Reservoir pipeline connector butt joint construction method

By using the convex ring limit structure and pin limit steps in the reservoir pipeline interface, the displacement and disengagement problem of the sealing ring during the fallback adjustment is solved, and the stable and close contact of the sealing ring is achieved, ensuring the sealing effect of the reservoir pipeline interface.

CN118980004APending Publication Date: 2024-11-19CHINA WATER CONSERVANCY & HYDROPOWER NO 9 ENG BUREAU CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411201308.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

When the existing reservoir pipeline interface is backward and adjusted, the sealing ring is prone to displacement and disengagement.

Method used

The convex ring limit structure is adopted, through the butt installation and pin limit steps, the elastic seal ring is ensured to be in close contact at the pipe interface, and it is restricted to fall back through the pin to prevent disengagement.

Benefits of technology

Effectively prevent the sealing ring from displaced and disengagement during the pipe interface backward adjustment, ensuring the sealing effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118980004A_ABST
    Figure CN118980004A_ABST
Patent Text Reader

Abstract

The invention discloses a reservoir pipeline connector butt joint construction method. The reservoir pipeline connector butt joint construction method comprises the construction method that a convex ring is used for limiting to avoid displacement and separation of an elastic sealing ring. The pipeline A is sleeved with the pipeline B, the pipeline B is in close contact with the elastic sealing ring, when the pipeline B is far away from the pipeline A for rollback adjustment, the elastic sealing ring is limited by the convex ring and is not prone to displacement and separation, and the problem that when the sealing ring is installed at the sinking position of the step at the end of the pipeline connector, displacement and separation are prone to occurring during rollback adjustment of the pipeline connector is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a reservoir pipeline interface butt construction method, belonging to the technical field of water conservancy pipeline construction. Background Art

[0002] When constructing water conservancy facilities such as reservoirs, it is necessary to lay pipelines to guide and discharge water and other fluids. After the pipeline segments are transported to the construction site, the pipeline interfaces need to be docked to achieve the extension and laying, and sealing rings need to be installed when the pipeline interfaces are docked to achieve sealing.

[0003] The prior art is shown in Chinese patent publication number CN2058716U, which discloses that a rubber sealing ring is installed at the step-down position of the cast iron pipe socket to be installed with the socket. Although the sealing ring can be installed at the step-down position at the end of the pipe interface for docking, it is easy to shift and detach when the pipe interface is retracted and adjusted. Summary of the invention

[0004] In order to solve the above technical problems, the present invention provides a reservoir pipeline interface butt connection construction method.

[0005] The present invention is achieved through the following technical solutions.

[0006] The present invention provides a reservoir pipeline interface butt construction method, comprising:

[0007] The invention discloses a construction method in which a convex ring is used to limit the position and prevent the elastic sealing ring from shifting and coming off.

[0008] The construction method comprises two steps of docking installation and pin limiting which are performed in sequence.

[0009] The docking installation steps are as follows: an elastic sealing ring made of elastic rubber is installed at the convex ring at the end of pipe A, and the elastic sealing ring is limited by the convex ring protruding radially; pipe B is sleeved onto the outside of pipe A; a tension ring is sleeved on the end of pipe B, and the tension ring is screwed with a tightening ring through bolts and nuts, and the tightening ring presses the elastic sealing ring axially; the nut is screwed on to pull pipe B to dock with pipe A. During this process, the nut is tightened to the right so that the tightening ring presses the elastic sealing ring, and the elastic sealing ring is squeezed to the inner diameter surface of pipe B along the inclined convex ring, so that the inner diameter surface of pipe B is in close contact with the elastic sealing ring for sealing.

[0010] The pin limiting step is: insert the pin into the inclined hole at the end of pipe B, insert the inclined pin into the limiting groove of the elastic sealing ring, the pin limits the retreat of the elastic sealing ring, the axial elastic force generated by the retreat of the elastic sealing ring is transmitted to the pipe B through the inclined pin, fill the inclined hole at the end of pipe B with a blocking layer to block the end of the pin, loosen the nut to the left, and remove the bolt and tension ring.

[0011] The beneficial effect of the present invention is that: the pipe B is sleeved on the outside of the pipe A and is in close contact with the elastic sealing ring. When the pipe B is moved back and adjusted away from the pipe A, the elastic sealing ring is limited by the convex ring and is not easily displaced or detached, thereby solving the problem that the sealing ring is installed at the sunken step at the end of the pipe interface and is easily displaced or detached when the pipe interface is moved back and adjusted. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a schematic diagram of the assembly structure of the present invention;

[0013] Figure 2 is a cross-sectional schematic diagram of the present invention with a top tightening ring;

[0014] Figure 3 is a cross-sectional schematic diagram of the present invention without a top tightening ring;

[0015] In the figure: 1-pipeline A; 11-convex ring; 2-elastic sealing ring; 21-limiting groove; 3-pipeline B; 4-tension ring; 41-bolt; 42-nut; 5-tightening ring; 6-pin; 7-blocking layer. DETAILED DESCRIPTION

[0016] The technical solution of the present invention is further described below, but the scope of protection claimed is not limited to the description.

[0017] like Figures 1 to 3 shown.

[0018] A reservoir pipeline interface connection construction method of the present application comprises the following steps:

[0019] Butt installation steps: an elastic sealing ring 2 made of elastic rubber is installed at the convex ring 11 at the end of the pipe A1, and the elastic sealing ring 2 is limited by the radially protruding convex ring 11; the pipe B3 is sleeved onto the outside of the pipe A1; the tension ring 4 is sleeved on the end of the pipe B3, and the tension ring 4 is screwed with a tightening ring 5 through a bolt 41 and a nut 42, and the tightening ring 5 presses against the elastic sealing ring 2 axially; the nut 42 is screwed on to pull the pipe B3 to dock with the pipe A1. During this process, the nut 42 is tightened to the right so that the tightening ring 5 presses against the elastic sealing ring 2, and the elastic sealing ring 2 is squeezed to the inner diameter surface of the pipe B3 along the inclined convex ring 11, so that the inner diameter surface of the pipe B3 is in close contact with the elastic sealing ring 2 for sealing.

[0020] Pin limiting step: insert the pin 6 into the inclined hole at the end of the pipe B3, insert the inclined pin 6 into the limiting notch 21 of the elastic sealing ring 2, the pin 6 limits the elastic sealing ring 2 from retreating, and the axial elastic force generated by the retreat of the elastic sealing ring 2 is transmitted to the pipe B3 through the inclined pin 6, and fill the oblique hole at the end of the pipe B3 with a blocking layer 7 to block the end of the pin 6, as shown in FIG. Figure 2As shown, the blocking layer 7 can be concrete or glue; the pin 6 is made of ceramic material or zinc-copper alloy material to ensure that the blocking layer 7 and the pin 6 are not easy to oxidize, rust and age; then the nut 42 is loosened to the left, and the bolt 41 and the tension ring 4 are removed. At this time, it presents a reservoir construction pipeline interface docking structure, such as Figure 3 described.

[0021] A reservoir construction pipeline interface docking structure of the present application includes:

[0022] A pipe A1 has a convex ring 11 at the end, the convex ring 11 protrudes radially outward from the pipe A1; an elastic sealing ring 2 is sleeved on the convex ring 11;

[0023] The pipe B3 is sleeved on the outside of the pipe A1, and the inner diameter surface of the pipe B3 is in close contact with the elastic sealing ring 2.

[0024] The end surface of the pipe B3 close to the pipe A1 is provided with an inclined hole, into which the pin 6 is inserted, and the elastic sealing ring 2 has a limiting notch 21, into which the inclined pin 6 is inserted. A blocking layer 7 is provided in the inclined hole at the end of the pin 6.

[0025] Pipe B3 is sleeved on the outside of pipe A1 and is in close contact with the elastic sealing ring 2. When pipe B3 moves away from pipe A1 and retracts, the elastic sealing ring 2 is limited by the convex ring 11 and is not easily displaced or detached, thereby solving the problem that the sealing ring is installed at the sunken step at the end of the pipe interface and is easily displaced or detached when the pipe interface is retracted or adjusted.

Claims

1. A reservoir pipeline interface docking construction method, characterized in that: include: A construction method is presented in which a convex ring (11) is used to limit the position and prevent the elastic sealing ring (2) from shifting and detaching.

2. The reservoir pipeline interface docking construction method according to claim 1, characterized in that: The construction method comprises two steps of docking installation and pin limiting which are performed in sequence.

3. The reservoir pipeline interface docking construction method according to claim 1, characterized in that: The docking installation steps are as follows: an elastic sealing ring (2) made of elastic rubber is installed at the convex ring (11) at the end of the pipe A (1), and the elastic sealing ring (2) is limited by the convex ring (11) protruding radially; the pipe B (3) is sleeved onto the outside of the pipe A (1); a tension ring (4) is sleeved onto the end of the pipe B (3), and the tension ring (4) is screwed with a tightening ring (5) through a bolt (41) and a nut (42), and the tightening ring (5) presses against the elastic sealing ring (2) axially; the nut (42) is screwed on to pull the pipe B (3) to dock with the pipe A (1), and during this process, the nut (42) is tightened to the right so that the tightening ring (5) presses against the elastic sealing ring (2), and the elastic sealing ring (2) is squeezed to the inner diameter surface of the pipe B (3) along the inclined convex ring (11), so that the inner diameter surface of the pipe B (3) is in close contact with the elastic sealing ring (2) for sealing.

4. The reservoir pipeline interface docking construction method according to claim 1, characterized in that: The pin limiting step comprises: inserting a pin (6) into the inclined hole at the end of the pipe B (3), inserting the inclined pin (6) into the limiting groove (21) of the elastic sealing ring (2), the pin (6) limiting the elastic sealing ring (2) from retreating, and the axial elastic force generated by the retreat of the elastic sealing ring (2) being transmitted to the pipe B (3) through the inclined pin (6), filling the oblique hole at the end of the pipe B (3) with a blocking layer (7) to block the end of the pin (6), loosening the nut (42) to the left, and removing the bolt (41) and the tension ring (4).