Double-plunger throttling drainage downhole tool for high-water-content well

By setting up a double plunger structure in the well pipe, the pressure in the well is automatically used to realize pressure holding, gas extraction and liquid discharge, which solves the problems of low mining efficiency and short well life in the existing technology, and realizes the automated management of gas and liquid in the well and the formation of gas and liquid in the well Protect.

CN222102011UActive Publication Date: 2024-12-03CHENGDU JINGYU TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420331483.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-22
Publication Date
2024-12-03
Estimated Expiration
2034-02-22

AI Technical Summary

Technical Problem

The existing plunger drainage and gas extraction process leads to low mining efficiency and low well mining life in high water-bearing wells. The drainage process requires artificial control, which affects gas accumulation and well production efficiency.

Method used

A high-water well double-plunger throttling drainage downhole tool was designed. By setting a second limiter, a first-stage plunger and a first limiter in the well pipe, the pressure in the well is automatically realized by automatically implementing pressure holding, gas extraction and discharge liquid, avoid high-pressure gas injection and achieve automatic drainage.

Benefits of technology

It improves the mining efficiency and production life of the well, realizes the automated management of gas and liquid in the well, avoids damage to the formation gap and insufficient man-made control, and ensures good gas accumulation and timely discharge of liquid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222102011U_ABST
    Figure CN222102011U_ABST
Patent Text Reader

Abstract

The utility model relates to a double-plunger throttling drainage downhole tool for a high-water-content well. The double-plunger throttling drainage downhole tool comprises a second limiting stopper, a first-stage plunger and a first limiting stopper which are sequentially arranged in a well pipe from top to bottom. A section of pipe cavity is formed between the second limiting stopper and the first limiting stopper, and the first-stage plunger can be placed in the pipe cavity in an up-and-down sliding mode; the second limiter is provided with a central cavity C which is through up and down; a butt joint is arranged at the lower end of the second limiter, and a gas channel and a liquid channel are formed in the end head and the side wall of the butt joint respectively and communicate with the center cavity C; the first-stage plunger comprises a center rod and a plug sleeve; the center rod is provided with a center cavity B penetrating through the upper end, and the lower end of the center rod is provided with a channel opening; the plug sleeve is sleeved on the central rod in an up-down sliding manner; the first limiting device is provided with a center cavity A penetrating up and down. The device has the beneficial effects that automatic gas production and liquid drainage can be realized according to the well pressure condition; the production life of the well is prolonged; the mining efficiency is improved; automatic mining is achieved through a mechanical structure, and operation is simple.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of oil and gas exploitation, in particular to a double-plunger throttling drainage downhole tool for a high-water-content well. Background Art

[0002] During the gas well production process, as the production time of the production well gradually increases, the formation pressure will drop, resulting in a decrease in gas flow rate, which reduces the liquid carrying capacity and increases the liquid accumulation in the well (in layman's terms, during the gas production process, there will be useless liquid accumulation in the well. Due to the existence of formation pressure, the gas has sufficient pressure to gush out the accumulated liquid; but as the production time increases and the formation pressure decreases, the gas cannot bring the accumulated liquid out, resulting in more and more liquid accumulation in the well, which is not conducive to the accumulation of gas).

[0003] It should be noted that practice has proved that liquid accumulation in gas wells has a great impact on the production life of gas wells, especially low-pressure wells in the middle and late stages. Only when the liquid flowing into the gas well production layer is continuously discharged can a higher recovery rate and a longer life cycle be obtained.

[0004] Therefore, in order to discharge the accumulated liquid in the well, the plunger drainage gas production process is currently used to solve this problem. The working principle is: the plunger is inserted from the wellhead, and the plunger falls to the bottom of the well under the action of gravity. When there is accumulated liquid after a period of production, high-pressure gas is injected from the annulus. The high-pressure gas enters the oil pipe at the bottom of the well, and the plunger is lifted upward under the action of the high-pressure gas. In the process of moving upward, the plunger pushes the liquid column above the plunger upward, so that the liquid column moves to the wellhead and is discharged from the wellhead.

[0005] However, there are problems: 1. The movement of the plunger is achieved by injecting high-pressure gas from outside the well, which will affect the fracture structure of the formation. Frequent injection of high-pressure gas will reduce the production life of the well and prevent the well from being fully exploited. 2. Since the plunger is moved from the bottom of the well to the wellhead during the process of draining water using the plunger, gas extraction cannot be carried out during this period of time, thus affecting the extraction efficiency. 3. The timing of high-pressure gas injection is manually selected, not automatically executed. Draining water too early will affect the extraction efficiency (draining water before waiting for enough accumulated liquid), and draining water too late will prevent the gas from gathering well (too much accumulated liquid will prevent the gas from gathering well).

[0006] Based on the shortcomings of the existing plunger drainage gas production technology, a double plunger throttling drainage downhole tool for high water content wells is designed. Through structural design, it can automatically drain water according to the situation of liquid accumulation in the well, which does not affect the production efficiency, allows gas to be well accumulated from the formation into the gas, and has sufficient liquid carrying capacity. Utility Model Content

[0007] The purpose of the utility model is to overcome the shortcomings of the prior art, provide a double-plunger throttling drainage downhole tool for high water-content wells, solve the problems of low production efficiency and short well production life in the existing plunger drainage gas production process, and can automatically drain water according to actual conditions through a mechanical structure, which can not only ensure good production efficiency, but also allow oil and gas to be well gathered from the formation in the well without affecting the production life of the well.

[0008] The purpose of the utility model is achieved through the following technical solutions: A double-plunger throttling drainage downhole tool for a high water-content well includes a second stopper, a primary plunger, and a first stopper which are sequentially arranged from top to bottom in the well pipe;

[0009] There is a lumen between the second stopper and the first stopper, and the primary plunger can be slidably placed in the lumen;

[0010] The second stopper has a central cavity C that runs through the upper and lower parts; the lower end of the second stopper has a docking joint, and the end and side wall of the docking joint are respectively provided with an air channel and a liquid channel, and the air channel and the liquid channel are connected to the central cavity C;

[0011] The primary plunger comprises a central rod and a plug sleeve; the central rod has a central cavity B through which the upper end thereof passes, and the lower end of the central rod has a passage opening; the plug sleeve can be slidably sleeved on the central rod up and down, and when the plug sleeve moves upward relative to the central rod, the passage opening is opened, and when the plug sleeve moves downward relative to the central rod, the passage opening is closed;

[0012] The first stopper has a central cavity A that runs through from top to bottom;

[0013] When the pressure in the well is not enough, the first-stage plunger falls back and is held back by the first stopper. At this time, the plug sleeve falls back and blocks the channel opening. The gas and liquid in the well are blocked by the first-stage plunger, achieving pressure holding in the well.

[0014] When there is enough pressure in the well, the gas and liquid act on the lower end surface of the first-stage plunger through the central cavity A and push the first-stage plunger upward; the upper end of the first-stage plunger is sleeved on the docking head, and the gas channel is docked with the central cavity B, and the upper end of the first-stage plunger closes the liquid channel; as the pressure gas and liquid continue to act, the plug sleeve is pushed to move upward relative to the center rod, and the channel opening is opened; a large amount of gas and a small amount of liquid flow into the central cavity C through the channel opening, the central cavity B, and the gas channel, and finally rush to the wellhead for discharge;

[0015] When a large amount of gas and a small amount of liquid are discharged for a period of time, the pressure in the well decreases, so the first-level plunger falls back; when the first-level plunger falls back, the channel port is open, and the upper end of the first-level plunger is separated from the docking joint, the liquid channel is opened, and a large amount of liquid will flow out to the wellhead through the channel port, the central cavity B, the liquid channel, and the central cavity C;

[0016] When the first-stage plunger is completely returned, the first-stage plunger is stopped by the first limiter.

[0017] As a preferred technical solution of the present application, in the second limiter, a one-way valve is provided in the central cavity C, and a throttle is provided in the air passage.

[0018] As a preferred technical solution of the present application, in the second limiter, the docking joint is in the shape of a shoulder and neck; in the first-level plunger, a sleeve is installed at the upper end of the center rod; when the sleeve slides upward relative to the center rod, the upper end of the sleeve abuts against the sleeve to form a limit; when the first-level plunger moves upward, the sleeve is sleeved on the docking joint and abuts against the shoulder and neck to block the liquid channel.

[0019] As a preferred technical solution of the present application, the lower end of the center rod has a plug, and the diameter of the plug is larger than the diameter of the center rod; when the plug sleeve slides downward relative to the center rod, the lower end of the plug sleeve rests on the plug; at this time, the channel opening is closed.

[0020] As a preferred technical solution of the present application, a sealing ring is provided between the center rod and the plug sleeve.

[0021] As a preferred technical solution of the present application, the upper part of the first limiter is provided with a buffer portion A, and a fluid flow channel is opened on the buffer portion A to penetrate it from top to bottom; when the first-level plunger falls back, it hits the buffer portion A, thereby playing a buffering role; and the gas and liquid in the well act on the lower end of the first-level plunger after passing through the central cavity A and the fluid flow channel.

[0022] As a preferred technical solution of the present application, a secondary plunger capable of sliding up and down is provided above the second limiter in the well pipe; the structure of the secondary plunger is consistent with that of the primary plunger.

[0023] As a preferred technical solution of the present application, a gas production tree is provided at the wellhead, and the gas production tree has a pipe channel vertically connected to the well pipe; a buffer part B is provided at the top of the pipe channel; and the top of the secondary plunger can be against the buffer part B.

[0024] As a preferred technical solution of the present application, the second stopper and the first stopper can be deployed and fixed at any position in the well pipe through the continuous tubing operation equipment.

[0025] The utility model has the following advantages:

[0026] The traditional plunger drainage gas production process is to place the plunger at the bottom of the well, and then artificially inject high-pressure gas to lift the plunger to achieve drainage; the injected high-pressure gas will cause damage to the formation gaps, resulting in a reduction in the production life of the well; during the injection of high-pressure gas, only drainage can be achieved, but gas cannot be produced, and the plunger will move from the bottom of the well to the wellhead, which takes a long time, affecting the efficiency of gas production; the drainage cannot be automated, and is manually controlled, and it is not easy to grasp the actual drainage. Draining too early affects the gas production efficiency, and draining too late affects the production life of the well;

[0027] When the downhole pressure is insufficient, the first-level plunger falls back and contacts the first limiter, realizing automatic pressure holding in the well; when the pressure holding reaches a certain level, the plunger can be pushed up to connect with the second-line limiter to realize gas production; when the well pressure decreases after gas production, the plunger falls back downward, and water is discharged during the falling process;

[0028] Therefore, the utility model can automatically realize pressure holding, gas extraction and liquid discharge according to the actual well pressure, and the operation is simple and convenient without manual control;

[0029] And because there is no need to inject high-pressure gas, it will not damage the formation gaps and will not affect the production life of the well;

[0030] And because the plunger moves between the first limiter and the second limiter (compared to the traditional method from the bottom of the well to the wellhead), the plunger displacement time is short and does not affect the extraction efficiency; in addition, gas extraction and liquid drainage are continuous, and the liquid can be drained immediately after the gas extraction is completed (in the traditional method, the liquid drainage process must wait for the plunger to fall back to the bottom of the well before gas extraction), which can also further improve the extraction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a structural schematic diagram of the utility model;

[0032] Figure 2 is a schematic diagram of the structure of the second limiter;

[0033] Figure 3 is a schematic structural diagram of the lower part of the second limiter;

[0034] Figure 4 It is a structural schematic diagram of the plug sleeve in the secondary plunger sliding downward against the plug head;

[0035] Figure 5 It is a schematic diagram of the structure in which the plug sleeve in the secondary plunger slides upward and abuts against the sleeve;

[0036] Figure 6 is a schematic structural diagram of a first limiter;

[0037] Figure 7The second stopper is installed with the corresponding well pipe through the claw, and the structural schematic diagram of the well pipe (existing technology);

[0038] Figure 8 It is a structural schematic diagram of the second-stage plunger falling back and contacting the first stopper in the well pipe;

[0039] Fig. 9 It is a structural schematic diagram of the second-stage plunger being lifted and displaced upward in the well pipe;

[0040] Fig.10 A schematic diagram of the structure in which the secondary plunger is pushed upward and docked with the second stopper in the tube;

[0041] Fig.11 It is an enlarged view of the joint between the secondary plunger and the second limiter;

[0042] Fig.12 This is a schematic diagram of the structure before the gas tree and the first-stage plunger;

[0043] In the figure: 10-well pipe, 20-first-stage plunger;

[0044] 30-second stopper, 31-central cavity C, 32-joint, 33-gas channel, 34-liquid channel, 35-check valve, 36-throttle;

[0045] 40-secondary plunger, 41-center rod, 42-plug sleeve, 43-center cavity B, 44-channel opening, 45-sleeve, 46-plug head, 47-sealing ring;

[0046] 50-second stopper, 51-central cavity A, 52-buffer portion A;

[0047] 60-gas tree, 61-pipe channel, 62-buffer part B. DETAILED DESCRIPTION

[0048] The utility model is further described below in conjunction with the accompanying drawings, but the protection scope of the utility model is not limited to the following description.

[0049] It should be noted that the directions or positional relationships indicated by "left", "right", etc. are based on the directions or positional relationships shown in the accompanying drawings, or are the directions or positional relationships in which the utility model product is usually placed when in use, or are the directions or positional relationships commonly understood by those skilled in the art. Such terms are only for the convenience of describing the utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the utility model.

[0050] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features and technical solutions in the embodiments may be combined with each other.

[0051] (Example 1)

[0052] like Figures 1 to 12 As shown, a double plunger throttling drainage downhole tool for a high water-content well includes a second stopper 30, a primary plunger 40, and a first stopper 50 arranged in sequence from top to bottom in a well pipe 10; there is a lumen between the second stopper 30 and the first stopper 50, and the primary plunger 40 can be slidably placed in the lumen;

[0053] The second stopper 30 has a central cavity C31 extending vertically therethrough; a butt joint 32 is provided at the lower end of the second stopper, and an air channel 33 and a liquid channel 34 are respectively provided at the end and the side wall of the butt joint 32, and the air channel 33 and the liquid channel 34 are connected to the central cavity C31;

[0054] The primary plunger 40 includes a center rod 41 and a plug sleeve 42; the center rod 41 has a center cavity B43 that passes through its upper end, and the lower end of the center rod 41 has a passage opening 44; the plug sleeve 42 can be slidably mounted on the center rod 41 up and down, and when the plug sleeve 42 moves upward relative to the center rod 41, the passage opening 44 is opened, and when the plug sleeve 42 moves downward relative to the center rod 41, the passage opening 44 is closed;

[0055] The first stopper 50 has a central cavity A51 that runs through from top to bottom;

[0056] When working: ① Refer to Figure 8 When the pressure in the well is insufficient, the first plunger 40 falls back and is held by the first stopper 50. At this time, the plug sleeve 42 falls back and blocks the passage 44. The gas and liquid in the well are blocked by the first plunger 40, and the pressure in the well is held back. ② Refer to Fig. 9 When the well has sufficient pressure, the gas and liquid act on the lower end surface of the first-stage plunger 40 through the central cavity A51 and push the first-stage plunger 40 upward; the upper end of the first-stage plunger 40 is sleeved on the docking joint 32, and the gas channel 33 is docked with the central cavity B, and the upper end of the first-stage plunger 40 closes the liquid channel 34; as the pressure gas and liquid continue to act, the plug sleeve 42 is pushed to move upward relative to the central rod 41, and the channel port 44 is opened; a large amount of gas and a small amount of liquid flow into the central cavity C31 through the channel port 44, the central cavity B43, and the gas channel 33, and finally rush to the wellhead for discharge; ③ Refer to Fig.10 and Fig.11, when a large amount of gas and a small amount of liquid are discharged for a period of time, the pressure in the well decreases, so the first-level plunger 40 falls back; when the first-level plunger 40 falls back, the channel port 44 is open, and the upper end of the first-level plunger 40 is separated from the docking joint 32, the liquid channel 34 is opened, and a large amount of liquid will flow out to the wellhead through the channel port 44, the central cavity B43, the liquid channel 34, and the central cavity C31; ④ When the first-level plunger 40 is completely returned, the first-level plunger 40 is resisted by the first limiter 50.

[0057] See also Figure 2 The upper part of the second limiter 30 is a limit part, and the lower part is a docking joint 32. The limit part uses a conventional limit structure in an oil well (i.e., a structure that can be placed at any position of the well pipe 10 through a continuous oil pipe delivery device). The lower end of the limit part is fixed with the docking joint 32, and the two have a central cavity C31 that runs through from top to bottom. The lower end of the central cavity C31 is an air channel 33, and a throttle 36 is provided at the air channel 33 (i.e., only a small hole is provided to reduce the diameter of the air channel 33). The outer cylindrical surface of the docking joint 32 is in a shoulder-neck shape with a larger upper part and a smaller lower part. A liquid channel 36 is provided on the side wall at the small diameter of the lower part of the docking joint 32, and the liquid channel 36 runs through the central cavity C31. In addition, a one-way valve is also provided in the central cavity C31 at the upper position of the liquid channel 36.

[0058] When the primary plunger 40 is pushed upward by the pressurized gas and liquid, the upper end of the primary plunger 40 is docked with the docking head 32; Fig.10 and Fig.11 The upper end of the first-level plunger 40 is sleeved on the outside of the docking joint 32, and the plunger 40 is against the shoulder and neck of the docking joint 32. The upper end of the first-level plunger 40 seals the liquid channel 36, and the central cavity B43 of the first-level plunger 40 is connected with the central cavity C31 of the second limiter 30 through the gas channel 33 (throttle 36). Then most of the gas and a small amount of liquid will be discharged out of the well through the channel opening 44, the central cavity B43, the throttle 36, the one-way valve 36, and the central cavity C31, thereby realizing the discharge of gas - that is, realizing the gas extraction.

[0059] It should be noted that when the primary plunger 40 is pushed upward by gas and liquid, and in the process of the primary plunger 40 moving upward from the first stopper 50 to the second stopper 30, the plug sleeve 42 is against the plug head 46, that is, the channel opening 44 is closed; the entire primary plunger 40 is piston-shaped. After the primary plunger 40 is docked with the docking head 32, as the gas and liquid continue to act, the plug sleeve 42 will move upward relative to the center rod 41, and the channel opening 44 can be opened, that is, the primary plunger 40 can transport gas and liquid upward through the central cavity B43.

[0060] After gas production has lasted for a period of time and the gas-liquid pressure decreases, the first-stage plunger 40 falls back under the action of gravity, so that the upper end of the first-stage plunger 40 is separated from the docking joint 32, and the liquid channel 34 is opened, and at this time the channel opening 44 is open (when the first-stage plunger 40 falls back and collides with the first limiter 50, the sleeve 42 will slide downward relative to the rod 41 to achieve the closure of the channel opening 44), so a large amount of liquid is discharged upward from the well through the channel opening 44, the central cavity 43, the liquid channel 34, and the central cavity C31, thereby achieving the discharge of a large amount of liquid.

[0061] Therefore, it can be seen that as long as the downhole pressure is large enough, the first-level plunger 40 can be automatically pushed to move upward (at this time, the first-level plunger 40 is similar to a piston); when the first-level plunger 40 is docked with the docking joint 32 (the channel opening 44 is opened under the action of pressure), the liquid channel 34 can be automatically closed and the gas channel 33 can be docked with the central cavity B43 to realize gas collection (natural gas); when the downhole pressure decreases, the first-level plunger 40 falls back to open the liquid channel 34 to realize the discharge of liquid (drainage); when the first-level plunger 40 falls back, the channel opening 44 is closed, and the first-level plunger 40 plays the role of a piston again. The gas production and drainage of the entire well are determined according to the downhole pressure and are automatically executed through the corresponding mechanical structure; compared with the traditional method of manual periodic drainage, the automated gas production and drainage of this scheme will not cause excessive pressure buildup in the well, will not damage the formation gaps, and improve the production life of the well; and this scheme automatically produces gas and drains water according to the actual well pressure, and the actual gas production and drainage are good without affecting normal gas production. Compared with the traditional method of drainage that is too early or too late and affects the gas production time, this scheme has higher production efficiency.

[0062] It should be noted that the design of the throttle valve 36 is mainly to reduce the diameter to allow more gas to be discharged and reduce the discharge of liquid to achieve gas production. When the primary plunger 40 is separated from the docking joint 32, the main purpose is to discharge liquid.

[0063] See also Figure 5 , the primary plunger 40 is further designed; the center rod 41 has a central cavity B that runs through the center rod 41 from top to bottom, and a sleeve 45 is fixedly mounted on the upper end of the center rod 41; a passage opening 44 is opened on the side wall of the lower end of the center rod 41, and the lower end of the center rod 41 is blocked by installing a piston head 46. A plug sleeve 42 is mounted on the center rod 41, and a sealing ring 47 is arranged between the two; the plug sleeve 42 abuts against the lower end surface of the sleeve 45 when sliding upward, and abuts against the plug head 46 when sliding downward.

[0064] In this embodiment, the outer diameter of the plug head 46 is smaller than the outer diameter of the plug sleeve 42. When the primary plunger 40 is docked with the docking head 32, under the action of pressure, gas and liquid act on the lower end surface of the plug sleeve 42, allowing the plug sleeve 42 to slide upward relative to the center rod 41, thereby opening the channel opening 44.

[0065] See also Figure 5 The lower part of the first limiter 50 is a limit part, and the upper part is a buffer part A52. The limit part has a central cavity A51 that runs through the upper and lower parts, and the buffer part 52 has a fluid flow channel (not shown in the figure) that communicates with the upper and lower parts.

[0066] The buffer part 52 includes a connecting tube 53, in which a movable rod 54 is installed to slide up and down (the movable rod 54 has a central flow channel, which penetrates upward from the lower part and is led out from the side of the upper part), and a force-bearing head 56 is fixed to the upper end of the movable rod 54; a spring 55 is sleeved on the movable rod 54, and the two ends of the spring 55 are respectively against the force-bearing head 56 and the connecting tube 53;

[0067] When the primary plunger 40 falls back, it hits the buffer part A52 and plays a buffering role; and the gas and liquid in the well act on the lower end of the primary plunger 40 after passing through the central cavity A51 and the fluid flow channel.

[0068] In this embodiment, the limiting portion at the lower part of the first limiter 50 adopts a conventional clamping and fixing method used in oil and gas wells, see Figure 6 and Figure 7 .

[0069] (Example 2)

[0070] Based on Example 1, refer to Fig.12 In the well pipe 10 , a secondary plunger 20 capable of sliding up and down is also provided above the second stopper 30 ; the structure of the secondary plunger 20 is consistent with that of the primary plunger 40 .

[0071] See also Fig.12 In this embodiment, a gas production tree 60 is provided at the wellhead, and the gas production tree 60 has a pipe passage 61 vertically connected to the well pipe 10; a buffer portion B62 is provided at the top of the pipe passage 61; the top of the secondary plunger 20 can be against the buffer portion B62 (the buffer portion B62 has various structures, for example, it can be designed as Fig.12 A catcher 63 (the catcher adopts a conventional structural design) is also arranged on the side wall of the pipe channel 61.

[0072] When the downhole pressure is large enough, after the first-level plunger 40 is docked with the second limiter 30, the gas-liquid pressure can push the first-level plunger 20 upward, allowing the first-level plunger 20 to rest on the buffer part B62, and then be fixed by the catcher 63; then gas production and liquid drainage will be realized; when the drainage is completed, the catcher 63 releases the first-level plunger 40 (by setting a pressure sensor in the buffer part 63 and electrically connecting the pressure sensor to the catcher 63, the catcher 63 can automatically capture the first-level plunger 40; by electrically connecting the flow sensor at the drainage point to the catcher 63, the catcher 63 can automatically release the first-level plunger 40; all of these are conventional control methods and will not be repeated here).

[0073] It should be noted that, in the present invention, the second stopper 30 and the first stopper 50 can be deployed and fixed at any position in the well pipe 10 via the coiled tubing operation equipment (which is the existing equipment).

[0074] The above embodiments only express the preferred implementation modes, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the patent of the utility model. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the utility model, and these all belong to the protection scope of the utility model.

Claims

1. Double plunger throttling drainage downhole tool for high water content wells, Features: It comprises a second stopper (30), a primary plunger (40), and a first stopper (50) which are arranged in sequence from top to bottom in the well pipe (10); There is a tubular cavity between the second stopper (30) and the first stopper (50), and the primary plunger (40) can be slidably placed in the tubular cavity; The second stopper (30) has a central cavity C (31) extending vertically therethrough; a butt joint (32) is provided at the lower end of the second stopper, and an air channel (33) and a liquid channel (34) are respectively provided at the end and the side wall of the butt joint (32); the air channel (33) and the liquid channel (34) are in communication with the central cavity C (31); The primary plunger (40) comprises a center rod (41) and a plug sleeve (42); the center rod (41) has a center cavity B (43) penetrating the upper end thereof, and the lower end of the center rod (41) has a passage opening (44); the plug sleeve (42) is slidably mounted on the center rod (41) up and down, and when the plug sleeve (42) moves upward relative to the center rod (41), the passage opening (44) is opened, and when the plug sleeve (42) moves downward relative to the center rod (41), the passage opening (44) is closed; The first stopper (50) has a central cavity A (51) extending vertically through the first stopper; When the pressure in the well is insufficient, the first plunger (40) falls back and is held back by the first stopper (50), and the plug sleeve (42) falls back and blocks the passage opening (44); the gas and liquid in the well are blocked by the first plunger (40), thereby achieving pressure holding in the well; When the well has sufficient pressure, the gas and liquid act on the lower end surface of the first-stage plunger (40) through the central cavity A (51) and push the first-stage plunger (40) upward; the upper end of the first-stage plunger (40) is sleeved on the docking joint (32), and the gas channel (33) is docked with the central cavity B, and the upper end of the first-stage plunger (40) closes the liquid channel (34); as the pressure gas and liquid continue to act, the plug sleeve (42) is pushed to move upward relative to the central rod (41), and the channel opening (44) is opened; a large amount of gas and a small amount of liquid flow into the central cavity C (31) through the channel opening (44), the central cavity B (43), and the gas channel (33), and finally flow to the wellhead for discharge; After a large amount of gas and a small amount of liquid are discharged for a period of time, the pressure in the well decreases, so the first-stage plunger (40) falls back; when the first-stage plunger (40) falls back, the channel opening (44) is open, and the upper end of the first-stage plunger (40) is separated from the docking joint (32), the liquid channel (34) is opened, and a large amount of liquid will flow toward the wellhead through the channel opening (44), the central cavity B (43), the liquid channel (34), and the central cavity C (31); When the primary plunger (40) is completely retracted, the primary plunger (40) is stopped by the first stopper (50).

2. The double plunger throttling drainage downhole tool for high water content wells according to claim 1, Features: In the second limiter (30), a one-way valve (35) is arranged in the central cavity C (31), and a throttle (36) is arranged at the air passage (33).

3. The double plunger throttling drainage downhole tool for high water content wells according to claim 1, Features: In the second stopper (30), the butt joint (32) is in the shape of a shoulder or neck; In the primary plunger (40), a sleeve (45) is installed at the upper end of the center rod (41); when the sleeve (42) slides upward relative to the center rod (41), the upper end of the sleeve (42) abuts against the sleeve (45) to form a limit position; When the primary plunger (40) moves upward, the sleeve (45) is sleeved on the butt joint (32) and abuts against the shoulder to block the liquid passage (34).

4. The double plunger throttling drainage downhole tool for high water content wells according to claim 1 or 3, Features: The lower end of the central rod (41) is provided with a plug (46), and the diameter of the plug (46) is larger than the diameter of the central rod (41); When the plug sleeve (42) slides downwards relative to the central rod (41), the lower end of the plug sleeve (42) abuts against the plug head (46); at this time, the passage opening (44) is closed.

5. The double plunger throttling drainage downhole tool for high water content wells according to claim 1, Features: A sealing ring (47) is provided between the central rod (41) and the plug sleeve (42).

6. The double plunger throttling drainage downhole tool for high water content wells according to claim 1, Features: The first stopper (50) has a buffer portion A (52) at its upper portion, and a fluid flow channel is formed on the buffer portion A (52) to penetrate the buffer portion A (52) from top to bottom; When the primary plunger (40) falls back, it hits the buffer part A (52) and plays a buffering role; and the gas and liquid in the well act on the lower end of the primary plunger (40) after passing through the central cavity A (51) and the fluid flow channel.

7. The double plunger throttling drainage downhole tool for high water content wells according to claim 1, Features: In the well pipe (10), a secondary plunger (20) capable of sliding up and down is also arranged above the second stopper (30); the structure of the secondary plunger (20) is consistent with that of the primary plunger (40).

8. The double plunger throttling drainage downhole tool for high water content wells according to claim 7, Features: A gas tree (60) is arranged at the wellhead, and the gas tree (60) is provided with a pipe passage (61) vertically connected to the well pipe (10); A buffer portion B (62) is provided at the top of the tube channel (61); the top of the secondary plunger (20) can abut against the buffer portion B (62).

9. The double plunger throttling drainage downhole tool for high water content wells according to claim 1, Features: The second stopper (30) and the first stopper (50) can be deployed and fixed at any position in the well pipe (10) via the continuous tubing operation equipment.