Engineering measurement methods and systems based on big data

Through big data-based engineering measurement methods, satellite positioning and image analysis technology are used to solve the problem of existing construction progress monitoring relying on manual labor, and efficient and accurate construction progress monitoring and early warning are achieved.

CN118670348BActive Publication Date: 2024-11-15山东省地质矿产勘查开发局第一地质大队(山东省第一地质矿产勘查院)
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411066684.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-11-15
Estimated Expiration
2044-08-06

AI Technical Summary

Technical Problem

Most of the existing construction progress monitoring methods rely on manual labor, resulting in waste of resources and errors, and it is impossible to monitor construction progress in a timely and effective manner.

Method used

Using a big data-based engineering measurement method, satellite positioning is performed by determining the geographic fence of the construction area, monitoring points are determined, images are collected regularly, elevation difference is analyzed, and construction intervention requests are sent when the difference is greater than or equal to the preset threshold.

Benefits of technology

It realizes efficient monitoring and early warning during construction, reduces resource waste for manual monitoring, and improves monitoring accuracy and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118670348B_ABST
    Figure CN118670348B_ABST
Patent Text Reader

Abstract

The present invention provides an engineering measurement method and system based on big data. The method includes: determining a geographic fence including a construction area and performing satellite positioning to obtain a satellite positioning area of ​​the geographic fence; obtaining each monitoring point of the construction area based on different multi-directional attributes based on a monitoring point determination strategy; creating a regular monitoring task based on a construction plan, and performing regular image acquisition of the satellite positioning area based on a monitoring cycle in the regular monitoring task to obtain a monitoring image; determining the noise area of ​​the monitoring image, adjusting the monitoring point when any monitoring point is located in the noise area, performing elevation analysis on each monitoring point in the monitoring image based on a digital elevation model to obtain a point elevation; performing a difference calculation between the point elevation and the planned elevation in the construction plan to obtain an elevation difference, and sending a construction intervention request to a management terminal when the elevation difference is greater than or equal to a preset threshold. The present invention at least improves the monitoring efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to data processing technology, and in particular to an engineering measurement method and system based on big data. Background Art

[0002] During the construction process, monitoring the construction progress is a very important link. Only timely monitoring can ensure that the construction progress is within the normal range and avoid slow construction progress.

[0003] The inventors found in their research that most existing monitoring methods require manual monitoring, which wastes a certain amount of manpower and corresponding costs, and may also have certain errors. Summary of the invention

[0004] Based on the above problems, the present invention is proposed to provide an engineering measurement method and system based on big data that overcomes the above problems or at least partially solves the above problems.

[0005] According to one aspect of the present invention, there is provided an engineering measurement method based on big data, comprising the following steps:

[0006] Determine a geographic fence that includes the construction area, and perform satellite positioning based on the geographic fence to obtain a satellite positioning area corresponding to the geographic fence;

[0007] Based on the monitoring point determination strategy, the satellite positioning area is determined to obtain the monitoring points based on different multi-directional attributes located in the construction area;

[0008] Creating a regular monitoring task based on the construction plan, and performing regular image acquisition on the satellite positioning area based on the monitoring period in the regular monitoring task to obtain corresponding monitoring images;

[0009] Determine the noise area of ​​the monitoring image, adjust the monitoring point when any of the monitoring points is located in the noise area, and perform elevation analysis on each monitoring point in the monitoring image based on a digital elevation model to obtain point elevation;

[0010] The elevation of the point is calculated to be different from the planned elevation in the construction plan to obtain the elevation difference, and a construction intervention request is sent to the management end when the elevation difference is greater than or equal to a preset threshold.

[0011] Optionally, in the method according to the present invention, determining a geographic fence including a construction area, performing satellite positioning based on the geographic fence, and acquiring a satellite positioning area corresponding to the geographic fence includes:

[0012] In response to the construction end scanning a site identification code pre-set on the construction site, obtaining a construction design drawing corresponding to the construction site, and determining the included construction area based on the construction design drawing;

[0013] Determine a regional contour corresponding to the construction area, and determine the points of the regional contour based on the contour point determination strategy to obtain each positioning point located on the regional contour;

[0014] Determine the positioning coordinates corresponding to the positioning points based on the GPS coordinate determination module, retrieve the preset fence generation coefficient, and adjust the coordinates of the positioning coordinates based on the preset fence generation coefficient to obtain the coordinates of the fences constituting the geographic fence;

[0015] The coordinates of each fence are uploaded to the engineering satellite for satellite positioning to obtain the satellite positioning area corresponding to the geographic fence.

[0016] Optionally, in the method according to the present invention, determining the points of the area contour based on the contour point determination strategy to obtain each positioning point located on the area contour includes:

[0017] Performing grid processing based on the construction design drawing to obtain each longitudinal line segment and each transverse line segment located in the construction design drawing;

[0018] Determine grid intersection points having an intersection relationship based on the longitudinal line segments and the transverse line segments, and determine all grid intersection points that coincide with the area outline as a first point group;

[0019] Determine each contour vertex located on the area contour as a second point group, merge the first point group with the second point group to obtain a merged point group, and determine all grid intersection points and all contour vertices located in the merged point group as positioning points.

[0020] Optionally, in the method according to the present invention, the satellite positioning area is determined based on the monitoring point determination strategy to obtain the monitoring points located in the construction area based on different multi-directional attributes, including:

[0021] Establishing a regional coordinate system based on the construction area, and determining regional coordinate points constituting the construction area based on the regional coordinate system;

[0022] Determine the regional coordinate point corresponding to the regional center point located in the construction area as the original monitoring point based on the center direction, and determine the regional coordinate point with the minimum horizontal coordinate, the regional coordinate point with the maximum horizontal coordinate, the regional coordinate point with the minimum vertical coordinate, and the regional coordinate point with the maximum vertical coordinate respectively along the direction parallel to the X-axis and the direction parallel to the Y-axis based on the regional coordinate system;

[0023] Determine the regional coordinate point with the smallest horizontal coordinate as the original monitoring point based on the west attribute, determine the regional coordinate point with the largest horizontal coordinate as the original monitoring point based on the east attribute, determine the regional coordinate point with the smallest vertical coordinate as the original monitoring point based on the south, and determine the regional coordinate point with the largest vertical coordinate as the original monitoring point based on the north;

[0024] Obtaining the area size of the construction area, and performing a difference calculation between the area size and a preset size to obtain a size difference;

[0025] Retrieving a preset difference value, and comparing the size difference value with the preset difference value;

[0026] When the size difference is greater than the preset difference, adding a new monitoring point based on the point addition strategy;

[0027] When the size difference is not greater than the preset difference, the original monitoring point based on the west attribute, the original monitoring point based on the east attribute, the original monitoring point based on the south attribute, the original monitoring point based on the north attribute and the original monitoring point based on the center attribute are determined as all monitoring points based on different multi-directional attributes.

[0028] Optionally, in the method according to the present invention, adding a new monitoring point based on a point addition strategy includes:

[0029] Retrieving a preset point determination table, wherein the preset point determination table includes different size intervals and newly added quantities corresponding to the different size intervals;

[0030] Traversing the preset point determination table, determining a size interval including the area size as a target size interval, and obtaining the newly added quantity corresponding to the target size interval;

[0031] Determine the original monitoring point based on the west attribute, the original monitoring point based on the east attribute, the original monitoring point based on the south attribute, and the original monitoring point based on the north attribute as a reference point group, and determine the priority of each original monitoring point in the reference point group based on a preset priority setting rule;

[0032] Based on the newly added number, the newly added monitoring points are allocated one by one according to the update priority corresponding to each original monitoring point in the reference point group, the number of newly added points corresponding to each original monitoring point in the reference point group after allocation is determined, and new monitoring points are added to the corresponding original monitoring points based on the number of newly added points.

[0033] Optionally, in the method according to the present invention, adding new monitoring points to the corresponding original monitoring points based on the number of each new point respectively includes:

[0034] For each original monitoring point in the reference point group, a point connection line is established for connecting the first line segment endpoint and the second line segment endpoint, with the original monitoring point as the first line segment endpoint and the original monitoring point based on the center direction as the second line segment endpoint;

[0035] Obtain the segment length of the point connection line, and determine the number of newly added points corresponding to the original monitoring point as the number of divisions;

[0036] The line segment length is evenly divided based on the number of divisions to obtain the same number of division points as the number of newly added points on the point connection line;

[0037] Each divided point is determined as a newly added monitoring point corresponding to the original monitoring point and is added.

[0038] Optionally, in the method according to the present invention, determining a noise area of ​​the monitoring image, adjusting the monitoring point when any of the monitoring points is located in the noise area, and performing elevation analysis on each monitoring point located in the monitoring image based on a digital elevation model to obtain the point elevation, including:

[0039] Performing image recognition on the monitoring image based on the trained image recognition model, determining a construction sub-image located in the monitoring image and corresponding to the construction area, and determining a portion of the monitoring image other than the construction sub-image as a noise sub-image corresponding to the noise area;

[0040] An image coordinate system is established based on the monitoring image, and each noise coordinate point constituting the noise sub-image is determined as a noise coordinate group based on the image coordinate system;

[0041] Determine each monitoring coordinate point corresponding to each monitoring point based on the image coordinate system, and judge whether each monitoring coordinate point is located in the noise coordinate group;

[0042] When any monitoring coordinate point is located in the noise coordinate group, the monitoring point is adjusted, and the elevation analysis of each monitoring point located in the monitoring image is performed based on the digital elevation model to obtain the elevations of each point corresponding to each monitoring point.

[0043] Optionally, in the method according to the present invention, when any monitoring coordinate point is located in the noise coordinate group, the monitoring point is adjusted, and the elevation analysis of each monitoring point located in the monitoring image is performed based on the digital elevation model to obtain the elevation of each point corresponding to each monitoring point, including:

[0044] Determine the monitoring point corresponding to the monitoring coordinate point in the noise coordinate group as the point to be adjusted, and form the shortest connection line connected to the construction sub-image based on the point to be adjusted;

[0045] The endpoint of the line segment on the shortest connecting line that is far away from the point to be adjusted is determined as the adjusted point, and the elevation analysis of each monitoring point in the monitoring image is performed based on the digital elevation model to obtain the elevation of each point corresponding to each monitoring point.

[0046] Optionally, in the method according to the present invention, sending a construction intervention request to the management terminal when the elevation difference is greater than or equal to a preset threshold value includes:

[0047] When the elevation difference is greater than or equal to a preset threshold, the corresponding monitoring point is determined as a problem point, and a problem record form is established, wherein the problem record form includes a time record area and an elevation problem record area arranged in sequence in the horizontal direction;

[0048] Determine the acquisition time of the elevation difference value and fill it into the time recording area;

[0049] Creating an initial question display layer, wherein the initial question display layer includes a first area and a second area surrounding the first area;

[0050] Filling the monitoring image into the first area, configuring the problem point with a first color, and configuring the remaining monitoring points except the problem point with a second color, wherein the first color and the second color have a pixel difference of a preset pixel value;

[0051] Generate a text record column including a normal record slot and an abnormal record slot in the second area, fill the planned elevation into the normal record slot, and fill the point elevation corresponding to the problem point into the abnormal record slot;

[0052] Generate an associated connection line connecting the text record column and the problem point, and perform color configuration of the first color on the associated connection line to obtain a current problem display layer;

[0053] The current problem display layer is filled into the elevation problem record area, and a construction intervention request carrying the problem record form is sent to the management end.

[0054] According to another aspect of the present invention, there is provided an engineering measurement system based on big data, comprising:

[0055] a positioning module configured to determine a geographic fence including a construction area, and perform satellite positioning based on the geographic fence to obtain a satellite positioning area corresponding to the geographic fence;

[0056] A point determination module is configured to determine the point of the satellite positioning area based on a monitoring point determination strategy to obtain various monitoring points located in the construction area based on different multi-directional attributes;

[0057] A periodic acquisition module is configured to create a periodic monitoring task based on the construction plan, and to perform periodic image acquisition on the satellite positioning area based on the monitoring period in the periodic monitoring task to obtain a corresponding monitoring image;

[0058] a point adjustment module, configured to determine a noise area for the monitoring image, adjust the monitoring point when any of the monitoring points is located in the noise area, and perform elevation analysis on each monitoring point in the monitoring image based on a digital elevation model to obtain a point elevation;

[0059] The intervention module is configured to calculate the difference between the elevation of the point and the planned elevation in the construction plan to obtain the elevation difference, and send a construction intervention request to the management end when the elevation difference is greater than or equal to a preset threshold.

[0060] According to the solution of the present invention, the server will first determine the geographic fence including the construction area, and perform satellite positioning based on the geographic fence, so as to obtain the satellite positioning area corresponding to the geographic fence; then determine the point of the satellite positioning area based on the monitoring point determination strategy, so as to obtain each monitoring point based on different multi-directional attributes; then, the server will create a regular monitoring task based on the construction plan, and perform regular image acquisition on the satellite positioning area based on the monitoring cycle in the regular monitoring task, so as to obtain the corresponding monitoring image; then determine the noise area of ​​the monitoring image, and adjust the monitoring point when any monitoring point is located in the noise area, and then perform elevation analysis on each monitoring point in the monitoring image based on the digital elevation model, so as to obtain the point elevation; then, the server will perform a difference calculation between the point elevation and the planned elevation in the construction plan, so as to obtain the elevation difference, and send a construction intervention request to the management end when the elevation difference is greater than or equal to the preset threshold. The present invention can monitor the building elevation in time during the construction process, and issue a corresponding warning according to the monitoring result, so as to ensure a certain monitoring efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0061] Figure 1 A flowchart of an engineering measurement method based on big data according to an embodiment of the present invention is shown;

[0062] Figure 2 A schematic diagram showing how to add a new monitoring point;

[0063] Figure 3 A schematic diagram of a problem record form is shown;

[0064] Figure 4 A structural block diagram of an engineering measurement system based on big data according to another embodiment of the present invention is shown. DETAILED DESCRIPTION

[0065] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.

[0066] During the construction process, monitoring the construction progress is a very important link. Only timely monitoring can ensure that the construction progress is within the normal range and avoid slow construction progress.

[0067] The inventors found in their research that most existing monitoring methods require manual monitoring, which wastes a certain amount of manpower and corresponding costs, and may also have certain errors.

[0068] In order to solve the above problems in the prior art, the inventor proposes a solution of the present invention. An embodiment of the present invention provides an engineering measurement method based on big data, which can be executed in a computing device.

[0069] Figure 1 A flowchart of an engineering measurement method based on big data according to an embodiment of the present invention is shown, and the method is suitable for being executed in a computing device.

[0070] like Figure 1 As shown, the purpose of this embodiment is to implement an engineering measurement method based on big data, starting from step S102, in which the following steps are included:

[0071] A geographic fence including a construction area is determined, and satellite positioning is performed based on the geographic fence to obtain a satellite positioning area corresponding to the geographic fence.

[0072] For example, in this embodiment, in order to achieve corresponding regional positioning of the construction area, the server can determine the fence that can surround all construction areas based on geo-fence technology (a new application of LBS, which is to use a virtual fence to enclose a virtual geographic boundary), that is, the geo-fence, and then determine the position of the geo-fence through satellite positioning. At this time, the server can obtain the satellite positioning area corresponding to the geo-fence.

[0073] Furthermore, the above-mentioned “determining a geographic fence including a construction area, and performing satellite positioning based on the geographic fence to obtain a satellite positioning area corresponding to the geographic fence” further includes the following steps:

[0074] In response to the construction end scanning a site identification code pre-set on the construction site, obtaining a construction design drawing corresponding to the construction site, and determining the included construction area based on the construction design drawing;

[0075] Determine a regional contour corresponding to the construction area, and determine the points of the regional contour based on the contour point determination strategy to obtain each positioning point located on the regional contour;

[0076] Determine the positioning coordinates corresponding to the positioning points based on the GPS coordinate determination module, retrieve the preset fence generation coefficient, and adjust the coordinates of the positioning coordinates based on the preset fence generation coefficient to obtain the coordinates of the fences constituting the geographic fence;

[0077] The coordinates of each fence are uploaded to the engineering satellite for satellite positioning to obtain the satellite positioning area corresponding to the geographic fence.

[0078] For example, in this embodiment, in order to identify the construction site, a corresponding site sign is generally placed, and a corresponding site identification code is set on the site sign, and the site identification code can be a QR code or a barcode. When the construction end scans the site identification code, the server can obtain the construction design drawing of the construction site corresponding to the site identification code, and determine the included construction area according to the construction design drawing. Then the server will determine the area outline of the construction area, and then determine the point position of the area outline according to the outline point determination strategy, so as to obtain each positioning point on the area outline.

[0079] Then, the server will determine the coordinates of each positioning point based on the GPS coordinate determination module (such as a GPS measurement device), that is, each positioning coordinate. In order to ensure that the geo-fence generated by the server can surround all construction areas, it is necessary to ensure that the size of the generated geo-fence is larger than the construction area. Therefore, a preset fence generation coefficient can be pre-set in the server. After determining each positioning coordinate, the server will call the preset fence generation coefficient and adjust the coordinates of each positioning coordinate based on the preset fence generation coefficient, so as to obtain the coordinates of each fence constituting the geo-fence. For example, if the largest positioning coordinate with the horizontal coordinate is (2, 1) and the preset fence generation coefficient is 1.2, the server will adjust the positioning coordinate of the positioning point according to the preset fence generation coefficient, and the fence coordinate of the positioning point after adjustment is (2.4, 1.2). For another example, if the largest positioning coordinate with the vertical coordinate is (1, 2) and the preset fence generation coefficient is 1.2, the server will adjust the positioning coordinate of the positioning point according to the preset fence generation coefficient, and the fence coordinate of the positioning point after adjustment is (1.2, 2.4).

[0080] Then, the server will upload the coordinates of each fence to the engineering satellite and perform satellite positioning, thereby obtaining the satellite positioning area corresponding to the geographic fence. The geographic fence generated in this embodiment can surround all construction areas, facilitate the later monitoring of the elevation of all construction areas, and ensure the integrity of the monitoring data.

[0081] Furthermore, the above-mentioned “determining the points of the area contour based on the contour point determination strategy to obtain the positioning points on the area contour” further includes the following steps:

[0082] Performing grid processing based on the construction design drawing to obtain each longitudinal line segment and each transverse line segment located in the construction design drawing;

[0083] Determine grid intersection points having an intersection relationship based on the longitudinal line segments and the transverse line segments, and determine all grid intersection points that coincide with the area outline as a first point group;

[0084] Determine each contour vertex located on the area contour as a second point group, merge the first point group with the second point group to obtain a merged point group, and determine all grid intersection points and all contour vertices located in the merged point group as positioning points.

[0085] For example, in this embodiment, after obtaining the satellite positioning area corresponding to the geographic fence, the server will perform grid processing on the construction design drawing to obtain each longitudinal line segment and each transverse line segment in the construction design drawing. Then, the server will determine the points with intersection relationships between each longitudinal line segment and each transverse line segment as each grid intersection point, and determine all grid intersection points that coincide with the area contour as the first point group, and determine each contour vertex on the area contour as the second point group, and then merge the first point group with the second point group to obtain a merged point group, and determine all grid intersection points and all contour vertices in the merged point group as positioning points.

[0086] In step S104, the following contents are included:

[0087] The satellite positioning area is determined based on the monitoring point determination strategy to obtain the monitoring points located in the construction area based on different multi-directional attributes.

[0088] For example, in this embodiment, after determining each positioning point, the server can determine the point of the satellite positioning area based on the monitoring point determination strategy, thereby determining each monitoring point in the construction area based on different multi-directional attributes. This embodiment can determine specific monitoring points, thereby saving a certain amount of calculation for the server.

[0089] Furthermore, the above-mentioned “determining the location of the satellite positioning area based on the monitoring point determination strategy to obtain the monitoring points located in the construction area based on different multi-directional attributes” further includes the following steps:

[0090] Establishing a regional coordinate system based on the construction area, and determining regional coordinate points constituting the construction area based on the regional coordinate system;

[0091] Determine the regional coordinate point corresponding to the regional center point located in the construction area as the original monitoring point based on the center direction, and determine the regional coordinate point with the minimum horizontal coordinate, the regional coordinate point with the maximum horizontal coordinate, the regional coordinate point with the minimum vertical coordinate, and the regional coordinate point with the maximum vertical coordinate respectively along the direction parallel to the X-axis and the direction parallel to the Y-axis based on the regional coordinate system;

[0092] Determine the regional coordinate point with the smallest horizontal coordinate as the original monitoring point based on the west attribute, determine the regional coordinate point with the largest horizontal coordinate as the original monitoring point based on the east attribute, determine the regional coordinate point with the smallest vertical coordinate as the original monitoring point based on the south, and determine the regional coordinate point with the largest vertical coordinate as the original monitoring point based on the north;

[0093] Obtaining the area size of the construction area, and performing a difference calculation between the area size and a preset size to obtain a size difference;

[0094] Retrieving a preset difference value, and comparing the size difference value with the preset difference value;

[0095] When the size difference is greater than the preset difference, adding a new monitoring point based on the point addition strategy;

[0096] When the size difference is not greater than the preset difference, the original monitoring point based on the west attribute, the original monitoring point based on the east attribute, the original monitoring point based on the south attribute, the original monitoring point based on the north attribute and the original monitoring point based on the center attribute are determined as all monitoring points based on different multi-directional attributes.

[0097] For example, in this embodiment, the server will establish a regional coordinate system according to the construction area, and determine the various regional coordinate points that constitute the construction area in the regional coordinate system, determine the regional coordinate point corresponding to the regional center point of the construction area as the monitoring point based on the center direction, and determine the regional coordinate point with the minimum horizontal coordinate and the regional coordinate point with the maximum horizontal coordinate in the direction parallel to the X-axis and the regional coordinate point with the minimum vertical coordinate and the regional coordinate point with the maximum vertical coordinate in the direction parallel to the Y-axis according to the regional coordinate system. Then, the server will respectively determine the regional coordinate point with the minimum horizontal coordinate as the original monitoring point based on the west attribute, the regional coordinate point with the maximum horizontal coordinate as the original monitoring point based on the east attribute, the regional coordinate point with the minimum vertical coordinate as the original monitoring point based on the south attribute, and the regional coordinate point with the maximum vertical coordinate as the original monitoring point based on the north.

[0098] When the size of the construction area is large, it may cause the existing several original monitoring points to be unable to fully monitor the elevation of the construction area. Therefore, the server is pre-set with preset sizes and preset differences. After determining each original monitoring point, the server will obtain the size of the construction area and calculate the difference between the size and the preset size. The result of the difference calculation is the size difference. Then, the server will call the preset difference and compare the calculated size difference with the preset difference. When the size difference is greater than the preset difference, it means that the size of the construction area is large and more monitoring points are needed. At this time, the server will add new monitoring points based on the point addition strategy; when the size difference is less than or equal to the preset difference, it means that the existing detection points can fully monitor the elevation of the construction area. At this time, the server will determine the original monitoring points based on the west attribute, the original monitoring points based on the east attribute, the original monitoring points based on the south attribute, the original monitoring points based on the north attribute, and the original monitoring points based on the center attribute as all the monitoring points based on different multi-directional attributes.

[0099] This embodiment can determine whether new monitoring points are needed in the construction area based on the comparison result between the size difference and the preset difference, so as to ensure that the monitoring points can fully monitor the elevation conditions of the construction area and ensure the integrity of the monitoring data.

[0100] Furthermore, the above-mentioned “adding new monitoring points based on the point addition strategy” may also include the following steps:

[0101] Retrieving a preset point determination table, wherein the preset point determination table includes different size intervals and newly added quantities corresponding to the different size intervals;

[0102] Traversing the preset point determination table, determining a size interval including the area size as a target size interval, and obtaining the newly added quantity corresponding to the target size interval;

[0103] Determine the original monitoring point based on the west attribute, the original monitoring point based on the east attribute, the original monitoring point based on the south attribute, and the original monitoring point based on the north attribute as a reference point group, and determine the priority of each original monitoring point in the reference point group based on a preset priority setting rule;

[0104] Based on the newly added number, the newly added monitoring points are allocated one by one according to the update priority corresponding to each original monitoring point in the reference point group, the number of newly added points corresponding to each original monitoring point in the reference point group after allocation is determined, and new monitoring points are added to the corresponding original monitoring points based on the number of newly added points.

[0105] For example, in this embodiment, a preset point determination table is pre-set in the server, and the preset point determination table includes different size intervals and the newly added quantities corresponding to the different size intervals; after determining each monitoring point based on different multi-directional attributes, the server will call out the preset point determination table, traverse the preset point determination table, determine the size interval including the area size as the target size interval, and obtain the newly added quantity corresponding to the target size interval. Then, the server will determine the original monitoring point based on the west attribute, the original monitoring point based on the east attribute, the original monitoring point based on the south attribute, and the original monitoring point based on the north attribute as the reference point group.

[0106] In the server, preset priority setting rules can be pre-set according to actual needs, for example, the original monitoring point of the west attribute is set to the first priority, the original monitoring point of the east attribute is set to the second priority, the original monitoring point of the south attribute is set to the third priority, and the original monitoring point of the north attribute is set to the fourth priority. The server will determine the priority of each original monitoring point in the reference point group based on the preset priority setting rules, and then allocate the newly added monitoring points one by one according to the update priority of each original monitoring point in the reference point group according to the newly added number. If the newly added number is 5, the server will first allocate a newly added monitoring point to the original monitoring point of the west attribute, and then allocate a newly added monitoring point to the original monitoring point of the east attribute, and then allocate a newly added monitoring point to the original monitoring point of the south attribute, and then allocate a newly added monitoring point to the original monitoring point of the north attribute, and finally allocate a newly added monitoring point to the original monitoring point of the west attribute.

[0107] The server will determine the number of newly added points corresponding to each original monitoring point in the allocated reference point group, such as the number of newly added points of the original monitoring point with west attribute is 2, and the number of newly added points of the original monitoring points with east, south, and north attributes is 1. Then, the server will add new monitoring points to the corresponding original monitoring points based on the number of newly added points. The preset priority setting rules in this embodiment are artificially set according to the actual situation, so that the later monitoring data can provide a certain reference to the management end.

[0108] Furthermore, the above-mentioned “adding new monitoring points to the corresponding original monitoring points based on the number of each new point” also includes the following steps:

[0109] For each original monitoring point in the reference point group, a point connection line is established for connecting the first line segment endpoint and the second line segment endpoint, with the original monitoring point as the first line segment endpoint and the original monitoring point based on the center direction as the second line segment endpoint;

[0110] Obtain the segment length of the point connection line, and determine the number of newly added points corresponding to the original monitoring point as the number of divisions;

[0111] The line segment length is evenly divided based on the number of divisions to obtain the same number of division points as the number of newly added points on the point connection line;

[0112] Each divided point is determined as a newly added monitoring point corresponding to the original monitoring point and is added.

[0113] For example, in this embodiment, after determining the number of newly added points of each original monitoring point, the server will establish a point connection line for each original monitoring point in the reference point group, such as Figure 2 The two endpoints of the point connection line are the first line segment endpoint and the second line segment endpoint, the first line segment endpoint is the original monitoring point, and the second line segment endpoint is the original monitoring point based on the center direction, that is, the server will establish a point connection line for connecting the first line segment endpoint and the second line segment endpoint.

[0114] Next, the server will obtain the length of the point connection line, that is, the line segment length, and determine the number of newly added points corresponding to the original monitoring point as the number of divisions. Then, the server will evenly divide the line segment length according to the number of divisions. For example, if the number of divisions is 1, the server will determine a division point on the point connection line, and the position of the division point can evenly divide the line segment length into two parts, thereby obtaining the same number of division points as the number of newly added points on the point connection line. The server will then determine each division point as a newly added monitoring point corresponding to the original monitoring point and add it.

[0115] In step S106, the following contents are included:

[0116] A regular monitoring task is created based on the construction plan, and regular image acquisition is performed on the satellite positioning area based on the monitoring period in the regular monitoring task to obtain corresponding monitoring images.

[0117] For example, in this embodiment, after determining the monitoring points, the server will create a regular monitoring task based on the construction plan, and regularly collect images of the satellite positioning area according to the monitoring period in the regular monitoring task, thereby obtaining corresponding monitoring images. Here, the monitoring period can be, for example, one month, that is, corresponding image collection of the satellite positioning area will be performed every month after the start of construction.

[0118] In step S108, the following contents are included:

[0119] The noise area of ​​the monitoring image is determined, the monitoring point is adjusted when any of the monitoring points is located in the noise area, and the elevation of each monitoring point in the monitoring image is analyzed based on a digital elevation model to obtain the point elevation.

[0120] For example, in this embodiment, the noise area should be understood as unnecessary or redundant interference information in the monitoring image; when collecting images of the satellite positioning area, there may be airplanes or birds passing by or plastic sheets laid on the sink, thereby covering all or part of the satellite positioning area. These covered areas are noise areas, and the generation of noise areas will lead to inaccurate data in the later stage. Therefore, after obtaining the monitoring image, the server will determine the area covered by the satellite positioning area in the monitoring image, that is, determine the noise area;

[0121] When any monitoring point is located in the noise area, the server will adjust the monitoring point so that the adjusted monitoring point is no longer located in the noise area, and then perform elevation analysis on each monitoring point in the monitoring image based on the digital elevation model to obtain the point elevation. The digital elevation model is a digital simulation of the ground terrain through limited terrain elevation data, that is, a digital expression of the terrain surface morphology. It is a physical ground model that represents the ground elevation in the form of a set of ordered numerical arrays and has a certain degree of accuracy.

[0122] Furthermore, the above-mentioned “determining the noise area of ​​the monitoring image, adjusting the monitoring point when any of the monitoring points is located in the noise area, and performing elevation analysis on each monitoring point located in the monitoring image based on a digital elevation model to obtain the point elevation” also includes the following steps:

[0123] Performing image recognition on the monitoring image based on the trained image recognition model, determining a construction sub-image located in the monitoring image and corresponding to the construction area, and determining a portion of the monitoring image other than the construction sub-image as a noise sub-image corresponding to the noise area;

[0124] An image coordinate system is established based on the monitoring image, and each noise coordinate point constituting the noise sub-image is determined as a noise coordinate group based on the image coordinate system;

[0125] Determine each monitoring coordinate point corresponding to each monitoring point based on the image coordinate system, and judge whether each monitoring coordinate point is located in the noise coordinate group;

[0126] When any monitoring coordinate point is located in the noise coordinate group, the monitoring point is adjusted, and the elevation analysis of each monitoring point located in the monitoring image is performed based on the digital elevation model to obtain the elevations of each point corresponding to each monitoring point.

[0127] For example, in this embodiment, after obtaining the monitoring image, the server will perform image recognition on the monitoring image based on the trained image recognition model, so as to determine the area portion corresponding to the construction area in the monitoring image, that is, the construction sub-image, and determine the portion other than the construction sub-image in the monitoring image as the noise sub-image corresponding to the noise area. Here, the image recognition model can be obtained based on methods such as neural network learning or machine learning, which corresponds to pre-establishing an initial model and using a corresponding training set to train the initial model to obtain a corresponding image recognition model. It should be noted that since the generation process of the image recognition model is a prior art, this embodiment will not go into details about it.

[0128] The server will then determine the monitoring coordinate points of each monitoring point in the image coordinate system and determine whether each monitoring coordinate point is located in the noise coordinate group. When any monitoring coordinate point is located in the noise coordinate group, it means that the monitoring point is located in the noise area. If the elevation analysis is continued at the current monitoring point, the data will be inaccurate. Therefore, the server will adjust the monitoring point, and then perform elevation analysis on each monitoring point in the monitoring image based on the digital elevation model, so as to obtain the elevation of each point corresponding to each monitoring point.

[0129] This embodiment can determine images with two different attributes after performing image recognition on the surveillance image only once, without the need for secondary recognition, which can save a certain amount of computing power on the server.

[0130] Furthermore, the above-mentioned “when any monitoring coordinate point is located in the noise coordinate group, the monitoring point is adjusted, and the elevation analysis is performed on each monitoring point located in the monitoring image based on the digital elevation model to obtain the elevation of each point corresponding to each monitoring point” also includes the following steps:

[0131] Determine the monitoring point corresponding to the monitoring coordinate point in the noise coordinate group as the point to be adjusted, and form the shortest connection line connected to the construction sub-image based on the point to be adjusted;

[0132] The endpoint of the line segment on the shortest connecting line that is far away from the point to be adjusted is determined as the adjusted point, and the elevation analysis of each monitoring point in the monitoring image is performed based on the digital elevation model to obtain the elevation of each point corresponding to each monitoring point.

[0133] For example, in this embodiment, when the server determines that any monitoring coordinate point is located in the noise coordinate group, the monitoring point corresponding to the monitoring coordinate point in the noise coordinate group will be determined as the point to be adjusted, and a shortest connecting line connected to the construction sub-image will be formed according to the position of the point to be adjusted, and the endpoint of the line segment on the shortest connecting line away from the point to be adjusted will be determined as the adjusted point. Then, the server performs elevation analysis on each monitoring point in the monitoring image based on the digital elevation model, thereby obtaining the elevations of each point corresponding to each monitoring point.

[0134] This embodiment can minimize the difference in elevation between the adjusted point and the point to be adjusted to the greatest extent possible, thereby improving the accuracy of the monitoring data.

[0135] In step S110, the following contents are included:

[0136] The elevation of the point is calculated to be different from the planned elevation in the construction plan to obtain the elevation difference, and a construction intervention request is sent to the management end when the elevation difference is greater than or equal to a preset threshold.

[0137] For example, in this embodiment, after obtaining the elevation of each monitoring point, the server will calculate the difference between the elevation of each monitoring point and the planned elevation in the construction plan, thereby obtaining the elevation difference. The management end can pre-set a preset threshold in the server according to the actual situation. When the elevation difference is less than the preset threshold, it means that the current construction progress is in line with the construction plan; when the elevation difference is greater than or equal to the preset threshold, it means that the current construction progress does not meet the construction plan. At this time, the server will send a construction intervention request to the management end, so that the management end can check it in time.

[0138] Furthermore, the above-mentioned “sending a construction intervention request to the management terminal when the elevation difference is greater than or equal to a preset threshold value” further includes the following steps:

[0139] When the elevation difference is greater than or equal to a preset threshold, the corresponding monitoring point is determined as a problem point, and a problem record form is established, wherein the problem record form includes a time record area and an elevation problem record area arranged in sequence in the horizontal direction;

[0140] Determine the acquisition time of the elevation difference value and fill it into the time recording area;

[0141] Creating an initial question display layer, wherein the initial question display layer includes a first area and a second area surrounding the first area;

[0142] Filling the monitoring image into the first area, configuring the problem point with a first color, and configuring the remaining monitoring points except the problem point with a second color, wherein the first color and the second color have a pixel difference of a preset pixel value;

[0143] Generate a text record column including a normal record slot and an abnormal record slot in the second area, fill the planned elevation into the normal record slot, and fill the point elevation corresponding to the problem point into the abnormal record slot;

[0144] Generate an associated connection line connecting the text record column and the problem point, and perform color configuration of the first color on the associated connection line to obtain a current problem display layer;

[0145] The current problem display layer is filled into the elevation problem record area, and a construction intervention request carrying the problem record form is sent to the management end.

[0146] For example, in this embodiment, when the elevation difference is greater than or equal to the preset threshold, it means that the current construction progress does not meet the construction plan. The server will determine the corresponding monitoring point as a problem point and create a problem record form, such as Figure 3 As shown. The problem record form includes a time record area and an elevation problem record area arranged in sequence along the horizontal direction. The server will determine the time for obtaining the elevation difference and fill it into the time record area. Then, the server will create an initial problem display layer. In the initial problem display layer, there is a first area and a second area surrounding the first area. The server will fill the monitoring image into the first area and configure the problem point with the first color, such as red. Then, the remaining monitoring points except the problem point will be configured with the second color, such as blue. There is a pixel difference of a preset pixel value between the first color and the second color to ensure that the first color and the second color are not similar, which is convenient for the management end to view.

[0147] Finally, the server generates a text record column including a normal record slot and an abnormal record slot in the second area, and fills the planned elevation into the normal record slot, and fills the point elevation corresponding to the problem point into the abnormal record slot. Then, a line segment connecting the text record column and the problem point is generated, that is, an associated connection line, and the first color is configured for the associated connection line to obtain the current problem display layer. Then, the current problem display layer is filled into the elevation problem record area, and a construction intervention request carrying a problem record form is sent to the management end.

[0148] The problem record form generated in this embodiment includes the acquisition time of the right elevation difference, the monitoring image, the planned elevation and the abnormal elevation. Related connecting lines are also generated and marked with different colors, so that when the management end views the problem record form, it can quickly locate the monitoring point of the abnormal elevation and then quickly intervene in it, thereby improving work efficiency to a certain extent.

[0149] According to the solution of the present invention, the server will first determine the geographic fence including the construction area, and perform satellite positioning based on the geographic fence, so as to obtain the satellite positioning area corresponding to the geographic fence; then determine the point of the satellite positioning area based on the monitoring point determination strategy, so as to obtain each monitoring point based on different multi-directional attributes; then, the server will create a regular monitoring task based on the construction plan, and perform regular image acquisition on the satellite positioning area based on the monitoring cycle in the regular monitoring task, so as to obtain the corresponding monitoring image; then determine the noise area of ​​the monitoring image, and adjust the monitoring point when any monitoring point is located in the noise area, and then perform elevation analysis on each monitoring point in the monitoring image based on the digital elevation model, so as to obtain the point elevation; then, the server will perform a difference calculation between the point elevation and the planned elevation in the construction plan, so as to obtain the elevation difference, and send a construction intervention request to the management end when the elevation difference is greater than or equal to the preset threshold. The present invention can monitor the building elevation in time during the construction process, and issue a corresponding warning according to the monitoring result, so as to ensure a certain monitoring efficiency.

[0150] Another embodiment of the present invention provides an engineering measurement system based on big data. Figure 4 As the corresponding structural block diagram, the system includes:

[0151] a positioning module configured to determine a geographic fence including a construction area, and perform satellite positioning based on the geographic fence to obtain a satellite positioning area corresponding to the geographic fence;

[0152] A point determination module is configured to determine the point of the satellite positioning area based on a monitoring point determination strategy to obtain various monitoring points located in the construction area based on different multi-directional attributes;

[0153] A periodic acquisition module is configured to create a periodic monitoring task based on the construction plan, and to perform periodic image acquisition on the satellite positioning area based on the monitoring period in the periodic monitoring task to obtain a corresponding monitoring image;

[0154] a point adjustment module, configured to determine a noise area for the monitoring image, adjust the monitoring point when any of the monitoring points is located in the noise area, and perform elevation analysis on each monitoring point in the monitoring image based on a digital elevation model to obtain a point elevation;

[0155] The intervention module is configured to calculate the difference between the elevation of the point and the planned elevation in the construction plan to obtain the elevation difference, and send a construction intervention request to the management end when the elevation difference is greater than or equal to a preset threshold.

[0156] In the description provided herein, algorithms and displays are not inherently related to any particular computer, virtual system or other device. Various general purpose systems can also be used together with the examples of the present invention. According to the above description, it is obvious that the structure required for constructing such systems. In addition, the present invention is not directed to any specific programming language either. It should be understood that various programming languages ​​can be utilized to implement the content of the present invention described herein, and the above description of specific languages ​​is for the purpose of disclosing the preferred embodiment of the present invention.

[0157] In the description provided herein, a large number of specific details are described. However, it is understood that embodiments of the present invention can be practiced without these specific details. In some instances, well-known methods, structures and techniques are not shown in detail so as not to obscure the understanding of this description.

[0158] Similarly, it should be understood that in order to streamline the present disclosure and aid in understanding one or more of the various inventive aspects, in the above description of exemplary embodiments of the present invention, various features of the present invention are sometimes grouped together into a single embodiment, figure, or description thereof.

[0159] Those skilled in the art will appreciate that the modules or units or components of the devices in the examples disclosed herein may be arranged in the devices described in the embodiment, or alternatively may be located in one or more devices different from the devices in the examples. The modules in the foregoing examples may be combined into one module or may be divided into multiple submodules.

[0160] Those skilled in the art will appreciate that the modules in the devices in the embodiments can be adaptively changed and arranged in one or more devices different from the embodiments. The modules or units or components in the embodiments can be combined into one module or unit or component, and in addition they can be divided into multiple submodules or subunits or subassemblies. Except that at least some of such features and / or processes or units are mutually exclusive, all features disclosed in this specification and all processes or units of any method or device disclosed in this manner can be combined in any combination. Unless otherwise clearly stated, each feature disclosed in this specification can be replaced by an alternative feature providing the same, equivalent or similar purpose.

[0161] Furthermore, those skilled in the art will appreciate that although some embodiments described herein include certain features included in other embodiments but not other features, the combination of features from different embodiments is meant to be within the scope of the present invention and to form different embodiments.

[0162] In addition, some of the embodiments are described herein as methods or combinations of method elements that can be implemented by a processor of a computer system or by other devices that perform the functions. Therefore, a processor with necessary instructions for implementing the method or method elements forms a device for implementing the method or method elements. In addition, the elements described herein of the device embodiments are examples of devices for implementing the functions performed by the elements for the purpose of implementing the invention.

[0163] As used herein, unless otherwise specified, the use of ordinal numbers "first," "second," "third," etc. to describe common objects merely indicates that different instances of similar objects are involved, and is not intended to imply that the objects so described must have a given order in time, space, order, or in any other manner.

[0164] Although the present invention has been described in terms of a limited number of embodiments, it will be apparent to those skilled in the art, having benefit of the above description, that other embodiments are contemplated within the scope of the invention thus described. Furthermore, it should be noted that the language used in this specification is selected primarily for readability and didactic purposes, and not for the purpose of explaining or defining the subject matter of the present invention. The disclosure of the present invention is intended to be illustrative and not restrictive of the scope of the invention.

Claims

1. An engineering measurement method based on big data, characterized in that: The following steps are involved: Determine a geographic fence that includes the construction area, and perform satellite positioning based on the geographic fence to obtain a satellite positioning area corresponding to the geographic fence; Based on the monitoring point determination strategy, the satellite positioning area is determined to obtain the monitoring points based on different multi-directional attributes located in the construction area; Creating a regular monitoring task based on the construction plan, and performing regular image acquisition on the satellite positioning area based on the monitoring period in the regular monitoring task to obtain corresponding monitoring images; Determine the noise area of ​​the monitoring image, adjust the monitoring point when any of the monitoring points is located in the noise area, and perform elevation analysis on each monitoring point in the monitoring image based on a digital elevation model to obtain point elevation; Calculate the difference between the elevation of the point and the planned elevation in the construction plan to obtain an elevation difference, and send a construction intervention request to the management end when the elevation difference is greater than or equal to a preset threshold; The satellite positioning area is determined based on the monitoring point determination strategy to obtain the monitoring points located in the construction area based on different multi-directional attributes, including: Establishing a regional coordinate system based on the construction area, and determining regional coordinate points constituting the construction area based on the regional coordinate system; Determine the regional coordinate point corresponding to the regional center point located in the construction area as the original monitoring point based on the center direction, and determine the regional coordinate point with the minimum horizontal coordinate, the regional coordinate point with the maximum horizontal coordinate, the regional coordinate point with the minimum vertical coordinate, and the regional coordinate point with the maximum vertical coordinate respectively along the direction parallel to the X-axis and the direction parallel to the Y-axis based on the regional coordinate system; Determine the regional coordinate point with the smallest horizontal coordinate as the original monitoring point based on the west attribute, determine the regional coordinate point with the largest horizontal coordinate as the original monitoring point based on the east attribute, determine the regional coordinate point with the smallest vertical coordinate as the original monitoring point based on the south, and determine the regional coordinate point with the largest vertical coordinate as the original monitoring point based on the north; Obtaining the area size of the construction area, and performing a difference calculation between the area size and a preset size to obtain a size difference; Retrieving a preset difference value, and comparing the size difference value with the preset difference value; When the size difference is greater than the preset difference, adding a new monitoring point based on the point addition strategy; When the size difference is not greater than the preset difference, the original monitoring point based on the west attribute, the original monitoring point based on the east attribute, the original monitoring point based on the south attribute, the original monitoring point based on the north attribute, and the original monitoring point based on the center attribute are determined as all monitoring points based on different multi-directional attributes; Among them, adding new monitoring points based on the point addition strategy includes: Retrieving a preset point determination table, wherein the preset point determination table includes different size intervals and newly added quantities corresponding to the different size intervals; Traversing the preset point determination table, determining a size interval including the area size as a target size interval, and obtaining the newly added quantity corresponding to the target size interval; Determine the original monitoring point based on the west attribute, the original monitoring point based on the east attribute, the original monitoring point based on the south attribute, and the original monitoring point based on the north attribute as a reference point group, and determine the priority of each original monitoring point in the reference point group based on a preset priority setting rule; Allocating the newly added monitoring points one by one according to the update priorities corresponding to the original monitoring points in the reference point group based on the newly added number, determining the number of newly added points corresponding to the original monitoring points in the reference point group after allocation, and adding the newly added monitoring points to the corresponding original monitoring points based on the number of newly added points; Among them, based on the number of each newly added point, the corresponding original monitoring points are added with new monitoring points, including: For each original monitoring point in the reference point group, a point connection line is established for connecting the first line segment endpoint and the second line segment endpoint, with the original monitoring point as the first line segment endpoint and the original monitoring point based on the center direction as the second line segment endpoint; Obtain the segment length of the point connection line, and determine the number of newly added points corresponding to the original monitoring point as the number of divisions; The line segment length is evenly divided based on the number of divisions to obtain the same number of division points as the number of newly added points on the point connection line; Each divided point is determined as a newly added monitoring point corresponding to the original monitoring point and is added.

2. The engineering measurement method based on big data according to claim 1 is characterized in that: Determining a geographic fence including a construction area, and performing satellite positioning based on the geographic fence to obtain a satellite positioning area corresponding to the geographic fence, including: In response to the construction end scanning a site identification code pre-set on the construction site, obtaining a construction design drawing corresponding to the construction site, and determining the included construction area based on the construction design drawing; Determine a regional contour corresponding to the construction area, and determine the points of the regional contour based on the contour point determination strategy to obtain each positioning point located on the regional contour; Determine the positioning coordinates corresponding to the positioning points based on the GPS coordinate determination module, retrieve the preset fence generation coefficient, and adjust the coordinates of the positioning coordinates based on the preset fence generation coefficient to obtain the coordinates of the fences constituting the geographic fence; The coordinates of each fence are uploaded to the engineering satellite for satellite positioning to obtain the satellite positioning area corresponding to the geographic fence.

3. The engineering measurement method based on big data according to claim 2 is characterized in that: The point positions of the area contour are determined based on the contour point determination strategy to obtain each positioning point on the area contour, including: Performing grid processing based on the construction design drawing to obtain each longitudinal line segment and each transverse line segment located in the construction design drawing; Determine grid intersection points having an intersection relationship based on the longitudinal line segments and the transverse line segments, and determine all grid intersection points that coincide with the area outline as a first point group; Determine each contour vertex located on the area contour as a second point group, merge the first point group with the second point group to obtain a merged point group, and determine all grid intersection points and all contour vertices located in the merged point group as positioning points.

4. The engineering measurement method based on big data according to claim 1, characterized in that: Determining a noise area for the monitoring image, adjusting the monitoring point when any of the monitoring points is located in the noise area, and performing elevation analysis on each monitoring point in the monitoring image based on a digital elevation model to obtain point elevations, including: Performing image recognition on the monitoring image based on the trained image recognition model, determining a construction sub-image located in the monitoring image and corresponding to the construction area, and determining a portion of the monitoring image other than the construction sub-image as a noise sub-image corresponding to the noise area; An image coordinate system is established based on the monitoring image, and each noise coordinate point constituting the noise sub-image is determined as a noise coordinate group based on the image coordinate system; Determine each monitoring coordinate point corresponding to each monitoring point based on the image coordinate system, and judge whether each monitoring coordinate point is located in the noise coordinate group; When any monitoring coordinate point is located in the noise coordinate group, the monitoring point is adjusted, and the elevation analysis of each monitoring point located in the monitoring image is performed based on the digital elevation model to obtain the elevations of each point corresponding to each monitoring point.

5. The engineering measurement method based on big data according to claim 4 is characterized in that: When any monitoring coordinate point is located in the noise coordinate group, the monitoring point is adjusted, and the elevation analysis is performed on each monitoring point located in the monitoring image based on the digital elevation model to obtain the elevation of each point corresponding to each monitoring point, including: Determine the monitoring point corresponding to the monitoring coordinate point in the noise coordinate group as the point to be adjusted, and form the shortest connection line connected to the construction sub-image based on the point to be adjusted; The endpoint of the line segment on the shortest connecting line that is far away from the point to be adjusted is determined as the adjusted point, and the elevation analysis of each monitoring point in the monitoring image is performed based on the digital elevation model to obtain the elevation of each point corresponding to each monitoring point.

6. The engineering measurement method based on big data according to claim 5 is characterized in that: When the elevation difference is greater than or equal to a preset threshold, a construction intervention request is sent to the management end, including: When the elevation difference is greater than or equal to a preset threshold, the corresponding monitoring point is determined as a problem point, and a problem record form is established, wherein the problem record form includes a time record area and an elevation problem record area arranged in sequence in the horizontal direction; Determine the acquisition time of the elevation difference value and fill it into the time recording area; Creating an initial question display layer, wherein the initial question display layer includes a first area and a second area surrounding the first area; Filling the monitoring image into the first area, configuring the problem point with a first color, and configuring the remaining monitoring points except the problem point with a second color, wherein the first color and the second color have a pixel difference of a preset pixel value; Generate a text record column including a normal record slot and an abnormal record slot in the second area, fill the planned elevation into the normal record slot, and fill the point elevation corresponding to the problem point into the abnormal record slot; Generate an associated connection line connecting the text record column and the problem point, and perform color configuration of the first color on the associated connection line to obtain a current problem display layer; The current problem display layer is filled into the elevation problem record area, and a construction intervention request carrying the problem record form is sent to the management end.

7. An engineering measurement system based on big data, characterized in that: include: a positioning module configured to determine a geographic fence including a construction area, and perform satellite positioning based on the geographic fence to obtain a satellite positioning area corresponding to the geographic fence; A point determination module is configured to determine the point of the satellite positioning area based on a monitoring point determination strategy to obtain various monitoring points located in the construction area based on different multi-directional attributes; A periodic acquisition module is configured to create a periodic monitoring task based on the construction plan, and to perform periodic image acquisition on the satellite positioning area based on the monitoring period in the periodic monitoring task to obtain a corresponding monitoring image; a point adjustment module, configured to determine a noise area for the monitoring image, adjust the monitoring point when any of the monitoring points is located in the noise area, and perform elevation analysis on each monitoring point in the monitoring image based on a digital elevation model to obtain a point elevation; An intervention module is configured to calculate the difference between the elevation of the point and the planned elevation in the construction plan to obtain an elevation difference, and send a construction intervention request to the management end when the elevation difference is greater than or equal to a preset threshold; The satellite positioning area is determined based on the monitoring point determination strategy to obtain the monitoring points located in the construction area based on different multi-directional attributes, including: Establishing a regional coordinate system based on the construction area, and determining regional coordinate points constituting the construction area based on the regional coordinate system; Determine the regional coordinate point corresponding to the regional center point located in the construction area as the original monitoring point based on the center direction, and determine the regional coordinate point with the minimum horizontal coordinate, the regional coordinate point with the maximum horizontal coordinate, the regional coordinate point with the minimum vertical coordinate, and the regional coordinate point with the maximum vertical coordinate respectively along the direction parallel to the X-axis and the direction parallel to the Y-axis based on the regional coordinate system; Determine the regional coordinate point with the smallest horizontal coordinate as the original monitoring point based on the west attribute, determine the regional coordinate point with the largest horizontal coordinate as the original monitoring point based on the east attribute, determine the regional coordinate point with the smallest vertical coordinate as the original monitoring point based on the south, and determine the regional coordinate point with the largest vertical coordinate as the original monitoring point based on the north; Obtaining the area size of the construction area, and performing a difference calculation between the area size and a preset size to obtain a size difference; Retrieving a preset difference value, and comparing the size difference value with the preset difference value; When the size difference is greater than the preset difference, adding a new monitoring point based on the point addition strategy; When the size difference is not greater than the preset difference, the original monitoring point based on the west attribute, the original monitoring point based on the east attribute, the original monitoring point based on the south attribute, the original monitoring point based on the north attribute, and the original monitoring point based on the center attribute are determined as all monitoring points based on different multi-directional attributes; Among them, adding new monitoring points based on the point addition strategy includes: Retrieving a preset point determination table, wherein the preset point determination table includes different size intervals and newly added quantities corresponding to the different size intervals; Traversing the preset point determination table, determining a size interval including the area size as a target size interval, and obtaining the newly added quantity corresponding to the target size interval; Determine the original monitoring point based on the west attribute, the original monitoring point based on the east attribute, the original monitoring point based on the south attribute, and the original monitoring point based on the north attribute as a reference point group, and determine the priority of each original monitoring point in the reference point group based on a preset priority setting rule; Allocating the newly added monitoring points one by one according to the update priorities corresponding to the original monitoring points in the reference point group based on the newly added number, determining the number of newly added points corresponding to the original monitoring points in the reference point group after allocation, and adding the newly added monitoring points to the corresponding original monitoring points based on the number of newly added points; Among them, based on the number of each newly added point, the corresponding original monitoring points are added with new monitoring points, including: For each original monitoring point in the reference point group, a point connection line is established for connecting the first line segment endpoint and the second line segment endpoint, with the original monitoring point as the first line segment endpoint and the original monitoring point based on the center direction as the second line segment endpoint; Obtain the segment length of the point connection line, and determine the number of newly added points corresponding to the original monitoring point as the number of divisions; The line segment length is evenly divided based on the number of divisions to obtain the same number of division points as the number of newly added points on the point connection line; Each divided point is determined as a newly added monitoring point corresponding to the original monitoring point and is added.