Automatic snow removal and road maintenance system
The automatic snow removal system addresses inefficiencies and health risks of traditional methods by using buried pipes and heating stations to melt snow and ice automatically, enhancing safety and reducing costs through automation and reclaimed water use.
Patent Information
- Application Number
- CN202420621290.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-28
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-03-28
AI Technical Summary
Traditional snow removal methods on highways are inefficient, labor-intensive, costly, and pose health risks to workers, while mechanical vehicles struggle to keep up with snowfall and can cause instability and accidents.
An automatic snow removal and maintenance system with buried pipes and nozzles connected to a heating station, equipped with snow sensors, that melts snow and ice automatically, reducing the need for manual labor and machinery, and using reclaimed water for maintenance.
Facilitates fully automatic, unattended snow and ice removal with high efficiency, saving labor and material costs, ensuring road safety, and promoting social benefits through automation and reduced reliance on industrial salt.
Smart Images

Figure CN222100717U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of highway equipment, in particular to an automatic snow removal and highway maintenance system. Background Art
[0002] Winter is an indispensable season that we must experience, and the most obvious thing about winter is the snowy weather. Although the snowy weather can bring infinite joy to children, it also brings layers of obstacles to traffic, and even frequent traffic accidents, and many families have lost their loved ones. Therefore, snow removal is very important;
[0003] Traditional highway snow removal methods include salting, sweeping, blowing, shoveling, melting, etc., but they have the following disadvantages:
[0004] 1. When the ground is frozen, manual spreading and cleaning may cause slips and falls due to instability;
[0005] 2. Low labor efficiency, requiring a lot of manpower and slow progress;
[0006] 3. Severe cold weather may cause frostbite to workers;
[0007] 4. When the vehicle is being shoveled or melted, it is very easy for the vehicle to slip and become unstable, and even cause traffic construction;
[0008] 5. Although vehicles can improve snow removal efficiency, they are mobile and cannot keep up with the speed of snowfall and the degree of snow accumulation;
[0009] 6. Traditional cleaning is costly and requires a large number of mechanical vehicles, cleaning personnel and materials;
[0010] Therefore, the utility model proposes an automatic snow removal and road maintenance system to solve the problems existing in the prior art. Summary of the invention
[0011] In view of the above problems, the utility model proposes an automatic snow removal and road maintenance system, which is convenient for fully automatic unattended snow and ice removal, has high work efficiency, eliminates occupational health injuries caused by snow removal personnel, and saves a lot of labor costs, machinery costs and material costs such as industrial salt.
[0012] To achieve the purpose of the utility model, the utility model is implemented through the following technical solutions: an automatic snow removal and maintenance highway system, comprising a first snow removal pipe, a tee pipe and a nozzle, a plurality of groups of the tee pipes are equidistantly arranged on the first snow removal pipe, the nozzle is connected to the upper end opening of the tee pipe, the first snow removal pipe is provided with three groups, and a second snow removal pipe is connected between two adjacent groups of the first snow removal pipes, the first snow removal pipe and the second snow removal pipe are both arranged inside the surface layer of the highway, the three groups of the first snow removal pipes are respectively arranged at the center line of the highway and the roadside on both sides, and the nozzle extends out of the surface layer of the highway;
[0013] A heating pipe is connected to the first snow removal pipe on one side, and an input end of the heating pipe is connected to a heating station.
[0014] A further improvement is that a snow sensor is provided on the roadside stone of the highway, and the signal output end of the snow sensor is connected to the heating station.
[0015] A further improvement is that: the heating pipes are arranged in multiple groups at equal distances, and a pressure pump station is connected to the heating pipes.
[0016] A further improvement is that both ends of the three-way pipe are connected to the first snow removal pipe through flanges, a connecting pipe is provided on the upper end opening of the three-way pipe, and a thread is provided on the upper part of the outer side of the connecting pipe.
[0017] A further improvement is that the nozzle includes a nozzle pipe and a nozzle disc, the nozzle disc is arranged above the nozzle pipe, a nozzle is arranged on the outer side of the nozzle disc, and a plurality of groups of nozzles are arranged at equal angles around the center of the nozzle disc.
[0018] A further improvement is that the nozzle and the spray disc are integrally formed and connected, and the lower end of the nozzle is mounted on the connecting pipe through a thread.
[0019] A further improvement is that the first snow removal pipe and the second snow removal pipe both include a pressure-resistant pipe, a heat-resistant casing and an insulation layer, the heat-resistant casing is sleeved on the outside of the pressure-resistant pipe, and the insulation layer is coated on the outside of the heat-resistant casing.
[0020] The beneficial effects of the utility model are:
[0021] 1. The utility model pre-buries the first snow removal pipe and the second snow removal pipe into the surface layer of the highway, connects the heat source medium to the heating station through the heating pipe, and sprays out from the nozzle, so as to facilitate snow removal from the center line of the highway and the roadside on both sides, and facilitates fully automatic unattended snow and ice removal, with high work efficiency, eliminating occupational health damage caused by snow removal personnel, and saving a lot of labor costs, machinery costs and material costs such as industrial salt.
[0022] 2. In other seasons, the utility model can replace the heat source medium connected to the heating pipe with reclaimed water, which is convenient for road spraying, maintenance and cooling. One pipe has multiple uses, is easy to promote, and has high social benefits.
[0023] 3. The utility model senses snowfall through snow sensors and transmits signals to the heating station, thereby automatically sensing snow and ice removal, from traditional mechanical and manual snow removal to the final automation of spray snow removal, with good social benefits and effectively ensuring the safety of vehicle traffic.
[0024] 4. The utility model has a tee pipe installed on the first snow removal pipe through a flange, and the nozzle is installed on the connecting pipe on the tee pipe through a thread. The modular design is convenient for segmented maintenance and improves installation efficiency and durability. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is the front view of the utility model;
[0026] Figure 2 It is a schematic diagram of the highway laying of the utility model;
[0027] Figure 3 This is a schematic diagram of the installation of the nozzle of the utility model;
[0028] Figure 4 It is a schematic diagram of the first snow removal pipe and the second snow removal pipe of the utility model.
[0029] Among them: 1. The first snow removal pipe; 2. The three-way pipe; 3. The nozzle; 4. The second snow removal pipe; 5. The highway; 6. The heating pipe; 7. The heating station; 8. The snow sensor; 9. The pressure pump station; 10. The flange; 11. The connecting pipe; 12. The thread; 13. The nozzle; 14. The spray disc; 15. The nozzle; 16. The pressure-resistant pipe; 17. The heat-resistant casing; 18. The insulation layer. DETAILED DESCRIPTION
[0030] In order to deepen the understanding of the present invention, the present invention will be further described in detail below in conjunction with an embodiment. The embodiment is only used to explain the present invention and does not constitute a limitation on the protection scope of the present invention. Embodiment 1
[0031] according to Figure 1 , 2As shown in Figures 3 and 4, this embodiment proposes an automatic snow removal and maintenance highway system, including a first snow removal pipe 1, a three-way pipe 2 and a nozzle 3. The first snow removal pipe 1 is provided with a plurality of groups of the three-way pipes 2 at equal intervals. The nozzle 3 is connected to the upper end opening of the three-way pipe 2. The first snow removal pipe 1 is provided with three groups, and a second snow removal pipe 4 is connected between two adjacent groups of the first snow removal pipes 1. The first snow removal pipe 1 and the second snow removal pipe 4 are both arranged inside the surface layer of the highway 5. The three groups of the first snow removal pipes 1 are respectively arranged at the center line of the highway 5 and the roadsides on both sides. The nozzle 3 extends out of the surface layer of the highway 5.
[0032] The first snow removal pipe 1 on one side is connected to a heating pipe 6, and the input end of the heating pipe 6 is connected to a heating station 7. Traditional highway construction consists of the following: a base layer composed of crushed stone, a cushion layer composed of ash soil, a middle layer composed of water-stabilized soil, and a surface layer composed of asphalt or concrete. At present, 98% of highways use asphalt as the surface layer. The asphalt surface layer is divided into an upper layer and a lower layer, which is usually designed as a 4cm upper layer of fine asphalt and a 6cm lower layer of coarse asphalt or a combination of 5+5cm. Before the upper layer of the road is constructed and after the lower layer is constructed, the first snow removal pipe 1 and the second snow removal pipe 4 connected with the nozzle 3 are placed in the upper part of the lower layer, and the nozzle 3 is protected and fixed in position. The snow removal pipe is installed at the center line marking of the road and the edge of the curbstone. This position is not easy for vehicles to roll over, which can fully protect the safety of the snow removal pipe 1 and the cleanliness of the nozzle 3. At the same time, since the traditional design of the two-way lane is a double-sided reverse slope, the layout of the center line of the road can effectively cover the entire road surface, quickly melt snow, and remove snow water in time to prevent ice and freezing of the road surface. The entire automatic snow removal and maintenance highway system calculates the heat loss in the early stage. Since the snow removal pipe is designed with insulation and antifreeze measures, and the front and rear nozzles 3 can use different spraying water models as needed to change the amount of snow removal water, it can effectively ensure that the heat source reaches a coverage range of 15-20km. A heating pipe 6 is laid again every 15-20km to connect the nearby heating station 7. For example, the service area of the expressway can be used as the heating station 7. When it starts to snow, the automatic snow removal and maintenance highway system of the entire road surface can automatically identify and start, and the hot water at the heating station 7 is sprayed through the heating pipe 6 and then through the nozzle 3 to effectively remove snow and ice. At the same time, snow removal salt can also be sprayed. When the vehicle passes through the road surface, the sprayed hot water and snow removal salt are fully rolled and taken away, thereby always keeping the road surface clean and greatly improving the efficiency of snow removal and ice removal. When it is hot, the hot water can be replaced with medium water for road surface spraying and maintenance cooling, saving the investment of sprinkler trucks, and the efficiency is extremely high and the cost is low.
[0033] A snow sensor 8 is provided on the curbstone of the highway 5, and the signal output end of the snow sensor 8 is connected to the heating station 7. The snow sensor 8 senses snowfall and transmits a signal to the heating station 7, thereby automatically sensing snow and ice removal. From traditional mechanical and manual snow removal to the final automatic snow removal by spraying, when it starts to snow, the automatic snow removal and maintenance highway system of the entire road surface can automatically recognize and start, and the hot water at the heating station 7 is sprayed through the heating pipe 6 and then through the nozzle 3 to effectively remove snow and ice. At the same time, snow removal salt can also be sprayed. When a vehicle passes by the road surface, the sprayed hot water and snow removal salt are fully crushed and taken away, thereby always keeping the road surface clean.
[0034] The heating pipes 6 are arranged in multiple groups at equal intervals, and the heating pipes 6 are connected to a pressure pump station 9. When it starts to snow, the automatic snow removal and maintenance highway system of the entire road surface can automatically recognize and start. Under the pressure of the pressure pump station 9, the hot water at the heating station 7 is sprayed through the heating pipes 6 and then through the nozzle 3 to effectively remove snow and ice. At the same time, snow removal salt can also be sprayed. When vehicles pass by the road surface, the sprayed hot water and snow removal salt are fully crushed and taken away, thereby always keeping the road surface clean.
[0035] Both ends of the three-way pipe 2 are connected to the first snow removal pipe 1 through flanges 10. A connecting pipe 11 is provided on the upper end opening of the three-way pipe 2, and a thread 12 is provided on the upper side of the outer side of the connecting pipe 11. The nozzle 3 includes a nozzle 13 and a spray disc 14. The spray disc 14 is arranged above the nozzle 13. A nozzle 15 is provided on the outer side of the spray disc 14, and a plurality of nozzles 15 are arranged at equal angles around the center of the spray disc 14. The nozzle 13 and the spray disc 14 are integrally formed and connected, and the lower end of the nozzle 13 is installed with the connecting pipe 11 through the thread 12. The three-way pipe 2 is installed on the first snow removal pipe 1 through the flange 10, and the nozzle 3 is installed with the connecting pipe 11 on the three-way pipe 2 through the thread 12. The modular design is convenient for segmented maintenance, and improves installation efficiency and durability. When the nozzle 3 sprays water, water is sprayed from the nozzle 15 on the side, and the coverage range is wide. Embodiment 2
[0036] according to Figure 1 , 2 As shown in Figures 3 and 4, this embodiment proposes an automatic snow removal and maintenance highway system, including a first snow removal pipe 1, a three-way pipe 2 and a nozzle 3. The first snow removal pipe 1 is provided with a plurality of groups of the three-way pipes 2 at equal intervals. The nozzle 3 is connected to the upper end opening of the three-way pipe 2. The first snow removal pipe 1 is provided with three groups, and a second snow removal pipe 4 is connected between two adjacent groups of the first snow removal pipes 1. The first snow removal pipe 1 and the second snow removal pipe 4 are both arranged inside the surface layer of the highway 5. The three groups of the first snow removal pipes 1 are respectively arranged at the center line of the highway 5 and the roadsides on both sides. The nozzle 3 extends out of the surface layer of the highway 5.
[0037] The first snow removal pipe 1 on one side is connected to a heating pipe 6, and the input end of the heating pipe 6 is connected to a heating station 7. Traditional highway construction consists of the following: a base layer composed of crushed stone, a cushion layer composed of ash soil, a middle layer composed of water-stabilized soil, and a surface layer composed of asphalt or concrete. At present, 98% of highways use asphalt as the surface layer. The asphalt surface layer is divided into an upper layer and a lower layer, which is usually designed as a 4cm upper layer of fine asphalt and a 6cm lower layer of coarse asphalt or a combination of 5+5cm. Before the upper layer of the road is constructed and after the lower layer is constructed, the first snow removal pipe 1 and the second snow removal pipe 4 connected with the nozzle 3 are placed in the upper part of the lower layer, and the nozzle 3 is protected and fixed in position. The snow removal pipe is installed at the center line marking of the road and the edge of the curbstone. This position is not easy for vehicles to roll over, which can fully protect the safety of the snow removal pipe 1 and the cleanliness of the nozzle 3. At the same time, since the traditional design of the two-way lane is a double-sided reverse slope, the layout of the center line of the road can effectively cover the entire road surface, quickly melt snow, and remove snow water in time to prevent ice and freezing of the road surface. The entire automatic snow removal and maintenance highway system calculates the heat loss in the early stage. Since the snow removal pipe is designed with insulation and antifreeze measures, and the front and rear nozzles 3 can use different spraying water models as needed to change the amount of snow removal water, it can effectively ensure that the heat source reaches a coverage range of 15-20km. A heating pipe 6 is laid again every 15-20km to connect the nearby heating station 7. For example, the service area of the expressway can be used as the heating station 7. When it starts to snow, the automatic snow removal and maintenance highway system of the entire road surface can automatically identify and start, and the hot water at the heating station 7 is sprayed through the heating pipe 6 and then through the nozzle 3 to effectively remove snow and ice. At the same time, snow removal salt can also be sprayed. When the vehicle passes through the road surface, the sprayed hot water and snow removal salt are fully rolled and taken away, thereby always keeping the road surface clean and greatly improving the efficiency of snow removal and ice removal. When it is hot, the hot water can be replaced with medium water for road surface spraying and maintenance cooling, saving the investment of sprinkler trucks, and the efficiency is extremely high and the cost is low.
[0038] The first snow removal pipe 1 and the second snow removal pipe 4 both include a pressure-resistant pipe 16, a heat-resistant casing 17 and a heat-insulating layer 18. The heat-resistant casing 17 is sleeved on the outside of the pressure-resistant pipe 16, and the heat-insulating layer 18 is coated on the outside of the heat-resistant casing 17. When in use, the three-layer design of the pressure-resistant pipe 16, the heat-resistant casing 17 and the heat-insulating layer 18 makes the first snow removal pipe 1 and the second snow removal pipe 4 more durable and heat-insulated.
[0039] The automatic snow removal and maintenance highway system pre-buries the first snow removal pipe 1 and the second snow removal pipe 4 into the surface layer of the highway 5, connects the heat source medium to the heat supply station 7 through the heat supply pipe 6, and sprays out from the nozzle 3, so as to facilitate snow removal from the center line of the highway 5 and the roadside on both sides, and facilitates fully automatic unattended snow and ice removal, with high work efficiency, eliminating occupational health damage caused by snow removal personnel, and saving a lot of labor costs, machinery costs and industrial salt and other material costs; and in other seasons, the heat source medium connected to the heat supply pipe 6 can be replaced with reclaimed water, which is convenient for road spraying maintenance and cooling, one pipe for multiple uses, easy to promote, and high social benefits. At the same time, the snow sensor 8 senses snowfall and transmits signals to the heat station 7, so as to automatically sense snow removal and ice removal, from traditional mechanical and manual snow removal to the final spray snow removal automation, with good social benefits and effective guarantee of vehicle traffic safety. In addition, the tee pipe 2 is installed on the first snow removal pipe 1 through the flange 10, and the nozzle 3 is installed with the connecting pipe 11 on the tee pipe 2 through the thread 12. The modular design facilitates segmented maintenance and improves installation efficiency and durability.
[0040] The above shows and describes the basic principles, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principles of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.
Claims
1. An automatic snow removal and road maintenance system, comprising a first snow removal pipe (1), a three-way pipe (2) and a nozzle (3), characterized in that: A plurality of groups of the three-way pipes (2) are equidistantly arranged on the first snow removal pipe (1), the nozzle (3) is connected to the upper opening of the three-way pipe (2), the first snow removal pipe (1) is provided with three groups, and a second snow removal pipe (4) is connected between two adjacent groups of the first snow removal pipes (1), the first snow removal pipe (1) and the second snow removal pipe (4) are both arranged inside the surface layer of the highway (5), the three groups of the first snow removal pipes (1) are respectively arranged at the center line of the highway (5) and the roadside on both sides, and the nozzle (3) extends out of the surface layer of the highway (5); A heating pipe (6) is connected to the first snow removal pipe (1) on one side, and an input end of the heating pipe (6) is connected to a heating station (7).
2. The automatic snow removal and road maintenance system according to claim 1, characterized in that: A snow sensor (8) is provided on the curbstone of the highway (5), and a signal output end of the snow sensor (8) is connected to the heating station (7).
3. The automatic snow removal and road maintenance system according to claim 2, characterized in that: The heating pipes (6) are arranged in multiple groups at equal intervals, and a pressure pump station (9) is connected to the heating pipes (6).
4. The automatic snow removal and road maintenance system according to claim 1, characterized in that: Both ends of the three-way pipe (2) are connected to the first snow removal pipe (1) via flanges (10); a connecting pipe (11) is provided on the upper opening of the three-way pipe (2); and a thread (12) is provided on the upper part of the outer side of the connecting pipe (11).
5. The automatic snow removal and road maintenance system according to claim 4, characterized in that: The nozzle (3) comprises a nozzle pipe (13) and a nozzle disc (14), wherein the nozzle disc (14) is arranged above the nozzle pipe (13), a nozzle opening (15) is arranged on the outer side of the nozzle disc (14), and a plurality of groups of nozzle openings (15) are arranged at equal angles around the center of the nozzle disc (14).
6. The automatic snow removal and road maintenance system according to claim 5, characterized in that: The nozzle (13) and the nozzle disc (14) are integrally formed and connected, and the lower end of the nozzle (13) is mounted on the connecting pipe (11) via a thread (12).
7. An automatic snow removal and road maintenance system according to any one of claims 1 to 6, characterized in that: The first snow removal pipe (1) and the second snow removal pipe (4) both comprise a pressure-resistant pipe (16), a heat-resistant casing (17) and a thermal insulation layer (18); the heat-resistant casing (17) is sleeved on the outside of the pressure-resistant pipe (16), and the thermal insulation layer (18) is coated on the outside of the heat-resistant casing (17).
