Method for arranging small coal pillar grouting hole based on genetic algorithm in large deformation gob-side entry driving
CN122674170BActive Publication Date: 2026-10-16CHINA UNIV OF MINING & TECH
2 Cites 0 Cited by
Patent Information
- Application Number
- CN202611133960.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-29
- Publication Date
- 2026-10-16
- Estimated Expiration
- 2046-07-29
AI Technical Summary
Technical Problem
[0007]针对上述存在的技术不足,本发明的目的是提供一种基于遗传算法的大变形沿空掘巷小煤柱注浆孔布置方法,其能够解决现有沿空掘巷小煤柱注浆孔布置盲目、扩散重叠量大、加固盲区多、浆液利用率低、煤柱加固效果差的技术痛点,其通过探测分析、模型简化、半径折算、优化排布的流程,能够实现注浆孔科学化、精准化布置,兼顾加固完整性与施工经济性
Benefits of technology
[0027] 1. Drilling inspection technology is used to conduct in-situ detection of deformation, fractures, and broken zones within the coal pillar, quantitatively dividing the micro-fracture zone and the severely broken zone, and accurately delineating the target area for grouting reinforcement. This method abandons the traditional experience-based borehole layout, avoids ineffective drilling, and significantly reduces construction workload and material waste.
✦ Generated by Eureka AI based on patent content.
Abstract
The application discloses a large deformation gob-side entry driving small coal pillar grouting hole arrangement method based on a genetic algorithm, adopts a borehole peeping technology to detect distribution characteristics of internal deformation fissure and broken zone of the small coal pillar, and delimits a grouting reinforcement target area; the side wall of the coal pillar is simplified into a regular plane model, a safety coefficient is introduced to convert an effective diffusion radius in combination with actual diffusion characteristics of the slurry, then the minimum slurry diffusion range overlap degree and the maximum overall effective coverage area of adjacent grouting holes are taken as optimization targets, an intelligent optimization algorithm is used to iteratively solve optimal slurry diffusion radius and grouting hole arrangement parameters, and the hole diameter, hole depth, spacing and arrangement form are determined; a tilt grouting hole is additionally arranged in the deep broken zone, and peeping rechecking and additional hole drilling are carried out after construction. The application can accurately adapt to the reinforcement requirements of the broken small coal pillar, avoids grouting blank areas, reduces invalid slurry overlap, improves slurry utilization and coal pillar integrity, and is suitable for various small coal pillar grouting reinforcement engineering of gob-side entry driving.
Need to check novelty before this filing date? Find Prior Art