Flow control method and device, storage medium and semiconductor processing equipment
By setting up a virtual chamber and a reaction chamber in a semiconductor device to detect and correct the gas flow, the first-piece effect problem caused by the pre-processing chamber is solved, and process stability and film thickness uniformity are improved.
CN119717903APending Publication Date: 2025-03-28BEIJING NAURA MICROELECTRONICS EQUIP CO LTD
0 Cites 3 Cited by
Patent Information
- Application Number
- CN202311265614.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-09-27
- Publication Date
- 2025-03-28
AI Technical Summary
Technical Problem
In epitaxial equipment applications, the pretreatment chamber is in an idle state for a long time due to the long process time, resulting in the first-piece effect, which in turn affects the uniformity of the etching film thickness.
Method used
A flow control method is adopted to detect and correct the gas flow by setting up a virtual chamber and a reaction chamber in a semiconductor device and setting up a flow controller and a switch valve on the intake pipeline to compensate for temperature and flow changes and avoid the first-piece effect.
Benefits of technology
It effectively solves the problem of etching film thickness changes due to temperature and flow changes, and improves process stability and film thickness uniformity.
✦ Generated by Eureka AI based on patent content.
Abstract
The invention discloses a flow control method and device, a storage medium and semiconductor processing equipment. The flow control method comprises the steps that a second switch valve is switched on, a first switch valve is switched off, and the first actual flow of preset gas in a gas pipeline is detected when a flow controller is set to be the first current preset target flow; the second switch valve is switched off, the first switch valve is switched on, and the current equivalent flow of the preset gas in the gas pipeline is detected when the flow controller is set to be the first current preset target flow; calculating current temperature change values of the reaction chamber and the virtual chamber; calculating a first flow correction coefficient of a flow controller according to the first current preset target flow and the first actual flow; calculating a second flow correction coefficient of the flow controller according to the current temperature change value; and correcting the first current preset target flow of the flow controller by adopting the first flow correction coefficient and the second flow correction coefficient. The problem that the thickness of the etched film changes can be solved, and the first sheet effect is restrained.