Method, device and system for monitoring running condition of three-phase load of electric energy meter

By acquiring and analyzing the three-phase load operation data of the power meter and using pre-trained models to identify abnormal situations, the problem of low monitoring efficiency of the three-phase load operation of the power meter in the existing technology is solved, and automated abnormal status recognition and alarm are realized , improves monitoring efficiency and accuracy.

CN119064851APending Publication Date: 2024-12-03STATE GRID BEIJING ELECTRIC POWER CO +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411193602.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

In the prior art, monitoring of the three-phase load operation of the power meter relies on manual operation, resulting in low monitoring efficiency and error-prone, and complex factors are related to difficult to achieve accurate status monitoring, which affects the work efficiency of metrology managers.

Method used

By obtaining the list of power meter and three-phase load operation data, the data is analyzed using a pre-trained analysis model, abnormal data, including abnormalities in voltage, current and power factor, and recording or sending alarm information.

Benefits of technology

It realizes batch acquisition and abnormal state recognition of three-phase load operation data of the power meter, improves monitoring efficiency, reduces manual operation errors and consumption, and improves the working efficiency of metrology management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119064851A_ABST
    Figure CN119064851A_ABST
Patent Text Reader

Abstract

The embodiment of the invention discloses an electric energy meter three-phase load operation condition monitoring method, device and system, and relates to the technical field of power grid monitoring, and the method comprises the steps: obtaining electric energy meter list data which comprises electric energy meter numbers corresponding to electric energy meters registered in an electric energy meter monitoring system; obtaining electric energy meter three-phase load operation data corresponding to the electric energy meter list data; and analyzing the three-phase load operation data of the electric energy meter to determine abnormal data in the three-phase load operation data of the electric energy meter. Therefore, a technical problem of low efficiency of monitoring the running condition of the three-phase load of the electric energy meter due to the fact that the monitoring of the running condition of the three-phase load of the electric energy meter depends on manual operation in the prior art is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power grid monitoring, and in particular to a method, device and system for monitoring the operating condition of a three-phase load of an electric energy meter. Background Art

[0002] In order to ensure the economic and stable operation of the power grid, metering personnel need to focus on monitoring the three-phase load operation of the energy meter. The traditional monitoring method is mainly to manually query the relevant data of the energy meter in the energy meter monitoring system one by one, switch back and forth to observe and screen, sort out the relevant parameters required for the operation of the three-phase load, and then judge whether the relevant parameters are abnormal based on the staff's experience, and monitor the operation of the three-phase load of the energy meter through abnormal situations.

[0003] Manual operation has the following problems:

[0004] 1) The workload is huge, and the process is very cumbersome, labor-intensive, and error-prone.

[0005] 2) Due to the complex correlation between the factors that affect the operation of the three-phase load of the electricity meter and the actual reasons, the abnormal rules formulated based on the experience of the staff are difficult to achieve accurate status monitoring, which seriously affects the work efficiency of the metering management personnel. Summary of the invention

[0006] The embodiments of the present invention provide a method, device and system for monitoring the operating status of a three-phase load of an electric energy meter, so as to at least solve the technical problem of low efficiency of monitoring the operating status of a three-phase load of an electric energy meter in the related art because the monitoring of the operating status of a three-phase load of an electric energy meter relies on manual operation.

[0007] According to one aspect of an embodiment of the present invention, a method for monitoring the operation status of a three-phase load of an electric energy meter is provided, the method comprising: obtaining electric energy meter list data, wherein the electric energy meter list data comprises electric energy meter numbers corresponding to electric energy meters registered in an electric energy meter monitoring system; obtaining three-phase load operation data of the electric energy meter corresponding to the electric energy meter list data; and analyzing the three-phase load operation data of the electric energy meter to determine abnormal data in the three-phase load operation data of the electric energy meter.

[0008] Furthermore, the obtaining of the electric energy meter list data includes: receiving an electric energy meter list document corresponding to the electric energy meter list data; verifying the electric energy meter numbers corresponding to the electric energy meters in the electric energy meter list document in turn; and in case of verification failure, marking the electric energy meter numbers that failed the verification as not found in the electric energy meter list document.

[0009] Furthermore, the method of obtaining the three-phase load operation data of the electric energy meter corresponding to the electric energy meter list data includes: sequentially obtaining the three-phase current data, three-phase voltage data and three-phase power factor data corresponding to the electric energy meter number of each electric energy meter in the electric energy meter list data; and storing the three-phase current data, three-phase voltage data and three-phase power factor data in corresponding arrays respectively.

[0010] Furthermore, the method of sequentially obtaining the three-phase current data, three-phase voltage data and three-phase power factor data corresponding to the electric energy meter number of each electric energy meter in the electric energy meter list data includes: if the acquisition of the three-phase current data, the three-phase voltage data and the three-phase power factor data fails, then storing a preset text in the corresponding array, wherein the preset text is used to prompt the failure of data acquisition.

[0011] Furthermore, the analysis of the three-phase load operation data of the electric energy meter to determine the abnormal data in the three-phase load operation data of the electric energy meter includes: analyzing the three-phase voltage data in the three-phase load of the electric energy meter through a pre-trained voltage analysis model to determine the abnormal voltage data in the three-phase voltage data; wherein the voltage analysis model is trained by using a historical electric energy meter three-phase voltage value data set as a training sample.

[0012] Furthermore, the three-phase load operation data of the electric energy meter is analyzed to determine abnormal data in the three-phase load operation data of the electric energy meter, including: if the three-phase current data in the three-phase load of the electric energy meter contains negative current, zero current and load imbalance, then the three-phase current data is determined to be abnormal current data; wherein, when the percentage difference between the maximum current value and the minimum current value in the three-phase current data is greater than a preset threshold, then the three-phase current data is determined to be abnormal current data.

[0013] Furthermore, the three-phase power factor data in the three-phase load of the electric energy meter includes data in three arrays of first-phase power factor, second-phase power factor and third-phase power factor, wherein the analysis of the three-phase load operation data of the electric energy meter to determine the abnormal data in the three-phase load operation data of the electric energy meter includes: testing the first-phase power factor, the second-phase power factor and the third-phase power factor one by one, and determining that the power factor data exceeding the preset power factor threshold is abnormal power factor data.

[0014] Furthermore, after analyzing the three-phase load operation data of the electric energy meter to determine the abnormal data in the three-phase load operation data of the electric energy meter, it also includes: if there is abnormal data in the three-phase load operation data of the electric energy meter, recording it in the electric energy meter list document; and / or sending an alarm information corresponding to the abnormal data to a preset terminal.

[0015] According to one aspect of an embodiment of the present invention, a device for monitoring the operation status of a three-phase load of an electric energy meter is also provided, the device comprising: a first acquisition module, used to acquire electric energy meter list data, wherein the electric energy meter list data includes electric energy meter numbers corresponding to electric energy meters registered in an electric energy meter monitoring system; a second acquisition module, used to acquire the three-phase load operation data of the electric energy meter corresponding to the electric energy meter list data; and an analysis module, used to analyze the three-phase load operation data of the electric energy meter to determine abnormal data in the three-phase load operation data of the electric energy meter.

[0016] According to one aspect of an embodiment of the present invention, a three-phase load operation status monitoring system of an electric energy meter is also provided, the system comprising: an input module for obtaining electric energy meter list data, wherein the electric energy meter list data comprises electric energy meter numbers corresponding to electric energy meters registered in the electric energy meter monitoring system; a capture module for obtaining the three-phase load operation data of the electric energy meter corresponding to the electric energy meter list data; and an analysis module for analyzing the three-phase load operation data of the electric energy meter to determine abnormal data in the three-phase load operation data of the electric energy meter.

[0017] In an embodiment of the present invention, by acquiring the electric energy meter list data, wherein the electric energy meter list data includes the electric energy meter number corresponding to the electric energy meter registered in the electric energy meter monitoring system; acquiring the electric energy meter three-phase load operation data corresponding to the electric energy meter list data; analyzing the electric energy meter three-phase load operation data to determine the abnormal data in the electric energy meter three-phase load operation data. Acquiring the corresponding electric energy meter three-phase load operation data according to the electric energy meter list data, batch acquisition of the electric energy meter three-phase load operation data is realized. Furthermore, by analyzing the electric energy meter three-phase load operation data, the abnormal data in the electric energy meter three-phase load operation data is determined, and the abnormal state recognition of the electric energy meter three-phase load operation data is realized, thereby improving the monitoring efficiency of the electric energy meter three-phase load operation status, thereby solving the technical problem of low efficiency of the electric energy meter three-phase load operation status monitoring due to the fact that the electric energy meter three-phase load operation status monitoring in the related technology relies on manual operation for monitoring. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the accompanying drawings:

[0019] Figure 1 This is a schematic diagram of an optional application scenario in an embodiment of the present invention;

[0020] Figure 2 This is a schematic diagram of another optional application scenario in an embodiment of the present invention;

[0021] Figure 3 It is a flow chart of an optional method for monitoring the operation status of a three-phase load of an electric energy meter in an embodiment of the present invention;

[0022] Figure 4 It is a schematic diagram of the framework of an optional device for monitoring the operation status of a three-phase load of an electric energy meter in an embodiment of the present invention;

[0023] Figure 5 The schematic diagram is a framework diagram of an optional three-phase load operation status monitoring system of an electric energy meter in an embodiment of the present invention. DETAILED DESCRIPTION

[0024] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present invention can be combined with each other without conflict.

[0025] The following detailed description is an exemplary description, which is intended to provide further detailed description of the present invention. Unless otherwise specified, all technical terms used in the present invention have the same meaning as those generally understood by those skilled in the art to which the present invention belongs. The terms used in the present invention are only for describing specific embodiments, and are not intended to limit the exemplary embodiments according to the present invention.

[0026] The method for monitoring the operation status of the three-phase load of the electric energy meter proposed in the embodiment of the present invention is applied to the electric energy meter monitoring system, such as Figure 1 As shown, the system includes a monitoring terminal 100, a plurality of electric energy meters 110 and a server 120, wherein the monitoring terminal 100 and the plurality of electric energy meters 110 are respectively connected to the server 120 through a network, and the monitoring terminal 100 can obtain the three-phase load operation data of the electric energy meters corresponding to the plurality of electric energy meters 110 through the server 120. In this embodiment, the plurality of electric energy meters 110 send their own three-phase load operation data of the electric energy meters to the server 120 at preset time intervals to realize the upload synchronization of the three-phase load operation data of the electric energy meters. The monitoring terminal 200 can interact with the user, and the user can issue corresponding user instructions through the monitoring terminal 200 to realize the management, query and monitoring of the electric energy meters.

[0027] In another embodiment, the monitoring terminal 200 has a direct network connection with multiple power meters 210, and the multiple power meters 210 send their own power meter three-phase load operation data to the monitoring terminal 200 at preset time intervals to achieve upload synchronization of the power meter three-phase load operation data.

[0028] Therefore, in this embodiment, the database in the electric energy meter monitoring system may be in the server 120 or in the monitoring terminal 200 .

[0029] The embodiment of the present invention provides a method for monitoring the operation status of a three-phase load of an electric energy meter, the method comprising:

[0030] S302, obtaining electric energy meter list data, wherein the electric energy meter list data includes electric energy meter numbers corresponding to electric energy meters registered in the electric energy meter monitoring system;

[0031] S304, obtaining the three-phase load operation data of the electric energy meter corresponding to the electric energy meter list data;

[0032] S306, analyzing the three-phase load operation data of the electric energy meter to determine abnormal data in the three-phase load operation data of the electric energy meter.

[0033] In this embodiment, the electric energy meter list data includes list data of the electric energy meter numbers of the electric energy meters, and the electric energy meters in this embodiment have all been registered or bound in the electric energy meter monitoring system. Among them, each electric energy meter number is unique in the electric energy meter monitoring system. The electric energy meter number can be the factory number of the electric energy meter, or it can be generated during the registration or binding process in the electric energy meter monitoring system.

[0034] According to the electric energy meter list data, a query is performed in the database in the electric energy meter monitoring system to obtain the three-phase load operation data of the electric energy meter corresponding to the electric energy meter list data; specifically, the electric energy meter number of the electric energy meter can be used to traverse and query in the database in the electric energy meter monitoring system to obtain the corresponding three-phase load operation data of the electric energy meter.

[0035] After obtaining the three-phase load operation data of the electric energy meter corresponding to the electric energy meter list data, the three-phase load operation data of the electric energy meter can be analyzed through the pre-trained monitoring and analysis model to determine the abnormal data in the three-phase load operation data of the electric energy meter. The monitoring and analysis model includes but is not limited to support vector machine (SVM) and random forest (RandomForest) algorithms, as well as neural network models such as autoencoders, generative adversarial networks (GANs) and graph neural networks (GNNs).

[0036] Through the embodiment of the present invention, the electric energy meter list data is obtained, wherein the electric energy meter list data includes the electric energy meter number corresponding to the electric energy meter registered in the electric energy meter monitoring system; the three-phase load operation data of the electric energy meter corresponding to the electric energy meter list data is obtained; and the three-phase load operation data of the electric energy meter is analyzed to determine the abnormal data in the three-phase load operation data of the electric energy meter. The corresponding three-phase load operation data of the electric energy meter is obtained according to the electric energy meter list data, so as to realize the batch acquisition of the three-phase load operation data of the electric energy meter. Furthermore, by analyzing the three-phase load operation data of the electric energy meter, the abnormal data in the three-phase load operation data of the electric energy meter is determined, and the abnormal state identification of the three-phase load operation data of the electric energy meter is realized, so as to improve the monitoring efficiency of the three-phase load operation of the electric energy meter, thereby solving the technical problem of low efficiency of the monitoring of the three-phase load operation of the electric energy meter in the related technology because the monitoring of the three-phase load operation of the electric energy meter relies on manual operation.

[0037] Optionally, in this embodiment, obtaining the electric energy meter list data includes but is not limited to: receiving an electric energy meter list document corresponding to the electric energy meter list data; verifying the electric energy meter numbers corresponding to the electric energy meters in the electric energy meter list document in turn; if the verification fails, marking the electric energy meter numbers that failed the verification as not found in the electric energy meter list document.

[0038] In this embodiment, an electric energy meter list document corresponding to the electric energy meter list data is received, and the electric energy meter numbers corresponding to the electric energy meters in the electric energy meter list document are checked in turn. If the electric energy meter number exists in the database of the electric energy meter monitoring system, the three-phase load operation data of the electric energy meter corresponding to the electric energy meter number is read directly. If the electric energy meter number does not exist in the database of the electric energy meter monitoring system, the electric energy meter number that fails the check is marked as not found in the electric energy meter list document.

[0039] In some application scenarios of the present embodiment, an electric energy meter list document corresponding to the electric energy meter list data is received, and the electric energy meter numbers corresponding to the electric energy meters in the electric energy meter list document are checked in turn. If the electric energy meter corresponding to the electric energy meter number is in a normal state, the three-phase load operation data of the electric energy meter corresponding to the electric energy meter number is read directly; if the electric energy meter corresponding to the electric energy meter number is in an abnormal state or a disconnected state, the electric energy meter number is marked as the corresponding abnormal state or disconnected state in the electric energy meter list document.

[0040] In a specific application scenario, the energy meter monitoring system is an electricity collection system, which includes a graphical user interface for user interaction. Log in to the electricity collection system in the graphical user interface, enter the administrator account and password, select the energy meter curve data query function, read the energy meter factory number from the specified energy meter list document, enter it into the corresponding position of the electricity collection system, and click query.

[0041] In actual application scenarios, the computer table list document is an Excel table, the electricity meter number is the factory number of the electricity meter, and the above process is a loop process, that is, this process is executed once according to the factory number of each electricity meter until all the factory numbers in the specified Excel table are read.

[0042] Through the above embodiments, it is possible to perform a preliminary screening of electric energy meters and screen out abnormal electric energy meters that are in abnormal states or have not been found.

[0043] Optionally, in this embodiment, the three-phase load operation data of the electric energy meter corresponding to the electric energy meter list data is obtained, including but not limited to: sequentially obtaining the three-phase current data, three-phase voltage data and three-phase power factor data corresponding to the electric energy meter number of each electric energy meter in the electric energy meter list data; and storing the three-phase current data, three-phase voltage data and three-phase power factor data in corresponding arrays respectively.

[0044] In a specific application scenario, the unit for capturing the three-phase load operation data of the electric energy meter in the electric energy meter monitoring system is divided into three modules: a voltage capture module, a current capture module, and a power factor capture module.

[0045] Among them, the voltage capture module is used to capture the three-phase voltage data of the electric energy meter and store it in three arrays of the first phase voltage, the second phase voltage, and the third phase voltage respectively. The current capture module is used to capture the three-phase current data of the electric energy meter and store it in three arrays of the first phase voltage, the second phase voltage, and the third phase voltage respectively. The power factor capture module is used to capture the three-phase power factor data of the electric energy meter and store it in three arrays of the first phase power factor, the second phase power factor, and the third phase power factor respectively.

[0046] Through the above embodiments, the automatic capture of the three-phase load operation data of the electric energy meter can be achieved, so as to improve the capture efficiency of the three-phase load operation data.

[0047] Optionally, in this embodiment, three-phase current data, three-phase voltage data and three-phase power factor data corresponding to the electric energy meter number of each electric energy meter in the electric energy meter list data are obtained in sequence, including but not limited to: if the three-phase current data, the three-phase voltage data and the three-phase power factor data fail to be obtained, then a preset text is stored in the corresponding array, wherein the preset text is used to prompt that the data acquisition fails.

[0048] In this embodiment, if an abnormality in data capture is detected in any module, a repeated capture mechanism is executed, and the capture cycle is repeated for a preset number of times. If the capture is successful within the preset number of times, the corresponding data is stored in the corresponding array; if all captures fail after the preset number of times, a preset text is stored in the corresponding array. For example, the preset text contains the characters "Capture failed!", and this text is used to prompt that data acquisition failed.

[0049] Optionally, in this embodiment, the three-phase load operation data of the electric energy meter is analyzed to determine abnormal data in the three-phase load operation data of the electric energy meter, including but not limited to: through a pre-trained voltage analysis model, the three-phase voltage data in the three-phase load of the electric energy meter is analyzed to determine abnormal voltage data in the three-phase voltage data; wherein the voltage analysis model is obtained by training using a historical electric energy meter three-phase voltage value data set as a training sample.

[0050] In this embodiment, the data in the three arrays of the first phase voltage, the second phase voltage, and the third phase voltage in the three-phase voltage data are analyzed. Whether the three-phase voltage is abnormal is analyzed by using a voltage analysis model, which is a model obtained by fitting the historical electric energy meter three-phase voltage value data set as a training sample.

[0051] The fitting method is: through the KS test (Kolmogorov-Smirnov Test) method, the normality test is performed according to the maximum difference between the cumulative distribution function of the historical voltage value data set and the theoretical distribution, and the data within the 95% confidence interval of the data set is obtained as the normal voltage value, and the data exceeding the 95% confidence interval is taken as the abnormal voltage value. The specific implementation method is:

[0052] According to the two assumptions of the KS test in the normality test:

[0053] H0: The sample comes from a normal distribution; H1: The sample does not come from a normal distribution.

[0054] Assume that the existing population X, the samples are x1, x2, x3...xn, first determine the empirical distribution function S(x) of the data, S(x) is a step function, and the calculation formula is:

[0055]

[0056] Among them, n is the total number of samples, and S(x) is the cumulative probability of the samples.

[0057] Calculate the cumulative probability of F(x0), the calculation formula is:

[0058]

[0059] The test statistic is:

[0060] D=sup x |S(x)-F(x0)

[0061] The distribution of D is the same for all continuous distributions f(x0) under the null hypothesis, so it has nothing to do with the distribution. In actual operations, since s(x) is a step function, only discrete values ​​are removed. Considering the jump problem, if there are n observations, the following statistics can be used to replace D:

[0062]

[0063] When p<α, reject the null hypothesis.

[0064] The normality of the data set distribution is tested through the above KS test process. If the test result is H1, it means that the data set conforms to the normal distribution. Further, by querying the normal distribution table, the data corresponding to the 95% confidence interval of the data set is determined as the normal voltage value to obtain the normal voltage value interval.

[0065] The voltage value data within the normal voltage value range is regarded as the normal value, and the data in the three arrays of the first phase voltage, the second phase voltage, and the third phase voltage are tested one by one, and the data exceeding this range is regarded as the abnormal voltage value.

[0066] Through the above embodiment, the three-phase voltage data in the three-phase load of the electric energy meter is analyzed through the pre-trained voltage analysis model to determine the abnormal voltage data in the three-phase voltage data, so as to achieve accurate positioning of the abnormal voltage data.

[0067] Optionally, in this embodiment, the three-phase load operation data of the electric energy meter is analyzed to determine abnormal data in the three-phase load operation data of the electric energy meter, including but not limited to: if the three-phase current data in the three-phase load of the electric energy meter contains negative current, zero current and load imbalance, the three-phase current data is determined to be abnormal current data; wherein, when the percentage difference between the maximum current value and the minimum current value in the three-phase current data is greater than a preset threshold, the three-phase current data is determined to be abnormal current data.

[0068] In this embodiment, the three-phase current data includes data in three arrays of the first phase current, the second phase current, and the third phase current. In the embodiment of the present invention, the three-phase current is analyzed by using a current analysis model to determine whether it is abnormal. Common current abnormalities include: negative current, zero current, and three-phase imbalance (see Table 1).

[0069] Table 1 Abnormal current conditions and specific manifestations

[0070] Abnormal current Specific manifestations Negative current The current is negative 0 current Current appears 0 value Three-phase unbalance IPVR>10%

[0071] The load imbalance rate refers to the percentage difference between the maximum current value and the minimum current value in the three-phase current. When the three-phase current imbalance rate exceeds the preset threshold, the stability of the power system will be affected, which may cause failure and damage to power equipment, thereby affecting the power supply quality. Therefore, the three-phase current needs to be monitored and controlled during the operation of the power system to ensure its stability and safety.

[0072] In a specific application scenario, the allowable range of three-phase current imbalance is set to a load imbalance rate of no more than 10%. The load imbalance rate refers to the percentage difference between the maximum current value and the minimum current value in the three-phase current. When the three-phase current imbalance rate exceeds 10%, the stability of the power system will be affected.

[0073] The calculation method of load imbalance rate is as follows:

[0074]

[0075]

[0076] Among them, I a , I b , I c Represent the three-phase current, max(I a , I b , I c ) represents the maximum value of the three-phase current, min(I a , I b , I c ) represents the minimum value of the three-phase current, I avg Represents the average value of the three-phase current. If IVIR>10%, it means that the three-phase current unbalance rate exceeds 10%, and this group of current values ​​is considered abnormal.

[0077] The data in the three arrays of the first phase current, the second phase current, and the third phase current are divided into 0-24 groups according to time, and each group is determined one by one whether negative current, zero current, or three-phase imbalance occurs. If so, the group of data is marked as abnormal current data. Through this embodiment, abnormal current data can be determined quickly and accurately.

[0078] Optionally, in this embodiment, the three-phase power factor data in the three-phase load of the electric energy meter includes data in three arrays of the first-phase power factor, the second-phase power factor and the third-phase power factor, wherein the three-phase load operation data of the electric energy meter is analyzed to determine the abnormal data in the three-phase load operation data of the electric energy meter, including but not limited to: testing the first-phase power factor, the second-phase power factor and the third-phase power factor one by one, and determining that the power factor data exceeding the preset power factor threshold is abnormal power factor data.

[0079] Specifically, in this embodiment, the three-phase power data includes data in three arrays of the first phase power factor, the second phase power factor and the third phase power factor, and the power factor analysis model is used to analyze whether the three-phase power factor is abnormal.

[0080] In this embodiment, the power factor is taken as follows:

[0081] 1. For power users with high voltage power supply of 35kV and above, after considering reactive power compensation, the power factor of the primary side of the transformer should not be lower than 0.95 during peak load, and the power factor should not be higher than 0.95 during low load.

[0082] 2. For power users with 100kVA and above and 10kV power supply, the power factor should be above 0.95.

[0083] 3. The power factor of other electricity users is above 0.85.

[0084] Therefore, the power factor value data that meets the above specified range is taken as a normal value, and the data in the three arrays of the first phase power factor, the second phase power factor and the third phase power factor are tested one by one, and the data exceeding the specified range is taken as abnormal power factor data. Through this embodiment, the abnormal power factor data can be determined quickly and accurately.

[0085] Optionally, in this embodiment, after analyzing the three-phase load operation data of the electric energy meter to determine abnormal data in the three-phase load operation data of the electric energy meter, it also includes but is not limited to: if there is abnormal data in the three-phase load operation data of the electric energy meter, recording it in the electric energy meter list document; and / or, sending alarm information corresponding to the abnormal data to a preset terminal.

[0086] In a specific application scenario, the abnormal value data of the three-phase voltage, current and power factor of the target electric energy meter within a preset time period can be obtained. According to the obtained abnormal value judgment result, the judgment rule is as follows: If the number of abnormal values ​​of a certain data (first phase current, second phase current, third phase current, first phase voltage, second phase voltage, third phase voltage, first phase power factor, second phase power factor, third phase power factor) of a certain electric energy meter within a preset time period is ≥5, then the data is judged to be abnormal and recorded in the specified electric energy meter list document.

[0087] In this embodiment, when the electric energy meter has abnormal data, the alarm information corresponding to the electric energy meter with abnormal data is sent to the monitoring terminal or the preset communication terminal. The alarm information includes but is not limited to SMS, email and notification information corresponding to the application software.

[0088] Through the embodiment of the present invention, the electric energy meter list data is obtained, wherein the electric energy meter list data includes the electric energy meter number corresponding to the electric energy meter registered in the electric energy meter monitoring system; the three-phase load operation data of the electric energy meter corresponding to the electric energy meter list data is obtained; and the three-phase load operation data of the electric energy meter is analyzed to determine the abnormal data in the three-phase load operation data of the electric energy meter. The corresponding three-phase load operation data of the electric energy meter is obtained according to the electric energy meter list data, so as to realize the batch acquisition of the three-phase load operation data of the electric energy meter. Furthermore, by analyzing the three-phase load operation data of the electric energy meter, the abnormal data in the three-phase load operation data of the electric energy meter is determined, and the abnormal state identification of the three-phase load operation data of the electric energy meter is realized, so as to improve the monitoring efficiency of the three-phase load operation of the electric energy meter, thereby solving the technical problem of low efficiency of the monitoring of the three-phase load operation of the electric energy meter in the related technology because the monitoring of the three-phase load operation of the electric energy meter relies on manual operation.

[0089] It is known from common technical knowledge that the present invention can be implemented by other embodiments that do not deviate from its spirit or essential features. Therefore, the above disclosed embodiments are only illustrative in all respects and are not exclusive. All changes within the scope of the present invention or within the scope equivalent to the present invention are included in the present invention.

[0090] In an embodiment of the present invention, a three-phase load operation monitoring device for an electric energy meter is also provided. Figure 4 As shown, the device comprises:

[0091] A first acquisition module 40 is used to acquire electric energy meter list data, wherein the electric energy meter list data includes electric energy meter numbers corresponding to electric energy meters registered in the electric energy meter monitoring system;

[0092] The second acquisition module 42 is used to acquire the three-phase load operation data of the electric energy meter corresponding to the electric energy meter list data;

[0093] The analysis module 44 is used to analyze the three-phase load operation data of the electric energy meter to determine abnormal data in the three-phase load operation data of the electric energy meter.

[0094] Through the embodiment of the present invention, the electric energy meter list data is obtained, wherein the electric energy meter list data includes the electric energy meter number corresponding to the electric energy meter registered in the electric energy meter monitoring system; the three-phase load operation data of the electric energy meter corresponding to the electric energy meter list data is obtained; and the three-phase load operation data of the electric energy meter is analyzed to determine the abnormal data in the three-phase load operation data of the electric energy meter. The corresponding three-phase load operation data of the electric energy meter is obtained according to the electric energy meter list data, so as to realize the batch acquisition of the three-phase load operation data of the electric energy meter. Furthermore, by analyzing the three-phase load operation data of the electric energy meter, the abnormal data in the three-phase load operation data of the electric energy meter is determined, and the abnormal state identification of the three-phase load operation data of the electric energy meter is realized, so as to improve the monitoring efficiency of the three-phase load operation of the electric energy meter, thereby solving the technical problem of low efficiency of the monitoring of the three-phase load operation of the electric energy meter in the related technology because the monitoring of the three-phase load operation of the electric energy meter relies on manual operation.

[0095] In an embodiment of the present invention, a three-phase load operation monitoring system of an electric energy meter is also proposed. Figure 5 As shown, the system comprises:

[0096] An input module 50, used to obtain electric energy meter list data, wherein the electric energy meter list data includes electric energy meter numbers corresponding to electric energy meters registered in the electric energy meter monitoring system;

[0097] A capture module 52, used for acquiring the three-phase load operation data of the electric energy meter corresponding to the electric energy meter list data;

[0098] The analysis module 54 is used to analyze the three-phase load operation data of the electric energy meter to determine abnormal data in the three-phase load operation data of the electric energy meter.

[0099] Optionally, in this embodiment, the input module 50 is used to:

[0100] Receiving an electric energy meter list document corresponding to the electric energy meter list data;

[0101] Checking the electric energy meter numbers corresponding to the electric energy meters in the electric energy meter list document in turn;

[0102] In the case of a verification failure, the number of the electric energy meter that failed the verification is marked as not found in the electric energy meter list document.

[0103] Optionally, in this embodiment, the grabbing module 52 is used to:

[0104] Sequentially obtain the three-phase current data, three-phase voltage data and three-phase power factor data corresponding to the electric energy meter number of each electric energy meter in the electric energy meter list data;

[0105] The three-phase current data, three-phase voltage data and three-phase power factor data are stored in corresponding arrays respectively.

[0106] Optionally, in this embodiment, the grabbing module 52 is further used for:

[0107] If the three-phase current data, the three-phase voltage data and the three-phase power factor data fail to be acquired, a preset text is stored in the corresponding array, wherein the preset text is used to prompt the data acquisition failure.

[0108] Optionally, in this embodiment, the analysis module 54 is used to:

[0109] Analyzing the three-phase voltage data in the three-phase load of the electric energy meter by using a pre-trained voltage analysis model to determine abnormal voltage data in the three-phase voltage data;

[0110] The voltage analysis model is obtained by training with a historical electric energy meter three-phase voltage value data set as a training sample.

[0111] Optionally, in this embodiment, the analysis module 54 is used to: if the three-phase current data in the three-phase load of the electric energy meter contains negative current, zero current and load imbalance, determine that the three-phase current data is abnormal current data;

[0112] When the percentage difference between the maximum current value and the minimum current value in the three-phase current data is greater than a preset threshold, the three-phase current data is determined to be abnormal current data.

[0113] Optionally, in this embodiment, the three-phase power factor data in the three-phase load of the electric energy meter includes data in three arrays of the first phase power factor, the second phase power factor and the third phase power factor, wherein, optionally, in this embodiment, the analysis module 54 is used to:

[0114] The first phase power factor, the second phase power factor and the third phase power factor are tested one by one to determine that the power factor data exceeding a preset power factor threshold is abnormal power factor data.

[0115] Optionally, in this embodiment, an alarm module is also included, and the module is used to:

[0116] After analyzing the three-phase load operation data of the electric energy meter to determine abnormal data in the three-phase load operation data of the electric energy meter, if there is abnormal data in the three-phase load operation data of the electric energy meter, recording it in the electric energy meter list document; and / or,

[0117] Send the alarm information corresponding to the abnormal data to the preset terminal.

[0118] Through the embodiment of the present invention, the electric energy meter list data is obtained, wherein the electric energy meter list data includes the electric energy meter number corresponding to the electric energy meter registered in the electric energy meter monitoring system; the three-phase load operation data of the electric energy meter corresponding to the electric energy meter list data is obtained; and the three-phase load operation data of the electric energy meter is analyzed to determine the abnormal data in the three-phase load operation data of the electric energy meter. The corresponding three-phase load operation data of the electric energy meter is obtained according to the electric energy meter list data, so as to realize the batch acquisition of the three-phase load operation data of the electric energy meter. Furthermore, by analyzing the three-phase load operation data of the electric energy meter, the abnormal data in the three-phase load operation data of the electric energy meter is determined, and the abnormal state identification of the three-phase load operation data of the electric energy meter is realized, so as to improve the monitoring efficiency of the three-phase load operation of the electric energy meter, thereby solving the technical problem of low efficiency of the monitoring of the three-phase load operation of the electric energy meter in the related technology because the monitoring of the three-phase load operation of the electric energy meter relies on manual operation.

[0119] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0120] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0121] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0122] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0123] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A method for monitoring the operation of a three-phase load of an electric energy meter, characterized in that: The method comprises: Acquire electric energy meter list data, wherein the electric energy meter list data includes electric energy meter numbers corresponding to electric energy meters registered in the electric energy meter monitoring system; Obtaining the three-phase load operation data of the electric energy meter corresponding to the electric energy meter list data; The three-phase load operation data of the electric energy meter is analyzed to determine abnormal data in the three-phase load operation data of the electric energy meter.

2. The method according to claim 1, characterized in that The step of obtaining the electric energy meter list data includes: Receiving an electric energy meter list document corresponding to the electric energy meter list data; Checking the electric energy meter numbers corresponding to the electric energy meters in the electric energy meter list document in turn; In the case of a verification failure, the number of the electric energy meter that failed the verification is marked as not found in the electric energy meter list document.

3. The method according to claim 1, characterized in that The obtaining of the three-phase load operation data of the electric energy meter corresponding to the electric energy meter list data includes: Sequentially obtain the three-phase current data, three-phase voltage data and three-phase power factor data corresponding to the electric energy meter number of each electric energy meter in the electric energy meter list data; The three-phase current data, three-phase voltage data and three-phase power factor data are stored in corresponding arrays respectively.

4. The method according to claim 3, characterized in that The step of sequentially acquiring the three-phase current data, the three-phase voltage data, and the three-phase power factor data corresponding to the electric energy meter number of each electric energy meter in the electric energy meter list data includes: If the three-phase current data, the three-phase voltage data and the three-phase power factor data fail to be acquired, a preset text is stored in the corresponding array, wherein the preset text is used to prompt the data acquisition failure.

5. The method according to claim 1, characterized in that The analyzing the three-phase load operation data of the electric energy meter to determine abnormal data in the three-phase load operation data of the electric energy meter includes: Analyzing the three-phase voltage data in the three-phase load of the electric energy meter by using a pre-trained voltage analysis model to determine abnormal voltage data in the three-phase voltage data; The voltage analysis model is obtained by training with a historical electric energy meter three-phase voltage value data set as a training sample.

6. The method according to claim 1, characterized in that The analyzing the three-phase load operation data of the electric energy meter to determine abnormal data in the three-phase load operation data of the electric energy meter includes: If the three-phase current data in the three-phase load of the electric energy meter contains negative current, zero current and load imbalance, the three-phase current data is determined to be abnormal current data; When the percentage difference between the maximum current value and the minimum current value in the three-phase current data is greater than a preset threshold, the three-phase current data is determined to be abnormal current data.

7. The method according to claim 1, characterized in that The three-phase power factor data in the three-phase load of the electric energy meter includes data in three arrays of the first phase power factor, the second phase power factor and the third phase power factor, wherein: The analyzing the three-phase load operation data of the electric energy meter to determine abnormal data in the three-phase load operation data of the electric energy meter includes: The first phase power factor, the second phase power factor and the third phase power factor are tested one by one to determine that the power factor data exceeding a preset power factor threshold is abnormal power factor data.

8. The method according to claim 2, characterized in that: After analyzing the three-phase load operation data of the electric energy meter to determine abnormal data in the three-phase load operation data of the electric energy meter, the method further includes: If there is abnormal data in the three-phase load operation data of the electric energy meter, record it in the electric energy meter list document; and / or, Send the alarm information corresponding to the abnormal data to the preset terminal.

9. A three-phase load operation monitoring device for an electric energy meter, characterized in that: The device comprises: A first acquisition module is used to acquire electric energy meter list data, wherein the electric energy meter list data includes electric energy meter numbers corresponding to electric energy meters registered in the electric energy meter monitoring system; A second acquisition module is used to acquire the three-phase load operation data of the electric energy meter corresponding to the electric energy meter list data; The analysis module is used to analyze the three-phase load operation data of the electric energy meter to determine abnormal data in the three-phase load operation data of the electric energy meter.

10. A three-phase load operation monitoring system for an electric energy meter, characterized in that: The system comprises: An input module, used for acquiring electric energy meter list data, wherein the electric energy meter list data includes electric energy meter numbers corresponding to electric energy meters registered in the electric energy meter monitoring system; A capture module, used for acquiring the three-phase load operation data of the electric energy meter corresponding to the electric energy meter list data; The analysis module is used to analyze the three-phase load operation data of the electric energy meter to determine abnormal data in the three-phase load operation data of the electric energy meter.