Link tracing methods, devices, media, and computer program products
By dynamically enabling application-layer tracing based on the system's operating status and associating it with NAT data, the problems of high overhead and link breakage in existing technologies are solved. This achieves a close connection between applications and the network, improving troubleshooting efficiency.
Patent Information
- Application Number
- CN202610921689.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-06-24
- Publication Date
- 2026-09-15
AI Technical Summary
Existing link tracing technologies suffer from problems such as high overhead for full data collection, difficulty in tracing NAT scenarios, and disconnect between application and network monitoring in cloud-native and load-balanced scenarios, making troubleshooting difficult.
By collecting predetermined process information of the target system, identifying the running status, dynamically enabling application layer tracing, and combining NAT data with five-tuple information, full-link tracing data is generated to realize the association between application layer call information and network transmission path.
It reduces system overhead, solves the link breakage problem in NAT scenarios, improves troubleshooting efficiency, and achieves integrated observability of applications and networks.