Data detection method, device, electronic equipment and storage medium
By combining multiple initial detection results of small models and secondary processing of the intermediate detection results of large models, the problem of high computing resources consumption when large models work together is solved, and more efficient computing resources utilization is achieved.
Patent Information
- Application Number
- CN202411853966.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-16
- Publication Date
- 2025-04-01
- Estimated Expiration
- 2044-12-16
AI Technical Summary
When large models work together with small models, the computing resources consumed are large, resulting in inefficiency.
By combining multiple initial detection results belonging to the same task type, using a large model to detect the combined data, intermediate detection results are obtained, and secondary detection results of each data to be detected based on the intermediate detection results and data mapping relationship, and finally the final detection results of the data to be detected are obtained.
A large model only needs to perform one detection to obtain the final detection results for multiple data to be detected in the small model, reducing the number of times the large model detects data and reducing the computing resources consumed by the large model working together with the small model.