Reactive optimal configuration method and system for transformer substation

Through the genetic algorithm optimization of capacitor bank configuration and trend calculation, the problems of low adjustment capabilities and frequent equipment switching in the reactive compensation configuration of the substation are solved, and effective response to load fluctuations and stable voltage improvements are achieved.

CN119093394APending Publication Date: 2024-12-06TECH COLLEGE BRANCH OF STATE GRID CORP OF CHINA +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411113831.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The existing reactive compensation configuration method for substations has problems such as low regulation capability and frequent equipment switching when capacitors are grouped, resulting in system voltage not meeting the requirements and equipment damage, making it difficult to cope with the peak and valley differences in electricity consumption requirements after new energy access.

Method used

Genetic algorithms are used to optimize the capacitor bank configuration scheme, simulate its operation process on a typical daily load curve, combine entropy weight method and Newton Lafson method to optimize the active loss, capacitor action times and voltage pass rate to form a comprehensive reactive power Optimize configuration model.

Benefits of technology

It effectively solves the problem of reactive power adjustment capability of capacitors with frequent equipment switching, taking into account load fluctuations and timing, and improves the voltage stability and equipment service life of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119093394A_ABST
    Figure CN119093394A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of transformer substations, and provides a reactive power optimization configuration method and system for a transformer substation, and the method comprises the steps: initializing a population, and coding a capacitor bank configuration scheme for each individual in the population; optimizing the population by adopting a genetic algorithm to obtain an optimal individual, and in the optimization process, simulating the switching of a capacitor bank configuration scheme corresponding to each individual of the population on a typical daily load curve to obtain each objective function value, and then obtaining the fitness of each individual through an entropy weight method; wherein the objective function comprises active loss, capacitor action times and voltage qualified rate; switching on the typical daily load curve by simulating a capacitor bank configuration scheme to obtain compensation capacity and capacitor action times at each moment under the typical daily load curve; and on the basis of the compensation capacity at each moment, performing load flow calculation through a Newton-Raphson method to obtain the active power loss and voltage qualification rate. The problem of contradiction between capacitor unequal-capacity grouping reactive power regulation capability and frequent switching of equipment can be solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of substations, and in particular relates to a method and system for optimizing reactive power configuration of a substation. Background Art

[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.

[0003] Power capacitors are important reactive power compensation equipment in substations. Reasonable reactive power configuration plays a vital role in the high-quality operation of power systems.

[0004] At present, there are many studies on the reactive power compensation capacity of substations. However, the configuration of capacitors in groups is often extensive. Taking the 110kV substation as an example, the usual practice is to divide the capacitors into 2 to 4 groups with equal capacity after determining the total compensation capacity. This method is simple and convenient with low investment cost. However, when the equipment is put into operation, it is easy to cause a large reactive power difference in the substation due to the low reactive power regulation ability of the capacitor, resulting in the system voltage not meeting the requirements and large active power loss.

[0005] In order to enhance the reactive power regulation capability of compensation equipment, one solution is to configure capacitors in unequal capacity groups. However, when unequal capacity grouped capacitors are in operation, there is a problem of frequent switching of equipment, which can easily cause damage to the equipment. Therefore, when performing reactive power configuration of substations, capacitors are often configured in equal capacity groups. However, with the accelerated construction of new power systems, new energy sources such as photovoltaics and wind power have developed rapidly in recent years, and new energy-consuming equipment such as electric vehicles have begun to be widely connected, resulting in a continuous widening of the peak-to-valley difference in electricity demand, and a significant increase in the demand for the construction of flexible regulation capabilities of power systems. It is imperative to optimize and improve the conventional reactive power configuration method of substations, and unequal capacity grouping of capacitors may be one of the solutions. However, as mentioned above, compared with the conventional capacitor equal capacity grouping method, the unequal capacity grouping configuration method has the problem of frequent switching of compensation devices and easy damage to equipment during operation. Summary of the invention

[0006] In order to solve the technical problems existing in the above-mentioned background technology, the present invention provides a method and system for optimizing reactive power configuration of a substation, which simulates the operation process of a capacitor on a typical daily load curve, obtains capacitor operation adjustment costs such as active power loss, number of capacitor actions, and node voltage qualification rate, and adopts a genetic algorithm to solve the problem, thereby obtaining a reactive power configuration scheme for the substation, which intuitively reflects the operation effect of the capacitor, takes into account the volatility and timing of the load, and can solve the contradiction between the reactive power adjustment capability of capacitors with unequal capacitance groups and the frequent switching of equipment.

[0007] In order to achieve the above object, the present invention adopts the following technical solution:

[0008] A first aspect of the present invention provides a method for optimizing reactive power configuration of a substation, comprising:

[0009] Obtain typical daily load curve;

[0010] Initialize the population, each individual in the population encodes a capacitor bank configuration scheme;

[0011] The population is optimized by using a genetic algorithm to obtain the optimal individual. During the optimization process, the capacitor bank configuration scheme corresponding to each individual in the population is simulated to be switched on the typical daily load curve. After obtaining each objective function value, the fitness of each individual is obtained by an entropy weight method.

[0012] Decoding the optimal individual into an optimal capacitor bank configuration scheme to perform reactive power optimization configuration of the substation;

[0013] Among them, the objective function includes active power loss, number of capacitor actions and voltage qualification rate; by simulating the capacitor group configuration scheme and switching on the typical daily load curve, the compensation capacity and the number of capacitor actions at each moment under the typical daily load curve are obtained; based on the compensation capacity at each moment, combined with the load on the low-voltage side of the main transformer, the active network loss and voltage qualification rate are obtained through Newton-Raphson method flow calculation.

[0014] Furthermore, the objective function also includes a planned investment cost of a capacitor, and the planned investment cost of the capacitor is a weighted sum of the number of capacitor groups and the capacitor capacity.

[0015] Furthermore, the fitness of the individual is:

[0016]

[0017] Among them, b represents the number of objective functions, f j represents the jth objective function value of an individual after normalization, x ij represents the jth objective function value of the ith individual after normalization, and a represents the number of individuals in the population.

[0018] Furthermore, the step of switching on and off on a typical daily load curve includes:

[0019] Arrange the single group capacity of capacitors and the gears they form in order from small to large;

[0020] The capacitor position at the initial moment on the typical daily load curve defaults to the minimum position that satisfies the requirement that the power factor on the low-voltage side of the substation is greater than the set value and the voltage is qualified;

[0021] At regular intervals, the power factor on the low-voltage side of the substation is monitored. If it does not meet the requirements, the capacitor groups at adjacent levels are gradually added or removed until the power factor or voltage meets the requirements.

[0022] A second aspect of the present invention provides a substation reactive power optimization configuration system, comprising:

[0023] A data acquisition module is configured to: acquire a typical daily load curve;

[0024] An initialization module is configured to: initialize a population, each individual in the population encodes a capacitor bank configuration scheme;

[0025] The optimization module is configured to: optimize the population using a genetic algorithm to obtain the optimal individual, and in the optimization process, simulate the capacitor bank configuration scheme corresponding to each individual in the population to be switched on the typical daily load curve, obtain each objective function value, and then obtain the fitness of each individual by an entropy weight method;

[0026] A configuration module is configured to: decode the optimal individual into an optimal capacitor bank configuration scheme to perform reactive power optimization configuration of the substation;

[0027] Among them, the objective function includes active power loss, number of capacitor actions and voltage qualification rate; by simulating the capacitor group configuration scheme and switching on the typical daily load curve, the compensation capacity and the number of capacitor actions at each moment under the typical daily load curve are obtained; based on the compensation capacity at each moment, combined with the load on the low-voltage side of the main transformer, the active network loss and voltage qualification rate are obtained through Newton-Raphson method flow calculation.

[0028] Furthermore, the objective function also includes a planned investment cost of a capacitor, and the planned investment cost of the capacitor is a weighted sum of the number of capacitor groups and the capacitor capacity.

[0029] Furthermore, the fitness of the individual is:

[0030]

[0031] Among them, b represents the number of objective functions, f j represents the jth objective function value of an individual after normalization, x ij represents the jth objective function value of the ith individual after normalization, and a represents the number of individuals in the population.

[0032] Furthermore, the step of switching on and off on a typical daily load curve includes:

[0033] Arrange the single group capacity of capacitors and the gears they form in order from small to large;

[0034] The capacitor position at the initial moment on the typical daily load curve defaults to the minimum position that satisfies the requirement that the power factor on the low-voltage side of the substation is greater than the set value and the voltage is qualified;

[0035] At regular intervals, the power factor on the low-voltage side of the substation is monitored. If it does not meet the requirements, the capacitor groups at adjacent levels are gradually added or removed until the power factor or voltage meets the requirements.

[0036] A third aspect of the present invention provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps in the method for optimizing reactive power configuration of a substation as described above.

[0037] The fourth aspect of the present invention provides a computer device, including a computer-readable storage medium, a processor, and a computer program stored on the computer-readable storage medium and executable on the processor, wherein when the processor executes the program, the steps in a substation reactive power optimization configuration method as described above are implemented.

[0038] Compared with the prior art, the present invention has the following beneficial effects:

[0039] The present invention simulates the operation process of capacitors on a typical daily load curve, obtains capacitor operation adjustment costs such as active power loss, capacitor action times, node voltage qualification rate, etc., adopts a genetic algorithm to solve, and obtains a reactive power configuration scheme for a substation, which directly reflects the operation effect of the capacitor, takes into account the volatility and timing of the load, and can solve the contradiction between the reactive power adjustment capability of capacitors with unequal capacitance groups and the frequent switching of equipment.

[0040] The present invention uses power factor, voltage, switching interval, etc. as constraints to simulate the operation process of the capacitor on a typical daily load curve, which is more in line with engineering practice. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.

[0042] Figure 1 is a simplified model diagram of a power grid according to the first embodiment of the present invention;

[0043] Figure 2 is a flow chart of a genetic algorithm according to the first embodiment of the present invention;

[0044] Figure 3 It is a structural diagram of a computer device according to a fourth embodiment of the present invention. DETAILED DESCRIPTION

[0045] To make the purpose, technical solution and advantages of the embodiments of the present invention more clear, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0046] It should be noted that the following detailed descriptions are all illustrative and intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.

[0047] Embodiment 1

[0048] This embodiment provides a method for optimizing reactive power configuration of a substation.

[0049] The present embodiment provides a method for optimizing reactive power configuration of a substation, which considers the operation and regulation cost of capacitors in the planning stage, simulates the switching operation process of capacitors on typical daily load curves in four quarters, obtains system active power loss, capacitor action times, system node voltage qualification rate, etc., and establishes a substation reactive power optimization configuration model that comprehensively considers capacitor planning investment cost and operation and regulation cost.

[0050] The present embodiment provides a method for optimizing reactive power configuration of a substation. First, several curves of each quarter are merged based on the principle of minimizing the distance between the curves to obtain typical daily active load curves and reactive load curves of four quarters. Then, according to the capacitor switching regulations, the operation process of the capacitor on the typical daily load curve is simulated to obtain the capacitor operation adjustment costs such as system active power loss, capacitor operation times, and system node voltage qualification rate. Combined with the planned investment cost of the capacitor, a reactive power optimization configuration model is obtained. Finally, a genetic algorithm is used to solve the problem to obtain a reactive power configuration plan for the substation.

[0051] This embodiment provides a method for optimizing reactive power configuration of a substation, comprising the following steps:

[0052] Step 1: Obtain original data: Collect relevant information such as substation load, line, transformer, etc. based on historical data.

[0053] Step 2: Calculate and obtain a simplified power grid model based on the original data.

[0054] Taking the 110 / 10kV main transformer as the research object, the equivalent model of the distribution network is as follows Figure 1 As shown in the figure, the voltage levels of nodes 1, 2, and 3 are 110kV, 110kV, and 10kV respectively; G is the equivalent power source of the remote large system; Z L , Z T They are the equivalent impedance of 110kV transmission line and main transformer respectively; S L , Q CThey are respectively the low-voltage side load and reactive power compensation capacity of the 110kV main transformer.

[0055] Step 3: Calculate the typical daily load curve. Several curves are merged based on the principle of minimum distance between curves to obtain the typical daily active load curve and typical daily reactive load curve of the substation in four quarters.

[0056] Step 4: Calculate the investment cost of capacitor planning. Consult relevant information to obtain the investment cost of capacitors when planning the substation.

[0057] Step 5: Calculate the capacitor operation adjustment cost. According to the capacitor switching principle, simulate the capacitor switching process on the typical daily load curve of the four seasons to obtain the reactive compensation capacity of the power system at different times. Then, combined with the simplified power grid model, the capacitor adjustment cost during system operation is obtained through the Newton-Raphson method flow calculation.

[0058] In order to calculate the capacitor operation adjustment cost, this embodiment simulates and calculates the capacitor switching process on a typical daily load curve (typical daily active load curve and typical daily reactive load curve). According to the relevant regulations for substation operation, capacitors are usually switched on and off when the system does not meet the power factor constraint or voltage constraint, and sufficient interval time is required for switching on and off. The typical daily active load curve is P L , the typical daily reactive load curve is Q L , load apparent power S L =P L +jQ L , power factor This embodiment sets:

[0059] 1) When the power factor on the low-voltage side of the substation is less than 0.9, the capacitor is put into operation. When the power factor on the low-voltage side of the substation is greater than 0.98, the capacitor is withdrawn. If the power factor meets the requirements, the capacitor is not put into operation or withdrawn.

[0060] 2) When the voltage on the low-voltage side of the substation is less than 0.9, the capacitor is put into operation; when the voltage on the low-voltage side of the substation is greater than 1.05, the capacitor is removed;

[0061] 3) When capacitors are switched in and out, the capacitor with the smallest single group capacity will be activated first;

[0062] 4) The time interval between capacitor switching on and off is 15 minutes.

[0063] On a typical daily load curve, the capacitor switching process is as follows:

[0064] 1) Arrange the capacitor capacity Q in ascending order 0i And the gear position Q formed by it Tj ;

[0065] 2) The capacitor position at the initial moment on the typical daily load curve defaults to the minimum position that satisfies the power factor on the low-voltage side of the substation greater than the set value of 0.9 and the voltage is qualified;

[0066] 3) Monitor the power factor of the low-voltage side of the substation at regular intervals (15 minutes). If it does not meet the requirements, gradually put the capacitor banks in the adjacent positions into or out of service until the power factor or voltage meets the requirements.

[0067] 4) According to the above process, complete the simulation of capacitor switching on and off on typical daily load curves in spring, summer, autumn and winter.

[0068] When the capacitor is in operation, it will switch on and off the capacitor bank according to the reactive power demand of the substation. The more frequent the operation, the higher the cost. In addition, the system voltage quality and active network loss are closely related to the reactive power regulation ability of the capacitor. Therefore, the regulation cost of the capacitor during operation can include the following three aspects:

[0069] 1) System active network loss: active network loss generated by related equipment during power grid operation, including lines and transformers;

[0070] 2) Capacitor switching cost: The labor cost required for each capacitor switching and the life loss of the equipment can be expressed by the number of capacitor switching times within the sampling period;

[0071] 3) Node voltage deviation: The node voltage does not meet the relevant regulations due to insufficient reactive power compensation of the system, which can be expressed by the voltage qualification rate within the sampling period.

[0072] According to the capacitor switching principle, the capacitor switching process is simulated when it is running on the typical daily load curve of each season, and the compensation capacity at each moment under the typical daily load curve is obtained. and the number of capacitor actions at each moment Combination Figure 1 The power grid model of node 3 is At each moment, the Newton-Raphson method power flow calculation is performed to obtain the system active network loss at each moment. And voltage pass rate Among them, S L is the load on the low voltage side of the 110kV main transformer. The formula is as follows:

[0073]

[0074]

[0075] In the formula, Respectively represent the daily average value of the system's annual and quarterly active power loss; T = 24h, represents the time period on the typical daily load curve; N eRepresents the branch set of the system; represents the active power loss of branch k at time t; Respectively represent the daily average of the capacitor's annual and quarterly operation times; Indicates the number of operations of the capacitor at time t; Respectively represent the qualified rate of system node voltage in the year, quarter and time t; N d Indicates the number of nodes in the system; Indicates the number of system nodes that do not meet the voltage requirements at time t; Represents capacitor adjustment cost and system active power loss Capacitor operation times System node voltage qualification rate Related.

[0076] Among them, the Newton-Raphson method power flow calculation process is as follows:

[0077] 1) According to Z L , Z T , establish the node admittance matrix;

[0078] 2) Initialize node voltage: Node 1 is a balanced node, the voltage amplitude is set to 1.02, and the phase angle is set to 0; Nodes 2 and 3 are PQ nodes (nodes where active power and reactive power are known to be injected), the voltage amplitude is set to 1, and the phase angle is set to 0;

[0079] 3) Calculate power imbalance: Calculate the power injection (or absorption) and power injection imbalance of each node using the node voltage and node admittance matrix;

[0080] 4) Construct Jacobian matrix: According to the power imbalance, construct Jacobian matrix to update node voltage; Jacobian matrix describes the relationship between power imbalance and node voltage; in the power imbalance matrix, the outflow power of node 3 is is a known quantity;

[0081] 5) Solve the linear equations: Use the Newton-Raphson method to iteratively solve the linear equations to update the node voltages until they converge to a solution;

[0082] 6) Check convergence: After each iteration, it is necessary to check whether the power flow calculation has converged. Usually, an error tolerance is set to determine whether further iteration is needed;

[0083] 7) End of iteration: When the power flow calculation converges, the voltage amplitude and phase angle of each node, as well as the power size and power flow direction of each branch are output;

[0084] 8) Output result: According to the voltage of each node, the number of nodes that do not meet the voltage requirements is obtained According to the power difference between the two ends of each branch, we can get

[0085] Step 6: Establishment of reactive power optimization configuration model. Including capacitor planning investment cost and operation regulation cost, firstly, linear membership function is used to fuzzify the objective function, and then appropriate weights are selected to transform multiple objectives into a single objective.

[0086] In order to coordinate the problem of inconsistency between the reactive power regulation capability of capacitors during operation and the actual reactive power demand of substations, this paper proposes to consider the regulation cost of capacitors during operation in the reactive power planning stage of substations, and establish a substation reactive power optimization configuration model that comprehensively considers the planning investment cost and operation regulation cost of capacitors, as follows:

[0087]

[0088] W C =w N N Q +w Q Q C

[0089] In the formula, F W W represents the reactive power optimization target of this embodiment; C Indicates the investment cost of the capacitor; when j = 1, 2, 3, 4, F j Respectively represent W C , w N 、w Q Respectively represent the unit price of the number of capacitors and the unit price of capacity; N Q , Q C They represent the number of capacitor groups and capacitor capacity respectively.

[0090] Constraints include total capacity constraints, single group capacity constraints, and group number constraints, as follows:

[0091]

[0092] In the formula, Q 0i , Q 0max , Q 0min Respectively represent the single group capacity of capacitors and its upper and lower limits; N Q 、N Q,max 、N Q,min Respectively represent the number of capacitor groups and their upper and lower limits.

[0093] Step 7: Reactive power optimization calculation. Set the optimization variable to the single capacitor group capacity Q 0u , the number of optimization variables is the upper limit of the number of groups N Q,maxThe genetic algorithm is used to calculate the optimal reactive power compensation capacity and grouping, which is used to guide planners to optimize the reactive power configuration of substations. If the calculation result shows that the capacity of a single group is zero, it means that the group of capacitors does not need to be configured.

[0094] As an intelligent optimization algorithm, genetic algorithm has the advantages of wide application range, strong optimization ability, simple program implementation, etc. It is suitable for solving complex nonlinear optimization problems such as reactive power planning optimization, but it also has problems such as slow calculation speed and poor convergence.

[0095] In this embodiment, the genetic algorithm is set as follows:

[0096] 1) Obtaining the fitness function.

[0097] Each iterative calculation has a valid solutions, and each solution has b (in this embodiment, b=4) objective function values ​​(i.e., the planned investment cost W of the capacitor) C , Active network loss Capacitor operation times Voltage pass rate ).

[0098] Since the dimensions of each objective function are different, normalization is required. For the smaller the better objective function, the following formula is used for processing:

[0099]

[0100] In the formula, F max,j 、F min,j Respectively represent the maximum and minimum values ​​of the jth objective function among all solutions; F j Represents the j-th objective function value of an individual before normalization.

[0101] Using the weighted method, we get the population fitness function:

[0102]

[0103] In the formula, λ j represents f j The weight coefficient, f j Represents the j-th objective function value of an individual after normalization.

[0104] Among them, each weight coefficient is determined by the entropy method.

[0105] First, according to the normalization result of the objective function, the fuzzy objective function matrix is ​​obtained:

[0106]

[0107] In the formula, x ijrepresents the fuzzy objective function value of the jth objective function value of the ith individual, that is, f j .

[0108] Then, we calculate f j The entropy of is:

[0109]

[0110] Finally, we calculate f j The entropy weight of is:

[0111]

[0112] Where 0≤λ j ≤1,

[0113] 2) Adaptive crossover mutation rate.

[0114] In order to speed up the population convergence, the crossover rate and mutation rate of the crossover and mutation operations in the evolution of the race will be continuously adjusted with the fitness of the evolving individuals, so that individuals with higher fitness have lower crossover mutation rates, thereby protecting the excellent individuals in the population. Individuals with lower fitness in the population have higher crossover mutation rates, thereby making individuals with lower fitness produce more changes. The crossover rate P of the crossover and mutation operations is c and mutation rate P m for:

[0115]

[0116]

[0117] In the formula, f W,max represents the fitness of the best individual in the population; f W,avg is the average fitness of the population, f W ′ is the individual with higher fitness among the crossover individuals, f W is the fitness of the individual to be mutated, k1, k2, k3, k4 are controllable parameters of population evolution.

[0118] 3) Elite retention strategy. When the fitness of the offspring of excellent individuals (whose fitness is higher than the average fitness of the population) after crossover mutation is lower than the average fitness of the population, the parent individual is retained as a member of the new population, and the parent individual will no longer participate in subsequent evolution; if the fitness of the offspring individual is higher than the average fitness of the population, the offspring is retained, and the parent individual can still participate in subsequent crossover mutation.

[0119] 4) Through the above operations, such as Figure 2 As shown, the genetic algorithm calculation process of this embodiment is summarized as follows:

[0120] ① Initial data input: Set the optimization variable to the single group capacity of the capacitor Q 0u , the number of optimization variables is the upper limit of the number of groups N Q,max , that is, the chromosome length is set to N Q,max , usually N Q,max =4, let g = 1, input the maximum number of iterations G,

[0121] ② Randomly generate the initial population: Each individual in the population encodes a configuration scheme of the capacitor bank. An individual is a chromosome, including up to N Q,max capacitor groups, and encode the capacity Q of each capacitor group 0u , each individual must satisfy the constraints;

[0122] ③Simulate the switching of capacitor banks corresponding to each individual in the population on the typical daily load curve to obtain the value of each objective function W C , The fitness f of each individual is obtained by the entropy weight method W ;

[0123] ④ Determine whether g≤G? If yes, proceed to the next step; if no, skip to step ⑧;

[0124] ⑤Perform selection, crossover and mutation operations on each individual;

[0125] ⑥ Calculate the fitness f of each individual W , adopt an elite retention strategy to retain individuals with better fitness;

[0126] ⑦g=g+1, jump to step ④;

[0127] ⑧ Output the calculation results and use the value of the individual with the highest fitness as the configuration plan of the capacitor bank.

[0128] The present embodiment provides a method for optimizing reactive power configuration of a substation. In the reactive power planning stage, the operating effect of capacitors is considered, and the contradiction between the reactive power regulation capability of capacitors with unequal capacitance grouping and the frequent switching of equipment can be resolved.

[0129] The embodiment provides a method for optimizing reactive power configuration of a substation, which performs reactive power optimization calculation on a typical daily load curve composed of a typical daily active load curve and a reactive load curve in four quarters, taking into account the volatility and timing of the load.

[0130] The present embodiment provides a method for optimizing reactive power configuration of a substation, which establishes operation adjustment cost indicators such as system active power loss, capacitor action times, and system node voltage qualification rate through power flow calculation, and intuitively reflects the operation effect of the capacitor.

[0131] The present embodiment provides a method for optimizing reactive power configuration of a substation, which uses power factor, voltage, switching interval, etc. as constraints, simulates the operation process of capacitors on a typical daily load curve, and is more in line with engineering practice.

[0132] Embodiment 2

[0133] This embodiment provides a substation reactive power optimization configuration system, which specifically includes:

[0134] A data acquisition module is configured to: acquire a typical daily load curve;

[0135] An initialization module is configured to: initialize a population, each individual in the population encodes a capacitor bank configuration scheme;

[0136] The optimization module is configured to: optimize the population using a genetic algorithm to obtain the optimal individual, and in the optimization process, simulate the capacitor bank configuration scheme corresponding to each individual in the population to be switched on the typical daily load curve, obtain each objective function value, and then obtain the fitness of each individual by an entropy weight method;

[0137] A configuration module is configured to: decode the optimal individual into an optimal capacitor bank configuration scheme to perform reactive power optimization configuration of the substation;

[0138] Among them, the objective function includes active power loss, number of capacitor actions and voltage qualification rate; by simulating the capacitor group configuration scheme and switching on the typical daily load curve, the compensation capacity and the number of capacitor actions at each moment under the typical daily load curve are obtained; based on the compensation capacity at each moment, combined with the load on the low-voltage side of the main transformer, the active network loss and voltage qualification rate are obtained through Newton-Raphson method flow calculation.

[0139] The objective function also includes a planned investment cost of capacitors, and the planned investment cost of capacitors is a weighted sum of the number of capacitor groups and the capacitor capacity.

[0140] Among them, the fitness of an individual is:

[0141]

[0142] Among them, b represents the number of objective functions, f j represents the jth objective function value of an individual after normalization, x ij represents the jth objective function value of the ith individual after normalization, and a represents the number of individuals in the population.

[0143] The steps of switching on and off on a typical daily load curve include:

[0144] Arrange the single group capacity of capacitors and the gears they form in order from small to large;

[0145] The capacitor position at the initial moment on the typical daily load curve defaults to the minimum position that satisfies the requirement that the power factor on the low-voltage side of the substation is greater than the set value and the voltage is qualified;

[0146] At regular intervals, the power factor on the low-voltage side of the substation is monitored. If it does not meet the requirements, the capacitor groups at adjacent levels are gradually added or removed until the power factor or voltage meets the requirements.

[0147] It should be noted here that the various modules in this embodiment correspond one-to-one to the various steps in Example 1, and the specific implementation process is the same, which will not be repeated here.

[0148] Embodiment 3

[0149] This embodiment provides a computer-readable storage medium on which a computer program is stored. When the program is executed by a processor, the steps in the method for optimizing reactive power configuration of a substation as described in the first embodiment above are implemented.

[0150] Embodiment 4

[0151] This embodiment provides a computer device, such as Figure 3 As shown, it includes a computer-readable storage medium 1003, a processor 1001, a communication interface 1002, and a computer program stored on the computer-readable storage medium 1003 and executable on the processor 1001, wherein the processor 1001, the communication interface 1002, and the computer-readable storage medium 1003 can be connected via a bus or other means. The communication interface 1002 is used to receive and send data, and when the processor 1001 executes the program, the steps in the method for optimizing the configuration of reactive power in a substation as described in the first embodiment above are implemented.

[0152] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0153] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0154] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0155] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for optimizing reactive power configuration of a substation, characterized in that: include: Obtain typical daily load curve; Initialize the population, each individual in the population encodes a capacitor bank configuration scheme; The population is optimized by using a genetic algorithm to obtain the optimal individual. During the optimization process, the capacitor bank configuration scheme corresponding to each individual in the population is simulated to be switched on the typical daily load curve. After obtaining each objective function value, the fitness of each individual is obtained by an entropy weight method. Decoding the optimal individual into an optimal capacitor bank configuration scheme to perform reactive power optimization configuration of the substation; Among them, the objective function includes active power loss, number of capacitor actions and voltage qualification rate; by simulating the capacitor group configuration scheme and switching on the typical daily load curve, the compensation capacity and the number of capacitor actions at each moment under the typical daily load curve are obtained; based on the compensation capacity at each moment, combined with the load on the low-voltage side of the main transformer, the active network loss and voltage qualification rate are obtained through Newton-Raphson method flow calculation.

2. A method for optimizing reactive power configuration of a substation according to claim 1, characterized in that: The objective function also includes a planned investment cost of a capacitor, and the planned investment cost of the capacitor is a weighted sum of the number of capacitor groups and the capacitor capacity.

3. A method for optimizing reactive power configuration of a substation according to claim 1, characterized in that: The fitness of the individual is: Among them, b represents the number of objective functions, f j represents the jth objective function value of an individual after normalization, x ij represents the jth objective function value of the ith individual after normalization, and a represents the number of individuals in the population.

4. A method for optimizing reactive power configuration of a substation according to claim 1, characterized in that: The step of switching on and off on a typical daily load curve comprises: Arrange the single group capacity of capacitors and the gears they form in order from small to large; The capacitor position at the initial moment on the typical daily load curve defaults to the minimum position that satisfies the requirement that the power factor on the low-voltage side of the substation is greater than the set value and the voltage is qualified; At regular intervals, the power factor on the low-voltage side of the substation is monitored. If it does not meet the requirements, the capacitor groups at adjacent levels are gradually added or removed until the power factor or voltage meets the requirements.

5. A substation reactive power optimization configuration system, characterized in that: include: A data acquisition module is configured to: acquire a typical daily load curve; An initialization module is configured to: initialize a population, each individual in the population encodes a capacitor bank configuration scheme; The optimization module is configured to: optimize the population using a genetic algorithm to obtain the optimal individual, and in the optimization process, simulate the capacitor bank configuration scheme corresponding to each individual in the population to be switched on the typical daily load curve, obtain each objective function value, and then obtain the fitness of each individual by an entropy weight method; A configuration module is configured to: decode the optimal individual into an optimal capacitor bank configuration scheme to perform reactive power optimization configuration of the substation; Among them, the objective function includes active power loss, number of capacitor actions and voltage qualification rate; by simulating the capacitor group configuration scheme and switching on the typical daily load curve, the compensation capacity and the number of capacitor actions at each moment under the typical daily load curve are obtained; based on the compensation capacity at each moment, combined with the load on the low-voltage side of the main transformer, the active network loss and voltage qualification rate are obtained through Newton-Raphson method flow calculation.

6. A substation reactive power optimization configuration system as claimed in claim 5, characterized in that: The objective function also includes a planned investment cost of a capacitor, and the planned investment cost of the capacitor is a weighted sum of the number of capacitor groups and the capacitor capacity.

7. A substation reactive power optimization configuration system as claimed in claim 5, characterized in that: The fitness of the individual is: Among them, b represents the number of objective functions, f j represents the jth objective function value of an individual after normalization, x ij represents the jth objective function value of the ith individual after normalization, and a represents the number of individuals in the population.

8. A substation reactive power optimization configuration system as claimed in claim 5, characterized in that: The step of switching on and off on a typical daily load curve comprises: Arrange the single group capacity of capacitors and the gears they form in order from small to large; The capacitor position at the initial moment on the typical daily load curve defaults to the minimum position that satisfies the requirement that the power factor on the low-voltage side of the substation is greater than the set value and the voltage is qualified; At regular intervals, the power factor on the low-voltage side of the substation is monitored. If it does not meet the requirements, the capacitor groups at adjacent levels are gradually added or removed until the power factor or voltage meets the requirements.

9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the steps in a method for optimizing reactive power configuration of a substation as described in any one of claims 1 to 4 are implemented.

10. A computer device comprising a computer-readable storage medium, a processor, and a computer program stored in the computer-readable storage medium and executable on the processor, characterized in that: When the processor executes the program, the steps in the method for optimizing reactive power configuration of a substation as described in any one of claims 1 to 4 are implemented.