Road network emergency rescue point layout method for reconstruction and extension construction period of special road section of expressway

By collecting and analyzing environmental and traffic information on special sections of the highway, we dynamically assess risks, and use geographic information systems and optimization algorithms to determine the best location of emergency rescue points, solving the problem of improper allocation of emergency rescue resources during construction and achieving rapid response. and efficient rescue.

CN118736835APending Publication Date: 2024-10-01CHINA MERCHANTS CHONGQING COMM RES & DESIGN INST
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411007820.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

During the reconstruction and expansion of special sections of highways, existing technology cannot adapt to changes in road conditions in real time, resulting in an insufficiently dynamic layout of emergency rescue points, affecting rescue efficiency and resource utilization.

Method used

By collecting road section environmental and traffic information, a comprehensive data set is constructed, using geographical information systems and optimization algorithms to dynamically assess risks, determine the best location of emergency rescue points, and optimize the allocation of rescue resources based on accident response time and material demand.

Benefits of technology

Real-time risk assessment and emergency rescue point layout during the construction period of special highway section reconstruction and expansion are realized, ensuring that rescue resources provide the most effective support in the shortest time, and improving the timeliness and resource utilization of emergency response.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118736835A_ABST
    Figure CN118736835A_ABST
Patent Text Reader

Abstract

The invention discloses a highway special section reconstruction and extension construction period road network emergency rescue point layout method comprising the following steps: collecting special section environment and traffic information, and constructing a special section comprehensive data set; performing risk assessment on each special road section by using the special road section comprehensive data set, and calculating the risk degree of each special road section; according to the risk degree obtained through calculation, the risks are graded and quantified; analyzing the road network accessibility of a special road section, and analyzing the demand quantity of relief goods and the expected response time in combination with the accident occurrence frequency and the risk level; and the optimal position of the emergency rescue point is determined by comprehensively considering the expected response time and the demand quantity of the rescue materials. The real-time data and geographic information can be utilized to dynamically reflect the actual risk condition of the special road section in the reconstruction and extension period, so that the optimal position of the emergency rescue point is determined, and the most effective rescue can be provided in the shortest time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of expressways, and in particular to a method for arranging road network emergency rescue points during the reconstruction and expansion construction period of a special section of an expressway. Background Art

[0002] During the reconstruction and expansion of special sections of existing highways, the risk of accidents often increases significantly due to changes in section characteristics and temporary obstacles caused by construction. In particular, in some complex sections such as curves, ramps, and active construction areas, obstructed vision and changing road conditions pose a great challenge to driving safety. In these cases, existing technologies mainly rely on historical accident data and traditional traffic flow analysis to assess risks and deploy emergency rescue points accordingly. However, these methods have several significant drawbacks:

[0003] First, traditional methods usually rely on historical data and empirical judgment in risk assessment, and lack adaptability to real-time changes in road conditions. This means that under the ever-changing road network conditions, existing risk assessments may not accurately reflect the current safety situation. For example, temporary changes in road section configuration or emergencies during construction are often not immediately reflected in the assessment model, resulting in reduced timeliness and accuracy of emergency response measures. Second, existing emergency rescue point layout strategies are usually relatively static, without considering real-time data on accidents and possible dynamic changes in risks. This static layout method ignores the daily fluctuations in road network usage patterns and the drastic changes in special circumstances, making it possible for rescue resources to be configured in an inefficient manner, thereby affecting rescue efficiency and resource utilization.

[0004] Therefore, a method for setting up road network emergency rescue points during the reconstruction and expansion period of special sections of highways is needed, which can use real-time data and geographic information to dynamically reflect the actual risk situation of special sections during the reconstruction and expansion period, thereby determining the optimal location of emergency rescue points and providing the most effective rescue in the shortest time. Summary of the invention

[0005] In view of this, the purpose of the present invention is to overcome the defects in the prior art and provide a method for setting up road network emergency rescue points during the reconstruction and expansion construction period of special sections of highways. The method can utilize real-time data and geographic information to dynamically reflect the actual risk situation of special sections during the reconstruction and expansion period, thereby determining the optimal location of emergency rescue points and providing the most effective rescue in the shortest time.

[0006] The method for laying out emergency rescue points of a road network during the reconstruction and expansion construction period of a special section of a highway of the present invention comprises the following steps:

[0007] S1. Collect special road section environment and traffic information and build a comprehensive data set for special road sections;

[0008] S2, using the comprehensive data set of special road sections to conduct risk assessment on each special road section and calculate the risk level of each special road section;

[0009] S3. Classify and quantify the risks based on the calculated risk level;

[0010] S4. Analyze the accessibility of the road network in special sections, and analyze the demand for rescue supplies and expected response time based on the frequency and risk level of accidents;

[0011] S5. Consider the expected response time and the demand for rescue supplies to determine the best location for the emergency rescue point.

[0012] Furthermore, the environmental and traffic information includes road section geometry parameters, accident consequence data, accident vehicle types, accident frequency, traffic flow, environmental factors and construction activity data.

[0013] Further, the step S1 specifically includes:

[0014] S11. Automatically measure and record geometric parameters of road sections through laser scanning and image capture technology, generate a three-dimensional model of the road section in real time and extract geometric parameters of the road section by combining GPS and digital maps with vehicle-mounted sensor data; the geometric parameters of the road section include curvature radius R, slope G and length L;

[0015] S12. Deploy an intelligent accident analysis module to automatically extract accident consequence data by connecting to the accident database of the traffic management bureau; the accident consequence data includes accident type, direct loss and indirect impact of the accident; wherein the accident type is automatically classified by analyzing the accident scene video; the direct loss is calculated by associating insurance records and accident reports;

[0016] S13. Automatically record the types of accident vehicles passing through a specific road section through cameras and license plate recognition technology, and count the frequency of accidents for each type of vehicle;

[0017] S14. Using geomagnetic sensors and wireless data transmission technology, automatically record and analyze the traffic flow of a specific road section, the traffic flow including traffic density and traffic peak; and update the traffic flow data by minute, hour and day:

[0018]

[0019] Where V(t) represents the total traffic flow at time t; λ i is the flow weight of the i-th type of vehicle, reflecting the contribution of different vehicle types to the total flow; V i(t) is the basic flow of the i-th type of vehicle at time t; k(t) is the vehicle density at time t, reflecting the degree of traffic congestion; α is the congestion impact coefficient, which is used to adjust the impact of density on flow; ω and is the periodic adjustment parameter;

[0020] S15. Deploy environmental monitoring stations, which are equipped with meteorological sensors and cameras to automatically record environmental factors, including temperature T, precipitation P, light intensity I, and road slip coefficient μ;

[0021] S16. Record construction activity data through construction monitoring; the construction activity data includes construction time t, traffic lane C, traffic section layout, speed limit S in the work area, and traffic guidance facilities and construction method information;

[0022] S17. Obtain the environment and traffic information of multiple special road sections according to steps S11 to S16, take the environment and traffic information of each special road section as a data point, and form a special road section comprehensive data set from multiple data points.

[0023] Further, the step S3 specifically includes:

[0024] The calculated risk level R is used to classify the risk into six levels, and the corresponding risk values ​​are (L1, L2, L3, L4, L5, L6), where L1 is the lowest risk level and L6 is the highest risk level;

[0025] A specific numerical range is set for each risk level. The numerical range is based on statistical analysis and prediction model output and is determined using the following expression:

[0026]

[0027] in, is the upper bound of the k-th risk, R min and R max are the minimum and maximum observed risk, α k is the adjustment factor associated with risk level k.

[0028] Further, the step S4 specifically includes:

[0029] Calculate the risk-related accessibility index A for each special road segment k , risk-related accessibility index A k The following expression is used to reflect the impact of accident frequency and risk level on road network accessibility:

[0030]

[0031] Among them, f jis the accident frequency of the jth road section, is the risk level corresponding to the jth road section, is the road accessibility score of the jth road segment obtained based on GIS data analysis, and N is the total number of evaluated road segments;

[0032] Assess the amount of relief supplies needed for each specific road section Use the following formula:

[0033]

[0034] Among them, v j is the traffic flow of the jth road section, d j is the distance from the jth road section to the nearest rescue center; so that the material supply strategy matches the actual demand and risk level of the road section;

[0035] Calculating expected response time To optimize the allocation of rescue resources, the formula is as follows:

[0036]

[0037] Among them, η is a factor adjusted according to the risk level of the road section, which is used to enhance the response speed to high-risk areas.

[0038] Further, the step S5 specifically includes:

[0039] Consider the expected response time Relief supplies required Construct a model to minimize comprehensive consumption:

[0040]

[0041] Among them, Z is the objective function to be optimized, K is the total number of risk levels considered, and C k is the consumption under the kth risk level; w t 、w m 、w c , respectively, are the expected response time Relief supplies required and consumption C k The weight factor of

[0042] The particle swarm optimization algorithm is used to solve the minimum comprehensive consumption model. For each potential rescue point location, the comprehensive score corresponding to the rescue point location is calculated to determine the advantages and disadvantages of the rescue point location. The location evaluation is based on geographical accessibility, the availability of nearby medical resources, and the connectivity of the road network:

[0043]

[0044] Where Y(x) is the comprehensive score of potential position x, and w i is the weight of the i-th resource, λ i is the distance decay parameter, controlling the effect of distance on resource availability, d i (x) is the distance from location x to the i-th resource, α i is a time sensitivity parameter, which is related to the impact of emergency resource response time, τ i (x) is the average time to reach the i-th resource;

[0045] The potential rescue point location with the highest comprehensive score is used as the optimal location of the emergency rescue point.

[0046] Furthermore, it also includes: S6, conducting a simulation test for the selected optimal position to verify whether the rescue efficiency of the selected optimal position reaches the predetermined target at a confidence level of at least 95%; and adjusting the optimal position of the emergency rescue point according to the simulation test results.

[0047] The beneficial effects of the present invention are as follows: the present invention discloses a method for arranging road network emergency rescue points during the reconstruction and expansion construction period of a special section of a highway, which dynamically evaluates risks by comprehensively using real-time data and a gray clustering evaluation method, and reflects in real time the actual risk situation of the special section during the reconstruction and expansion period. It also uses a geographic information system and an optimization algorithm to determine the optimal location of the emergency rescue point, and ensures that each rescue point can provide the most effective rescue in the shortest time by comprehensively considering the accident response time, material support capabilities, and the severity of the accident. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] The present invention will be further described below in conjunction with the accompanying drawings and embodiments:

[0049] Figure 1 It is a schematic diagram of the flow of the method for deploying emergency rescue points of the present invention. DETAILED DESCRIPTION

[0050] The present invention is further described below in conjunction with the accompanying drawings, as shown in the drawings:

[0051] This embodiment discloses a method for deploying road network emergency rescue points during the reconstruction and expansion construction period of a special section of a highway, including the following steps:

[0052] S1. Collect special road section environment and traffic information and build a comprehensive data set for special road sections;

[0053] S2, using the comprehensive data set of special road sections to conduct risk assessment on each special road section and calculate the risk level of each special road section;

[0054] S3. Classify and quantify the risks based on the calculated risk level;

[0055] S4. Analyze the accessibility of the road network in special sections, and analyze the demand for rescue supplies and expected response time based on the frequency and risk level of accidents;

[0056] S5. Consider the expected response time and the demand for rescue supplies to determine the best location for the emergency rescue point.

[0057] In this embodiment, in step S1, the environment and traffic information includes road section geometry parameters, accident consequence data, accident vehicle type, accident frequency, traffic flow, environmental factors and construction activity data. Step S1 specifically includes:

[0058] S11. Automatically measure and record geometric parameters of road sections through laser scanning and image capture technology, generate a three-dimensional model of the road section in real time and extract geometric parameters of the road section by combining GPS and digital maps with vehicle-mounted sensor data; the geometric parameters of the road section include curvature radius R, slope G and length L;

[0059]

[0060] Among them, s is the natural parameter along the road segment, x(s) and y(s) represent the position function in the plane coordinate system, and a and b represent the horizontal coordinates of the start and end of the road segment;

[0061] S12. Deploy an intelligent accident analysis module to automatically extract accident consequence data by connecting to the accident database of the traffic management bureau; the accident consequence data includes accident type, direct loss and indirect impact of the accident; wherein the accident type is automatically classified by analyzing the accident scene video; the direct loss is calculated by associating insurance records and accident reports;

[0062] The direct loss D is:

[0063] Among them, a i and b i is the adjustment factor, depending on the severity of the accident type, f i is the accident frequency, c i is the average cost, w i is a weight factor, reflecting the influence of different accident types;

[0064] S13. Automatically record the types of accident vehicles passing through a specific road section through cameras and license plate recognition technology, and count the frequency of accidents for each type of vehicle; among which, the frequency of accidents involving i for:

[0065] Among them, n iis the number of accidents of the i-th type of vehicle during the observation period, m is the total number of vehicle types, N 总事故数 is the number of all accidents recorded on that road section during the same period;

[0066] S14. Using geomagnetic sensors and wireless data transmission technology, automatically record and analyze the traffic flow of a specific road section, the traffic flow including traffic density and traffic peak; and update the traffic flow data by minute, hour and day:

[0067]

[0068] Where V(t) represents the total traffic flow at time t; λ i is the flow weight of the i-th type of vehicle, reflecting the contribution of different vehicle types to the total flow; V i (t) is the basic flow of the i-th type of vehicle at time t; k(t) is the vehicle density at time t, reflecting the degree of traffic congestion; α is the congestion impact coefficient, which is used to adjust the impact of density on flow; ω and is the periodic adjustment parameter;

[0069] S15. Deploy environmental monitoring stations, which are equipped with meteorological sensors and cameras to automatically record environmental factors, including temperature T, precipitation P, light intensity I, and road slip coefficient μ;

[0070] S16. Record construction activity data through construction monitoring; the construction activity data includes construction time t, traffic lane C, traffic section layout, speed limit S in the work area, and traffic guidance facilities and construction method information; wherein,

[0071]

[0072] Where ξ is the construction time influence coefficient, T 施工 is the construction time, S0 is the speed limit when there is no construction, ρ is the influence coefficient of the reduction of the number of lanes in the construction area on the speed limit, C 实际 and C 理论 are the actual and theoretical numbers of lanes to be kept open, respectively;

[0073] S17. Obtain the environment and traffic information of multiple special road sections according to steps S11 to S16, take the environment and traffic information of each special road section as a data point, and form a comprehensive data set of special road sections from multiple data points for risk assessment and emergency rescue point layout decision-making.

[0074] Among them, the comprehensive data set Data 综合 for:

[0075] Data 综合 ={(R i ,Gi ,L i ,D i ,f i ,V i (t),T i ,P i ,I i ,μ i ,C i ,S i )|i=1,2,…,n}, i represents the number

[0076] Base number.

[0077] In this embodiment, in step S2, the existing grey clustering evaluation method is used to conduct risk assessment on each special road section through the comprehensive data set of special road sections, and the risk of each special road section is calculated based on the severity of the accident consequences, the type of accident vehicle, the frequency of accidents, traffic flow changes, and multi-dimensional data of environmental factors.

[0078] Among them, the correlation degree of each data point to the overall risk assessment is calculated, and the grey correlation coefficient γ(x0,x i ):

[0079]

[0080] Among them, x0(k) is the value of the reference sequence at time k, x i (k) is the value of the ith comparison sequence at time k, δ(x0(k),x i (k))=|x0(k)-x i (k)| represents the absolute value of the difference between the two sequences at time k, ρ is the resolution coefficient, which takes a value between (0,1), and w k is the weight of the kth feature, reflecting the importance of the feature in the overall evaluation, β(t k ) is the time weighting function, as time t k It changes with the passage of time and is used to emphasize the impact of recent data on the correlation. k Each feature is set according to its importance in the actual situation. Accident frequency and number of casualties will be given higher weights. Where λ is the decay constant, t k is the interval from the current time to the observation time.

[0081] In this embodiment, step S3 specifically includes:

[0082] The calculated risk level R is used to classify the risk into six levels, and the corresponding risk values ​​are (L1, L2, L3, L4, L5, L6), where L1 is the lowest risk level and L6 is the highest risk level. The trend of historical risk data is predicted by combining time series analysis and exponential smoothing method, and the threshold of risk level is adjusted according to the prediction results. The risk value L k The dynamic adjustment formula is as follows:

[0083]

[0084] Among them, y j (t) is the risk value observed at the jth time, and n is the number of observations;

[0085] Use the random forest algorithm to evaluate and update the risk level threshold, and automatically optimize the risk level classification by analyzing the real-time updated traffic flow, accident data and environmental changes:

[0086] L k ′ =RF(X,Y;θ);

[0087]

[0088] Here, RF represents the random forest model, X and Y are the data matrices of features and target variables, θ represents the model parameters, and N is the number of data points.

[0089] A specific numerical range is set for each risk level. The numerical range is based on statistical analysis and prediction model output and is determined using the following expression:

[0090]

[0091] in, is the upper bound of the k-th risk, R min and R max are the minimum and maximum observed risk, α k is the adjustment coefficient associated with risk level k, α k Determined based on historical accident data and safety assessments, with values ​​ranging from 1 to 6;

[0092] Corresponding response measures can be set for each level of risk, including the activation level of the early warning system, the intensity of traffic control and the allocation of rescue resources. The specific measures are formulated through the following parameterized model:

[0093]

[0094] Among them, M k represents the response measures for the kth level risk, is the average risk level of this risk level, CVk is the coefficient of variation, DR k is the accident density ratio, β0, β i is the regression coefficient, f i It is a nonlinear function for different risk parameters;

[0095] The real-time data monitoring system is used to continuously update the risk level and corresponding response measures, so that all measures are synchronized with the risk status of the current road section.

[0096] In this embodiment, the geographic information system is used to analyze the road network accessibility of special road sections. The analysis is based on a real-time updated road network data model that combines road construction status, accident frequency, and risk level R. k ; The step S4 specifically comprises:

[0097] Calculate the risk-related accessibility index A for each special road segment k , risk-related accessibility index A k The following expression is used to reflect the impact of accident frequency and risk level on road network accessibility:

[0098]

[0099] Among them, f j is the accident frequency of the jth road section, is the risk level corresponding to the jth road section, is the road accessibility score of the jth road segment obtained based on GIS data analysis, and N is the total number of evaluated road segments;

[0100] Assess the amount of relief supplies needed for each specific road section Use the following formula:

[0101]

[0102] Among them, v j is the traffic flow of the jth road section, d j is the distance from the jth road section to the nearest rescue center; so that the material supply strategy matches the actual demand and risk level of the road section;

[0103] Calculating expected response time To optimize the allocation of rescue resources, the formula is as follows:

[0104]

[0105] Among them, η is a factor adjusted according to the risk level of the road section, which is used to enhance the response speed to high-risk areas.

[0106] In this embodiment, the step S5 specifically includes:

[0107] Consider the expected response time Relief supplies required Construct a model to minimize comprehensive consumption:

[0108]

[0109] Among them, Z is the objective function to be optimized, K is the total number of risk levels considered, and C k is the consumption under the kth risk level; w t 、w m 、w c , respectively, are the expected response time Relief supplies required and consumption C k The weight factor of

[0110] Deploy a multi-objective optimization framework to minimize response time and consumption while maximizing the efficiency of material support capacity and accident severity. Use the existing particle swarm optimization algorithm to solve the minimum comprehensive consumption model. For each potential rescue point location, calculate the comprehensive score corresponding to the rescue point location to determine the advantages and disadvantages of the rescue point location. The location evaluation is based on geographical accessibility, the availability of nearby medical resources, and the connectivity of the road network:

[0111]

[0112] Where Y(x) is the comprehensive score of potential position x, and w i is the weight of the i-th resource, λ i is the distance decay parameter, controlling the effect of distance on resource availability, d i (x) is the distance from location x to the i-th resource, α i is a time sensitivity parameter, which is related to the impact of emergency resource response time, τ i (x) is the average time to reach the i-th resource;

[0113] The potential rescue point location with the highest comprehensive score is used as the optimal location of the emergency rescue point. In this process, the recommended rescue point can be automatically calibrated by combining geographic information system analysis, comprehensive traffic flow, road conditions, historical accident data and environmental factors, and compared with the existing infrastructure and resource distribution, and an implementation plan can be formulated, and a deployment and operation plan can be developed.

[0114] In this embodiment, the present invention further includes: S6, performing a simulation test on the selected optimal position to verify whether the rescue efficiency of the selected optimal position reaches the predetermined target under a confidence level of at least 95%; and adjusting the optimal position of the emergency rescue point according to the simulation test result. Specifically, the steps include:

[0115] Establish the rescue point efficiency model E(x) and calculate the rescue time and rescue success rate. The formula is:

[0116]

[0117] Where E(x) is the efficiency score of rescue point x, ω e and ω s are the weight factors of time efficiency and success rate, T 实际 (x) is the average response time actually measured at position x, T 目标 is the predetermined target response time, S(x) is the rescue success rate;

[0118] A rescue point consumption model C(x) is established to evaluate the consumption related to operation and maintenance. The formula is:

[0119]

[0120] Where C(x) is the consumption score of rescue point x, c i is the unit input of the i-th type of consumption, u i (x) is the usage of the i-th type of resource at rescue point x;

[0121] The synthetic simulation test result R(x) makes the comprehensive performance of the rescue point x meet the predetermined target at a confidence level of 95%. The formula is:

[0122] R(x)=κ·E(x)+(1-κ)·C(x);

[0123] Among them, κ is the coefficient of balancing efficiency and consumption, R(x) is the overall score of rescue point x;

[0124] Conduct batch simulation runs and use Monte Carlo simulation to evaluate the result distribution under different rescue point configurations so that the statistical confidence level of the score R(x) reaches or exceeds 95%; adjust the specific location or configuration of the rescue point according to the simulation test results to optimize the rescue strategy.

[0125] The present invention utilizes geographic information systems and optimization algorithms to determine the optimal location of emergency rescue points. By comprehensively considering the accident response time, material support capabilities, and the severity of the accident, it ensures that each rescue point can provide the most effective rescue support in the shortest time. At the same time, according to the real-time risk assessment results, the rescue measures can be updated in real time, including the material allocation of the rescue point, the dispatch of the rescue team, and the optimization of the rescue route, so that the rescue strategy is more flexible and adaptable, and can effectively respond to the rapid changes in road conditions and risk levels during construction. In addition, the layout of the rescue points is verified through simulation tests to ensure that at least 95% of the confidence level, the optimal location of the selected rescue point can achieve the predetermined rescue efficiency target, ensuring the rational layout of rescue resources and reducing resource waste.

[0126] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.

Claims

1. A method for laying out emergency rescue points on a road network during the reconstruction and expansion period of a special section of a highway, characterized by: include: S1. Collect special road section environment and traffic information and build a comprehensive data set for special road sections; S2, using the comprehensive data set of special road sections to conduct risk assessment on each special road section and calculate the risk level of each special road section; S3. Classify and quantify the risks based on the calculated risk level; S4. Analyze the accessibility of the road network in special sections, and analyze the demand for rescue supplies and expected response time based on the frequency and risk level of accidents; S5. Consider the expected response time and the demand for rescue supplies to determine the best location for the emergency rescue point.

2. The method for laying out road network emergency rescue points during the reconstruction and expansion period of a special section of a highway according to claim 1 is characterized by: The environmental and traffic information includes road section geometry parameters, accident consequence data, accident vehicle types, accident frequency, traffic flow, environmental factors and construction activity data.

3. The method for laying out road network emergency rescue points during the reconstruction and expansion period of a special section of a highway according to claim 2 is characterized by: The step S1 specifically includes: S11. Automatically measure and record geometric parameters of road sections through laser scanning and image capture technology, generate a three-dimensional model of the road section in real time and extract geometric parameters of the road section by combining GPS and digital maps with vehicle-mounted sensor data; the geometric parameters of the road section include curvature radius R, slope G and length L; S12. Deploy an intelligent accident analysis module to automatically extract accident consequence data by connecting to the accident database of the traffic management bureau; the accident consequence data includes accident type, direct loss and indirect impact of the accident; wherein the accident type is automatically classified by analyzing the accident scene video; the direct loss is calculated by associating insurance records and accident reports; S13. Automatically record the types of accident vehicles passing through a specific road section through cameras and license plate recognition technology, and count the frequency of accidents for each type of vehicle; S14. Using geomagnetic sensors and wireless data transmission technology, automatically record and analyze the traffic flow of a specific road section, the traffic flow including traffic density and traffic peak; and update the traffic flow data by minute, hour and day: Where V(t) represents the total traffic flow at time t; λ i is the flow weight of the i-th type of vehicle, reflecting the contribution of different vehicle types to the total flow; V i (t) is the basic flow of the i-th type of vehicle at time t; k(t) is the vehicle density at time t, reflecting the degree of traffic congestion; α is the congestion impact coefficient, which is used to adjust the impact of density on flow; ω and is the periodic adjustment parameter; S15. Deploy environmental monitoring stations, which are equipped with meteorological sensors and cameras to automatically record environmental factors, including temperature T, precipitation P, light intensity I, and road slip coefficient μ; S16. Record construction activity data through construction monitoring; the construction activity data includes construction time t, traffic lane C, traffic section layout, speed limit S in the work area, and traffic guidance facilities and construction method information; S17. Obtain the environment and traffic information of multiple special road sections according to steps S11 to S16, take the environment and traffic information of each special road section as a data point, and form a special road section comprehensive data set from multiple data points.

4. The method for laying out road network emergency rescue points during the reconstruction and expansion construction period of a special section of a highway according to claim 1, characterized in that: The step S3 specifically includes: The calculated risk level R is used to classify the risk into six levels, and the corresponding risk values ​​are (L1, L2, L3, L4, L5, L6), where L1 is the lowest risk level and L6 is the highest risk level; A specific numerical range is set for each risk level. The numerical range is based on statistical analysis and prediction model output and is determined using the following expression: in, is the upper bound of the k-th risk, R min and R max are the minimum and maximum observed risk, α k is the adjustment factor associated with risk level k.

5. The method for laying out road network emergency rescue points during the reconstruction and expansion period of a special section of a highway according to claim 1, characterized in that: The step S4 specifically includes: Calculate the risk-related accessibility index A for each special road segment k , risk-related accessibility index A k The following expression is used to reflect the impact of accident frequency and risk level on road network accessibility: Among them, f j is the accident frequency of the jth road section, is the risk level corresponding to the jth road section, is the road accessibility score of the jth road segment obtained based on GIS data analysis, and N is the total number of evaluated road segments; Assess the amount of relief supplies needed for each specific road section Use the following formula: Among them, v j is the traffic flow of the jth road section, d j is the distance from the jth road section to the nearest rescue center; so that the material supply strategy matches the actual demand and risk level of the road section; Calculating expected response time To optimize the allocation of rescue resources, the formula is as follows: Among them, η is a factor adjusted according to the risk level of the road section, which is used to enhance the response speed to high-risk areas.

6. The method for laying out road network emergency rescue points during the reconstruction and expansion period of a special section of a highway according to claim 1, characterized in that: The step S5 specifically includes: Consider the expected response time Relief supplies required Construct a model to minimize comprehensive consumption: Among them, Z is the objective function to be optimized, K is the total number of risk levels considered, and C k is the consumption under the kth risk level; w t 、w m 、w c , respectively, are the expected response time Relief supplies required and consumption C k The weight factor of The particle swarm optimization algorithm is used to solve the minimum comprehensive consumption model. For each potential rescue point location, the comprehensive score corresponding to the rescue point location is calculated to determine the advantages and disadvantages of the rescue point location. The location evaluation is based on geographical accessibility, the availability of nearby medical resources, and the connectivity of the road network: Where Y(x) is the comprehensive score of potential position x, and w i is the weight of the i-th resource, λ i is the distance decay parameter, controlling the effect of distance on resource availability, d i (x) is the distance from location x to the i-th resource, α i is a time sensitivity parameter, which is related to the impact of emergency resource response time, τ i (x) is the average time to reach the i-th resource; The potential rescue point location with the highest comprehensive score is used as the optimal location of the emergency rescue point.

7. The method for laying out emergency rescue points during the reconstruction and expansion of special sections of expressways according to claim 1 is characterized by: Also includes: S6. Conduct simulation tests for the selected optimal position to verify whether the rescue efficiency of the selected optimal position reaches the predetermined target at a confidence level of at least 95%; And adjust the optimal location of the emergency rescue point based on the simulation test results.

Citation Information

Cited By

  • Vehicle rescue management method and system based on cloud platform and edge computing

    CN120181504A