Semi-closed circulating wind tunnel for thermal test of cooling device and test method
Through the method of adjusting the pneumatic air valve with a semi-enclosed circulation wind tunnel and controller, the problems of high energy consumption and equipment cost in the thermal performance test of rail transit cooling devices are solved, and efficient heat dissipation performance measurement and different working conditions are achieved. , reducing equipment investment.
Patent Information
- Application Number
- CN202411173053.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-12-03
AI Technical Summary
In the existing thermal performance testing technology of rail transit cooling devices, the test energy consumption and equipment investment cost are relatively high, and it is necessary to have separate air inlet heating equipment.
Design a semi-enclosed circulation wind tunnel, including the air inlet section, air outlet section, negative pressure fan, data acquisition module and controller, and realize zero circulation, semi-circulation or preheating full circulation by adjusting the opening of the pneumatic air valve. In the circulation conditions, the return air volume of the return air section is used to increase the air temperature entering the cold source inlet, and the heat exchange of the subject sample is calculated to evaluate the heat dissipation performance.
Effectively simulate the real working status of rail transit cooling devices, measure heat dissipation performance, reduce test energy consumption and equipment investment costs, and be able to conduct combined test conditions of different air temperatures and air volumes to meet the heat dissipation capacity requirements of different cooling devices.
Smart Images

Figure CN119063955A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of thermal performance testing of rail transit cooling devices, and in particular to a semi-closed circulation wind tunnel for thermal testing of cooling devices and a testing method. Background Art
[0002] Rail transit, as an important means of transportation, has developed by leaps and bounds, and cooling devices, as an indispensable part of the stable operation of rail transit such as electric locomotives and electric multiple units, have also developed with each passing day. It is crucial to select a suitable cooling device for rail transit, which has far-reaching significance in saving rail transit operating costs and extending its service life, ensuring safe operation, and energy conservation and environmental protection. Therefore, only by knowing the heat dissipation performance of each model and specification of cooling devices can we equip various locomotives with more efficient and economical cooling devices.
[0003] At present, rail transit cooling devices mainly use air cooling, that is, using the natural wind during rail transit operation to dissipate heat from the heat source. Therefore, thermal tests often use wind tunnels to provide simulated wind, and use the simulated wind to pass through the cooling device to dissipate the simulated heat source, so as to evaluate the heat dissipation performance of the cooling device. However, the simulated wind usually needs to reach a specific temperature before the test can be carried out, so it is also necessary to equip an independent air inlet heating device, which increases the test energy consumption and equipment investment costs. Summary of the invention
[0004] In order to solve the technical problems of high test energy consumption and equipment investment cost in the existing thermal performance testing technology of rail transit cooling devices, the present invention provides a semi-closed circulation wind tunnel and a testing method for thermal testing of cooling devices.
[0005] To achieve the above object, the present invention provides the following technical solutions:
[0006] The invention discloses a semi-closed circulation wind tunnel for thermal testing of a cooling device, comprising an air inlet section, an air outlet section, a negative pressure fan, an air return section, a data acquisition module and a controller.
[0007] The air inlet section is connected to the cold source inlet of the sample machine, and the air inlet of the air inlet section is provided with a first pneumatic air valve. The heat source inlet of the sample machine is connected to a heat medium circulation system, thereby providing a simulated heat source for the sample machine.
[0008] The air outlet section is connected to the cold source outlet of the sample machine, and the air outlet of the air outlet section is provided with a second pneumatic air valve.
[0009] The negative pressure fan is used to provide negative pressure from the cold source inlet to the cold source outlet, so as to utilize the medium wind passing through the sample machine to cool and exchange heat on the simulated heat source.
[0010] One end of the return air section is connected to the air inlet section and is located downstream of the first pneumatic air valve, and the other end is connected to the air outlet section and is located upstream of the second pneumatic air valve.
[0011] The data acquisition module is used to collect the air volume m at the cold source inlet 1 and inlet air temperature t 1 , and is also used to collect the outlet air temperature t of the cold source 2 .
[0012] The controller is used to adjust the opening of the first pneumatic air valve and the second pneumatic air valve according to the received control command, so as to realize the flow condition of zero cycle, half cycle or preheating full cycle, and calculate the heat exchange Q of the sample machine under the two flow conditions of zero cycle and half cycle. The calculation formula is Q=c 1 m 1 (t 2 -t 1 ), in order to evaluate the heat dissipation performance of the test machine; c 1 is the first average temperature T 1 Specific heat of air under 1 =(t 1 +t 2 ) / 2; in which, at zero cycle, all the medium air in the air outlet section is discharged from the air outlet; in half cycle and preheating full cycle, the return air volume of the return air section is increased to increase the air temperature entering the cold source inlet.
[0013] As a further improvement of the above solution, the controller achieves a zero-circulation flow condition by adjusting the openings of the first pneumatic air valve and the second pneumatic air valve to 100%.
[0014] As a further improvement of the above scheme, the controller sets the PID parameters of the first pneumatic air valve and the second pneumatic air valve, and automatically adjusts the opening of the first pneumatic air valve and the second pneumatic air valve according to the set target parameter value to maintain the air intake volume m 1 , Inlet air temperature t 1 It is consistent with the set target parameter value, thus achieving a half-cycle flow condition.
[0015] As a further improvement of the above scheme, the controller is also used to determine whether each test adopts a zero-cycle or half-cycle flow condition according to the control instruction. If the test adopts a half-cycle flow condition, the opening of the first pneumatic air valve is first adjusted to 0 and the opening of the second pneumatic air valve is adjusted to 1%, thereby realizing a full preheating cycle until the inlet air temperature t 1 After reaching the set target parameter value, it switches to the half-cycle flow condition.
[0016] The semi-closed circulation wind tunnel for thermal testing of cooling devices also includes: a fan inlet section and a transition connection section.
[0017] The outlet of the fan inlet section is connected to the air suction port of the negative pressure fan, and the air exhaust port of the negative pressure fan is connected to the inlet of the air outlet section.
[0018] Two groups of transition connection sections are provided; each group of transition connection sections includes a first transition air duct; the first transition air duct of one group of transition connection sections is provided between the outlet of the air inlet section and the inlet of the cold source, and the first transition air duct of the other group of transition connection sections is provided between the cold source outlet of the test machine and the inlet of the fan inlet section, so as to realize the transition connection of the air path; a soft connector is provided at one end of the first transition air duct away from the test machine.
[0019] As a further improvement of the above scheme, the air inlet section includes a No. 1 three-way connector, a first square and round transition section, a first straight pipe air duct and a first honeycomb rectifier; one of the inlets of the No. 1 three-way connector is connected to the air inlet, and the first pneumatic air valve is arranged at the inlet; the other inlet of the No. 1 three-way connector is connected to the return air section; there are two first square and round transition sections, and the outlet of the No. 1 three-way connector is connected to one of the first square and round transition sections, the first straight pipe air duct, another first square and round transition section, and the first transition air duct near the cold source inlet in sequence; the first honeycomb rectifier is arranged in the first straight pipe air duct.
[0020] The fan inlet section includes a second square-circle transition section, a second straight pipe air duct and a second honeycomb rectifier; one end of the second square-circle transition section is connected to the first transition air duct close to the cold source outlet, and the other end is connected to the second straight pipe air duct and the suction port of the negative pressure fan in sequence; the second honeycomb rectifier is arranged in the second straight pipe air duct.
[0021] As a further improvement of the above scheme, the data acquisition module includes an air volume measuring instrument, a first air temperature measuring instrument, a second air temperature measuring instrument and an air pressure measuring instrument; the air volume measuring instrument and the first air temperature measuring instrument are both installed on the first straight pipe air duct and are both located downstream of the first honeycomb rectifier, wherein the air volume measuring instrument is used to collect the air volume m entering the cold source inlet 1 The first wind temperature measuring instrument is used to collect the inlet air temperature t of the cold source inlet 1 The second wind temperature measuring instrument is installed on the second straight duct and is located downstream of the second honeycomb rectifier, and is used to collect the outlet air temperature t of the cold source outlet 2 There are two groups of wind pressure measuring instruments, which are installed on two groups of transition connection sections respectively and are used to collect the wind pressure passing through the cold source inlet and the cold source outlet respectively.
[0022] As a further improvement of the above scheme, the air outlet section includes a No. 2 three-way joint and a second transition air duct; one of the outlets of the No. 2 three-way joint is connected to the air outlet, and a second pneumatic air valve is arranged at the outlet; the other outlet of the No. 2 three-way joint is connected to the return air section; the inlet of the No. 2 three-way joint is connected to the second transition air duct and the exhaust outlet of the negative pressure fan in sequence.
[0023] The present invention also discloses a cooling device testing method, which is applied to the semi-closed circulation wind tunnel for thermal testing of the cooling device, so as to test the heat dissipation performance of the cooling device, i.e. the test machine. The testing method includes the following steps, i.e. S1 to S4.
[0024] S1. Determine whether each test adopts a zero-cycle or half-cycle flow condition according to the control instruction; if the test adopts a zero-cycle flow condition, execute step S2; if the test adopts a half-cycle flow condition, execute step S3.
[0025] S2. A zero-circulation flow condition is achieved by adjusting the openings of the first pneumatic air valve and the second pneumatic air valve to 100%.
[0026] S3, by adjusting the opening of the first pneumatic air valve to 0 and the opening of the second pneumatic air valve to 1%, the preheating full cycle is realized until the inlet air temperature t 1 When the set target parameter value is reached, step S4 is then executed.
[0027] S4. By setting the PID parameters of the first pneumatic air valve and the second pneumatic air valve, the opening of the first pneumatic air valve and the second pneumatic air valve are automatically adjusted according to the set target parameter values to maintain the air intake volume m 1 , Inlet air temperature t 1 It is consistent with the set target parameter value, thus achieving a half-cycle flow condition.
[0028] Among them, under the two circulation conditions of zero cycle and half cycle, the heat transfer Q of the sample machine is calculated, and the calculation formula is Q = c 1 m 1 (t 2 -t 1 ) to evaluate the heat dissipation performance of the test machine.
[0029] As a further improvement of the above scheme, in step S1, when the ambient temperature t a =t 1 When the control instruction is: the current test adopts the zero-circulation flow condition; when the ambient temperature t a <t 1 , the control instruction is: the current test adopts a half-cycle flow condition.
[0030] In step S4, in the half-cycle circulation condition, the return air volume m 2 and the air volume at the air inlet m a Satisfies the following formula:
[0031]
[0032] In the formula, c ais the second average temperature T 2 Specific heat of air under 2 =(t 1 +t a ) / 2.
[0033] Compared with the prior art, the present invention has the following beneficial effects:
[0034] The present invention can effectively simulate the actual working state of rail transit cooling devices and measure the heat dissipation performance of rail transit cooling devices; it can also realize zero circulation, half circulation, and preheating full circulation switching of the test medium wind according to the target wind temperature, and utilize specific circulation conditions to heat the simulated wind in the air inlet section to achieve target wind temperature regulation by itself, without the need to separately equip the air inlet end heating equipment, thereby comprehensively reducing the test energy consumption and equipment investment cost; in addition, the present invention can also carry out combined test conditions of different wind temperatures and air volumes to meet the test requirements of the heat dissipation capacity of different rail transit cooling devices. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 This is a schematic diagram of the structure of a semi-closed circulation wind tunnel for thermal testing of a cooling device in Example 1 of the present invention.
[0036] Figure 2 This is a flow chart of the testing method of the cooling device in Example 2 of the present invention.
[0037] In the figure:
[0038] 1. Air inlet section; 10. Air inlet; 11. First pneumatic air valve; 12. No. 1 three-way connector; 13. First square-circle transition section; 14. First straight duct; 15. First honeycomb rectifier; 2. Transition connection section; 21. First transition duct; 22. Soft connector; 3. Test machine; 4. Fan inlet section; 41. Second square-circle transition section; 42. Second straight duct; 43. Second honeycomb rectifier; 5. Negative pressure fan; 6. Air outlet section; 60. Air outlet; 61. Second pneumatic air valve; 62. No. 2 three-way connector; 63. Second transition duct; 7. Return air section; 71. Rectangular duct; 72. Elbow; 80. Air volume measuring instrument; 81. First wind temperature measuring instrument; 82. Second wind temperature measuring instrument; 83. Wind pressure measuring instrument; 9. Heat medium circulation system; A. Bracket. DETAILED DESCRIPTION
[0039] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0040] Example 1
[0041] See also Figure 1 This embodiment provides a semi-closed circulation wind tunnel for thermal testing of cooling devices. The main structure can be arranged in a ring-shaped surrounding type to test the cooling performance of the test machine 3, which is in the following order: air inlet section 1, a transition connection section 2, the test machine 3, fan inlet section 4, negative pressure fan 5, air outlet section 6, and return air section 7. The wind tunnel may also include a data acquisition module and a controller (not shown).
[0042] In the present invention, the wind tunnel is used to provide wind of target temperature and flow rate to the cold source inlet of the sample machine 3, and the heat source inlet of the sample machine 3 can be connected to a heat medium circulation system 9. The heat medium circulation system 9 and the wind tunnel are in a parallel relationship and belong to the same heat exchanger measurement system. The heat medium circulation system 9 is used to provide a simulated heat source for the sample machine 3, that is, to provide a heat medium with target temperature, pressure and flow rate.
[0043] In some embodiments, the wind tunnel may also include a bracket A for supporting the main structure, which is arranged below each section of the pipeline. The bracket A may be made of 10# channel steel and connected to each section of the pipeline by bolts. The bottom of the bracket A of the air inlet section 1, the fan inlet section 4, the air outlet section 6, and the return air section 7 may be fixed to the bottom surface, and a pulley may be installed at the bottom of the bracket A of the transition section 2 to facilitate the replacement of different models of the test machine 3. In addition, each section of the pipeline of the wind tunnel may be connected by a flange.
[0044] The air inlet section 1 is connected to the cold source inlet of the sample machine 3, and the air inlet 10 of the air inlet section 1 is provided with a first pneumatic air valve 11. Specifically, the air inlet section 1 may include a No. 1 three-way joint 12, a first square-circle transition section 13, a first straight pipe air duct 14 and a first honeycomb rectifier 15; one of the inlets of the No. 1 three-way joint 12 is connected to the air inlet 10, and the first pneumatic air valve 11 is provided at the inlet; the other inlet of the No. 1 three-way joint 12 is connected to the return air section 7; there are two first square-circle transition sections 13, and the outlet of the No. 1 three-way joint 12 is connected to one of the first square-circle transition sections 13, the first straight pipe air duct 14, the other first square-circle transition section 13, and the first transition air duct 21 near the cold source inlet in sequence; the first honeycomb rectifier 15 is provided in the first straight pipe air duct 14, and the cross section of the first straight pipe air duct 14 may be circular.
[0045] In this embodiment, the first pneumatic air valve 11 is installed sideways, and the valve blade opening is adjusted in the horizontal direction, so that the cold air entering the air inlet 10 and the hot air returning from the return air section 7 are disturbed, and the wind temperature is more evenly distributed along the cross section. In addition, the main cross-sectional size of the circular air duct is DN800 (a pipe with a nominal diameter of 800 mm), and the main cross-sectional size of the rectangular air duct is 1000×1000 mm, which meets the maximum air volume of 16m3 / s, the test requirement is that the maximum resistance of the test machine 3 is 1500Pa.
[0046] Two groups of transition connection sections 2 are provided; each group of transition connection sections 2 includes a first transition air duct 21; the first transition air duct 21 of one group of transition connection sections 2 is provided between the outlet of the air inlet section 1 and the inlet of the cold source, and the first transition air duct 21 of the other group of transition connection sections 2 is provided between the cold source outlet of the sample machine 3 and the inlet of the fan inlet section 4, so as to realize the transition connection of the air path; a soft connector 22 is provided at one end of the first transition air duct 21 away from the sample machine 3.
[0047] The outlet of the fan inlet section 4 is connected to the air suction port of the negative pressure fan 5, and the air discharge port of the negative pressure fan 5 is connected to the inlet of the air outlet section 6. Specifically, the fan inlet section 4 may include a second square-circle transition section 41, a second straight pipe air duct 42, and a second honeycomb rectifier 43; one end of the second square-circle transition section 41 is connected to the first transition air duct 21 near the cold source outlet, and the other end is connected to the second straight pipe air duct 42 and the air suction port of the negative pressure fan 5 in sequence; the second honeycomb rectifier 43 is arranged in the second straight pipe air duct 42, and the cross section of the second straight pipe air duct 42 may be circular.
[0048] The negative pressure fan 5 is used to provide negative pressure from the cold source inlet to the cold source outlet, so as to cool and exchange heat with the simulated heat source by using the medium wind passing through the sample machine 3. In this embodiment, the negative pressure fan 5 can be a variable frequency fan, and the different air volume requirements of the sample machine 3 can be met by changing the frequency of the negative pressure fan 5.
[0049] The air outlet section 6 is connected to the cold source outlet of the sample machine 3, and the air outlet 60 of the air outlet section 6 is provided with a second pneumatic air valve 61. Specifically, the air outlet section 6 may include a No. 2 three-way joint 62 and a second transition air duct 63; one of the outlets of the No. 2 three-way joint 62 is connected to the air outlet 60, and the second pneumatic air valve 61 is provided at the outlet; the other outlet of the No. 2 three-way joint 62 is connected to the return air section 7; the inlet of the No. 2 three-way joint 62 is connected to the second transition air duct 63 and the exhaust outlet of the negative pressure fan 5 in sequence.
[0050] One end of the return air section 7 is connected to the air inlet section 1 and is located downstream of the first pneumatic air valve 11, and the other end is connected to the air outlet section 6 and is located upstream of the second pneumatic air valve 61. In this embodiment, the return air section 7 can be composed of multiple sections of rectangular air ducts 71 and elbows 72, forming an "L"-shaped structure that connects the air outlet section 6 and the air inlet section 1.
[0051] The data acquisition module is used to collect the air volume m at the cold source inlet 1 and inlet air temperature t 1 , and is also used to collect the outlet air temperature t of the cold source 2Specifically, the data acquisition module may include an air volume meter 80, a first air temperature meter 81, a second air temperature meter 82, and an air pressure meter 83. The air volume meter 80 and the first air temperature meter 81 are both installed on the first straight duct 14 and are both located downstream of the first honeycomb rectifier 15. The air volume meter 80 is used to collect the air volume m entering the cold source inlet. 1 The first wind temperature measuring instrument 81 is used to collect the inlet air temperature t of the cold source inlet 1 The second wind temperature measuring instrument 82 is installed on the second straight duct 42 and is located downstream of the second honeycomb rectifier 43, and is used to collect the outlet temperature t of the cold source outlet 2 There are two groups of wind pressure measuring instruments 83, which are respectively installed on two groups of transition connection sections 2, and are respectively used to collect the wind pressure passing through the cold source inlet and the cold source outlet, so that on the one hand, the pressure loss upstream and downstream of the sample machine 3 can be calculated, and on the other hand, it is used for negative pressure regulation. Since the absolute pressure at the sample machine 3 is negative pressure, the physical properties of the air need to query the physical properties of the actual pressure when calculating the heat exchange rate.
[0052] In this embodiment, the air volume measuring instrument 80 can be a Pitot tube anemometer. Two sets of Pitot tube anemometers can be used at a single air volume measuring point, which are vertically distributed in the same cross section. The average value of the measurement results is taken as the air volume m 1 The first wind temperature measuring instrument 81 and the second wind temperature measuring instrument 82 can both use integrated temperature transmitters. The wind pressure measuring instrument 83 can use a pressure transmitter or a differential pressure transmitter. A single temperature measuring point uses ten integrated temperature transmitters, which are evenly distributed on the same cross section. The average value of the measurement results is taken as the medium wind temperature passing through the point.
[0053] The controller is used to adjust the opening of the first pneumatic air valve 11 and the second pneumatic air valve 61 according to the received control command, so as to realize the flow condition of zero cycle, half cycle or preheating full cycle, and calculate the heat exchange Q of the sample machine 3 under the two flow conditions of zero cycle and half cycle, and the calculation formula is Q=c 1 m 1 (t 2 -t 1 ), in order to evaluate the heat dissipation performance of the sample machine 3; c 1 is the first average temperature T 1 Specific heat of air under 1 =(t 1 +t 2 ) / 2; wherein, at zero cycle, all the medium wind of the air outlet section 6 is discharged from the air outlet 60; at half cycle and preheating full cycle, the return air volume of the return air section 7 is increased to increase the wind temperature entering the cold source inlet.
[0054] The tester can pre-set the target parameter values of the test machine 3, including the designed air inlet volume and the designed air inlet temperature. 1 Reach the designed air volume and air temperature t 1 Reach the designed air inlet temperature.
[0055] The controller is also used to determine whether to adopt a zero-cycle or half-cycle flow condition for each test according to the control instruction.
[0056] If the ambient temperature t a If the air temperature is equal to the designed air inlet temperature, it means that the ambient air entering from the air inlet 10 can directly enter the sample machine 3 (without heating), and the control instruction is: execute zero circulation. At this time, the controller adjusts the opening of the first pneumatic air valve 11 and the second pneumatic air valve 61 to 100%, thereby achieving a zero circulation flow condition. It should be noted that this situation is extremely rare. Generally, the designed air inlet temperature must be higher than the room temperature, that is, the ambient temperature t a .
[0057] If the ambient temperature t a The controller sets the PID parameters of the first pneumatic air valve 11 and the second pneumatic air valve 61, and automatically adjusts the opening of the first pneumatic air valve 11 and the second pneumatic air valve 61 according to the set target parameter values to maintain the air intake volume m 1 , Inlet air temperature t 1 It is consistent with the set target parameter value, thus achieving a half-cycle flow condition.
[0058] In addition, if the test adopts a half-cycle flow condition, in order to reduce energy consumption and make the medium wind quickly stabilize at the target value, the opening of the first pneumatic air valve 11 can be adjusted to 0, and the opening of the second pneumatic air valve 61 can be adjusted to 1%, so as to achieve a full preheating cycle until the inlet air temperature t 1 After reaching the set target parameter value, it switches to the half-cycle flow condition.
[0059] Example 2
[0060] This embodiment provides a cooling device testing method, which can be applied to the semi-closed circulation wind tunnel for thermal testing of the cooling device in Embodiment 1, so as to test the heat dissipation performance of the cooling device, i.e., the test machine 3. Figure 2 The testing method includes the following steps, namely S1 to S4.
[0061] S1. Determine whether to use zero-cycle or half-cycle flow conditions for each test according to the control instructions; at the same time, confirm that the heat medium circulation system 9 is ready; if the test uses zero-cycle flow conditions, execute step S2; if the test uses half-cycle flow conditions, execute step S3.
[0062] In step S1, when the ambient temperature t a =t 1 When the control instruction is: the current test adopts the zero-circulation flow condition; when the ambient temperature t a <t 1 , the control instruction is: the current test adopts a half-cycle flow condition.
[0063] S2. By adjusting the openings of the first pneumatic air valve 11 and the second pneumatic air valve 61 to 100%, a zero-circulation flow condition is achieved.
[0064] S3, by adjusting the opening of the first pneumatic air valve 11 to 0 and the opening of the second pneumatic air valve 61 to 1%, a full preheating cycle is achieved until the inlet air temperature t 1 When the set target parameter value is reached, step S4 is then executed.
[0065] S4. By setting the PID parameters of the first pneumatic air valve 11 and the second pneumatic air valve 61, the opening of the first pneumatic air valve 11 and the second pneumatic air valve 61 is automatically adjusted according to the set target parameter value to maintain the air intake volume m 1 , Inlet air temperature t 1 It is consistent with the set target parameter value, thus achieving a half-cycle flow condition.
[0066] Among them, under the two circulation conditions of zero cycle and half cycle, the heat exchange Q of the sample machine 3 is calculated, and the calculation formula is Q = c 1 m 1 (t 2 -t 1 ) to evaluate the heat dissipation performance of the test machine 3.
[0067] In step S4, in the half-cycle circulation condition, the return air volume m of the return air section 7 is 2 And the air volume of the air inlet 10 m a Satisfies the following formula:
[0068]
[0069] In the formula, c a is the second average temperature T 2 Specific heat of air under 2 =(t 1 +t a ) / 2.
[0070] It should be noted that in steps S2, S3, and S4, the negative pressure fan 5 is in the on state, so that the medium wind in the wind tunnel circulates, and the monitoring value of the air volume measuring instrument 80 is stabilized at the target air volume by adjusting the frequency of the negative pressure fan 5. In addition, the circulation pump and the heating module in the heat medium circulation system 9 are in the on state. When the monitoring value of the first wind temperature measuring instrument 81 is higher than t 1 When the target parameter value, i.e., the designed air volume and the designed air temperature, is input into the upper computer, the two pneumatic air valves automatically adjust the opening according to the target parameter value to mix the ambient cold air with the return hot air until the monitoring value of the first air temperature measuring instrument 81 is stable at t 1 When the heat balance error between the air side and the liquid is stabilized below 1%, the test is considered to have reached equilibrium, and the heat exchange capacity of the test machine 3 is calculated at this time.
[0071] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A semi-closed circulation wind tunnel for thermal testing of cooling devices, characterized in that: include: An air inlet section (1) is connected to the cold source inlet of the sample machine (3), and an air inlet (10) of the air inlet section (1) is provided with a first pneumatic air valve (11); wherein the heat source inlet of the sample machine (3) is connected to a heat medium circulation system (9), thereby providing a simulated heat source for the sample machine (3); An air outlet section (6) connected to the cold source outlet of the sample machine (3), and an air outlet (60) of the air outlet section (6) is provided with a second pneumatic air valve (61); A negative pressure fan (5) is used to provide negative pressure from the cold source inlet to the cold source outlet, so as to utilize the medium wind passing through the sample machine (3) to cool and exchange heat with the simulated heat source; An air return section (7), one end of which is connected to the air inlet section (1) and is located downstream of the first pneumatic air valve (11), and the other end of which is connected to the air outlet section (6) and is located upstream of the second pneumatic air valve (61); A data acquisition module, which is used to collect the air inlet volume m1 and the air inlet temperature t1 of the cold source inlet, and is also used to collect the air outlet temperature t2 of the cold source outlet; and A controller is used to adjust the opening of the first pneumatic air valve (11) and the second pneumatic air valve (61) according to the received control instructions, so as to realize the circulation conditions of zero cycle, half cycle or preheating full cycle, and calculate the heat exchange amount Q of the sample machine (3) under the two circulation conditions of zero cycle and half cycle, and the calculation formula is Q=c1m1(t2-t1), so as to evaluate the heat dissipation performance of the sample machine (3); c1 is the air specific heat at the first average temperature T1, T1=(t1+t2) / 2; wherein, at zero cycle, the medium air of the air outlet section (6) is all discharged from the air outlet (60); at half cycle and preheating full cycle, the air temperature entering the cold source inlet is increased by increasing the return air volume of the return air section (7).
2. A semi-closed circulation wind tunnel for thermal testing of cooling devices according to claim 1, characterized in that: The controller achieves a zero-circulation flow condition by adjusting the openings of the first pneumatic air valve (11) and the second pneumatic air valve (61) to 100%.
3. The semi-closed circulation wind tunnel for thermal testing of cooling devices according to claim 2 is characterized in that: The controller sets the PID parameters of the first pneumatic air valve (11) and the second pneumatic air valve (61), and automatically adjusts the opening of the first pneumatic air valve (11) and the second pneumatic air valve (61) according to the set target parameter values, so as to keep the air intake volume m1 and the air intake temperature t1 consistent with the set target parameter values, thereby achieving a semi-circulation circulation condition.
4. The semi-closed circulation wind tunnel for thermal testing of cooling devices according to claim 3 is characterized in that: The controller is also used to determine whether to adopt a zero-cycle or half-cycle flow condition for each test according to the control instruction. If the test adopts a half-cycle flow condition, the opening of the first pneumatic air valve (11) is first adjusted to 0, and the opening of the second pneumatic air valve (61) is adjusted to 1%, thereby achieving a full preheating cycle until the inlet air temperature t1 reaches the set target parameter value, and then switching to a half-cycle flow condition.
5. The semi-closed circulation wind tunnel for thermal testing of cooling devices according to claim 1 is characterized in that: Also includes: The fan inlet section (4) has an outlet connected to the air intake of the negative pressure fan (5), and the air outlet of the negative pressure fan (5) is connected to the inlet of the air outlet section (6); and The transition connection section (2) is provided with two groups; each group of transition connection sections (2) includes a first transition air duct (21); the first transition air duct (21) of one group of transition connection sections (2) is provided between the outlet of the air inlet section (1) and the inlet of the cold source, and the first transition air duct (21) of the other group of transition connection sections (2) is provided between the cold source outlet of the test machine (3) and the inlet of the fan inlet section (4), so as to realize the transition connection of the air path; a soft connector (22) is provided at one end of the first transition air duct (21) away from the test machine (3).
6. The semi-closed circulation wind tunnel for thermal testing of cooling devices according to claim 5 is characterized in that: The air inlet section (1) comprises a No. 1 three-way joint (12), a first square-circle transition section (13), a first straight pipe air duct (14) and a first honeycomb rectifier (15); one of the inlets of the No. 1 three-way joint (12) is connected to the air inlet (10), and a first pneumatic air valve (11) is arranged at the inlet; the other inlet of the No. 1 three-way joint (12) is connected to the return air section (7); two first square-circle transition sections (13) are arranged, and the outlet of the No. 1 three-way joint (12) is connected to one of the first square-circle transition sections (13), the first straight pipe air duct (14), the other first square-circle transition section (13), and the first transition air duct (21) near the cold source inlet in sequence; the first honeycomb rectifier (15) is arranged in the first straight pipe air duct (14); The fan inlet section (4) comprises a second square-circle transition section (41), a second straight pipe air duct (42) and a second honeycomb rectifier (43); one end of the second square-circle transition section (41) is connected to the first transition air duct (21) close to the cold source outlet, and the other end is connected to the second straight pipe air duct (42) and the air suction port of the negative pressure fan (5) in sequence; the second honeycomb rectifier (43) is arranged in the second straight pipe air duct (42).
7. The semi-closed circulation wind tunnel for thermal testing of cooling devices according to claim 6 is characterized in that: The data acquisition module comprises an air volume measuring instrument (80), a first air temperature measuring instrument (81), a second air temperature measuring instrument (82) and an air pressure measuring instrument (83); the air volume measuring instrument (80) and the first air temperature measuring instrument (81) are both installed on the first straight duct (14) and are both located downstream of the first honeycomb rectifier (15), wherein the air volume measuring instrument (80) is used to collect the air volume m1 entering the cold source inlet, and the first air temperature measuring instrument (81) is used to collect the air inlet temperature t1 at the cold source inlet; the second air temperature measuring instrument (82) is installed on the second straight duct (42) and is located downstream of the second honeycomb rectifier (43), and is used to collect the air outlet temperature t2 at the cold source outlet; two groups of air pressure measuring instruments (83) are provided, which are respectively installed on two groups of transition connection sections (2), and are respectively used to collect the air pressure passing through the cold source inlet and the cold source outlet.
8. The semi-closed circulation wind tunnel for thermal testing of cooling devices according to claim 5, characterized in that: The air outlet section (6) comprises a No. 2 three-way joint (62) and a second transition air duct (63); one of the outlets of the No. 2 three-way joint (62) is connected to the air outlet (60), and a second pneumatic air valve (61) is arranged at the outlet; the other outlet of the No. 2 three-way joint (62) is connected to the return air section (7); the inlet of the No. 2 three-way joint (62) is connected to the second transition air duct (63) and the exhaust port of the negative pressure fan (5) in sequence.
9. A method for testing a cooling device, characterized in that: A semi-closed circulation wind tunnel for thermal testing of a cooling device as claimed in any one of claims 1 to 8 is used to test the heat dissipation performance of the cooling device, i.e., the test machine (3), the test method comprising the following steps: S1. Determine whether each test adopts a zero-cycle or half-cycle flow condition according to the control instruction; if the test adopts a zero-cycle flow condition, execute step S2; if the test adopts a half-cycle flow condition, execute step S3; S2, adjusting the openings of the first pneumatic air valve (11) and the second pneumatic air valve (61) to 100%, thereby achieving a zero-circulation flow condition; S3, by adjusting the opening of the first pneumatic air valve (11) to 0 and the opening of the second pneumatic air valve (61) to 1%, a full preheating cycle is achieved until the inlet air temperature t1 reaches the set target parameter value, and then executing step S4; S4. By setting the PID parameters of the first pneumatic air valve (11) and the second pneumatic air valve (61), and automatically adjusting the opening of the first pneumatic air valve (11) and the second pneumatic air valve (61) according to the set target parameter value, so as to keep the air intake volume m1 and the air intake temperature t1 consistent with the set target parameter value, thereby achieving a semi-circulation circulation condition; Among them, under the two circulation conditions of zero cycle and half cycle, the heat exchange amount Q of the sample machine (3) is calculated, and the calculation formula is Q=c1m1(t2-t1), so as to evaluate the heat dissipation performance of the sample machine (3).
10. A cooling device testing method according to claim 9, characterized in that: In step S1, when the ambient temperature t a = t1, the control instruction is: the current test adopts the zero-circulation flow condition; when the ambient temperature t a When t1 is less than t1, the control instruction is: the current test adopts a half-cycle flow condition; In step S4, in the half-cycle circulation condition, the return air volume m2 of the return air section (7) and the intake air volume m a Satisfies the following formula: In the formula, c a is the specific heat of air at the second average temperature T2, T2 = (t1 + t a ) / 2.
