Field tester for transverse water permeability coefficient of drainage pavement
By designing a field measuring instrument for lateral seepage coefficients for asphalt pavement and using the normal water head test method, the problem that the existing technology cannot accurately measure the lateral seepage coefficients of the pavement is solved, and the true reflection and accurate measurement of the pavement drainage capacity are achieved. Reduces damage to the road surface and measurement errors.
Patent Information
- Application Number
- CN202420534942.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-19
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-03-19
AI Technical Summary
The prior art cannot effectively measure the lateral seepage coefficient of asphalt pavement on-site, resulting in the inability to accurately reflect the true drainage capacity of the pavement. On-site sampling will cause damage to the pavement, with a long test time and a large result error.
A field measuring instrument for transverse seepage coefficient of drainage pavement was designed, using the normal head test method. By setting a water tank, flowmeter and side baffle on the asphalt pavement, the head difference was formed to measure the seepage flow rate and head difference, using Darcy's law Calculate the lateral seepage coefficient to reflect the lateral drainage capacity of the pavement.
It realizes the accurate measurement of the lateral seepage coefficient of the built road surface on site, which can truly reflect the lateral drainage capacity of the road surface, solves the error problem of on-site measurement, reduces the damage to the road surface, and improves the measurement efficiency and accuracy.
Smart Images

Figure CN222105304U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of instrument testing, in particular to an on-site measuring instrument for the lateral water seepage coefficient of a drainage pavement. Background Art
[0002] The water seepage process of asphalt pavement involves two stages. The first is vertical seepage, which refers to the gradual penetration of water from the road surface into the deep layer of the asphalt pavement until it reaches the waterproof layer. Then, the seepage enters the second stage, namely lateral flow. In this stage, the water that penetrates into the asphalt pavement will flow horizontally until it finally reaches the location of the road drainage facilities. The ability of water to flow horizontally inside the asphalt pavement reflects the drainage capacity of the pavement, which can be characterized by the lateral water seepage coefficient.
[0003] If the lateral drainage is not smooth, rainwater and other liquids will quickly accumulate on the road surface, forming puddles and puddles of varying sizes. These accumulated water will not only cause great inconvenience to the driving of vehicles, but may also seriously threaten driving safety. On slippery roads, the vehicle's grip will be significantly reduced, and the braking distance will be greatly extended, increasing the risk of traffic accidents. Long-term road surface water will also cause continuous erosion of road surface materials. Water will penetrate into the tiny gaps in the road surface materials, gradually eroding its internal structure, causing the road surface performance to gradually decline. In cold areas, accumulated water will also form ice layers at low temperatures, causing freeze-thaw effects on the road surface materials, further aggravating the damage and aging of the road surface. If the drainage problem is not solved for a long time, the accumulation of water will continue to exist, and the roadbed may be submerged. The roadbed is an important structure that supports the road surface. Once it is soaked and eroded by water, its stability will be seriously affected. Long-term flooding will cause the roadbed soil to soften, which will in turn cause the roadbed to settle and deform. This will not only further aggravate the damage to the road surface, but may also increase the risk of road collapse, seriously threatening driving safety.
[0004] According to the research of scholars in related fields, the drainage inside the pavement is divided into vertical drainage and transverse drainage, and transverse drainage accounts for the vast majority of the total drainage. Therefore, it is necessary to introduce an evaluation index for transverse drainage of asphalt pavement, namely the transverse water permeability coefficient.
[0005] There is no on-site measurement method for the transverse water permeability coefficient of drainage pavement in the current specifications. In the relevant field, some authors have made a simple laboratory measurement device for the transverse water permeability coefficient. The principle is based on Darcy's law, using the constant head method or the variable head method to measure the water permeability coefficient of the test block.
[0006] In experiments, the constant head test method is often used to determine the water permeability coefficient k. This method measures the seepage volume Q under different cross-sectional areas A and seepage lengths L by keeping the water head difference ΔH constant, thereby calculating the water permeability coefficient K. This method is simple and easy to implement, and the results are relatively accurate, so it has been widely used in engineering practice.
[0007] In the specification, there are two main types of methods for measuring water permeability coefficient. The first type is mainly applicable to on-site pavements and asphalt mixture rutting plate specimens in the laboratory. The test method follows Appendix D of the "Technical Specifications for Design and Construction of Drained Asphalt Pavement" (JTG / T3350-03-2020), T 0730 in the "Test Procedure for Highway Asphalt and Asphalt Mixture" (JTG E20), and T 0971 in the "Field Test Procedure for Highway Roadbed and Pavement" (JTG 3450). These methods all use the variable head test principle. Among them, the "Technical Specifications for Design and Construction of Drained Asphalt Pavement" (JTG / T 3350-03-2020) specifically recommends the use of an automatic electronic water permeability meter to reduce the errors caused by manual meter reading and timing, especially for the characteristics of large water permeability coefficient and fast seepage velocity of drainage pavement.
[0008] The second type of test method is specifically for water seepage experiments in the laboratory, which is used to determine the vertical water seepage coefficient of the specimen. The specific test method can be found in Appendix C of the Technical Specifications for Design and Construction of Drained Asphalt Pavement (JTG / T 3350-03-2020). It is aimed at drainage asphalt pavements with a large water seepage coefficient and uses the constant head method to determine the water seepage coefficient.
[0009] The characteristic of the constant head method is that the head difference remains stable during the seepage process, which makes the seepage velocity not decay, so it is suitable for the determination of the water permeability coefficient of various asphalt pavements. However, when the variable head method is used to measure the pavement with a large water permeability coefficient, the seepage velocity will change significantly during the process due to the short seepage time, which will increase the coefficient of variation of the result.
[0010] In the research of related fields, a few scholars proposed the measurement method of lateral water permeability coefficient based on Darcy's law, which is divided into variable head method and constant head method.
[0011] Constant head instrument such as Figure 1 As shown, the left end is the water input point. The left opening of the left container is to maintain the water head height. The upper and lower parts and the front and back of the asphalt mixture rutting plate specimen are blocked. Then the water is input into the rutting plate specimen from the left side. The water flows through the rutting plate specimen and outputs to the water receiving instrument on the right side. The water level of the water receiving instrument is set before the experiment starts, and a constant water head height is maintained between the input water flow. The pressure pipe is used to measure the water pressure of the water flow input tank and the water flow output tank. The lateral water permeability coefficient of the asphalt mixture rutting plate specimen is determined by measuring the water collected and flowing out within a fixed time.
[0012] Whether it is on-site sampling or re-making test blocks according to design documents, indoor tests cannot reflect the lateral drainage capacity of the drainage pavement under actual conditions. Secondly, on-site sampling causes greater damage to the pavement; the test time is long and the flow calculation results have large errors.
[0013] The experimental principle of this device is based on Darcy's law and adopts the constant head test method. In 1859, French hydraulic engineer Henry Darcy summarized the law of water penetration in porous media through long-term penetration tests: the seepage volume Q is proportional to the cross-sectional area A perpendicular to the water flow direction and the vertical head difference, and inversely proportional to the seepage length L. This is the famous Darcy's law, and its expression is:
[0014]
[0015] Where: Q is the seepage rate (cm 3 / s), which indicates the volume of fluid passing through a certain section per unit time; K is the water permeability coefficient (cm / s), which indicates the difficulty of porous media for fluid penetration and is a constant related to the properties of the medium; A is the seepage cross-sectional area (cm 2 ), which is the cross-sectional area perpendicular to the direction of water flow; ΔH is the head difference (cm); L is the seepage length (cm), which is the path length of the fluid through the porous medium; J is the hydraulic gradient, dimensionless.
[0016] In the Darcy seepage model, the seepage water performs one-dimensional uniform motion, that is, the magnitude and direction of the seepage velocity and hydraulic gradient remain unchanged along the seepage direction, which can be extended to three-dimensional situations. Utility Model Content
[0017] In view of the above-mentioned deficiencies, the utility model proposes an on-site measuring instrument for the lateral water seepage coefficient of drainage pavement. The utility model is mainly used for measuring the lateral (horizontal) water seepage coefficient of drainage pavement on-site, reflecting the flow of water inside the built asphalt pavement, and used to evaluate the lateral (horizontal) drainage capacity of the existing asphalt pavement; new evaluation indicators are introduced into the old road evaluation system for the acceptance of new roads. The utility model only considers the lateral (planar) movement of seepage water, and does not take the vertical movement of seepage water into consideration.
[0018] The utility model is implemented by at least one of the following technical solutions.
[0019] A field measuring instrument for the transverse water seepage coefficient of a drainage pavement, comprising a water tank with a drainage hole, a front water storage cavity, a side baffle, a cover plate, a rear water storage cavity, and a flow meter;
[0020] The front water storage cavity, the side baffles and the rear water storage cavity are located in the grooves opened around the test area; the cover plate covers the asphalt pavement of the test area; the water tank and the flow meter are respectively connected to the front water storage cavity and the rear water storage cavity.
[0021] Furthermore, the front water storage cavity and the rear water storage cavity have the same shape, both of which are square containers with side openings, a hole in the top, and an extended strap on the top.
[0022] Furthermore, the widths of the front water storage cavity and the rear water storage cavity are equal to the width of the test area.
[0023] Furthermore, a hole is opened at the lower side of the water tank.
[0024] Furthermore, the opening at the lower part of the side of the water tank is connected to the top opening of the front water storage cavity; the top opening of the rear water storage cavity 7 is connected to the flow meter.
[0025] Furthermore, the side baffles are provided on both sides of the test area, and the height of the side baffles should be higher than the height of the road surface drainage layer, and the length should be greater than the length of the test area.
[0026] Furthermore, the height of the leakage hole is higher than the height of the axis of the flow meter, so that a water head difference is formed between the water tank and the flow meter.
[0027] Furthermore, the cover plate is longer than the length of the test area and has the same width as the test area, and is placed above the test area when in use.
[0028] Furthermore, the flow meter can display instantaneous flow.
[0029] Furthermore, all mechanical gaps in the measuring instrument are sealed with waterproof materials.
[0030] The test method of the field measuring instrument for the transverse water permeability coefficient of a drainage pavement includes the following steps: after installing the instrument, continuously add water to the water tank to check the water tightness of the instrument. Water can only flow from the water tank through the test area into the flow meter; record the reading Q (cm) when the flow meter is stable. 3 / s), measure the vertical height ΔH (cm) between the leakage hole and the flowmeter axis, seepage cross-sectional area (cross-sectional area of the test area) A (cm 2 ), seepage length (length of test area) L (cm).
[0031] The lateral drainage capacity of the pavement is evaluated by the calculation formula of the seepage volume Q, the measured water head difference ΔH, the seepage length L, the seepage cross-sectional area A, and the lateral (horizontal) water seepage coefficient K of the pavement according to Darcy's law:
[0032]
[0033] Compared with the prior art, the utility model has the following beneficial effects:
[0034] The utility model device can measure the lateral (horizontal) water seepage coefficient of the built road surface on site, evaluate the lateral (horizontal) drainage capacity of the built drainage road surface, solve the problem of on-site measurement of the lateral water seepage coefficient of the drainage road surface, and can reflect the lateral (horizontal) drainage capacity of the drainage road surface under real conditions. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] In order to more clearly illustrate the specific implementation of the utility model or the technical solution in the prior art, the following is a brief introduction to the drawings required for use in the specific implementation or the description of the prior art.
[0036] Figure 1 It is a constant head lateral permeability test device;
[0037] Figure 2 This is a schematic structural diagram of an on-site measuring instrument for the transverse water seepage coefficient of a drainage pavement according to an embodiment of the utility model;
[0038] Figure 3 This is a structural stereogram of an on-site measuring instrument for the transverse water seepage coefficient of a drainage pavement according to an embodiment of the utility model;
[0039] Figure 4 This is a structural stereogram of the front water storage cavity 4 or the rear water storage cavity 7 of an on-site measuring instrument for the transverse water seepage coefficient of a drainage pavement according to an embodiment of the utility model.
[0040] In the figure, 1-leakage hole; 2-water tank; 3-side baffle; 4-front water storage cavity; 5-cover plate; 6-flow meter; 7-rear water storage cavity. DETAILED DESCRIPTION
[0041] In order to make the purpose, technical method and advantages of the utility model clearer, the utility model will be further described in detail below with reference to the accompanying drawings and specific examples. These examples are only illustrative and not limiting of the utility model.
[0042] The orientation descriptions involved in the present utility model (such as up, down, front, back, left, right, etc.) are based on the orientation or position relationship shown in the accompanying drawings. This description is for the convenience of description and simplified explanation, and does not mean that the device or element must have a specific orientation or operate in a specific manner in actual application. These orientation descriptions should not be regarded as limitations on the utility model. Unless explicitly stated, the terms "set", "install", "connect" and so on are understood in a broad sense in the present utility model, emphasizing that the specific meanings of these terms should be reasonably determined based on the specific content of the technical solution. Technical personnel in the relevant technical field can reasonably determine the specific meanings of the above terms in the present utility model in combination with the specific content of the technical solution.
[0043] like Figure 2 , Figure 3As shown, a field measuring instrument for the lateral water permeability coefficient of a drainage pavement of the present embodiment includes: a water tank 2 with a drainage hole 1, a front water storage cavity 4, a side baffle 3, a cover plate 5, a rear water storage cavity 7, and a flow meter 6. Before conducting the experiment, a square road test block needs to be selected at the selected road surface as the asphalt pavement test area. The test area is grooved around to place the front water storage cavity 4, the rear water storage cavity 7 and the side baffle 3. The front water storage cavity 4, the rear water storage cavity 7 and the side baffle 3 are located in the grooves opened around the asphalt pavement test area; the cover plate 5 covers the asphalt pavement in the test area (the area surrounded by the groove); the water tank 2 and the flow meter 6 are respectively connected to the front water storage cavity 4 and the rear water storage cavity 7 with water pipes; the water tank 2 and the flow meter 6 are located on the asphalt pavement;
[0044] The water tank 2 is opened at the lower side of the side, and the size of the hole is a six-point hole with a thread. Its size refers to the metric thread size. The water tank 2 is connected to a water source (tap water pipe, etc.). Water should be added continuously during the test process to keep water flowing out of the leakage hole 1 to ensure a constant water head height. The height of the leakage hole 1 should be higher than the axis height of the flow meter 6 to ensure that water flows through the test area.
[0045] like Figure 4 As shown, the front water storage cavity 4 and the rear water storage cavity 7 are of the same shape, both are square containers with side openings, both have openings on the top, and have extended straps on the top. The size of the top opening is a six-point hole with threads, and its size refers to the metric thread size. The width of the front water storage cavity 4 and the rear water storage cavity 7 is equal to the width of the test area (the area surrounded by the groove). The top opening of the rear water storage cavity 7 is connected to the flow meter 6 with a water pipe. The lower opening on the side of the water tank 2 is connected to the top opening of the front water storage cavity 4 with a water pipe through their respective openings; the top opening of the rear water storage cavity 7 is connected to the flow meter 6 with a water pipe.
[0046] As an embodiment, the water pipe is made of steel pipe, PVC pipe or hard rubber pipe, and a six-point water pipe joint is used.
[0047] There are two side baffles 3 in total, the height of which should be higher than the height of the road drainage layer, the length of which should be longer than the length of the test area (the area surrounded by the groove), and they are placed on both sides of the test area.
[0048] The cover plate 5 should be longer than the length of the test area and have the same width as the test area. When in use, it is placed above the test area.
[0049] As an embodiment, the flow meter 6 can display instantaneous flow, which is used to determine whether the flow is stable and record the flow size when it is stable.
[0050] All places where mechanical gaps exist are sealed with waterproof materials. The water tank 2, the front water storage cavity 4, the rear water storage cavity 7, and the flow meter 6 are connected using a six-point water pipe joint to ensure water tightness; the front water storage cavity 4, the side baffle 3, the cover plate 5, the rear water storage cavity 7 and the test area are sealed with sealing putty; the side baffle 3 and the water storage cavity 4, the cover plate 5, and the rear water storage cavity 7 are sealed with sealing putty; a heavy object is placed on the cover plate 5 to improve the sealing performance; the fragments produced by cutting can be filled in the gap between the front water storage cavity 4, the side baffle 3, the rear water storage cavity 7 and the cut groove to increase the sealing performance.
[0051] The on-site measuring instrument for the transverse water permeability coefficient of a drainage pavement in this embodiment adopts a method of testing the water permeability coefficient with a constant water head, and the test steps include:
[0052] 1. Cut a circular groove at the selected point with an inner ring length of 40cm, a width of 30cm, an outer ring length of 50cm, and a width of 34cm, and the depth reaches the road surface waterproof layer.
[0053] 2. Clean up the debris, dust and mud generated by cutting.
[0054] 3. Place two side baffles 3 in the test area (the grooves on both sides). The height of the baffles should be higher than the depth of the grooves. Use sealing putty to waterproof the test area and the baffles 3. If necessary, fill the gap between the baffles 3 and the grooves with the debris produced by cutting.
[0055] 4. Place two water storage cavities (4, 7) at both ends of the test area, use sealing putty to make waterproof measures between the test area and the water storage cavity, and fill the gaps between the two water storage cavities (4, 7) and the cut grooves with the fragments produced by cutting when necessary.
[0056] 5. Place the cover 5 on the test area, and use sealing glue to make waterproof measures between the cover 5 and the test area, the baffle 3 and the two water storage chambers (4, 7). Heavy objects can be pressed on them to ensure the sealing.
[0057] 6. Connect the water tank, connect the water tank 2 and the front water storage cavity 4 and take waterproof measures.
[0058] 7. Connect the flow meter 6 and connect the flow meter 6 to the rear water storage cavity 7. The height of the flow meter 6 should be lower than the height of the water tank drain hole 1.
[0059] 8. Continue to add water to the water tank 2, and water will continue to overflow from the leakage hole 1, so that the water tank 2 and the two water storage chambers (4, 7) are filled with water, and check the water tightness. At this time, water can only flow into the flow meter 6 from the test area.
[0060] 9. Record the reading of flow meter 6 when it is stable.
[0061] 10. Measure the head difference, that is, the vertical height between the water tank drain hole 1 and the axis of the flow meter 6
[0062] After installing the instrument, continue to add water to the water tank 2 to check the water tightness of the instrument. Water can only flow from the water tank 2 through the test area into the flow meter 6. Record the reading Q (cm) when the flow meter is stable. 3 / s), measure the vertical height ΔH (cm) between the leakage hole 1 and the axis of the flow meter 6, and the seepage cross-sectional area (cross-sectional area of the test area) A (cm 2 ), seepage length (length of test area) L (cm). Calculate the (horizontal) water seepage coefficient according to the following formula:
[0063]
[0064] Repeat the test three times in parallel and take the average to get the horizontal seepage coefficient K of the pavement.
[0065] The preferred embodiments of the utility model disclosed above are only used to help explain the utility model. The preferred embodiments do not describe all the details in detail, nor do they limit the utility model to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the utility model, so that those skilled in the art can understand and use the utility model well.
Claims
1. An on-site measuring instrument for the transverse water permeability coefficient of a drainage pavement, characterized in that: It comprises a water tank (2) with a drain hole (1), a front water storage cavity (4), a side baffle (3), a cover plate (5), a rear water storage cavity (7), and a flow meter (6); The front water storage cavity (4), the side baffle (3) and the rear water storage cavity (7) are located in grooves opened around the test area; the cover plate (5) covers the asphalt pavement of the test area; the water tank (2) and the flow meter (6) are respectively connected to the front water storage cavity (4) and the rear water storage cavity (7).
2. The on-site measuring instrument for the transverse water permeability coefficient of a drainage pavement according to claim 1, characterized in that: The front water storage cavity (4) and the rear water storage cavity (7) are of the same shape, both being square containers with side openings, a hole in the top, and an extended strap on the top.
3. The on-site measuring instrument for the transverse water permeability coefficient of drainage pavement according to claim 1, characterized in that: The widths of the front water storage cavity (4) and the rear water storage cavity (7) are equal to the width of the test area.
4. The on-site measuring instrument for the transverse water permeability coefficient of drainage pavement according to claim 1, characterized in that: The lower part of the side of the water tank (2) has an opening.
5. The on-site measuring instrument for the transverse water permeability coefficient of drainage pavement according to claim 4, characterized in that: The opening at the lower part of the side of the water tank (2) is connected to the top opening of the front water storage cavity (4); and the top opening of the rear water storage cavity is connected to the flow meter (6).
6. The on-site measuring instrument for the transverse water permeability coefficient of drainage pavement according to claim 1, characterized in that: The side baffles (3) are arranged on both sides of the test area. The height of the side baffles (3) should be higher than the height of the road surface drainage layer, and the length should be greater than the length of the test area.
7. The on-site measuring instrument for the transverse water permeability coefficient of drainage pavement according to claim 1, characterized in that: The height of the leakage hole (1) is higher than the height of the axis of the flow meter (6), so that a water head difference is formed between the water tank (2) and the flow meter (6).
8. The on-site measuring instrument for the transverse water permeability coefficient of drainage pavement according to claim 1, characterized in that: The cover plate (5) is longer than the length of the test area and has the same width as the test area, and is placed above the test area when in use.
9. The on-site measuring instrument for the transverse water permeability coefficient of drainage pavement according to claim 1, characterized in that: The flow meter (6) can display instantaneous flow.
10. An on-site measuring instrument for lateral water permeability coefficient of drainage pavement according to any one of claims 1 to 9, characterized in that: All mechanical gaps in the measuring instrument are sealed with waterproof materials.