Hydrological test section integrated treatment structure and construction method thereof

CN122190176APending Publication Date: 2026-06-12SHANDONG HYDROLOGICAL CENT

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
SHANDONG HYDROLOGICAL CENT
Filing Date
2026-04-13
Publication Date
2026-06-12

Smart Images

  • Figure CN122190176A_ABST
    Figure CN122190176A_ABST
Patent Text Reader

Abstract

The application belongs to the technical field of water conservancy and hydrology monitoring, and relates to a hydrological test section integrated regulation structure and a construction method thereof. The hydrological test section integrated regulation structure comprises a riverbed, a regulation structure layer and a sensing and monitoring integrated system. The regulation structure layer comprises a river bottom area on the riverbed and a slope area connected with both ends of the river bottom area. The river bottom area and the slope area are formed by pouring membrane bag concrete. The river bottom area is provided with a flow contraction section formed by pouring membrane bag concrete and narrowing towards the center line of the river. The sensing and monitoring integrated system comprises a sensing and monitoring integrated system I embedded in the membrane bag concrete and a sensing and monitoring integrated system II arranged on the bank. The application can perfectly adapt to the current situation of remote, scattered, poor river condition and limited investment of small and medium-sized river hydrological stations, and solves the dilemma of unaffordable and unfeasible traditional schemes.
Need to check novelty before this filing date? Find Prior Art