First-pile-method pile shoe type jacket structure and construction method thereof

By using pile boots and limit support components in the first pile method conduit frame to adjust the height of the steel pipe pile to avoid underwater pile cutting, and protect the grouting seal ring by guiding and extending sleeves and protective keys, the top elevation of the steel pipe pile is solved. The difference and grouting seal ring damage have achieved efficient and stable catheter installation.

CN119083480AActive Publication Date: 2024-12-06ZHEJIANG ELECTRIC POWER DESIGN INST
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411143825.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-12-06
Estimated Expiration
2044-08-20

AI Technical Summary

Technical Problem

During the construction of the existing pile-first-pile-based conduit frame foundation, due to the uncertainty of the seabed geology, the pile top elevation difference is required, which requires underwater pile cutting operations, which increases the construction difficulty and cost. The grouting seal ring is easily damaged during the installation process, affecting the structure. stability.

Method used

The pile boot-type conduit frame structure is adopted. By setting pile boots and limit support components on the steel pipe piles, the height of the pile boots is adjusted to eliminate the difference in top height, avoid underwater pile cutting, and a guide is set in the pile boots. The sleeve and protective keys are being extended to protect the grouting seal to ensure successful grouting.

Benefits of technology

It reduces construction difficulty and cost, improves construction efficiency, avoids damage to grouting seal rings, and ensures stable installation of the conduit frame.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083480A_ABST
    Figure CN119083480A_ABST
Patent Text Reader

Abstract

The invention discloses a first-pile-method pile shoe type jacket structure and a construction method thereof, and aims to provide the first-pile-method pile shoe type jacket structure and the construction method thereof which can avoid underwater pile cutting operation, so that the construction difficulty and the construction cost are reduced, and the construction efficiency is improved. A first pile method pile shoe type jacket structure comprises a plurality of steel pipe piles, a plurality of pile shoes and a jacket body, the pile shoes are fixedly connected to the bottom of the jacket body, the steel pipe piles are sleeved with the pile shoes, each steel pipe pile is sleeved with the corresponding pile shoe, and limiting supporting components are arranged at the tops of the pile shoes. The pile shoe is supported on the top of the steel pipe pile through the limiting supporting component. During actual construction, the pile shoes on the steel pipe piles are located at the same height by adjusting the limiting supporting components according to the top elevation of the steel pipe piles.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of offshore wind power engineering, and in particular to a pile-first method pile shoe type conductor frame structure and a construction method thereof. Background Art

[0002] Wind energy is a clean and renewable energy source. Wind power generation is one of the most mature power generation methods in terms of technology, scale development conditions and development prospects. Wind power will become an important energy source with its abundant resources, good environmental benefits and gradually reduced power generation costs.

[0003] Offshore wind power structures usually consist of three parts: wind turbine main engine, tower and foundation. Wind turbine foundations include single pile, multi-pile jacket, suction tube jacket, high pile cap, etc. Among them, the multi-pile jacket foundation (hereinafter referred to as jacket foundation) uses 3 or more steel pipe piles driven into the seabed and connected to it with a jacket.

[0004] The jacket is equipped with casing, which is connected to the steel pipe pile by grouting, and the upper part is connected to the tower by flange. The jacket also plays the role of foundation leveling. The jacket and the steel pipe pile can be connected on the water surface when the water depth is shallow, and underwater when the water depth is deep. The jacket foundation has wide adaptability, especially suitable for projects with large single unit capacity and deep water depth, and its requirements for seabed geological conditions are not high.

[0005] According to the order of piling, the jacket foundation is divided into the first pile jacket foundation and the second pile jacket foundation. The second pile jacket is usually used for booster station foundation. In the second pile jacket foundation, the jacket is first sunk, and then the steel pipe piles are driven into the seabed. For shallow waters, there is also a special second pile jacket structure, which adopts the method of piling inside the main leg.

[0006] The first pile method is usually used for wind turbine foundations. The first pile method requires the construction of steel pipe piles first; then, Fig.10 As shown, the jacket is installed, and the jacket is inserted into the corresponding steel pipe pile 2 through the bottom insertion leg column 10, and supported on the upper end of the steel pipe pile by the steel top plate 11 inserted on the top of the leg column. However, the current pile-first jacket foundation has the following shortcomings: First, in the actual construction process, due to the large uncertainty of the seabed geological conditions, the elevation of the top of each steel pipe pile is prone to differences (even more than 3 meters or 5 meters when the difference is large); and the jacket is a prefabricated structure with a certain structural size. In order to avoid the jacket tilting after installation, the current pile-first jacket foundation construction process often requires underwater pile cutting before installing the jacket to make the top elevation of each steel pipe pile consistent. Underwater pile cutting requires divers to go into the water to operate, which creates difficulties for construction, affects construction efficiency, and increases construction difficulty and construction cost. In particular, for deep-water jackets with a water depth of 50-80 meters, underwater pile cutting construction is more difficult.

[0007] In the prior art, the rear pile method jacket does not need to consider the problem of underwater pile cutting. However, the disadvantages of the rear pile method jacket foundation are that the sealing structure is complex and the overall cost is high, which is much higher than the cost of underwater pile cutting.

[0008] Secondly, during the installation of the jacket, in order to facilitate installation, the lengths of the jacket's insertion legs are different. Usually there is one longest, one second longest, and two shorter ones. During installation, the longest leg is inserted into the steel pipe pile first, followed by the second longest insertion leg, and finally the two short insertion legs. During the installation process, it is difficult for the jacket to maintain a very stable state. Fig.11 As shown, when the angle between the inserted leg column 10 and the steel pipe pile 2 is too large, the protection key will not be able to effectively protect the grouting sealing ring 5 (there are certain requirements for the minimum gap between the steel pipe pile and the inserted leg column, and the protection key size cannot be increased to protect the grouting sealing ring, otherwise it will affect the smooth insertion of the inserted leg column into the steel pipe pile), and the steel pipe pile can easily bump into the grouting sealing ring on the inserted leg column, causing damage to the grouting sealing ring.

[0009] If the length of the inserted leg column is extended to increase the distance between the grouting seal ring and the lower end of the inserted leg column, when the inserted leg column is inside the steel pipe pile and reaches a position that may damage the grouting seal ring, the angle between the steel pipe pile and the inserted leg column is small, so that the protection key can protect the grouting seal ring to prevent the steel pipe pile from hitting the grouting seal ring. However, this will cause new problems. Specifically, due to the extension of the length of the inserted leg column, the suspended section of the steel pipe pile (i.e., the steel pipe pile located above the seabed) also needs to be extended accordingly. Otherwise, after the inserted leg column is inserted into the steel pipe pile, the seabed soil in the steel pipe pile will flow into the top of the grouting seal ring and fill the grouting cavity, resulting in the subsequent grouting between the pile shoe and the steel pipe pile. The pile shoe and the steel pipe pile cannot be connected as a whole through the grouting material, affecting the stability of the conductor frame installation structure; and extending the suspended section of the steel pipe pile will affect the stability of the conductor frame installation structure and have certain side effects on structural safety (in actual design, the suspended section of the steel pipe pile should be as short as possible). Summary of the invention

[0010] The first purpose of the present invention is to overcome the problem that in the prior art, during the construction process of the jacket foundation using the pile-first method, in order to avoid the jacket tilting after installation, underwater pile cutting operations are required, which causes construction difficulties, affects construction efficiency, and increases construction difficulty and construction cost; and to provide a pile-first method pile shoe jacket structure and a construction method thereof that can avoid underwater pile cutting operations, thereby reducing construction difficulty and construction cost and improving construction efficiency.

[0011] The second object of the present invention is to provide a pile-first method pile shoe type conductor frame structure and a construction method thereof that can effectively avoid damage to the grouting seal ring during the conductor frame installation process without affecting the stability of the conductor frame installation structure.

[0012] The technical solution of the present invention is: A pile-first method pile shoe type jacket structure includes a plurality of steel pipe piles and a jacket body, and also includes a plurality of pile shoes, wherein the pile shoes are fixedly connected to the bottom of the jacket body, the pile shoes are sleeved on the steel pipe piles, and each steel pipe pile is sleeved with the pile shoes, and a limited support component is provided on the top of the pile shoe, and the pile shoe is supported on the top of the steel pipe pile by the limited support component. During actual construction, according to the top elevation of each steel pipe pile, the limited support component is adjusted to make the pile shoes on each steel pipe pile at the same height. During the actual construction of a pile-first method pile shoe type jacket structure of the present scheme, steel pipe piles are first constructed and driven into the seabed; then, the limiting support components on the top of each pile shoe are adjusted (the limiting support components are lengthened or shortened) according to the top elevation of each steel pipe pile, and the difference in the top height of each steel pipe pile is eliminated by the limiting support components, so that after the pile shoe is supported on the top of the steel pipe pile by the limiting support components, the pile shoes on each steel pipe pile are located at the same height, and the jacket body can be upright without underwater pile cutting operations to avoid tilting; therefore, underwater pile cutting operations can be avoided while ensuring that the jacket is upright after installation to avoid tilting, thereby reducing construction difficulty and construction costs, and improving construction efficiency.

[0013] Preferably, a grouting seal ring is further provided at the lower part of the inner wall of the pile shoe, and the grouting seal ring is sealed and connected to the outer wall of the steel pipe pile. A guide extension sleeve extending downward is provided at the lower end of the pile shoe, and the length of the guide extension sleeve is greater than or equal to a set value, and the guide extension sleeve is inserted into the seabed soil layer. A number of circumferentially distributed protection keys are provided on the inner wall of the pile shoe below the grouting sealing ring, and a protective slope is provided on the side of the protection key facing the center of the pile shoe. Since the grouting sealing ring is inside the pile shoe, the grouting sealing ring will not be damaged by collision with foreign objects or other structures before the steel pipe pile is inserted into the pile shoe. More importantly, the problem of damage to the grouting sealing ring during the installation of the conductor frame can be effectively avoided by setting a guide extension sleeve without affecting the stability of the conductor frame installation structure. Specifically, during the installation of the conductor frame, due to the setting of the guide extension sleeve, the upper end of the steel pipe pile will be inserted into the guide extension sleeve first, thereby guiding the pile shoe. When the top of the steel pipe pile is close to the position of the grouting sealing ring, the relative angle between the pile shoe and the steel pipe pile is ensured to be small. In this way, the grouting sealing ring can be effectively protected by the protection key to prevent the steel pipe pile from hitting the grouting sealing ring. The sealing ring will be damaged, resulting in the problem of damage to the grouting sealing ring; on the other hand, after the pile shoe is supported on the top of the steel pipe pile by the limiting support component, the guiding extension sleeve will be inserted into the seabed soil layer. In this way, the installation height of the bottom of the conductor frame will not be increased due to the setting of the guiding extension sleeve; at the same time, since the pile shoe is located on the outside of the steel pipe pile, the soil on the seabed will not flow into the top of the grouting sealing ring during the process of the guiding extension sleeve being inserted into the seabed soil layer, thereby not affecting the subsequent grouting between the pile shoe and the steel pipe pile, thereby ensuring that the grouting material connects the pile shoe and the steel pipe pile as one.

[0014] As a preference, a guide assembly is further included below the protection key, which includes a plurality of guide blocks circumferentially distributed on the inner wall of the pile shoe or the inner wall of the guide extension sleeve, and a guide slope is provided on the side of the guide block facing the center of the pile shoe. In this way, during the installation of the conductor frame, the steel pipe pile can be guided by the guide slope of the guide block to be inserted into the pile shoe, which is conducive to the smooth descent of the pile shoe and ensures the grouting gap between the pile shoe and the steel pipe pile.

[0015] Preferably, the limiting support component includes a plurality of chains or steel wire ropes, and the chains or steel wire ropes form a mesh structure above the top of the pile shoe. The chains or steel wire ropes form a mesh structure, which can reliably support the pile shoe on the top of the steel pipe pile and limit the position of the conductor frame in the vertical direction. On the other hand, when there are differences in the top elevations of the steel pipe piles, the differences in the top heights of the steel pipe piles can be eliminated by adjusting the lengths of the chains or steel wire ropes connected to the tops of the pile shoes, so that after the pile shoes are supported on the tops of the steel pipe piles by the limiting support component, the pile shoes on the steel pipe piles are at the same height, so that the conductor frame body is upright and avoids tilting; and the adjustment speed is fast, and adjustments can be made at the construction site.

[0016] Preferably, the limiting support component includes: Support steel frame, located above the top of the pile shoe; A number of steel bars are distributed circumferentially around the pile shoe, the lower end of the steel bar is welded or bolted to the pile shoe, and the upper end of the steel bar is welded or bolted to the supporting steel frame. The limiting support component formed by the supporting steel frame and the steel bar can reliably support the pile shoe on the top of the steel pipe pile and limit the position of the conductor frame in the vertical direction. On the other hand, when there is a difference in the top elevation of each steel pipe pile, the difference in the top height of each steel pipe pile can be eliminated by adjusting the distance between the supporting steel frame and the top of the pile shoe, so that after the pile shoe is supported on the top of the steel pipe pile by the limiting support component, the pile shoes on each steel pipe pile are at the same height, so that the conductor frame body is upright and avoids tilting. When one of the lower end of the steel bar and the pile shoe as well as the upper end of the steel bar and the supporting steel frame is connected by bolts, adjustments can be made at the construction site; when the lower end of the steel bar and the pile shoe as well as the upper end of the steel bar and the supporting steel frame are all connected by welding, it is necessary to adjust the distance between the supporting steel frame and the top of the pile shoe during the manufacturing process in the processing plant according to the top elevation of each steel pipe pile. This method is mainly suitable for situations where the interval between the construction of the steel pipe pile and the construction of the conductor frame is long.

[0017] Preferably, the position-limiting support component includes an upper support tube, the lower end of which is connected to the upper end of the pile shoe, the upper end of which extends upward, and a support cover is provided at the upper end of the upper support tube. This method is mainly suitable for applications where the interval between the construction of the steel pipe pile and the construction of the conductor frame is long. During the manufacturing process at the processing plant, the length of the upper support tube is adjusted according to the top elevation of each steel pipe pile to eliminate the difference in the top height of each steel pipe pile, so that after the pile shoe is supported on the top of the steel pipe pile by the position-limiting support component, the pile shoes on each steel pipe pile are at the same height, so that the conductor frame body is upright and avoids tilting.

[0018] As a preferred embodiment, an anti-sinking plate is further included, which is fixedly connected to the bottom of the jacket body, and the anti-sinking plate is provided with a plurality of through holes distributed in an array, and the anti-sinking plate is sunk into the seabed soil layer. The anti-sinking plate is provided to limit the settlement of the jacket.

[0019] As a preferred embodiment, the lower end of the pile shoe is provided with an expansion section whose inner diameter gradually increases from top to bottom. Adding the expansion section at the lower end of the pile shoe facilitates the pile shoe to be inserted into the steel pipe pile.

[0020] A construction method of a pile shoe type jacket structure using a pile-first method comprises the following steps in sequence: First, steel pipe pile installation, driving the steel pipe pile into the seabed; Second, the top elevation of each steel pipe pile is obtained; then, the limit support component is adjusted according to the obtained top elevation of each steel pipe pile, so that after the pile shoe is supported on the top of the steel pipe pile by the limit support component, the pile shoe on each steel pipe pile can be located at the same height; Third, install the jacket body, put the pile shoe on the corresponding steel pipe pile, and support the pile shoe on the top of the steel pipe pile through the limit support component. At this time, the pile shoe on each steel pipe pile is at the same height; Fourth, grouting and sealing, grouting between the pile shoe and the steel pipe pile, so that the pile shoe and the steel pipe pile are connected as one. The construction method of the pile-first method pile shoe type jacket structure of this scheme adjusts the limit support components on the top of each pile shoe (lengthens or shortens the limit support components) according to the top elevation of each steel pipe pile, and eliminates the difference in the top height of each steel pipe pile through the limit support components, so that after the pile shoe is supported on the top of the steel pipe pile by the limit support components, the pile shoes on each steel pipe pile are at the same height, and the jacket body can be upright without underwater pile cutting operations to avoid tilting; therefore, it is possible to avoid underwater pile cutting operations while ensuring that the jacket is upright after installation to avoid tilting, thereby reducing construction difficulty and construction costs, and improving construction efficiency.

[0021] The beneficial effects of the present invention are: Firstly, it can ensure that the jacket is upright after installation and avoid tilting, thus avoiding underwater pile cutting operations, thereby reducing construction difficulty and construction costs and improving construction efficiency.

[0022] Secondly, it can effectively avoid the problem of damaging the grouting seal ring during the installation of the conductor frame without affecting the stability of the conductor frame installation structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a structural schematic diagram of a pile shoe type conductor frame structure of the present invention.

[0024] Figure 2 It is a partial structural schematic diagram of an implementation manner of the limiting support component of the present invention.

[0025] Figure 3 It is a partial structural schematic diagram of the pile shoe of the present invention when it is supported on the top of the steel pipe pile through the limiting support component.

[0026] Figure 4 It is a partial structural schematic diagram of another embodiment of the position-limiting support component of the present invention.

[0027] Figure 5 It is a partial structural schematic diagram of the third embodiment of the position-limiting support component of the present invention.

[0028] Figure 6 It is a partial structural schematic diagram of an implementation manner of the pile shoe of the present invention.

[0029] Figure 7 It is a partial structural schematic diagram of an implementation mode of a certain state in the process of inserting the pile shoe into the steel pipe pile during the construction of the pile shoe type jacket structure using the pile-first method of the present invention.

[0030] Figure 8 It is a partial structural schematic diagram of an implementation manner of the anti-sinking plate of the present invention.

[0031] Fig. 9 It is a partial structural schematic diagram of another embodiment of the anti-sinking plate of the present invention.

[0032] Fig.10 It is a partial structural schematic diagram of a pile-first method jacket foundation in the prior art after the inserted leg column is completely inserted into the steel pipe pile.

[0033] Fig.11 The present invention is a partial structural schematic diagram of the process in which the insertion leg column of the pile-first method jacket foundation in the prior art is inserted into the steel pipe pile.

[0034] In the figure: The main body of the pipe frame 1, the connecting column legs 1.1, and the connecting plate 1.2; Steel pipe pile 2; Pile shoe 3, connecting ring 3.0, expansion section 3.1; Position-limiting support component 4, chain 4.1, support steel frame 4.2, steel bar 4.3, diagonal support 4.4, upper support cylinder 4.5, support cover plate 4.6; Grouting seal 5; Guide extension sleeve 6; Guide block 7, guide slope 7.1; Protection key 8, protection bevel 8.1; Anti-sinking plate 9; Insert the leg column 10; Steel top plate11. DETAILED DESCRIPTION

[0035] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments: Specific embodiment 1, as Figure 1 , Figure 2 , Figure 3 As shown, a pile-first method pile shoe type jacket structure includes a plurality of steel pipe piles 2, a plurality of pile shoes 3 and a jacket body 1. The pile shoes 3 are fixedly connected to the bottom of the jacket body 1. The pile shoes 3 are sleeved on the steel pipe piles 2, and each steel pipe pile 2 is sleeved with the pile shoes 3. A limited support component 4 is provided on the top of the pile shoe 3. The pile shoe 3 is supported on the top of the steel pipe pile 2 by the limited support component 4.

[0036] During actual construction, the limit support components 4 are adjusted according to the top elevations of the steel pipe piles 2 so that the pile shoes 3 on the steel pipe piles 2 are located at the same height.

[0037] During the actual construction of a pile shoe type jacket structure of the pile-first method of the present embodiment, the steel pipe piles 2 are first constructed and driven into the seabed; then, the limiting support components 4 at the top of each pile shoe 3 are adjusted (the limiting support components 4 are lengthened or shortened) according to the top elevation of each steel pipe pile 2, and the difference in the top height of each steel pipe pile 2 is eliminated by the limiting support components 4, so that after the pile shoe 3 is supported on the top of the steel pipe pile 2 by the limiting support components 4, the pile shoes 3 on each steel pipe pile 2 are located at the same height, and the jacket body 1 can be upright without performing underwater pile cutting operations to avoid tilting; therefore, underwater pile cutting operations can be avoided while ensuring that the jacket is upright after installation to avoid tilting, thereby reducing the construction difficulty and construction cost, and improving the construction efficiency.

[0038] In this embodiment, the pile shoe 3 corresponds to the steel pipe pile 2. The pile shoe 3 is made of a steel pipe, and of course the pile shoe 3 can also be made of other metals.

[0039] In one implementation of this embodiment, Figure 2 , Figure 3 As shown, the limiting support component 4 includes a plurality of chains 4.1 or steel wire ropes, and the chains 4.1 or steel wire ropes form a mesh structure above the top of the pile shoe 3. The chains 4.1 or steel wire ropes form a mesh structure, which can reliably support the pile shoe 3 on the top of the steel pipe pile 2 and limit the position of the conductor frame in the vertical direction. On the other hand, when there are differences in the top elevations of the steel pipe piles 2, the differences in the top heights of the steel pipe piles 2 can be eliminated by adjusting the lengths of the chains 4.1 or steel wire ropes connected to the tops of the pile shoes 3, so that after the pile shoes 3 are supported on the tops of the steel pipe piles 2 by the limiting support component 4, the pile shoes 3 on each steel pipe pile 2 are located at the same height, so that the conductor frame body 1 is upright and avoids tilting; and the adjustment speed is fast, and it can be adjusted at the construction site.

[0040] Specifically, a plurality of connection holes evenly distributed in the circumference are fixed on the top of the pile shoe 3. The ends of the chain 4.1 or the wire rope are fixedly connected to the connection holes. The connection holes are formed in the following ways: first, a plurality of connection rings 3.0 evenly distributed in the circumference are fixed on the top of the pile shoe 3, and the inner holes of the connection rings 3.0 form the connection holes. Second, the connection holes are formed by directly opening holes on the top of the side wall of the pile shoe 3.

[0041] In the second implementation of this embodiment, Figure 4As shown, the position-limiting support component 4 includes a supporting steel frame 4.2 and a plurality of steel bars 4.3 uniformly distributed around the pile shoe 3. There are 3 to 6 steel bars 4.3. In the present embodiment, there are 4 steel bars 4.3. The supporting steel frame 4.2 is in a cross shape, an X shape, a Y shape or other shapes. The supporting steel frame 4.2 is located above the top of the pile shoe 3. The steel bars 4.3 are distributed vertically. The lower end of the steel bar 4.3 is welded or bolted to the pile shoe 3, and the upper end of the steel bar 4.3 is welded or bolted to the supporting steel frame 4.2. The position-limiting support component 4 formed by the supporting steel frame 4.2 and the steel bars 4.3 can reliably support the pile shoe 3 on the top of the steel pipe pile 2, and limit the position of the guide frame in the vertical direction. On the other hand, when there are differences in the top elevations of the steel pipe piles 2, the differences in the top elevations of the steel pipe piles 2 can be eliminated by adjusting the spacing between the support steel frame 4.2 and the top of the pile shoe 3, so that after the pile shoe 3 is supported on the top of the steel pipe pile 2 by the limit support component 4, the pile shoe 3 on each steel pipe pile 2 is at the same height, thereby making the jacket body 1 stand upright and avoid tilting. When only one of the lower end of the steel bar 4.3 and the pile shoe 3 and the upper end of the steel bar 4.3 and the support steel frame 4.2 is connected by bolts, the spacing between the support steel frame 4.2 and the top of the pile shoe 3 can be adjusted at the construction site.

[0042] When the lower end of the steel bar 4.3 and the pile shoe 3 as well as the upper end of the steel bar 4.3 and the supporting steel frame 4.2 are connected by welding, it is necessary to adjust the distance between the supporting steel frame 4.2 and the top of the pile shoe 3 during the manufacturing process in the processing plant according to the top elevation of each steel pipe pile 2. This method is mainly suitable for situations where the interval between the construction of the steel pipe pile 2 and the construction of the conductor frame is long.

[0043] In this embodiment, an oblique brace 4.4 is provided between the upper end of the steel bar 4.3 and the supporting steel frame 4.2. The upper part of the oblique brace 4.4 is inclined toward the center of the supporting steel frame 4.2. The oblique brace 4.4 plays a role in strengthening the structure on the one hand, and is also conducive to adjusting the relative position between the steel pipe pile 2 and the pile shoe 3 on the other hand, so that the four steel bars 4.3 are evenly stressed.

[0044] In the third implementation of this embodiment, Figure 5As shown, the limiting support component 4 includes an upper support tube 4.5, the lower end of which is connected to the upper end of the pile shoe 3, the upper end of which extends upward, and a support cover plate 4.6 is provided at the upper end of the upper support tube 4.5. The upper support tube 4.5 and the pile shoe 3 are an integrally formed structure; or the lower end of the upper support tube 4.5 is connected to the upper end of the pile shoe 3 by welding; or the lower end of the upper support tube 4.5 is connected to the upper end of the pile shoe 3 by a flange. This method is mainly suitable for applications where the interval between the construction of the steel pipe pile 2 and the construction of the conductor frame is long. During the manufacturing process in the processing plant, the length of the upper support tube 4.5 is adjusted according to the top elevation of each steel pipe pile 2 to eliminate the difference in the top height of each steel pipe pile 2, so that after the pile shoe 3 is supported on the top of the steel pipe pile 2 by the limiting support component 4, the pile shoe 3 on each steel pipe pile 2 is at the same height, so that the conductor frame body 1 is upright and avoids tilting.

[0045] like Figure 1 As shown, when the pile shoe 3 is supported on the top of the steel pipe pile 2 by the limiting support component 4, the lower end of the pile shoe 3 is close to the seabed or inserted into the seabed soil layer. In this embodiment, when the pile shoe 3 is supported on the top of the steel pipe pile 2 by the limiting support component 4, the lower end of the pile shoe 3 is inserted into the seabed soil layer.

[0046] Further, such as Figure 1 As shown, the bottom of the jacket body 1 is provided with a connection column leg 1.1 corresponding to the pile shoe 3, and the pile shoe 3 is fixedly connected to the corresponding connection column leg 1.1. In this embodiment, a plurality of connection plates 1.2 are arranged between the pile shoe 3 and the corresponding connection column leg 1.1, and the connection plates 1.2 are perpendicular to the axis of the pile shoe 3, and the connection plates 1.2 are welded to the pile shoe 3, and the connection plates 1.2 are welded to the connection column leg 1.1. The pile shoe 3 is close to the connection column leg 1.1, or the outer wall of the pile shoe 3 is close to the outer wall of the connection column leg 1.1.

[0047] Further, such as Figure 6 As shown, the lower end of the pile shoe 3 is provided with an expansion section 3.1 whose inner diameter gradually increases from top to bottom. In this embodiment, the axial length of the expansion section 3.1 is less than or equal to half of the inner diameter of the pile shoe 3. Adding the expansion section 3.1 at the lower end of the pile shoe 3 facilitates the pile shoe 3 to be inserted into the steel pipe pile 2.

[0048] Of course, it should be noted that the lower end of the pile shoe 3 may not be provided with the enlarged diameter section 3.1, that is, the inner and outer diameters of the pile shoe 3 are consistent from top to bottom.

[0049] Specific embodiment 2, as Figure 1 , Figure 2 , Figure 3 , Figure 7As shown, a pile-first method pile shoe type conductor frame structure includes a plurality of steel pipe piles 2, a plurality of pile shoes 3 and a conductor frame body 1. The pile shoes 3 are fixedly connected to the bottom of the conductor frame body 1. The pile shoes 3 are sleeved on the steel pipe piles 2, and each steel pipe pile 2 is sleeved with the pile shoes 3. In this embodiment, the pile shoes 3 correspond to the steel pipe piles 2 one by one, and the pile shoes 3 are made of steel pipes. A limited support component 4 is provided on the top of the pile shoe 3. The pile shoe 3 is supported on the top of the steel pipe pile 2 by the limited support component 4. During actual construction, according to the top elevation of each steel pipe pile 2, the limited support component 4 is adjusted to make the pile shoes 3 on each steel pipe pile 2 at the same height.

[0050] like Figure 7 As shown, a grouting seal ring 5 is also provided at the lower part of the inner wall of the pile shoe 3. The grouting seal ring 5 is sealed and connected to the outer wall of the steel pipe pile 2. The lower end of the pile shoe 3 is provided with a guide extension sleeve 6 extending downward. The length of the guide extension sleeve 6 is greater than or equal to a set value. In this embodiment, the length of the guide extension sleeve 6 is greater than or equal to the inner diameter of the pile shoe 3. The inner diameter of the guide extension sleeve 6 is consistent with the inner diameter of the pile shoe 3. When the pile shoe 3 is supported on the top of the steel pipe pile 2 by the limiting support component 4, the guide extension sleeve 6 is completely inserted in the seabed soil layer. The pile shoe 3 and the guide extension sleeve 6 are an integrally formed structure; or the pile shoe 3 and the guide extension sleeve 6 are welded and connected. The grouting seal ring 5 is located above the seabed.

[0051] A plurality of circumferentially evenly distributed protection keys 8 are provided on the inner wall of the pile shoe 3 below the grouting seal ring 5, and the protection keys 8 are close to the grouting seal ring 5. A protection slope 8.1 is provided on the side of the protection key 8 facing the center of the pile shoe 3. The upper end of the protection slope 8.1 is inclined toward the center of the pile shoe 3.

[0052] During the actual construction of a pile shoe type jacket structure of the pile-first method of the present embodiment, the steel pipe piles 2 are first constructed and driven into the seabed; then, the limiting support components 4 at the top of each pile shoe 3 are adjusted (the limiting support components 4 are lengthened or shortened) according to the top elevation of each steel pipe pile 2, and the difference in the top height of each steel pipe pile 2 is eliminated by the limiting support components 4, so that after the pile shoe 3 is supported on the top of the steel pipe pile 2 by the limiting support components 4, the pile shoes 3 on each steel pipe pile 2 are located at the same height, and the jacket body 1 can be upright without performing underwater pile cutting operations to avoid tilting; therefore, underwater pile cutting operations can be avoided while ensuring that the jacket is upright after installation to avoid tilting, thereby reducing the construction difficulty and construction cost, and improving the construction efficiency.

[0053] On the other hand, since the grouting seal 5 is inside the pile shoe 3, the grouting seal 5 will not be damaged by foreign objects or collisions with other structures before the steel pipe pile 2 is inserted into the pile shoe 3. More importantly, the problem of damage to the grouting seal 5 during the installation of the conductor frame can be effectively avoided by setting the guide extension sleeve 6 without affecting the stability of the conductor frame installation structure. Specifically, during the installation of the conductor frame, due to the setting of the guide extension sleeve 6, the upper end of the steel pipe pile 2 will first be inserted into the guide extension sleeve 6 to guide the pile shoe 3. When the top of the steel pipe pile 2 is close to the position of the grouting seal 5, the relative angle between the pile shoe 3 and the steel pipe pile 2 is ensured to be small. In this way, the grouting seal 5 can be effectively protected by the protection key 8 to prevent the steel pipe pile 2 from hitting the grouting seal. The sealing ring 5 leads to the problem of damage to the grouting sealing ring 5; and after the pile shoe 3 is supported on the top of the steel pipe pile 2 by the limiting support component 4, the guiding extension sleeve 6 will be inserted into the seabed soil layer. In this way, the installation height of the bottom of the conductor frame will not be increased due to the setting of the guiding extension sleeve 6; at the same time, since the pile shoe 3 is located on the outside of the steel pipe pile 2, the guiding extension sleeve 6 is inserted into the seabed soil layer, and the soil on the seabed will not flow into the top of the grouting sealing ring 5, thereby not affecting the subsequent grouting between the pile shoe 3 and the steel pipe pile 2, thereby ensuring that the grouting material connects the pile shoe 3 and the steel pipe pile 2 as a whole.

[0054] The grouting seal ring 5 is a rubber sealing strip, which can be a common rubber sealing strip (i.e., a sealing strip that does not expand when exposed to water) or a water-absorbing and swelling sealing strip. In this embodiment, the grouting seal ring 5 is a sealing strip that does not expand when exposed to water.

[0055] In one implementation of this embodiment, Figure 2 , Figure 3 As shown, the limiting support component 4 includes a plurality of chains 4.1 or steel wire ropes, and the chains 4.1 or steel wire ropes form a mesh structure above the top of the pile shoe 3. The chains 4.1 or steel wire ropes form a mesh structure, which can reliably support the pile shoe 3 on the top of the steel pipe pile 2 and limit the position of the conductor frame in the vertical direction. On the other hand, when there are differences in the top elevations of the steel pipe piles 2, the differences in the top heights of the steel pipe piles 2 can be eliminated by adjusting the lengths of the chains 4.1 or steel wire ropes connected to the tops of the pile shoes 3, so that after the pile shoes 3 are supported on the tops of the steel pipe piles 2 by the limiting support component 4, the pile shoes 3 on each steel pipe pile 2 are located at the same height, so that the conductor frame body 1 is upright and avoids tilting; and the adjustment speed is fast, and it can be adjusted at the construction site.

[0056] Specifically, a plurality of connection holes evenly distributed in the circumference are fixed on the top of the pile shoe 3. The ends of the chain 4.1 or the wire rope are fixedly connected to the connection holes. The connection holes are formed in the following ways: first, a plurality of connection rings 3.0 evenly distributed in the circumference are fixed on the top of the pile shoe 3, and the inner holes of the connection rings 3.0 form the connection holes. Second, the connection holes are formed by directly opening holes on the top of the side wall of the pile shoe 3.

[0057] In the second implementation mode of this embodiment, Figure 4 As shown, the position-limiting support component 4 includes a supporting steel frame 4.2 and a plurality of steel bars 4.3 uniformly distributed around the pile shoe 3. There are 3 to 6 steel bars 4.3. In the present embodiment, there are 4 steel bars 4.3. The supporting steel frame 4.2 is in a cross shape, an X shape, a Y shape or other shapes. The supporting steel frame 4.2 is located above the top of the pile shoe 3. The steel bars 4.3 are distributed vertically. The lower end of the steel bar 4.3 is welded or bolted to the pile shoe 3, and the upper end of the steel bar 4.3 is welded or bolted to the supporting steel frame 4.2. The position-limiting support component 4 formed by the supporting steel frame 4.2 and the steel bars 4.3 can reliably support the pile shoe 3 on the top of the steel pipe pile 2, and limit the position of the guide frame in the vertical direction. On the other hand, when there are differences in the top elevations of the steel pipe piles 2, the differences in the top elevations of the steel pipe piles 2 can be eliminated by adjusting the spacing between the support steel frame 4.2 and the top of the pile shoe 3, so that after the pile shoe 3 is supported on the top of the steel pipe pile 2 by the limit support component 4, the pile shoe 3 on each steel pipe pile 2 is at the same height, thereby making the jacket body 1 stand upright and avoid tilting. When only one of the lower end of the steel bar 4.3 and the pile shoe 3 and the upper end of the steel bar 4.3 and the support steel frame 4.2 is connected by bolts, the spacing between the support steel frame 4.2 and the top of the pile shoe 3 can be adjusted at the construction site.

[0058] When the lower end of the steel bar 4.3 and the pile shoe 3 as well as the upper end of the steel bar 4.3 and the supporting steel frame 4.2 are connected by welding, it is necessary to adjust the distance between the supporting steel frame 4.2 and the top of the pile shoe 3 during the manufacturing process in the processing plant according to the top elevation of each steel pipe pile 2. This method is mainly suitable for situations where the interval between the construction of the steel pipe pile 2 and the construction of the conductor frame is long.

[0059] In this embodiment, an oblique brace 4.4 is provided between the upper end of the steel bar 4.3 and the supporting steel frame 4.2. The upper part of the oblique brace 4.4 is inclined toward the center of the supporting steel frame 4.2. The oblique brace 4.4 plays a role in strengthening the structure on the one hand, and is also conducive to adjusting the relative position between the steel pipe pile 2 and the pile shoe 3 on the other hand, so that the four steel bars 4.3 are evenly stressed.

[0060] In the third implementation of this embodiment, Figure 5As shown, the limiting support component 4 includes an upper support tube 4.5, the lower end of which is connected to the upper end of the pile shoe 3, the upper end of which extends upward, and a support cover plate 4.6 is provided at the upper end of the upper support tube 4.5. The upper support tube 4.5 and the pile shoe 3 are an integrally formed structure; or the lower end of the upper support tube 4.5 is connected to the upper end of the pile shoe 3 by welding; or the lower end of the upper support tube 4.5 is connected to the upper end of the pile shoe 3 by a flange. This method is mainly suitable for applications where the interval between the construction of the steel pipe pile 2 and the construction of the conductor frame is long. During the manufacturing process in the processing plant, the length of the upper support tube 4.5 is adjusted according to the top elevation of each steel pipe pile 2 to eliminate the difference in the top height of each steel pipe pile 2, so that after the pile shoe 3 is supported on the top of the steel pipe pile 2 by the limiting support component 4, the pile shoe 3 on each steel pipe pile 2 is at the same height, so that the conductor frame body 1 is upright and avoids tilting.

[0061] Further, such as Figure 1 As shown, the bottom of the jacket body 1 is provided with a connection column leg 1.1 corresponding to the pile shoe 3, and the pile shoe 3 is fixedly connected to the corresponding connection column leg 1.1. In this embodiment, a plurality of connection plates 1.2 are arranged between the pile shoe 3 and the corresponding connection column leg 1.1, and the connection plates 1.2 are perpendicular to the axis of the pile shoe 3, and the connection plates 1.2 are welded to the pile shoe 3, and the connection plates 1.2 are welded to the connection column leg 1.1. The pile shoe 3 is close to the connection column leg 1.1, or the outer wall of the pile shoe 3 is close to the outer wall of the connection column leg 1.1.

[0062] Furthermore, the lower end of the pile shoe 3 is provided with an expansion section whose inner diameter gradually increases from top to bottom. In this embodiment, the expansion section is arranged at the lower end of the guide extension sleeve 6, and the axial length of the expansion section is less than or equal to half of the inner diameter of the pile shoe 3. The expansion section is added at the lower end of the pile shoe 3 to facilitate the pile shoe 3 to be inserted into the steel pipe pile 2.

[0063] Of course, it should be noted that the lower end of the pile shoe 3 may not be provided with a diameter expansion section, that is, the inner and outer diameters of the pile shoe 3 are consistent from top to bottom.

[0064] Further, such as Figure 7 As shown, a pile-first method pile shoe type conductor frame structure also includes a guide assembly. The guide assembly is located below the protection key 8. The guide assembly includes a plurality of guide blocks 7 circumferentially distributed in sequence on the inner wall of the pile shoe 3 or the inner wall of the guide extension sleeve 6, and a guide slope 7.1 is provided on the side of the guide block 7 facing the center of the pile shoe 3. The upper end of the guide slope 7.1 is inclined toward the center of the pile shoe 3. In this way, during the installation of the conductor frame, the steel pipe pile 2 can be inserted into the pile shoe 3 through the guide slope 7.1 of the guide block 7 to guide it, which is conducive to the smooth descent of the pile shoe 3 and ensures the grouting gap between the pile shoe 3 and the steel pipe pile 2.

[0065] Specific embodiment 3: The rest of the structure of this embodiment refers to specific embodiment 1 or specific embodiment 2, and the difference is that: like Figure 8 As shown, a pile-first method pile shoe type jacket structure also includes an anti-sinking plate 9. The anti-sinking plate 9 is fixedly connected to the bottom of the jacket body 1. The anti-sinking plate 9 is provided with a plurality of through holes distributed in an array. The anti-sinking plate 9 is sunk into the seabed soil layer. The anti-sinking plate 9 is provided to limit the settlement of the jacket. Steel ribs are welded on the anti-sinking plate 9 to enhance the structural strength and friction of the anti-sinking plate 9. In one implementation of this embodiment, Figure 8 As shown, the anti-sinking plate 9 covers the entire bottom of the jacket body 1. This embodiment is suitable for soil layers with poor geological conditions and has a better anti-sinking effect.

[0066] In another implementation of this embodiment, Fig. 9 As shown, an anti-sinking plate 9 is partially provided at the bottom of the jacket body 1, specifically, an anti-sinking plate 9 is provided at each pile shoe 3. This embodiment is suitable for soil layers with good geological conditions.

[0067] Specific embodiment 4 is a construction method of a pile-first method pile shoe type jacket structure. The specific structure of the pile-first method pile shoe type jacket structure in the construction method refers to specific embodiment 1 or specific embodiment 2 or specific embodiment 3.

[0068] A construction method of a pile shoe type jacket structure using a pile-first method comprises the following steps in sequence: First, the steel pipe piles 2 are installed by driving the steel pipe piles 2 into the seabed.

[0069] Second, obtain the top elevation of each steel pipe pile 2; then, adjust the limit support component 4 according to the obtained top elevation of each steel pipe pile 2, so that after the pile shoe 3 is supported on the top of the steel pipe pile 2 by the limit support component 4, the pile shoe 3 on each steel pipe pile 2 can be located at the same height.

[0070] Third, install the jacket body 1, and sleeve the pile shoes 3 on the corresponding steel pipe piles 2, so that the pile shoes 3 are supported on the top of the steel pipe piles 2 through the limiting support components 4. At this time, the pile shoes 3 on each steel pipe pile 2 are at the same height.

[0071] Fourth, grouting and sealing, grouting is performed between the pile shoe 3 and the steel pipe pile 2, so that the pile shoe 3 and the steel pipe pile 2 are connected as one. The construction method of the pile shoe type jacket structure of the pile first method of this embodiment adjusts the limiting support component 4 on the top of each pile shoe 3 (lengthens or shortens the limiting support component 4) according to the top elevation of each steel pipe pile 2, and eliminates the difference in the top height of each steel pipe pile 2 through the limiting support component 4, so that after the pile shoe 3 is supported on the top of the steel pipe pile 2 by the limiting support component 4, the pile shoe 3 on each steel pipe pile 2 is at the same height, and the jacket body 1 can be upright without underwater pile cutting operation to avoid tilting; therefore, it is possible to avoid underwater pile cutting operation while ensuring that the jacket is upright after installation to avoid tilting, thereby reducing the construction difficulty and construction cost, and improving construction efficiency.

[0072] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any way. Any simple modification, change and equivalent transformation made to the above embodiment based on the technical essence of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. A pile-first method pile shoe type jacket structure, comprising a plurality of steel pipe piles and a jacket body, characterized in that: It also includes a plurality of pile shoes, which are fixedly connected to the bottom of the conductor frame body, and the pile shoes are sleeved on the steel pipe piles. Each steel pipe pile is sleeved with the pile shoes, and a limited support component is arranged on the top of the pile shoe, and the pile shoe is supported on the top of the steel pipe pile through the limited support component.

2. The pile shoe type jacket structure according to claim 1 is characterized in that: During construction, the limit support components are adjusted according to the top elevation of each steel pipe pile so that the pile shoes on each steel pipe pile are at the same height.

3. The pile-first method pile shoe type jacket structure according to claim 1 is characterized in that: A grouting seal ring is also provided at the lower part of the inner wall of the pile shoe, and the grouting seal ring is sealed and connected to the outer wall of the steel pipe pile. A guide extension sleeve extending downward is provided at the lower end of the pile shoe, and the length of the guide extension sleeve is greater than or equal to a set value, and the guide extension sleeve is inserted into the seabed soil layer; A plurality of circumferentially distributed protection keys are arranged on the inner wall of the pile shoe below the grouting sealing ring, and a protection inclined surface is arranged on the side of the protection key facing the center of the pile shoe.

4. The pile-first method pile shoe type jacket structure according to claim 3 is characterized in that: It also includes a guide assembly located below the protection key, which includes a plurality of guide blocks distributed in sequence on the inner wall of the pile shoe or the inner wall of the guide extension sleeve in the circumferential direction, and a guide slope is provided on the side of the guide block facing the center of the pile shoe.

5. A pile-first method pile shoe type jacket structure according to claim 1, 2, 3 or 4, characterized in that: The position-limiting support component includes a plurality of chains or steel wire ropes, and the chains or steel wire ropes form a mesh structure above the top of the pile shoe.

6. A pile-first method pile shoe type jacket structure according to claim 1, 2 or 3, characterized in that: The position limiting support component comprises: A supporting steel frame located above the top of the pile shoe; A plurality of steel bars are distributed circumferentially around the pile shoe, wherein the lower ends of the steel bars are welded or bolted to the pile shoe, and the upper ends of the steel bars are welded or bolted to the supporting steel frame.

7. A pile-first method pile shoe type jacket structure according to claim 1, 2, 3 or 4, characterized in that: The position-limiting support component comprises an upper support tube, the lower end of the upper support tube is connected to the upper end of the pile shoe, the upper end of the upper support tube extends upward, and a support cover plate is provided at the upper end of the upper support tube.

8. The pile-first method pile shoe type jacket structure according to claim 1, 2, 3 or 4, characterized in that: It also includes an anti-sinking plate, which is fixedly connected to the bottom of the jacket body. The anti-sinking plate is provided with a plurality of through holes distributed in an array, and the anti-sinking plate is sunk into the seabed soil layer.

9. A pile-first method pile shoe type jacket structure according to claim 1, 2, 3 or 4, characterized in that: The lower end of the pile shoe is provided with an expanding diameter section whose inner diameter gradually increases from top to bottom.

10. A construction method for a pile shoe type jacket structure using a pile-first method according to any one of claims 1 to 9, characterized in that: The following steps are included in sequence: First, steel pipe pile installation, driving the steel pipe pile into the seabed; Second, the top elevation of each steel pipe pile is obtained; then, the limit support component is adjusted according to the obtained top elevation of each steel pipe pile, so that after the pile shoe is supported on the top of the steel pipe pile by the limit support component, the pile shoe on each steel pipe pile can be located at the same height; Third, install the jacket body, put the pile shoe on the corresponding steel pipe pile, and support the pile shoe on the top of the steel pipe pile through the limit support component. At this time, the pile shoe on each steel pipe pile is at the same height; Fourth, grouting sealing: grouting is performed between the pile shoe and the steel pipe pile to connect the pile shoe and the steel pipe pile as one.

Citation Information

Patent Citations

  • Rear-piling jacket construction method, rear-piling jacket construction assembly and rear-piling jacket

    CN107268669A

  • Offshore wind power pile shoe expansion type jacket foundation

    CN112252354A

  • Offshore lifting type base booster station and installation and maintenance method thereof

    CN116657575A

  • Sink preventing and leveling device for installation of offshore platform pile pipe frame

    CN201043271Y

  • A foot boots formula jacket structure for marine booster station

    CN206298888U