Bridge arm combined chain bucket ship unloader

By adopting a combined bridge arm design and a stable triangular frame structure in the chain bucket unloader, the problem of overload and maintenance costs of L-shaped chain bucket unloader equipment is solved, and efficient, energy-saving and environmentally friendly unloading operations are achieved. , adapt to different water levels and ship movements.

CN119079598APending Publication Date: 2024-12-06SHANGHAI MAIRUIEN OCEAN ENG TECH CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202310247887.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-03-15
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

During the unloading of bulk bulk cargo, the equipment is overloaded, worn and maintained due to the mechanical mechanism of lateral material extraction, and the adaptability to docks with large winds and waves along the coast is weak, and the production efficiency has reached The limit is hard to make any breakthrough.

Method used

A bridge-arm combined chain bucket ship unloader was designed, using parallelogram boom linkage mechanism and trolley running bridge-type load-bearing structure components to realize the forward efficient continuous material excavation of chain buckets, combining soft landing universal wheels and wire ropes. The winding system, the lifting arm can be lifted and swung sideways, forming a stable triangular frame structure to adapt to different water levels and ship movements.

Benefits of technology

It effectively reduces the overload and wear of the equipment, improves the reliability and production efficiency of the equipment, reduces maintenance costs, meets higher environmental protection requirements, and achieves efficient and energy-saving unloading operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119079598A_ABST
    Figure CN119079598A_ABST
Patent Text Reader

Abstract

The invention relates to a bridge arm combined type chain bucket ship unloader which comprises a portal frame machine base capable of walking along a wharf track. The parallelogram arm frame connecting rod mechanism is arranged on the portal frame base; the trolley running bridge type bearing structure is hinged with an upper hinge point and a lower hinge point at the front end of the parallelogram arm frame connecting rod mechanism and consists of a front pull rod, a rear pull rod, a main beam and a rear extending beam; the running trolley can move back and forth along tracks of the main beam and the rear extending beam; the chain bucket material taking mechanism comprises a chain bucket lifting arm which is installed on the running trolley and can ascend and descend vertically, a follow-up material receiving conveyor assembly and a transfer conveyor assembly, wherein the follow-up material receiving conveyor assembly and the transfer conveyor assembly are installed on a discharging opening in the upper portion of the chain bucket lifting arm. Compared with the prior art, the beneficial effects of environmental protection and energy conservation of an existing L-shaped chain bucket ship unloader are kept and exceeded, the problem that in the prior art, the reliability and efficiency of equipment are improved is thoroughly solved, and the technology development of bulk cargo ship unloaders is positively promoted.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of chain bucket ship unloading equipment and relates to a bridge arm combined chain bucket ship unloader. Background Art

[0002] At present, the unloading of bulk cargoes such as coal and ore is mainly undertaken by two types of machines: bridge-type grab ship unloaders and a small number of L-type chain bucket ship unloaders. The characteristics of the bridge-type grab ship unloader are that it is applicable to a wide range of ship types and is simple to maintain, but it is not environmentally friendly and has high energy consumption. The characteristics of the L-type chain bucket ship unloader are good environmental performance and slightly higher efficiency than the grab ship unloader. The disadvantage is that due to the mechanical mechanism of lateral material collection, key mechanisms and components are prone to overload and wear, resulting in high maintenance costs; the adaptability to ship movement at coastal docks with large winds and waves is weak; production efficiency has basically reached its limit, and it is difficult to achieve a major breakthrough in production efficiency.

[0003] The existing L-type chain bucket ship unloader carries out planar excavation of materials through the combination of the rotation of the L-type chain bucket material head at the lower end of the chain bucket lifting arm and the radial movement of the chain bucket along the chain. Due to the distribution deviation of the mechanical properties of the material, it is very easy to cause the material to be squeezed and piled up by the side wall of the chain bucket during the excavation process, causing the entire rotating mechanism to overload and the chain bucket lifting arm to twist too much, resulting in aggravated wear of key components such as the chain and sprocket. This is also the main reason for the high maintenance cost of the existing L-type chain bucket ship unloader.

[0004] The L-type chain bucket reclaimer requires a certain response time because the overflow action of the cylinder requires a certain response time. During the berthing operation, the ups and downs of the ship are affected by the waves of the water body, which is relatively complex. Especially in some coastal docks with strong winds and waves, it is easy for the response of the hydraulic cylinder to be difficult to keep up with the movement speed of the ship, resulting in excessive lifting force at the L-type reclaimer head. Not only will it have a destructive effect on the reclaimer and the cylinder, but it will also be transmitted to the slewing support of the chain bucket ship unloader through the structure, and will also have a destructive effect on the slewing support and pinion gear. Summary of the invention

[0005] The purpose of the present invention is to provide a bridge arm combined chain bucket ship unloader, which not only maintains and surpasses the advantages of environmental protection and energy saving of the existing L-type chain bucket ship unloader, but also thoroughly solves the shortcomings of the existing technology, and has a positive role in promoting the technical development of bulk cargo ship unloaders.

[0006] The purpose of the present invention can be achieved by the following technical solutions:

[0007] A bridge arm combined chain bucket ship unloader, comprising:

[0008] A gantry base that can travel along the dock track;

[0009] A parallelogram arm connecting rod mechanism arranged on the gantry base is composed of a front end connecting rod, an upper pull rod and a lower support rod, and upper and lower hinged supports installed on the gantry base;

[0010] A trolley running bridge-type bearing structure component and a main beam non-working lifting mechanism respectively hinged to the upper and lower hinge points at the front end of the parallelogram arm connecting rod mechanism;

[0011] A running trolley capable of reciprocating back and forth along the trolley running bridge-type bearing structure assembly;

[0012] The chain bucket material taking mechanism comprises a chain bucket lifting arm installed on the running trolley and capable of being raised and lowered, a follow-up material receiving conveyor assembly installed at the upper discharge port position of the chain bucket lifting arm, and a transfer conveyor assembly for receiving materials delivered by the follow-up material receiving conveyor assembly and transferring and discharging the materials.

[0013] Furthermore, the gantry base is in the form of an A-shaped gantry, which is composed of sea-side columns, land-side columns and a lower crossbeam.

[0014] Furthermore, the rear end upper and lower fixed hinge points (i.e., rear end hinged supports) of the parallelogram arm linkage mechanism are arranged on the land side columns.

[0015] Furthermore, the sea side main beam and the land side rear extension beam in the trolley running bridge bearing structure assembly are hinged; the front pull rod adopts a segmented short pull rod connection. In the non-working state, the chain bucket lifting arm can move with the running trolley to the parking position on the rear extension beam, and the main beam can be folded upward.

[0016] Furthermore, the front part of the land side rear extension beam is hinged to the lower hinge point of the front end connecting rod, and the rear part is hinged to the upper hinge point of the front end connecting rod through the rear tie rod, so that the rear extension beam, the front end connecting rod and the rear tie rod form a stable triangular frame structure.

[0017] Furthermore, a foldable front pull rod formed by hinged short pull rod sections is provided between the top of the front end connecting rod and the end position of the sea side main beam. When not in working state, the chain bucket lifting arm can move with the running trolley to the parking position on the land side rear extension beam, and the sea side main beam can be folded upward.

[0018] Furthermore, the chain bucket is composed of a chain and a plurality of buckets mounted on the chain, and is driven by a sprocket arranged on a chain bucket lifting arm. A chain bucket tensioning mechanism is also arranged on the chain bucket lifting arm.

[0019] Furthermore, a soft-landing universal wheel is provided at the bottom end of the chain bucket lifting arm.

[0020] Furthermore, the chain bucket lifting arm is lifted and lowered on the running trolley through a wire rope winding system, and a lateral swing hinge is provided between the chain bucket lifting arm and the running trolley.

[0021] Furthermore, the upper end of the follow-up material receiving conveyor assembly is hinged to the chain bucket lifting arm so that its feed port is directly opposite to the discharge chute position of the chain bucket arm, and the lower end is supported on the track of the transfer conveyor assembly by rollers.

[0022] Furthermore, the lower end of the transfer conveyor assembly is hinged on a gantry directly above the wharf conveying equipment, and the upper end is supported on rollers at the sea side end of the main beam.

[0023] Furthermore, the transfer conveyor assembly is also provided with a movable track along its axial direction.

[0024] Compared with the prior art, the present invention has the following advantages:

[0025] (1) The bridge-arm combined chain bucket ship unloader realizes the reasonable mechanical function of the chain bucket to dig materials in a positive and efficient manner through the trolley-operated bridge-type bearing structure component composed of the main beam, rear extension beam, front pull rod and rear pull rod, and the chain bucket material-retrieving mechanism that moves back and forth with the trolley. It avoids the unfavorable stress state of the L-type chain bucket ship unloader when it rotates and digs materials sideways, and solves the difficulties of the L-type chain bucket ship unloader in equipment reliability, maintenance cost and significant efficiency improvement. The parallelogram arm connecting rod mechanism realizes the overall lifting and lowering of the trolley-operated bridge-type bearing structure component hinged at its front end. During the lifting and lowering process, the main beam and the rear extension beam always remain horizontal, so that the lifting and lowering of the beam can better ensure that the chain bucket ship unloader adapts to the unloading requirements of different water level changes and ship drafts, making the unloading operation more efficient.

[0026] (2) The bridge arm combined chain bucket ship unloader is not only highly efficient and energy-saving, and realizes the purpose of positive excavation by the chain bucket, but also has less disturbance to the materials during the excavation process, more stable material flow, and less dust in the cabin; the transportation process is basically fully enclosed, which can meet higher environmental protection requirements and comply with the national requirements for sustainable development. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0028] Figure 2 It is a schematic diagram of the parallelogram arm connecting rod mechanism of the present invention;

[0029] Figure 3 Schematic diagram of the bridge-type bearing structure assembly of the present invention

[0030] Figure 4 It is a schematic diagram of the lower part of the chain bucket arm of the present invention when taking materials;

[0031] Figure 5 This is a schematic diagram of the bridge arm combined chain bucket ship unloader in the low position working state;

[0032] Figure 6 This is a schematic diagram of the bridge arm combined chain bucket ship unloader in the unloading state;

[0033] Figure 7 This is a schematic diagram of the bridge arm combined chain bucket ship unloader in non-working state;

[0034] Description of the markings in the figure:

[0035] 1-chain bucket lifting arm, 101-chain bucket, 102-sea side rake plate, 103-rake amplitude variation mechanism, 104-tensioning mechanism, 105-land side rake plate, 106-soft landing universal wheel, 2-trolley running bridge bearing structure assembly, 201-main beam, 202-rear extension beam, 203-front pull rod, 204-rear pull rod, 3-running trolley, 4-follow-up material receiving conveyor assembly, 5-transfer conveyor assembly, 6-parallelogram arm connecting rod mechanism, 601-front end connecting rod, 602-upper pull rod, 603-land side column, 604-lower support rod, 7-support frame, 8-arm pitch drive system, 9-beam non-working tilt drive system, 10-machine room. DETAILED DESCRIPTION

[0036] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is implemented based on the technical solution of the present invention, and provides a detailed implementation method and specific operation process, but the protection scope of the present invention is not limited to the following embodiments.

[0037] In the following implementation manners or examples, unless otherwise specified, functional components or structures are conventional components or conventional structures used in the art to achieve corresponding functions.

[0038] In order to better ensure that the chain bucket ship unloader can adapt to different water level changes and unloading draft requirements, the present invention provides a bridge arm combined chain bucket ship unloader, the structure of which can be seen in Figures 1 to 7 As shown, including:

[0039] Mast frame base 7;

[0040] The parallelogram arm linkage mechanism 6 disposed on the gantry support 7 is composed of a front end link 601, an upper pull rod 602, a lower support rod 604, and a rear end upper and lower hinge supports fixed on a land side column 603 of the gantry base;

[0041] A trolley running bridge support structure assembly hinged to the upper and lower hinge points at the front end of the arm connecting rod mechanism 6;

[0042] A running trolley 3 capable of reciprocating back and forth along the bridge-type supporting structure assembly;

[0043] The chain bucket material taking mechanism includes a chain bucket lifting arm 1 installed on the running trolley 3 and capable of being raised and lowered, a chain bucket 101 installed on the chain bucket lifting arm 1 and used for circulating material taking, a follow-up material receiving conveyor assembly 4 arranged at the upper position of the chain bucket lifting arm 1 and used for receiving the material taken by the chain bucket 101, and a transfer conveyor assembly 5 for receiving the material delivered by the follow-up material receiving conveyor assembly 4 and transferring and discharging it.

[0044] In some specific implementations, please refer to Figure 2 As shown in the figures, the gantry base 7 is an A-shaped gantry, which is composed of sea-side columns, land-side columns 603 and a lower crossbeam. This structural form is stable and provides a reasonable structural support basis for the lifting and lowering of the trolley running bridge-type bearing structure components and the movement of the parallelogram arm connecting rod mechanism 6.

[0045] In some specific embodiments, the load-bearing beam part of the trolley running bridge-type load-bearing structure assembly is formed by hingedly connecting the main beam 201 on the sea side and the rear extension beam 202 on the land side, and the front pull rod 203 adopts a short pull rod segmented hinge form. When not in working state, the main beam 201 can be folded upwards.

[0046] In a more specific embodiment, the front portion of the land-side rear extension beam 202 is fixedly hinged on the same hinge axis of the front end connecting rod 601 and the lower support rod 604, the rear end of the land-side rear extension beam 202 is hinged to the rear pull rod 204, and is hinged through the rear pull rod 204 and the hinge axis of the front end connecting rod 601 and the upper pull rod 602, so that the land-side rear extension beam 202, the front end connecting rod 601 and the rear pull rod 204 form a stable triangular frame structure.

[0047] In a more specific embodiment, a foldable front tie rod 203 formed by hingedly connecting short tie rods in sections is arranged between the upper hinge shaft of the front end link 601 and the front end of the main beam 201 .

[0048] In some specific embodiments, the chain bucket is composed of a chain and a plurality of buckets mounted on the chain, and is driven by a sprocket provided on the chain bucket lifting arm 1 . The chain bucket lifting arm 1 is also provided with a tensioning mechanism 104 for the chain.

[0049] In some specific implementations, a soft-landing universal wheel 106 is further provided at the bottom end of the chain bucket lifting arm 1 .

[0050] In some specific implementations, the chain bucket lifting arm 1 is lifted and lowered on the running trolley 3 through a wire rope winding system, and a lateral swing hinge is also provided between the chain bucket lifting arm 1 and the running trolley 3 .

[0051] In some specific embodiments, the upper part of the follower material receiving conveyor assembly 4 is hinged to the chain bucket lifting arm 1, its feed port faces the chute discharge position of the chain bucket 101, and the lower part is supported by rollers and the track on the transfer conveyor assembly 5.

[0052] In a more specific embodiment, the lower portion of the transfer conveyor assembly 5 is hinged to a gantry base facing the wharf conveying equipment, and the upper portion is supported on rollers on the offshore side of the main beam 201 .

[0053] In a more specific embodiment, the upper portion of the transfer conveyor assembly 5 is further provided with a movable track along its axial direction, and a roller is provided at the lower end of the follow-up material receiving conveyor assembly 4 and can reciprocate on the movable track.

[0054] The above embodiments may be implemented individually or in any combination of two or more.

[0055] The above implementation is described in more detail below in conjunction with specific examples.

[0056] Embodiment 1:

[0057] Combination Figures 1 to 7 As shown, this embodiment provides a bridge-arm combined chain bucket ship unloader, which is composed of a parallelogram arm connecting rod mechanism 6, a trolley running bridge-type bearing structure assembly, a running trolley 3, a chain bucket material taking mechanism, a follow-up material receiving conveyor assembly 4, a transfer conveyor assembly 5, an arm pitching drive system 8, a beam non-working lifting drive system 9 and a machine room 10 and other main devices, wherein the trolley running bridge-type bearing structure assembly 2 is composed of a main beam 201, a rear extension beam 202, a segmented foldable front tie rod 203 and a rear tie rod 204, and is hinged to the upper and lower hinge points of the front end of the arm connecting rod mechanism. The main beam 201 and the rear extension beam 202 are hinged in a manner similar to the front and rear beams of the bridge grab ship unloader, and the hinge points of the two are located above the beam section. In this way, when the beam assembly is horizontally unfolded in the working state, the main beam 201 and the rear extension beam 202 can be fixed and constrained in the horizontal direction by the upper eccentric hinge, and the two sides of the hinge point can provide unidirectional bending moment transmission, and the sea side is supported by the front tie rod 203; the main beam 201 in the non-working state can be pulled upward by the main beam 201 lifting mechanism driving system 9, and the segmented hinged front tie rod 203 is naturally folded. The parallelogram arm connecting rod mechanism 6 is composed of the upper and lower hinge supports located on the land side column 603 of the gantry machine base after the front end connecting rod 601, the upper tie rod 602 and the lower support rod 604.

[0058] The upper and lower hinge points at the front end of the arm link mechanism 6 can be realized through the arm pitch drive system 8, and the trolley running bridge-type bearing structure assembly hinged thereon can be driven to move horizontally and lift, so that the running trolley 3 can move on the track of the horizontal main beam 201 and the rear extension beam 202, and drive the chain bucket lifting arm 1 installed on the running trolley 3 to make a horizontal straight reciprocating continuous digging movement in the cabin along the ship width direction, so as to achieve the purpose of the chain bucket forward digging materials. The lifting and lowering of the main beam 201 and the rear extension beam 202 can better ensure that the chain bucket ship unloader can adapt to the unloading requirements of the water level and the changes in the draft of the ship during the unloading process; effectively reduce the length requirement of the chain bucket lifting arm 1 and reduce the deadweight of the ship unloader.

[0059] In this embodiment, it also includes: a gantry base 7 as the foundation of the whole machine, which adopts a stable A-shaped gantry structure, which is specifically composed of sea-side columns, land-side columns 603 and a lower crossbeam, etc., which provides a stable structural support for the lifting and lowering of the beam, and provides reliable motion constraints for the pitch motion of the parallelogram arm connecting rod mechanism.

[0060] In this embodiment, a running trolley 3 is also included. The running trolley 3 moves horizontally back and forth on the main beam 201, driving the chain bucket lifting arm 1 to reciprocate in the cabin to achieve the purpose of forward excavation of the chain bucket, and is the main working mechanism of the ship unloader. The running trolley 3 can be driven by a conventional wire rope traction mechanism in the field, and the driving force of the mechanism can be set according to the specific type of cargo to be operated. When the excavation resistance is greater than the set value, the driving device with a safe wave protection system automatically unloads and slides, and the trolley stops or retreats in the reverse direction to ensure the safety of the chain bucket ship unloader. Once the resistance returns to below the normal value, the unloading trolley continues to advance and retrieve the material.

[0061] In this embodiment, a follow-up material receiving conveyor assembly 4 is also included. This embodiment adopts a material receiving conveyor commonly used in the field, whose upper end is hinged to the outlet chute of the chain bucket (that is, it is directly opposite to the chain bucket discharge port during the circulating conveying process), and the lower end relies on rollers to move on the track of the transfer conveyor assembly 5. It can follow the movement of the lower end on the transfer conveyor assembly 5 along the moving track of the transfer conveyor assembly 5 and slide along the moving angle, which can ensure that the chain bucket feeding arm is quickly lifted or lowered or the running trolley 3 moves. The material can be effectively unloaded from the chain bucket chute to the transfer conveyor assembly 5 through the follow-up material receiving conveyor assembly 4, and the material flow can be kept stable during transportation.

[0062] In this embodiment, a transfer conveyor assembly 5 is also included, which can be a belt conveyor commonly used in the art. The upper end of the transfer conveyor assembly 5 is supported on the roller at the sea side end of the main beam 201 of the ship unloader, and the lower end is hinged on the gantry crossbeam facing the upper part of the wharf conveyor, and the unloaded materials are transferred to the wharf conveyor through the discharge chute. It is ensured that during the lifting and lowering process of the main beam 201, the materials discharged by the follow-up material receiving conveyor assembly 4 can always be effectively transferred to the wharf conveyor. The transfer conveyor assembly 5 is provided with a closed cover to ensure that no dust overflows during the unloading process.

[0063] In this embodiment, a lifting mechanism for raising and lowering the chain bucket lifting arm 1 on the running trolley 3 is also included. The overall lifting of the chain bucket lifting arm 1 relies on the upward pulling of the wire rope winding system, and the wire rope winding system is provided with a movable counterweight to control the ground pressure of the chain bucket at the bottom of the chain bucket lifting arm 1. The wire rope is a flexible component that can effectively unload the lifting force of the ship and prevent damage to the ship unloader. Secondly, the chain bucket lifting arm 1 is also provided with a lateral swing hinge at the support seat of the running trolley 3, which can prevent the movement of the ship along the length direction under the action of the water flow from causing an overload outside the arm plane of the ship unloader.

[0064] In this embodiment, the entire chain bucket reclaiming mechanism also includes a chain bucket 101, a sea-side rake plate 102, a rake amplitude changing mechanism 103, a tensioning mechanism 104, a land-side rake plate 105, and a soft landing universal wheel 106, wherein the chain bucket 101 is composed of a chain and a plurality of buckets mounted on the chain, and is driven by a sprocket wheel arranged on the chain bucket lifting arm 1. The tensioning mechanism 104 is mainly composed of a tensioning oil cylinder and a tensioning wheel driven by the tensioning oil cylinder and used to tighten the chain. The soft landing universal wheel 106 can be composed of a universal wheel with a buffer component.

[0065] The sea side rake plate 102 and the land side rake plate 105 can automatically implement the retracting and releasing action according to the signal of the running direction of the running trolley 3. When the chain bucket of the material taking head advances to the sea side to take materials, the land side rake plate 105 is put down to work, and the sea side rake plate 102 is put away. The land side rake plate 105 can rake out the materials in the dark cabin according to the running direction of the material taking head. On the contrary, when advancing to the land side, the sea side rake plate 102 is put down to work, and the land side rake plate 105 is put away, which can greatly reduce the amount of warehouse clearance and improve the efficiency of ship unloading. During the cabin cleaning operation, the chain bucket is close to the bottom of the cabin. The chain tension can be reduced by adjusting the tensioning cylinder to make the chain bucket loose, and the chain bucket is supported on the bottom of the cabin by the soft landing universal wheel 106. In this way, the chain bucket material taking head can perform the chain bucket sweeping cabin operation, thereby reducing the workload of the cabin cleaning machine, shortening the cabin cleaning time, and improving the efficiency of ship unloading.

[0066] In this embodiment, a non-working lifting drive system 9 is also included. When the ship unloader is in a non-working state, the front pull rod 203 is folded by pulling the movable pulley installed at the front end of the front pull rod 203 from the fixed pulley installed at the top end of the front end connecting rod 601 of the boom linkage mechanism 6 through the wire rope winding system, so that the main beam 201 is rotated and lifted up at the hinge point between the main beam 201 and the rear extension beam 202. The main beam 201 can be lifted up 80° and a safety hook can be hung, which facilitates the safety of ship berthing and the safety of waterway passage, while also ensuring the safety of the ship unloader under storm conditions.

[0067] In this embodiment, a rear extension beam 202 is also included. In non-working conditions, the running trolley 3 and the chain bucket lifting arm 1 thereon can be driven back to the inside of the dock along the rear extension beam 202, and the chain bucket lifting arm 1 can be brought back to the parking position of the dock, which is convenient for cleaning the chain bucket in the chain bucket pool, and is also convenient for daily maintenance and inspection of the chain and bucket. The rear extension beam 202 also has the function of directly lifting the cleaning machine along the rear extension beam 202 and the main beam 201 to the top of the hatch and into the bottom of the cabin during operation. Compared with the L-type chain bucket ship unloader that requires the arm frame to slowly rotate and lift, it can greatly reduce the auxiliary operation time of the ship unloader.

[0068] During specific operation, the bridge arm combined chain bucket ship unloader of this embodiment drives the chain bucket lifting arm 1 to move horizontally and linearly in the ship width direction in the cabin through the movement of the running trolley 3, realizing a favorable mechanical mechanism for the chain bucket to dig materials in a positive direction, and has the advantages of stable and controllable digging load and the direction of action in the main plane of the bridge frame, which is very beneficial to the service life of key components and reducing maintenance costs; the translation and lifting of the trolley running bridge bearing structure component 2 is achieved through the pitching of the parallelogram arm frame connecting rod mechanism 6, and the chain bucket lifting arm 1 can be coordinated with the lifting and sliding stroke of the running trolley 3 to realize the position adjustment of the chain bucket in the ship depth direction and the lifting of the chain bucket out of the cabin and other functions; the trolley walking mechanism at the bottom of the A-shaped gantry machine base walks along the dock track to realize the position adjustment of the chain bucket lifting arm 1 in the cabin along the ship length direction. In this way, the three-dimensional linear motion function of the chain bucket of the ship unloader in the cabin to continuously take materials layer by layer is achieved. The configuration of the bridge-arm combined chain bucket ship unloader has both the mechanical characteristics of the bridge-type ship unloader trolley's stable and continuous material extraction along the horizontal straight line of the beam and the efficient and reliable forward digging of materials by the chain bucket, as well as the reliable and smooth motion constraint of the boom-type crane's arm pitching and rotating at the hinge point and the light weight of the main bearing structure of the boom crane. It is a fusion of the advantages of both bridge-type and boom-type lifting and transportation equipment.

[0069] The chain bucket reclaiming arm is installed on the running trolley 3 and can slide up and down along the trolley. The lifting and lowering drive of the chain bucket lifting arm 1 is realized by winding the steel wire rope. Since the steel wire rope is a flexible component, the lifting force at the lower end of the chain bucket lifting arm 1 caused by the ups and downs of the ship due to the influence of waves can be unloaded quickly and effectively without damaging the structure, and it can adapt to the ship unloading operation in seaports with strong winds and waves.

[0070] It can be seen that the bridge arm combined chain bucket ship unloader of the present invention adopts the mode of trolley propulsion and forward material taking, and the ship unloader is subjected to more reasonable force, has higher production efficiency and equipment reliability, and lower maintenance cost. In view of the problem that the continuous ship unloader is easily overloaded by the movement of the hull caused by wind and waves during the material taking operation of the rigid lifting arm, a three-dimensional surge protection with more sensitive and effective unloading response is adopted. Therefore, the present invention can have greater advantages than the traditional L-type chain bucket ship unloader.

[0071] To sum up, the bridge arm combined chain bucket ship unloader of the present invention is not only efficient, energy-saving and reliable, but also the material is basically in a fully closed operation during the entire transportation process, the disturbance to the material during the material retrieval process in the cabin is smaller, the amount of cabin cleaning is greatly reduced, it can meet higher environmental protection requirements, and greatly improves the actual unloading efficiency.

[0072] The above description of the embodiments is to facilitate the understanding and use of the invention by those skilled in the art. It is obvious that those skilled in the art can easily make various modifications to these embodiments and apply the general principles described herein to other embodiments without creative work. Therefore, the present invention is not limited to the above embodiments, and improvements and modifications made by those skilled in the art based on the disclosure of the present invention without departing from the scope of the present invention should be within the scope of protection of the present invention.

Claims

1. A bridge arm combined chain bucket ship unloader, characterized in that: include: A gantry base that can travel along the dock track; A parallelogram boom linkage mechanism is arranged on the gantry base, comprising a front connecting rod, an upper rod and a lower support rod, wherein the upper and lower ends of the front connecting rod are respectively hinged to the upper rod and the lower support rod, and the upper rod and the lower support rod are also respectively installed on the gantry base through rear end hinged supports, and a parallelogram motion mechanism is formed by the front connecting rod, the upper rod, the lower support rod and a partial area of ​​the gantry base, so that the parallelogram boom linkage mechanism as a whole can pitch and rotate based on the two rear end hinged supports; A trolley running bridge-type bearing structure component and a main beam non-working lifting mechanism respectively hinged to the upper and lower hinge points at the front end of the parallelogram arm connecting rod mechanism; A running trolley capable of reciprocating back and forth along the trolley running bridge-type bearing structure assembly; The chain bucket material taking mechanism comprises a chain bucket lifting arm installed on the running trolley and capable of being raised and lowered, a follow-up material receiving conveyor assembly installed at the upper discharge port position of the chain bucket lifting arm, and a transfer conveyor assembly for receiving materials delivered by the follow-up material receiving conveyor assembly and transferring and discharging the materials.

2. The bridge arm combined chain bucket ship unloader according to claim 1, characterized in that: The gantry base is in the form of an A-shaped gantry, which includes a sea side column, a land side column and a lower crossbeam.

3. The bridge arm combined chain bucket ship unloader according to claim 2, characterized in that: The upper and lower rear end hinged supports in the parallelogram arm connecting rod mechanism are installed on the land side column.

4. The bridge arm combined chain bucket ship unloader according to claim 1, characterized in that: The load-bearing beam in the trolley running bridge-type load-bearing structure assembly is formed by hingedly connecting the main beam on the sea side and the rear extension beam on the land side, and the hinge center is located above the cross-section of the main beam and the rear extension beam, which plays a favorable mechanical function of enabling the hinge point to transmit bending moment in one direction.

5. The bridge arm combined chain bucket ship unloader according to claim 4, characterized in that: The front part of the land side rear extension beam is hinged to the lower hinge point of the front end connecting rod, and the rear part is hinged to the upper hinge point of the front end connecting rod through the rear tie rod, so that the rear extension beam, the front end connecting rod and the rear tie rod form a stable triangular frame structure; A foldable front pull rod formed by hingedly connecting short pull rods in sections is also provided between the top of the front end connecting rod and the end position of the sea side main beam.

6. The bridge arm combined chain bucket ship unloader according to claim 1, characterized in that: The chain bucket is composed of a chain and a plurality of buckets mounted on the chain, and is driven by a sprocket wheel arranged on a chain bucket lifting arm. A chain bucket tensioning mechanism is also arranged on the chain bucket lifting arm.

7. The bridge arm combined chain bucket ship unloader according to claim 1, characterized in that: The bottom end of the chain bucket lifting arm is also provided with a soft landing universal wheel.

8. The bridge arm combined chain bucket ship unloader according to claim 1, characterized in that: The chain bucket lifting arm is lifted and lowered on the running trolley through a wire rope winding system, and a lateral swing hinge is provided between the chain bucket lifting arm and the running trolley.

9. The bridge arm combined chain bucket ship unloader according to claim 1, characterized in that: The upper end of the follow-up material receiving conveyor assembly is hinged to the chain bucket lifting arm, facing the discharge position of the chain bucket lifting arm, and the lower end is supported on the upper track of the transfer conveyor assembly through rollers, and naturally follows the displacement movement with the lifting and lowering of the chain bucket lifting arm and the running trolley or the trolley running bridge-type bearing structure assembly.

10. The bridge arm combined chain bucket ship unloader according to claim 9, characterized in that: The lower end of the transfer conveyor assembly is hinged on the gantry base, and the upper end is placed on the sea side support roller of the load-bearing beam of the trolley running bridge-type load-bearing structure assembly. As the trolley running bridge-type load-bearing structure assembly rises and falls, the transfer conveyor assembly can adapt to the angle at the lower end hinge point.

Citation Information

Patent Citations

  • Movable continuous-type hanging chain type bucket ship unloader

    CN111410061A

  • Novel rectilinear reciprocating type and high-efficiency intelligent environment-friendly type unloader with continuous chain buckets

    CN111606080A

  • Chain bucket ship unloader

    CN115724236A

  • Ship unloader and control method thereof

    CN115744379A

  • Apparatus and method for unloading

    CN1178186A