Method and device for optimizing configuration of electric energy replacement equipment based on grid carrying capacity
By optimizing the number and location of the electrical energy substitution equipment, the problem of unsatisfactory power substitution caused by few influencing factors in the prior art is solved, and efficient energy allocation and stable power grid operation are achieved.
Patent Information
- Application Number
- CN202411577854.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-07
- Publication Date
- 2025-03-25
- Estimated Expiration
- 2044-11-07
AI Technical Summary
The existing electrical energy alternatives consider few influencing factors, resulting in the inability to achieve efficient energy allocation.
By obtaining historical load information, environmental factor information, electrical energy substitute equipment parameter information and building heat storage parameter information on the demand side, the power distribution system uses the objective function of maximizing load power, and processes this information to generate the number and location information of the power substitute equipment, and optimize the configuration in the power distribution system.
The accuracy of the number and location of the electrical energy substitution equipment is improved, and a more ideal electrical energy substitution solution is obtained, efficient energy allocation is achieved, and energy consumption is reduced while ensuring the stable operation of the power grid.