to the accompanying drawings. It should be understood that these drawings are only for illustrative purposes and are not intended to limit the scope of protection of the present invention. In the drawings:
[0040] Figure 1 A schematic flow chart of a method for purifying, storing and utilizing mine water resources in desert areas provided by one embodiment of the present invention;
[0041] Figure 2 A schematic diagram of the construction of the upper isolation layer below the desert surface;
[0042] Figure 3 A schematic diagram of constructing a lower isolation layer below an upper isolation layer;
[0043] Figure 4 A schematic diagram of pumping out the silt between the lower isolation layer and the upper isolation layer to form a desert underground reservoir;
[0044] Figure 5 A schematic diagram of adding multiple wood piles to a desert underground water reservoir;
[0045] Figure 6 This is a schematic diagram for laying out water pumps and drainage pipes;
[0046] Figure 7 Schematic diagram of using desert underground reservoirs to store water;
[0047] Figure 8 A schematic diagram of drilling multiple fracturing boreholes at intervals along the upper isolation layer;
[0048] Fig. 9 A schematic diagram of arranging a water pipe in a fracturing borehole;
[0049] Fig.10 A schematic diagram of using a desert underground reservoir to store water, wherein a water pipe is arranged in the upper isolation layer;
[0050] Fig.11 is a cross-sectional view of the water pipe along the radial direction;
[0051] Fig.12 This is a schematic diagram of an aqueduct filled with gravel;
[0052] Fig.13 It is a schematic diagram of the arrangement of the water pipe and the upper isolation layer;
[0053] Fig.14 Schematic diagram of using desert underground reservoirs to store water, where the water pipes are filled with gravel;
[0054] Fig.15 It is a cross-sectional view of the drainage pipe along the axial direction;
[0055] Fig.16 It is a cross-sectional view of the grouting pipe, wherein the anchor claw is pulled and retracted by the airbag mechanism;
[0056] Fig.17 It is a cross-sectional view of the grouting pipe, wherein the anchor claw is pulled open by the airbag mechanism;
[0057] Fig.18 It is a partial enlarged view of the installation area of the anchor claw and the airbag mechanism;
[0058] Fig.19 It is a partial cross-sectional view of the grouting pipe main pipe;
[0059] Fig. 20 It is a schematic diagram of the assembly of the anchor claw and the airbag mechanism;
[0060] Fig.21 It is a schematic diagram of the airbag mechanism when the anchor claws are expanded after the slurry is injected into the airbag mechanism;
[0061] Fig. 22 is a cross-sectional view of the airbag mechanism;
[0062] Fig.23 is a schematic diagram of the anchor claws being in a retracted state during the first stage of grouting;
[0063] Fig.24 is a schematic diagram of the anchor claws being in an open state at another stage of grouting;
[0064] Fig.25 It is a schematic diagram of grouting from the proximal end of the grouting pipe main pipe after the grouting pipe is arranged in place;
[0065] Fig.26 It is a schematic diagram of the airbag mechanism stretching the anchor claw outward after the first stage of grouting;
[0066] Fig. 27 It is a schematic diagram of the coagulation of slurry and surrounding sand particles after grouting is completed;
[0067] Fig.28 A schematic diagram of cutting off the proximal and distal ends of the grouting pipe main pipe;
[0068] Fig.29 for Fig.28Cross-sectional view along AA. DETAILED DESCRIPTION
[0069] The specific embodiments of the present invention are further described below in conjunction with the accompanying drawings. The same components are represented by the same reference numerals. It should be noted that the words "front", "rear", "left", "right", "upper" and "lower" used in the following description refer to directions in the accompanying drawings, and the words "inner" and "outer" refer to directions toward or away from the geometric center of a specific component, respectively.
[0070] like Figure 1 As shown, an embodiment of the present invention provides a method for purifying, storing and utilizing mine water resources in desert areas, comprising the following steps:
[0071] S1: A desert underground water reservoir 3 is constructed around a mine in a desert area, and a sand purification area is located above the desert underground water reservoir 3.
[0072] S2: The mine water is transported to the sand purification area through pipelines, and the mine water purified in the sand purification area seeps into the desert underground reservoir 3 for storage.
[0073] S3: Pumping out the water in the desert underground reservoir 3 and transporting it to a designated location.
[0074] The method for purifying, storing and utilizing mine water resources in desert areas provided by the present invention is mainly aimed at mine water produced in desert areas or mines in desert areas.
[0075] The steps of the method for purifying, storing and utilizing mine water resources in desert areas provided by the present invention are as follows:
[0076] The first step is to construct a desert underground reservoir 3 around a mine in a desert area in advance. The desert reservoir 3 can be realized by constructing upper and lower isolation layers below the desert surface, and then hollowing out the sand between the upper and lower isolation layers to form a water storage area, which is the desert underground reservoir 3. The upper isolation layer is the top plate of the desert underground reservoir 3, and the lower isolation layer is the bottom plate of the desert underground reservoir 3. The upper part of the upper isolation layer is mainly sand in the desert, which plays a filtering and purification role. This part of the area is called the sand purification area. After the upper isolation layer is built, a permeable hole can be drilled on the upper isolation layer, or the upper isolation layer can be fractured to form a water-conducting fissure, thereby connecting the sand purification area and the desert underground reservoir 3. The water filtered through the sand purification area can seep through the permeable holes and / or water-conducting fissures of the upper isolation layer to the desert underground reservoir 3 for storage. When the water seeps through the permeable holes and / or water-conducting fissures of the isolation layer, it will be filtered again. The existence of the upper isolation layer can enable the sand purification area above to have a certain water storage capacity, and is also conducive to irrigation of the surrounding vegetation.
[0077] Step 2: Use pipelines to transport part or all of the mine water generated by mines in desert areas to the sand purification area. The entire volume of the sand purification area is large and can temporarily store a lot of water. The mine water entering the sand purification area seeps from top to bottom, and the sand filters the suspended matter, particulate matter and other impurities in the water. After the mine water reaches the upper isolation layer, it seeps through the permeable holes and / or water-conducting fissures to the desert underground reservoir 3 for storage.
[0078] Step 3: Use pipelines to pump out the water in the desert underground reservoir 3 and transport it to a designated place for use. The water in the desert underground reservoir 3 can be transported back to the mine for mine production, the water in the desert underground reservoir 3 can be used for vegetation irrigation in the desert, and the water in the desert underground reservoir 3 can be pumped out and purified for factory production and domestic water use.
[0079] In summary, the method for purifying, storing and utilizing mine water resources in desert areas provided by the present invention fully utilizes the filtering characteristics of sand in the desert, reduces the projects and equipment required for mine water purification, and reduces costs. The top plate of the desert underground water reservoir 3 plays a certain water-isolating function, so that the sand purification area above and the surrounding desert area have a water-retaining function, thereby improving the irrigation method and effect of the vegetation above.
[0080] In one embodiment, if Figure 2-7 As shown, the construction method of the desert underground reservoir 3 includes the following steps:
[0081] S11: Select a construction area around the mine.
[0082] S12: constructing an upper isolation layer 1 below the desert surface, and fracturing the upper isolation layer 1.
[0083] S13: constructing a lower insulation layer 2 below the upper insulation layer 1.
[0084] S14: using a sand pumping device to pump out the silt between the lower isolation layer 2 and the upper isolation layer 1 to form a desert underground water reservoir 3.
[0085] S15: Add multiple wood piles 31 into the desert underground water reservoir 3 to support the upper isolation layer 1.
[0086] S16: at least one water pumping pipe 4 is laid downward from the desert surface, the lower end of the water pumping pipe 4 is located in the desert underground reservoir 3, and the upper end of the water pumping pipe 4 extends above the desert surface.
[0087] In this embodiment, the construction method of the desert underground water reservoir 3 is as follows:
[0088] The first step: design the construction area of the desert underground water reservoir 3 according to the location of the mine. Generally, the desert underground water reservoir 3 is preferably within 5 kilometers from the mine, which can ensure that the desert underground water reservoir 3 has enough space to form a sufficiently large water storage area and sand filtration area, and avoid the mine water transportation path being too long.
[0089] Step 2: Use a directional drill to construct and form the upper isolation layer 1 from below the desert surface, which can be achieved by drilling and grouting. The slurry can use existing cement slurry or microbial slurry. Cement sand fixation technology and microbial sand fixation technology are already relatively mature technologies. The composition of cement slurry and microbial slurry can refer to the content in the prior art, which will not be repeated here.
[0090] Then, the upper isolation layer 1 is fractured to form water-conducting fractures. The upper isolation layer 1 can be fractured by drilling holes in the upper isolation layer 1 to generate fractures in the upper isolation layer 1, or other fracture methods can be used.
[0091] The height of the upper isolation layer 1 from the desert surface can be set as needed.
[0092] Step 3: construct a lower isolation layer 2 below the upper isolation layer 1. The lower isolation layer 2 can be formed in the same way as the upper isolation layer 1. The height of the lower isolation layer 2 from the upper isolation layer 1 can be set as needed. The lower isolation layer 2 is no longer fractured or drilled, and its integrity must be maintained to ensure the water storage function.
[0093] From the cross-section, the upper isolation layer 1 and the lower isolation layer 2 are U-shaped, arc-shaped or semicircular.
[0094] Step 4: Use sand pumping equipment to pump out the silt between the lower isolation layer 2 and the upper isolation layer 1 to form a desert underground water reservoir 3. The sand pumping method can adopt existing equipment and methods, which will not be described in detail here.
[0095] Step 5: An annular opening is formed around the upper isolation layer 1 and the lower isolation layer 2. Multiple wood piles 31 are added to the desert underground reservoir 3 or the water storage area from multiple positions of the annular opening to support the upper isolation layer 1. The height of the wood pile 31 is slightly smaller than the height difference between the upper isolation layer 1 and the lower isolation layer 2. The wood pile 31 slides into the desert underground reservoir 3 or the water storage area along the lower isolation layer 2, and can meet the requirements by staying at any position. The surface of the lower isolation layer 2 is not smooth, and the sand will not be completely extracted when pumping sand. It dampens the downward movement of the wood pile 31, so that the wood pile 31 can stay at a certain position. Of course, the wood pile 31 can also be pushed by a drill rod to transport the wood pile 31 to a designated location.
[0096] When the upper isolation layer 1 is pressed and sinks, it will fall on the wood pile 31, and the wood pile 31 provides support to prevent the upper isolation layer 1 from breaking.
[0097] The wood pile 31 is in a frame structure, which can provide support while reducing the impact on water storage.
[0098] Preferably, the bottom plate of the wood pile 31 is in an arc shape, which reduces the contact friction with the lower isolation layer 2 and facilitates sliding the wood pile 31 into the desert underground reservoir 3 or the water storage area.
[0099] After the wood pile 31 is set up, the annular openings around the upper isolation layer 1 and the lower isolation layer 2 are sealed by a sealing structure 32. The sealing structure 32 can be grouting, or a sealing plate or the like.
[0100] Step 6: Drill a hole downward from the desert surface and lay at least one pumping pipe 4, the lower end of the pumping pipe 4 is in the desert underground reservoir 3, and the upper end of the pumping pipe 4 extends above the desert surface, for pumping water out of the desert underground reservoir 3 for use.
[0101] In one embodiment, if Figure 6 and Fig.15 As shown, at least one drainage pipe 5 is laid downward from the desert surface, and the wall of the drainage pipe 5 has a plurality of drainage holes 51. The lower end of the drainage pipe 5 is above the desert underground water reservoir 3, and the upper end of the drainage pipe 5 extends above the desert surface. The mine water delivery pipeline can be connected to the drainage pipe 5, and the drainage pipe 5 discharges the mine water into the sand filtering area to prevent the mine water from washing away the sand on the desert surface.
[0102] In one embodiment, if Figure 8-11 As shown, step S12 includes:
[0103] A plurality of fracturing boreholes 11 are drilled at intervals along the upper isolation layer 1 .
[0104] A water guide pipe 12 is arranged in the fracturing borehole 11 , and a plurality of water guide holes 121 are provided on the wall of the water guide pipe 12 .
[0105] In this embodiment, the upper isolation layer 1 is fractured by constructing a plurality of fracture boreholes 11 on the upper isolation layer 1. The direction of the fracture boreholes 11 may be perpendicular or parallel to the direction of the boreholes forming the upper isolation layer 1.
[0106] The water pipe 12 is laid out simultaneously when the fracturing borehole 11 is formed, that is, the pipe is laid out while the borehole is drilled. The wall of the water pipe 12 is densely covered with a plurality of water holes 121, which play a role in water guiding and filtering.
[0107] If the aperture of the fracturing borehole 11 is smaller than the thickness of the upper isolation layer 1, the water pipe 12 is in the upper isolation layer 1, playing a role of supporting the upper isolation layer 1, and the water hole 121 is connected with the surrounding water-conducting fissures.
[0108] Preferably, the direction of the fracturing borehole 11 is perpendicular to the direction of the borehole forming the upper isolation layer 1, so that the direction of the water pipe 12 is perpendicular to the direction of the upper isolation layer 1, and support can be provided to the upper isolation layer 1 perpendicular to the direction.
[0109] In one embodiment, if Figure 9-10 and Fig.13 As shown, the outer diameter of the water conduit 12 is greater than the average thickness of the upper insulation layer 1 .
[0110] At least part of the water conduit 12 protrudes above the upper insulating layer 1 , and at least part of the water conduit 12 protrudes below the upper insulating layer 1 .
[0111] In this embodiment, the aperture of the fracturing borehole 11 is larger than the average thickness of the upper isolation layer 1, and the outer diameter of the water pipe 12 is also larger than the average thickness of the upper isolation layer 1. After the water pipe 12 is laid, at least part of the water pipe 12 protrudes above the upper isolation layer 1, and at least part of the water pipe 12 protrudes below the upper isolation layer 1, and part of the water can enter the water pipe 12 through the water hole 121 above the water pipe 12, and then be discharged into the desert underground reservoir 3 through the water hole 121 below the water pipe 12.
[0112] Although the aperture of the fracturing borehole 11 in this embodiment is relatively large, since the upper isolation layer 1 has formed an integral structure, it will not fall even if it is cut at a certain place. In the method of this embodiment, it is preferred to construct the fracturing borehole and lay the water pipe after the wood pile 31 is supported, so that even if the upper isolation layer 1 sinks at a certain place, it will be supported by the wood pile 31.
[0113] In one embodiment, if Figure 12-13 As shown, the water pipe 12 is filled with gravel 13 for filtering and purification to further improve the filtering effect.
[0114] Specifically, after the water pipe 12 is laid out, pebble-shaped gravel 13 is placed from both ends of the water pipe 12 . When the gravel 13 entering from both sides comes into contact with each other, it will gradually accumulate toward the ends until the water pipe 12 is filled.
[0115] In one embodiment, if Figure 13-14 As shown, a layer of brackets 122 is provided in the water pipe 12, and the brackets 122 extend along the axial direction of the water pipe 12. One side of the brackets 122 is filled with large-grained gravel 13, and the other side of the brackets 122 is filled with small-grained gravel 13.
[0116] In this embodiment, a layer of brackets 122 is arranged on the water pipe 12, and a plurality of hollow holes 123 are provided on the brackets 122. The brackets 122 extend along the axial direction of the water pipe 12, thereby separating the inner holes of the water pipe 12. After the water pipe 12 is laid out, one side of the brackets 122 faces or tilts toward the sand purification area, and the other side faces or tilts toward the desert underground reservoir 3. Large grains of gravel 13 are filled into the space on the side of the bracket 122 facing or tilting toward the sand purification area, and small grains of gravel 13 are filled into the space on the side of the bracket 122 facing or tilting toward the desert underground reservoir 3, so as to achieve the effect of gradual layered filtration.
[0117] The size in this embodiment is only a relative concept, and is based on the size of the hollow hole 123. If the size of the gravel 13 is larger than the size of the hollow hole 123, it is called large-grain gravel 13; if the size of the gravel 13 is smaller than the size of the hollow hole 123, it is called small-grain gravel 13.
[0118] In one embodiment, if Figure 16-24 As shown, the upper isolation layer 1 and the lower isolation layer 2 are respectively formed by grouting through grouting pipes.
[0119] The grouting pipe includes a grouting pipe main pipe 6 and a plurality of anchoring claws 7 connected around the grouting pipe main pipe 6 and having a grouting flow channel 73. An airbag mechanism 8 capable of driving the anchoring claws 7 to swing outward is connected between the anchoring claws 7 and the grouting pipe main pipe 6, and the airbag mechanism 8 is connected to the grouting flow channel 73 of the grouting pipe main pipe 6.
[0120] When the airbag mechanism 8 is in the contracted state, the anchor claw 7 is tightened by the airbag mechanism 8 to the side of the grouting pipe main pipe 6 .
[0121] When slurry is injected into the airbag mechanism 8 and the airbag mechanism 8 is in an expanded state, the anchor claws 7 are swung out toward the outside of the grouting pipe main pipe 6 and inserted into the surrounding sand particles to inject grout into the sand particles.
[0122] This embodiment uses a grouting pipe with telescopic anchor claws to form the upper isolation layer 1 and / or the lower isolation layer 2.
[0123] The proximal end and the distal end involved in this embodiment are two opposite ends of an element. The proximal end refers to the end closer to the directional drilling rig during construction, and the distal end refers to the end farther from the directional drilling rig during construction.
[0124] The grouting pipe comprises a grouting pipe main pipe 6, a plurality of anchoring claws 7 and a plurality of air bag mechanisms 8. The grouting pipe main pipe 6 is a plastic pipe that can be bent according to the shape of the borehole. The proximal end of the grouting pipe main pipe 6 is used to be connected to a directional drilling machine, and the distal end of the grouting pipe main pipe 6 will extend from the borehole to the desert surface when the construction is completed.
[0125] A distal valve 64 is provided in the distal end of the grouting pipe main pipe 6. As required, a proximal valve can also be installed at the proximal end of the grouting pipe main pipe 6. The proximal end of the grouting pipe main pipe 6 is used for grouting, and during grouting, the distal valve 64 is closed to maintain the pressure in the pipe.
[0126] The wall of the grouting pipe main pipe 6 is provided with a plurality of grouting ports 610 and a plurality of pipe wall grooves 611, and the pipe wall grooves 611 are used to install the airbag mechanism 8 and provide guidance for the expansion and contraction of the airbag mechanism 8. A grouting port 610 is provided at the bottom of each pipe wall groove 611. The grouting port 610 is communicated with the central channel (grouting channel) of the grouting pipe main pipe 6.
[0127] A pipe wall opening 621 is arranged on the outside of each pipe wall groove 611 on the grouting pipe main pipe 6. The size of the pipe wall opening 621 is larger than that of the anchor claw 7. The pipe wall opening 621 can be used to install the anchor claw 7 and for the anchor claw 7 to pass through.
[0128] The anchor claw 7 can be a plastic anchor claw or a metal anchor claw, and a grouting channel 73 is provided in the anchor claw 7. The anchor claw 7 is used for anchoring in the sand and for spraying grout to the surrounding sand to condense the surrounding sand together. One end of the anchor claw 7 is pivotally connected to the rotating shaft 65, and the rotating shaft 65 passes through the through hole at one end of the anchor claw 7. The other end of the anchor claw 7 gradually tapers to form a claw shape, which plays an anchoring role. The outlet of the grouting channel 73 is at the edge of the anchor claw 7, and several outlets of the grouting channel 73 can be arranged at the edge of the anchor claw 7 to increase the grouting area or region. As needed, multiple grouting channels 73 can be arranged in the anchor claw 7.
[0129] The position of the anchor claw 7 roughly corresponds to the pipe wall opening 621. In normal state, the anchor claw 7 is attached to the outside of the pipe wall or accommodated in the pipe wall opening 621 to reduce the obstruction to the laying of the grouting pipe main pipe 6. During grouting, when a certain pressure condition is reached, the anchor claw 7 can be expanded outward by the inflated airbag mechanism 8, and the anchor claw 7 rotates around the rotating shaft 65 and swings outward from the pipe wall or swings out from the pipe wall opening 621.
[0130] The airbag mechanism 8 is an elastic bladder with a cavity, which can be made of rubber material. As needed, a skeleton can be configured in the rubber material and / or the thickness and toughness of the rubber material can be increased to enhance its ability to withstand slurry pressure, which can reach 10 MPa. As needed, a plurality of corrugated folds can be provided on the bladder body or bag body of the bladder bag so that the bladder bag can shrink and stretch. The airbag mechanism 8 in the present invention is used to expand by liquid pressure, not by gas, because it adopts the structural form of the elastic membrane bag of the airbag, and is called an airbag mechanism.
[0131] In normal state, the airbag mechanism 8 is in a contracted state, the main body of the airbag mechanism 8 is in the tube wall groove 611, one end of the airbag mechanism 8 is connected to the groove bottom of the tube wall groove 611, and the cavity of the airbag mechanism 8 is connected to the grouting port 610. As needed, a valve can be set in the grouting port 610 or the liquid inlet of the cavity. The other end of the airbag mechanism 8 is outside the tube wall groove 611 and connected to the anchor claw 7. The liquid outlet of the cavity is connected to the inlet of the grouting flow channel 73. As needed, a valve can be set at the inlet of the grouting flow channel 73 or the liquid outlet of the cavity. The above-mentioned valve can be an electric valve or a pressure valve, preferably a pressure valve. The pressure valve can be automatically opened and closed according to the pressure of the slurry.
[0132] When the airbag mechanism 8 is in the contracted state, it pulls the anchor claw 7 so that the anchor claw 7 is attached to the outside of the tube wall or is received in the tube wall opening 621 .
[0133] The airbag mechanism 8 is located on one side of the rotating shaft 65. When the slurry is injected into the airbag mechanism 8, the airbag mechanism 8 starts to inject grout and expand, thereby pushing the anchor claw 7 to rotate around the rotating shaft 65 to swing outward from the tube wall or swing outward from the tube wall opening 621.
[0134] After the airbag mechanism 8 is completely filled with slurry, the swing angle of the airbag mechanism 8 to open the anchor claw 7 is the largest.
[0135] As required, a baffle 622 is provided at one end of the tube wall opening 621 close to the rotating shaft 65, and a portion of the baffle 622 blocks the rotating shaft 65. When the anchor claw 7 swings outward to the maximum angle, the anchor claw 7 contacts the baffle 622, and the baffle 622 limits the anchor claw 7. Preferably, the maximum swing angle of the anchor claw 7 is 30°.
[0136] When the anchor claw 7 is in the outward swinging state, the slurry in the airbag mechanism 8 is ejected through the outlet of the grouting flow channel 73. When the anchor claw 7 is in the outward swinging state, the anchor claw 7 will be deeply inserted into the surrounding sand, and the grouting pipe main pipe 6 can be firmly anchored in the sand. The slurry ejected by the anchor claw 7 has left the grouting pipe main pipe 6 for a distance, and its flow range in the sand is wider, increasing the grouting radius, and can meet and condense with the slurry in other surrounding boreholes, which is conducive to better forming the isolation layer 5, so as to form a desert water storage area.
[0137] In one embodiment, if Figure 25-29 As shown, the upper isolation layer 1 and / or the lower isolation layer 2 are formed as follows:
[0138] Plan in advance the preset number and locations of holes to be drilled and prepare the grouting pipes in advance.
[0139] A directional drill is used to drill holes and lay grouting pipes below the desert surface until the distal end of the grouting pipe main pipe 6 is exposed above the desert surface, and the distal end of the grouting pipe main pipe 6 is closed.
[0140] Grouting is performed from the proximal end of the grouting pipe main pipe 6 until the airbag mechanism 8 opens the anchoring claws 7 outwards, and the anchoring claws 7 are inserted into the surrounding sand particles and grouting is performed into the surrounding sand particles.
[0141] After the slurry and the surrounding sand particles solidify, an upper isolation layer 1 and / or a lower isolation layer 2 are formed.
[0142] In this embodiment, the steps of forming the upper isolation layer 1 and / or the lower isolation layer 2 are roughly as follows:
[0143] Step 1: Pre-select the area where the desert underground water reservoir 3 needs to be formed in the desert area, and pre-plan the preset number and preset positions of the holes to be drilled, and prepare the grouting pipes in advance. For example, pre-plan the boreholes to be constructed and the curvature after the grouting pipes are laid; it is necessary to design the spacing D between two adjacent boreholes in the vertical direction of the boreholes. The spacing distance D can be calculated based on the radius r of the grouting pipe that can be grouted, preferably D≤2r. The shape of the borehole is set as needed. If the shape of the borehole is arc-shaped, and multiple boreholes arranged at intervals are also arranged along the arc, then the top plate and / or bottom plate of the desert underground water reservoir 3 are hemispherical or part of a hemispherical shape.
[0144] Step 2: Use a directional drilling rig to construct a borehole. You can construct the borehole first and then lay the grouting pipe, or you can lay the grouting pipe while constructing the borehole. The directional drilling rig is a drilling and grouting machine, which is the content of the prior art and will not be repeated here. Specifically, the proximal end of the grouting pipe main pipe 6 is connected to the directional drilling rig. The distal end of the grouting pipe main pipe 6 first follows into the borehole, and finally the distal end of the grouting pipe main pipe 6 is exposed above the desert surface, completing the laying of the grouting pipe, and then closing the distal valve 64 to prevent the slurry from being discharged from the distal end of the grouting pipe main pipe 6 during grouting.
[0145] Step 3: Use a directional drill to start grouting from the proximal end of the grouting pipe main pipe 6. When the grouting pipe main pipe 6 is filled with slurry, the slurry will rush into the airbag mechanism 8. The airbag mechanism 8 expands to push the anchor claws 7 outward. The anchor claws 7 are inserted into the surrounding sand and grouting is performed into the surrounding sand.
[0146] Step 4: Repeat steps 2 to 3 until drilling is completed, grouting pipes are laid, and grouting is completed at all preset locations.
[0147] Step 5: After the slurry and the surrounding sand solidify, the slurry between two adjacent grouting pipes converges and solidifies on the sand to form an upper isolation layer 1 and / or a lower isolation layer 2.
[0148] After the upper isolation layer 1 and / or the lower isolation layer 2 are formed, the proximal end and the distal end of the grouting pipe main pipe 6 exposed on the desert surface can be cut off as needed.
[0149] Among them, after the airbag mechanism 8 expands and stretches the anchor claws 7 outward, even if the airbag mechanism 8 is broken, the slurry will flow into the surrounding sand through the broken part and the tube wall opening 621, and the upper isolation layer 1 and / or the lower isolation layer 2 can still be formed.
[0150] In one embodiment, after the anchor claw 7 is stretched outward, the grouting pipe main pipe 6 is pulled against the stretching direction of the anchor claw 7, so that the anchor claw 7 is more deeply inserted into the surrounding sand. If the anchor claw 7 extends obliquely toward the proximal side, the proximal end of the grouting pipe main pipe 6 is pulled, so that the anchor claw 7 moves toward the proximal side and is more deeply inserted into the surrounding sand. If the anchor claw 7 extends obliquely toward the distal side, the distal end of the grouting pipe main pipe 6 is pulled, so that the anchor claw 7 moves toward the distal side and is more deeply inserted into the surrounding sand.
[0151] In one embodiment, if Figure 16-19 As shown, the grouting pipe main pipe 6 includes a main inner pipe 61 and a main outer pipe 62. The main outer pipe 62 is sleeved on the main inner pipe 61. The inner diameter of the main outer pipe 62 is larger than the outer diameter of the main inner pipe 61, and an annular cavity 63 is formed between the two. The length of the main outer pipe 62 is substantially equal to that of the main inner pipe 61, and the proximal end and the distal end of the main outer pipe 62 can be connected to the proximal end and the distal end of the main inner pipe 61 through a connecting ring.
[0152] A rotating shaft 65 is provided in the annular cavity 63, and the rotating shaft 65 can be connected to the main inner tube 61 through a connecting rod 612. The anchor claw 7 can be pivotally installed in the annular cavity 63, and the thickness of the annular cavity 63 can be set as required to meet the needs of installing the anchor claw 7.
[0153] The main outer tube 62 can be of a half-type structure, so that the airbag mechanism 8, the anchor claw 7 and the main inner tube 61 are installed first, and then the main outer tube 62 is installed. The two halves of the main outer tube 62 can be connected by buckles, clamps, etc.
[0154] The distal valve 64 is disposed at the distal end of the main outer tube 62 .
[0155] The tube wall of the main inner tube 61 is provided with a plurality of grouting ports 610 and a plurality of tube wall grooves 611, which are used to install the airbag mechanism 8 and provide guidance for the expansion and contraction of the airbag mechanism 8. The grouting ports 610 are connected to the central channel (grouting channel) of the main inner tube 61.
[0156] A tube wall opening 621 is disposed on the main outer tube 62 corresponding to the outer side of each tube wall groove 611 .
[0157] In normal state, the anchor claws 7 are received in the annular cavity 63 and / or the pipe wall opening 621 , and the anchor claws 7 do not protrude from the outside of the main outer pipe 62 , and do not cause any obstruction to the laying of the grouting pipe main pipe 6 .
[0158] During grouting, when a certain pressure condition is reached, the anchor claws 7 can be stretched outward by the expanded airbag mechanism 8, and the anchor claws 7 rotate around the rotating shaft 65 and swing outward from the pipe wall opening 621.
[0159] In one embodiment, if Figure 18-21 As shown, the anchor claw 7 includes an anchor claw body 71 and a plurality of grouting nozzles 72 arranged at the edge of the anchor claw body 71 , a grouting flow channel 73 is arranged in the anchor claw body 71 , and the grouting nozzles 72 are communicated with the grouting flow channel 73 .
[0160] The rotating shaft 65 is disposed at the distal end side of the tube wall opening 621 , the distal end of the anchor claw body 71 is pivotally connected to the rotating shaft 65 , and the proximal end of the anchor claw body 71 has a pointed tip.
[0161] When the anchor claw 7 is in an outward swinging state, the proximal end of the anchor claw body 71 extends obliquely toward the proximal end side of the grouting pipe main pipe 6 .
[0162] In this embodiment, the anchor claw 7 includes an anchor claw body 71 and a plurality of grouting nozzles 72. The anchor claw body 71 is plate-shaped, with a wide distal end and a narrow proximal end. The grouting channel 73 is provided in the anchor claw body 71, and the plurality of grouting nozzles 72 are provided at the edge of the anchor claw body 71, preferably at the edge of the anchor claw body 71 facing outward. Each grouting nozzle 72 is connected to the grouting channel 73. The shape, size, etc. of the grouting nozzle 72 can be set as required to meet the requirements of spraying slurry.
[0163] The rotating shaft 65 is arranged at the distal end of the pipe wall opening 621. The distal end of the anchor claw body 71 is provided with a connecting hole, and the distal end of the anchor claw body 71 is pivotally connected to the rotating shaft 65. The proximal end of the anchor claw body 71 has a sharp tip for piercing into sand.
[0164] When the anchor claw 7 is in an outward swinging state, the proximal end of the anchor claw body 71 extends obliquely toward the proximal end side of the grouting pipe main pipe 6 .
[0165] With such arrangement, when laying the grouting pipe, the distal end of the grouting pipe main pipe 6 moves forward in front. At the same time, since the distal end of the anchor claw body 71 is pivotally connected to the rotating shaft 65, when laying the grouting pipe, the moving direction of the grouting pipe main pipe 6 is not against the proximal end of the anchor claw body 71, but along the proximal end of the anchor claw body 71. The anchor claw body 71 will not be mistakenly expanded to affect the laying of the grouting pipe.
[0166] In one embodiment, a plurality of groups of anchor claw assemblies are provided along the axial direction of the grouting pipe main pipe 6, and each group of anchor claw assemblies includes a plurality of anchor claws 7 arranged at intervals along the circumference of the grouting pipe main pipe 6, which is conducive to firmly anchoring the grouting pipe main pipe 6 in the sand.
[0167] In one embodiment, if Figure 18-22 As shown, the liquid inlet 84 of the airbag mechanism 8 is communicated with the grouting channel of the main inner tube 61 , and a first valve 86 is provided in the liquid inlet 84 .
[0168] The liquid outlet 85 of the airbag mechanism 8 is communicated with the grouting channel 73 , and a second valve 87 is provided in the liquid outlet 85 .
[0169] The second valve 87 opens later than the first valve 86 .
[0170] In this embodiment, the first valve 86 and the second valve 87 can be electric valves or pressure valves. The advantage of the second valve 87 opening later than the first valve 86 is that when the airbag mechanism 8 is filled with slurry, it can fully expand, thereby stretching the anchor claw 7 to the maximum angle, and then the second valve 87 opens, and the anchor claw 7 starts grouting.
[0171] In one embodiment, when the main inner tube 61 is filled with slurry and the pressure reaches a first pressure value, the first valve 86 is opened.
[0172] When the airbag mechanism 8 is filled with slurry and the pressure reaches the second pressure value, the second valve 87 opens.
[0173] The second pressure value is greater than the first pressure value.
[0174] In this embodiment, the first valve 86 and the second valve 87 are pressure valves. The opening pressure value of the first valve 86 is a first pressure value, and the opening pressure value of the second valve 87 is a second pressure value. The second pressure value is greater than the first pressure value, which can ensure that the second valve 87 opens later than the first valve 86.
[0175] In one embodiment, if Fig. 22 As shown, the airbag mechanism 8 includes an outer plate 81 connected to the anchor claw 7, an inner plate 82 connected to the main inner tube 61, and an annular elastic bag body 83 connected between the outer plate 81 and the inner plate 82.
[0176] The liquid inlet 84 is provided on the inner plate 82 , and the liquid outlet 85 is provided on the outer plate 81 .
[0177] A reinforcing frame 89 is provided in the annular elastic bag 83 .
[0178] In this embodiment, the airbag mechanism 8 includes an outer plate 81, an inner plate 82 and an annular elastic capsule 83. The plate 31 and the inner plate 82 can be plastic plates, the liquid inlet 84 is provided on the inner plate 82, and the liquid outlet 85 is provided on the outer plate 81. The annular elastic capsule 83 can be an annular rubber bag or rubber sleeve. A reinforcing frame 89 is provided in the annular elastic capsule 83. The reinforcing frame 89 can be a spring structure, which can be stretched and improve the compression resistance of the annular elastic capsule 83.
[0179] During assembly, the outer plate 81 can be connected to the anchor claw 7 by means of fasteners, buckles, adhesives, etc., and the inner plate 82 can be connected to the bottom of the groove 611 of the pipe wall by means of fasteners, buckles, adhesives, etc.
[0180] In one embodiment, if Fig. 22 As shown, in order to prevent the slurry entering from the liquid inlet 84 from directly rushing to the second valve 87 in the liquid outlet 85, a buffer frame 88 is provided on the inner side of the liquid outlet 85. The buffer frame 88 is connected to the outer plate 81. The slurry flows to the liquid outlet 85 through the hollow area of the buffer frame 88. The buffer frame 88 can buffer the pressure of the slurry on the second valve 87, which helps to achieve the second valve 87 to open later than the first valve 86.
[0181] As needed, the above technical solutions can be combined to achieve the best technical effect.
[0182] The above are only the principles and preferred embodiments of the present invention. It should be noted that, for those skilled in the art, several other modifications can be made based on the principles of the present invention, which should also be considered as the protection scope of the present invention.
Claims
1. A method for purifying, storing and utilizing mine water resources in desert areas. It is characterized in that The steps include: S1: constructing a desert underground reservoir around a mine in a desert area, wherein the upper part of the desert underground reservoir is a sand purification area; the construction method of the desert underground reservoir comprises the following steps: S11: Selecting a construction area around the mine; S12: constructing an upper isolation layer below the desert surface, and fracturing the upper isolation layer; S13: constructing a lower isolation layer below the upper isolation layer; S14: using a sand pumping device to pump out the silt between the lower isolation layer and the upper isolation layer to form the desert underground water reservoir; S15: adding a plurality of wood piles into the desert underground water reservoir to support the upper isolation layer; S16: Laying at least one water pumping pipe downward from the desert surface, wherein the lower end of the water pumping pipe is located in the desert underground reservoir, and the upper end of the water pumping pipe extends above the desert surface; S2: transporting the mine water to the sand purification area through a pipeline, and the mine water purified by the sand purification area seeps into the desert underground reservoir for storage; S3: pumping water out of the desert underground reservoir and transporting it to a designated location; The upper isolation layer and the lower isolation layer are respectively grouting-formed through grouting pipes; The grouting pipe comprises a grouting pipe main pipe and a plurality of anchoring claws connected around the grouting pipe main pipe and having a grouting flow channel; an air bag mechanism capable of driving the anchoring claw to swing outward is connected between the anchoring claw and the grouting pipe main pipe, and the air bag mechanism is connected to the grouting flow channel of the grouting pipe main pipe; When the airbag mechanism is in a contracted state, the anchor claw is tightened by the airbag mechanism to the side of the grouting pipe main pipe; When grout is injected into the airbag mechanism and the airbag mechanism is in an expanded state, the anchor claw is swung out toward the outside of the grouting pipe main pipe and inserted into the surrounding sand to inject grout into the sand; The upper isolation layer and the lower isolation layer are formed as follows: Pre-planning the preset number and preset positions of the holes to be drilled, and preparing the grouting pipes in advance; Drilling a hole below the desert surface and laying the grouting pipe using a directional drill until the distal end of the grouting pipe main pipe is exposed above the desert surface, and closing the distal end of the grouting pipe main pipe; Grouting is performed from the proximal end of the grouting pipe main pipe until the airbag mechanism expands the anchor claw outward, and the anchor claw is inserted into the surrounding sand grains and grouting is performed into the surrounding sand grains; After the slurry and the surrounding sand particles solidify, the upper isolation layer and the lower isolation layer are formed.
2. The method for purifying, storing and utilizing mine water resources in desert areas according to claim 1, It is characterized in that At least one drainage pipe is laid downward from the desert surface, and a pipe wall of the drainage pipe has a plurality of drainage holes; The lower end of the drainage pipe is located above the desert underground water reservoir, and the upper end of the drainage pipe extends above the desert surface.
3. The method for purifying, storing and utilizing mine water resources in desert areas according to claim 1, It is characterized in that The step S12 comprises: Drilling a plurality of fracturing boreholes at intervals along the upper isolation layer; A water guide pipe is arranged in the fracturing borehole, and a plurality of water guide holes are provided on the wall of the water guide pipe.
4. The method for purifying, storing and utilizing mine water resources in desert areas according to claim 3, It is characterized in that The outer diameter of the water conduit is greater than the average thickness of the upper isolation layer; At least part of the water conduit protrudes above the upper isolation layer, and at least part of the water conduit protrudes below the upper isolation layer.
5. The method for purifying, storing and utilizing mine water resources in desert areas according to claim 3, It is characterized in that The aqueduct is filled with gravel for filtration and purification.
6. The method for purifying, storing and utilizing mine water resources in desert areas according to claim 3, It is characterized in that A layer of brackets is provided in the water conduit, and the brackets extend along the axial direction of the water conduit; One side of the support is filled with large-grained gravel, and the other side of the support is filled with small-grained gravel.
7. The method for purifying, storing and utilizing mine water resources in desert areas according to claim 1, It is characterized in that After the anchor claws are stretched outward, the grouting pipe main pipe is pulled in the opposite direction of the stretching direction of the anchor claws, so that the anchor claws are inserted deeper into the surrounding sand.
