R&D expense whole-process management and intelligent decision assistance method and system

CN122928274APending Publication Date: 2026-10-16BEIJING SHIJIU TECHNOLOGY CO LTD
0 Cites 0 Cited by

Patent Information

Application Number
CN202611395373.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-09
Publication Date
2026-10-16

AI Technical Summary

Technical Problem

预算控制与研发执行因此长期分离,供管理层参阅的费用信息滞后而零散,难以及时支撑研发投入决策

Benefits of technology

[0057] This invention enables closed-loop management of R&D expenses from data collection to rule adjustment, significantly improving the accuracy, compliance, and dynamic adaptability of expense aggregation. By using preset expense aggregation rules to analyze and structure multi-source heterogeneous data, data silos between different systems can be eliminated, reducing manual processing and verification costs. Precisely linking expense elements to R&D project lifecycle nodes creates an intuitive representation of expense distribution, making expense flows clearly traceable and facilitating managers to quickly grasp the overall picture of investment at each stage and identify weaknesses.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The present application relates to the technical field of data processing, and more particularly to a kind of R&D expense whole process management and intelligent decision-making auxiliary method and system.The method comprises: obtaining multi-source R&D expense data, based on expense collection rule is parsed and structured processing, extract cost element characteristics and establish the mapping relationship with project node, obtain structured expense dataset;Cost element is associated with the corresponding node in the life cycle of R&D project and matched to generate cost distribution state representation;According to the dependence between nodes, the compliance of cost distribution state representation is verified, and abnormal cost distribution mode is identified and abnormal identification information is generated;Risk quantification is carried out on the cost distribution state marked with abnormal identification to obtain risk assessment result, and cost adjustment suggestion is generated according to risk assessment result and budget control strategy, and the expense collection rule is adjusted accordingly.The present application can realize the automatic management and abnormal early warning of R&D expense whole process, and improve the compliance verification and intelligent decision-making efficiency.
Need to check novelty before this filing date? Find Prior Art