CG resource storage method and device and electronic equipment
By dividing CG teaching resources into sub-resources and scattering them into student equipment, the server storage pressure problem caused by centralized storage of CG teaching resources is solved, and the load balancing and performance improvement of resource access is achieved.
CN119718631AInactive Publication Date: 2025-03-28NEW SIGHT DIGITAL TECH CO LTD SHANDONG
0 Cites 0 Cited by
Patent Information
- Application Number
- CN202411721683.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-28
- Publication Date
- 2025-03-28
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Technical Problem
In the prior art, the centralized storage of CG teaching resources on the server may increase the storage pressure of the server and even congestion and downtime when a large number of students access it simultaneously.
Method used
The CG teaching resources are divided into multiple sub-resources and distributed them into the student equipment. By obtaining the CPU utilization of the student equipment, the devices are grouped to achieve optimized allocation of resources.
Benefits of technology
Significantly reduce the storage pressure of the server, realize load balancing of resource access, avoid the problem of slow server response, and improve overall resource utilization and performance.
✦ Generated by Eureka AI based on patent content.
Abstract
The invention discloses a CG resource storage method and device and electronic equipment, and relates to the field of data processing. In the method, CG resources needing to be stored are acquired, and the CG resources comprise CG teaching resources and CG practical training resources; acquiring a plurality of connected student devices; the student devices are grouped to obtain a preset first number of student device groups, and each student device group comprises a preset second number of student devices; segmenting the CG teaching resource to obtain a preset second number of CG teaching sub-resources; and sending the CG teaching sub-resources to the student equipment in each student equipment group in a one-to-one manner, so that the student equipment stores the CG teaching sub-resources, and correspondingly sending one CG teaching sub-resource to one student equipment. By implementing the technical scheme provided by the invention, the CG teaching resource is divided into a plurality of sub-resources, and the sub-resources are dispersed and stored in the student equipment, so that the storage pressure of the server can be reduced.
Need to check novelty before this filing date? Find Prior Art