A method and device for configuring and optimizing long-time energy storage capacity of a green electricity direct connection electric hydrogen ammonia park
By constructing an energy storage capacity configuration and optimized operation method in the green electricity direct-connection hydrogen-ammonia park, the problem of frequent equipment start-ups and shutdowns caused by fluctuations in wind and photovoltaic power generation has been solved, achieving efficient absorption of new energy and stable power supply, and improving the park's energy autonomy and economy.
Patent Information
- Application Number
- CN202610954239.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-06-30
- Publication Date
- 2026-09-15
AI Technical Summary
The existing off-grid green electricity direct-connection hydrogen and ammonia industrial parks suffer from large fluctuations in wind and photovoltaic power generation, making it difficult to continuously meet the stable power demand of electrolyzers and synthetic ammonia units, resulting in frequent equipment start-ups and shutdowns and low efficiency in the utilization of new energy sources.
The method of configuring and optimizing the long-term energy storage capacity of the green electricity direct-connection hydrogen-ammonia park is adopted. By constructing a set of wind and solar power output scenarios, establishing power and hydrogen balance constraints, calculating the optimal configuration scheme of energy storage capacity, and formulating the optimal scheduling scheme, the energy storage can store electricity when wind and solar power are in surplus and discharge when they are insufficient, thus smoothing power fluctuations.
This has improved the level of new energy consumption, reduced frequent equipment start-ups and shutdowns, increased equipment utilization and production process stability, reduced the number of infeasible production hours, enhanced the park's energy autonomy and power supply reliability, and controlled construction costs.