An intelligent building control system

By introducing building flow analysis modules and power analysis modules into the intelligent building control system, the problem that existing systems cannot predict trend time periods and perform effective control is solved, and flexible energy management for each time period in the building is realized, reducing energy consumption and costs.

CN119087887BActive Publication Date: 2025-03-25JIANGSU TONGWEI TECH CO LTD +1
4 Cites 1 Cited by

Patent Information

Application Number
CN202411316200.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-20
Publication Date
2025-03-25
Estimated Expiration
2044-09-20

AI Technical Summary

Technical Problem

The existing intelligent building control system cannot predict the trend time period type in the building, cannot analyze and control different situations, and cannot judge the application effect of peak time periods and the consumption status of the trough time periods, resulting in an increase in energy consumption.

Method used

An intelligent building control system was designed, including building flow analysis module, peak power monitoring module, peak power analysis module, trough power analysis module and control terminal. Monitor flow information through sensors, analyze time period types, evaluate the application effect of peak time periods and the energy consumption status of low time periods, and automatically switch power energy or connect power lines to optimize energy use.

Benefits of technology

It realizes flexible control of each time period in the building, reduces unnecessary energy consumption, reduces energy costs, improves the operating capacity of electrical equipment, and ensures efficient operation during peak periods and minimum energy consumption during trough periods.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention discloses an intelligent building control system, and relates to the technical field of intelligent building control. The invention comprises a building flow analysis module, a peak power monitoring module, a peak power analysis module, a valley power analysis module and a control terminal. The corresponding time period type in the building is obtained by judgment, and then the classification analysis and control of each time period is realized. According to the application effect of each power equipment in the building corresponding to the peak time period, it is judged whether each power equipment in the building needs to control the switching of electric energy in the peak time period. At the same time, based on the predicted consumption value, the consumption state of each power equipment in the building corresponding to the valley time period is judged, and then it is analyzed whether each power equipment needs to control the connection of power lines in the valley time period, so as to realize the flexible adjustment of energy application in the building, reduce unnecessary energy consumption, thereby reducing energy costs, and realize the intelligent control of each power equipment in the building corresponding to each time period.