A power engineering construction management method and system based on digital twinning
By quantitatively evaluating and updating the rule base for power engineering construction management, the problems of poor adaptability and low efficiency of digital twin technology during scene conversion are solved, intelligent rule adaptability evaluation and dynamic updating are realized, and the real-time decision-making ability and efficiency of power engineering construction management are improved.
Patent Information
- Application Number
- CN202510983484.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-07-17
- Publication Date
- 2025-10-14
- Estimated Expiration
- 2045-07-17
AI Technical Summary
The existing digital twin technology based on a fixed rule base in power engineering construction management faces the problems of poor adaptability during scene transitions and inefficient reliance on manual adjustments. It is unable to effectively adapt to the environmental characteristics and construction requirements of new scenes, resulting in low timeliness of construction management and low decision-making efficiency.
By quantitatively evaluating the reusability of each rule in the inherent construction management rule base in new scenarios, eliminating rules below the threshold, determining the missing domains of management rules, generating supplementary management rules adapted to new scenarios, and updating the rule base, the digital twin model is used to output management instructions in real time to achieve automated and intelligent rule adaptability evaluation and dynamic updates.
It has enhanced the real-time decision-making capabilities and scenario adaptability of digital twin models in dynamic power engineering construction management, significantly improved the efficiency and effectiveness of construction management, and reduced the need for manual intervention.