Air exhaust total heat recovery air conditioning system under working condition of combination of peacetime and urgent time of hospital
By designing a fully heat recovery air conditioning system in hospitals combined with the exhaust air under working conditions, using components such as compressors, four-way valves and heat exchangers, summer cold recovery and winter heat recovery are achieved, and the volume in the existing technology is solved The problem of large and large-occupancy rotary full-heat recovery machine improves the reliability and efficiency of heat recovery.
Patent Information
- Application Number
- CN202420726238.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-09
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-04-09
AI Technical Summary
The existing rotary wheel-type full heat recovery unit has a large volume, large area and net height, large piezoresistance, requires a transmission device, consumes power during operation and has leakage, which cannot be integrated with the air conditioning system, and is in extremely cold or hot climates. The heat cannot be effectively recovered.
A fully heat recovery air conditioning system for exhaust air under hospital flat and emergency conditions was designed, including compressor, four-way valve, fresh air heat exchanger, first throttle valve, exhaust air heat exchanger, indoor heat exchanger, The second throttle valve and outdoor heat exchanger are connected through pipelines, and the solenoid valve is used to achieve accurate flow and pressure control, the support plate improves the stability of the compressor, the switching components and the installation plate fixing equipment, and realizes the recovery of cold volume in summer and the recovery of heat in winter. Recycle.
It realizes the removal and dehumidification of fresh air in summer, and the recovery of exhaust heat in winter to heat the indoor air, solves the problem of temperature difference and humidity influence of conventional heat recovery devices, and improves the reliability and efficiency of heat recovery.
Smart Images

Figure CN222123437U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of building air conditioning, and particularly relates to an exhaust full heat recovery air conditioning system under hospital normal and emergency combined working conditions. Background Art
[0002] In hospital buildings, air conditioning consumes a huge amount of energy, accounting for 50% to 70% of the total energy consumption, which is about twice that of ordinary office buildings. Therefore, it is very necessary to take energy-saving measures for the hospital's air conditioning system. Among them, the fresh air load, as one of the components of the air conditioning load, generally accounts for 30% to 50% of the air conditioning load, and even exceeds 60% in winter, and even exceeds 70% in public buildings with a large population density. The use of exhaust heat recovery devices in the air conditioning system can recover and utilize the cold / heat contained in the exhaust air, pre-treat the fresh air, and thus reduce the energy consumption generated by processing the fresh air. The conventional heat recovery device is a rotary full heat recovery device.
[0003] In actual use, the rotary full heat recovery unit has a large volume, occupies a large building area and net height, has a large pressure resistance, requires a transmission device, consumes some power during operation, has leakage, cross contamination cannot be completely avoided during actual operation, and cannot be integrated with the air-conditioning system. Utility Model Content
[0004] The purpose of the utility model is to provide an exhaust full heat recovery air conditioning system under combined normal and emergency working conditions in a hospital, which solves the problems of conventional rotary full heat recovery units, such as large size, large occupied building area and large net height, large pressure resistance, need for transmission device, need to consume part of the power during operation, leakage, cross contamination cannot be completely avoided during actual operation, and cannot be integrated with the air conditioning system.
[0005] The above technical objectives of the utility model are achieved through the following technical solutions: an exhaust full heat recovery air conditioning system for a hospital under normal and emergency combined working conditions, comprising a compressor, a four-way valve, a fresh air heat exchanger, a first throttle valve, an exhaust heat exchanger, an indoor heat exchanger, a second throttle valve, and an outdoor heat exchanger. An exhaust port and an air intake port are provided on the compressor, a first pipeline is provided between the exhaust port and the four-way valve, a second pipeline is provided between the fresh air heat exchanger and the four-way valve, a third pipeline is provided between the fresh air heat exchanger and the first throttle valve, a fourth pipeline is provided between the exhaust heat exchanger and the other end of the first throttle valve, a fifth pipeline is provided between the exhaust heat exchanger and the four-way valve, a sixth pipeline is provided between the four-way valve and the air intake port, a seventh pipeline is provided between the second pipeline and the indoor heat exchanger, an eighth pipeline is provided between the indoor heat exchanger and the second throttle valve, a ninth pipeline is provided between the second throttle valve and the outdoor heat exchanger, and a tenth pipeline is provided between the outdoor heat exchanger and the fifth pipeline.
[0006] By adopting the above technical scheme, by arranging a compressor, a four-way valve, a fresh air heat exchanger, a first throttle valve, an exhaust air heat exchanger, an indoor heat exchanger, a second throttle valve, an outdoor heat exchanger, an exhaust port, an air intake port, a first pipeline, a second pipeline, a third pipeline, a fourth pipeline, a fifth pipeline, a sixth pipeline, a seventh pipeline, an eighth pipeline, a ninth pipeline, and a tenth pipeline, when the refrigeration cycle in summer is only in the exhaust air cooling capacity recovery mode, the indoor heat exchanger, the outdoor heat exchanger, and the second throttle valve are closed, the exhaust gas of the compressor flows through the four-way valve to the exhaust air heat exchanger for condensation, the liquid working medium is throttled by the first throttle valve and evaporates and absorbs heat in the fresh air heat exchanger, and the gaseous working medium flows through the four-way valve to the exhaust air heat exchanger for condensation, and the liquid working medium evaporates and absorbs heat in the fresh air heat exchanger after being throttled by the first throttle valve. The valve then returns to the compressor; in the summer refrigeration cycle, when only indoor refrigeration is performed and there is no exhaust air cooling recovery, the fresh air heat exchanger, the exhaust air heat exchanger and the first throttle valve are closed, and the exhaust gas of the compressor flows through the four-way valve to the outdoor heat exchanger for condensation. The liquid working medium is throttled by the second throttle valve and evaporates and absorbs heat in the indoor heat exchanger. The gaseous working medium flows through the four-way valve and then returns to the compressor; in the summer refrigeration cycle, when both indoor refrigeration and exhaust air cooling are performed, the exhaust gas of the compressor flows through the four-way valve, one way goes to the outdoor heat exchanger for condensation, the liquid working medium is throttled by the second throttle valve and evaporates and absorbs heat in the indoor heat exchanger, and the other way goes to the exhaust air heat exchanger for condensation. The liquid working medium is throttled by the second throttle valve and evaporates and absorbs heat in the indoor heat exchanger. After throttling by the first throttle valve, it evaporates and absorbs heat in the fresh air heat exchanger. The gaseous working fluid flowing out of the indoor heat exchanger and the fresh air heat exchanger is mixed, flows through the four-way valve and then returns to the compressor; in the winter heating cycle when only exhaust heat recovery is in operation, the indoor heat exchanger, the outdoor heat exchanger and the second throttle valve are closed, and the exhaust gas of the compressor flows through the four-way valve to the fresh air heat exchanger for condensation. After throttling by the first throttle valve, the liquid working fluid evaporates and absorbs heat in the exhaust air heat exchanger, and the gaseous working fluid flows through the four-way valve and then returns to the compressor; in the winter heating cycle when only indoor heating is performed and there is no exhaust heat recovery, the fresh air heat exchanger, the exhaust air heat exchanger and the first throttle valve are closed, and the exhaust gas of the compressor The air flows through the four-way valve to the indoor heat exchanger for condensation, the liquid working medium is throttled by the second throttle valve and evaporates and absorbs heat in the outdoor heat exchanger, and the gaseous working medium flows through the four-way valve and then returns to the compressor; in the winter heating cycle, when the indoor heating and exhaust heat recovery are performed at the same time, the exhaust gas of the compressor flows through the four-way valve, one way goes to the indoor heat exchanger for condensation, the liquid working medium is throttled by the second throttle valve and evaporates and absorbs heat in the outdoor heat exchanger, and the other way goes to the fresh air heat exchanger for condensation, the liquid working medium is throttled by the first throttle valve and evaporates and absorbs heat in the exhaust heat exchanger, and the gaseous working medium flowing out of the outdoor heat exchanger and the exhaust heat exchanger is mixed, flows through the four-way valve and then returns to the compressor.
[0007] The utility model is further configured as follows: the fresh air heat exchanger and the indoor heat exchanger can be an evaporator and a condenser.
[0008] By adopting the above technical solution, in summer working conditions, the fresh air heat exchanger and the indoor heat exchanger are evaporators, and in winter working conditions, the fresh air heat exchanger and the indoor heat exchanger are condensers.
[0009] The utility model is further configured as follows: the exhaust heat exchanger and the outdoor heat exchanger can be a condenser and an evaporator.
[0010] By adopting the above technical solution, in summer working conditions, the exhaust heat exchanger and the outdoor heat exchanger are condensers, and in winter working conditions, the exhaust heat exchanger and the outdoor heat exchanger are evaporators.
[0011] The utility model is further configured as follows: the first throttle valve and the second throttle valve can be a solenoid valve and a capillary tube.
[0012] Using the above technical solution, the first throttle valve and the second throttle valve are preferably solenoid valves, which can respond to control signals in a very short time and are very fast in switching operations. Since the switch is controlled by the electromagnetic principle, precise flow and pressure control can be achieved, which is suitable for applications requiring precise control.
[0013] The utility model is further configured as follows: a support plate is arranged on the surface of the compressor, and the support plates are in a plurality and arranged linearly.
[0014] By adopting the above technical solution and providing a support plate, the support plate can support the compressor during use, thereby improving the stability of the compressor.
[0015] The utility model is further configured as follows: a switch component for controlling the opening and closing of the four-way valve is arranged on the four-way valve.
[0016] By adopting the above technical solution and arranging a switch component, the switch component can control the four-way valve when in use.
[0017] The utility model is further configured as follows: the fresh air heat exchanger, the exhaust air heat exchanger, the indoor heat exchanger and the outdoor heat exchanger are all provided with mounting plates, and the mounting plates are provided with mounting holes.
[0018] By adopting the above technical solution, by setting the mounting plate and the mounting holes, the fresh air heat exchanger, the exhaust air heat exchanger, the indoor heat exchanger and the outdoor heat exchanger can be installed and fixed through the cooperation of the mounting plate and the mounting holes.
[0019] In summary, the utility model has the following beneficial effects:
[0020] By arranging a compressor, a four-way valve, a fresh air heat exchanger, a first throttle valve, an exhaust air heat exchanger, an indoor heat exchanger, a second throttle valve and an outdoor heat exchanger, under summer conditions, the coldness in the exhaust air can be recovered to deheat and dehumidify the fresh air and the indoor room. Under winter conditions, the heat in the exhaust air can be recovered to heat the exhaust air and the indoor room, thereby realizing sensible heat and latent heat recovery.
[0021] Based on the above-mentioned improvements, the overall technical effect achieved by this device is to solve the problem that the heat exchange effect of the conventional heat recovery device depends on the temperature difference and moisture content difference between the supply and exhaust air flows, and is greatly affected by the outdoor temperature and humidity. It solves the problem that the conventional exhaust heat recovery system cannot guarantee the supply air temperature under special climatic conditions (extremely cold or hot), and that part of the energy in the exhaust of the conventional exhaust heat recovery system is wasted. By combining the air-conditioning system with the wind system, it is possible to achieve full exhaust heat recovery after centralized processing of the fresh air and exhaust air, thereby further ensuring the reliability of hygiene and heat recovery. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 This is a structural principle diagram of an exhaust full heat recovery air conditioning system for a hospital under combined normal and emergency conditions;
[0023] Figure 2 It is a three-dimensional structural diagram of an exhaust full heat recovery air conditioning system under combined normal and emergency conditions in a hospital according to the utility model;
[0024] Figure 3 The utility model is a schematic diagram of the planar structure of an exhaust full heat recovery air conditioning system under combined normal and emergency working conditions in a hospital.
[0025] In the figure, 1, compressor; 101, exhaust port; 102, intake port; 2, four-way valve; 3, fresh air heat exchanger; 4, first throttle valve; 5, exhaust air heat exchanger; 6, indoor heat exchanger; 7, second throttle valve; 8, outdoor heat exchanger; 9, support plate; 10, switch assembly; 11, mounting plate; 12, mounting hole; L1, first pipeline; L2, second pipeline; L3, third pipeline; L4, fourth pipeline; L5, fifth pipeline; L6, sixth pipeline; L7, seventh pipeline; L8, eighth pipeline; L9, ninth pipeline; L10, tenth pipeline. DETAILED DESCRIPTION
[0026] The utility model is further described in detail below in conjunction with the accompanying drawings.
[0027] Example:
[0028] See also Figure 1-Figure 3The utility model provides a technical solution: an exhaust full heat recovery air conditioning system under hospital normal and emergency combined working conditions, including a compressor 1, a four-way valve 2, a fresh air heat exchanger 3, a first throttle valve 4, an exhaust air heat exchanger 5, an indoor heat exchanger 6, a second throttle valve 7, and an outdoor heat exchanger 8. The compressor 1 is provided with an exhaust port 101 and an air intake port 102. A first pipeline L1 is provided between the exhaust port 101 and the four-way valve 2. A second pipeline L2 is provided between the fresh air heat exchanger 3 and the four-way valve 2. A third pipeline L3 is provided between the fresh air heat exchanger 3 and the first throttle valve 4. Pipeline L3, a fourth pipeline L4 is provided between the exhaust heat exchanger 5 and the other end of the first throttle valve 4, a fifth pipeline L5 is provided between the exhaust heat exchanger 5 and the four-way valve 2, a sixth pipeline L6 is provided between the four-way valve 2 and the air intake port 102, a seventh pipeline L7 is provided between the second pipeline L2 and the indoor heat exchanger 6, an eighth pipeline L8 is provided between the indoor heat exchanger 6 and the second throttle valve 7, a ninth pipeline L9 is provided between the second throttle valve 7 and the outdoor heat exchanger 8, and a tenth pipeline L10 is provided between the outdoor heat exchanger 8 and the fifth pipeline L5.
[0029] By arranging the compressor 1, the four-way valve 2, the fresh air heat exchanger 3, the first throttle valve 4, the exhaust air heat exchanger 5, the indoor heat exchanger 6, the second throttle valve 7, the outdoor heat exchanger 8, the exhaust port 101, the air intake port 102, the first pipeline L1, the second pipeline L2, the third pipeline L3, the fourth pipeline L4, the fifth pipeline L5, the sixth pipeline L6, the seventh pipeline L7, the eighth pipeline L8, the ninth pipeline L9 and the tenth pipeline L10, when the refrigeration cycle is in the summer and only the exhaust air cooling capacity is recovered, the indoor heat exchanger 6, the outdoor heat exchanger 8 and the second throttle valve 7 are closed, the exhaust gas of the compressor 1 flows through the four-way valve 2 to the exhaust air heat exchanger 5 for condensation, and the liquid working medium is throttled by the first throttle valve 4 and then evaporates in the fresh air heat exchanger 3 The gaseous working medium flows through the four-way valve 2 and then returns to the compressor 1; in the summer refrigeration cycle, when only indoor refrigeration is performed and there is no exhaust air cooling recovery, the fresh air heat exchanger 3, the exhaust air heat exchanger 5 and the first throttle valve 4 are closed, and the exhaust gas of the compressor 1 flows through the four-way valve 2 to the outdoor heat exchanger 8 to condense, and the liquid working medium is throttled by the second throttle valve 7 and evaporates and absorbs heat in the indoor heat exchanger 6, and the gaseous working medium flows through the four-way valve 2 and then returns to the compressor 1; in the summer refrigeration cycle, when both indoor refrigeration and exhaust air cooling are performed, the exhaust gas of the compressor 1 flows through the four-way valve 2, one way to the outdoor heat exchanger 8 to condense, the liquid working medium is throttled by the second throttle valve 7 and evaporates and absorbs heat in the indoor heat exchanger 6, and the other way to the exhaust air heat exchanger 5 to cool The liquid working medium is throttled by the first throttle valve 4 and then evaporates and absorbs heat in the fresh air heat exchanger 3. The gaseous working medium flowing out of the indoor heat exchanger 6 and the fresh air heat exchanger 3 is mixed, flows through the four-way valve 2 and then returns to the compressor 1; in the winter heating cycle when only exhaust heat recovery is in operation, the indoor heat exchanger 6, the outdoor heat exchanger 8 and the second throttle valve 7 are closed, and the exhaust gas of the compressor 1 flows through the four-way valve 2 to the fresh air heat exchanger 3 for condensation, and the liquid working medium is throttled by the first throttle valve 4 and then evaporates and absorbs heat in the exhaust air heat exchanger 5, and the gaseous working medium flows through the four-way valve 2 and then returns to the compressor 1; in the winter heating cycle when only indoor heating is performed and there is no exhaust heat recovery, the fresh air heat exchanger 3, the exhaust air heat exchanger 5 and the first throttle valve 4 are closed, and the compressor 1 is The exhaust gas of the compressor 1 flows through the four-way valve 2 to the indoor heat exchanger 6 for condensation, and the liquid working medium is throttled by the second throttle valve 7 and evaporates and absorbs heat in the outdoor heat exchanger 8, and the gaseous working medium flows through the four-way valve 2 and then returns to the compressor 1; in the winter heating cycle, when the indoor heating and exhaust heat recovery are performed at the same time, the exhaust gas of the compressor 1 flows through the four-way valve 2, one way to the indoor heat exchanger 6 for condensation, the liquid working medium is throttled by the second throttle valve 7 and evaporates and absorbs heat in the outdoor heat exchanger 8, and the other way to the fresh air heat exchanger 3 for condensation, the liquid working medium is throttled by the first throttle valve 4 and evaporates and absorbs heat in the exhaust heat exchanger 5, and the gaseous working medium flowing out of the outdoor heat exchanger 8 and the exhaust heat exchanger 5 is mixed, flows through the four-way valve 2 and then returns to the compressor 1.
[0030] refer to Figure 2The fresh air heat exchanger 3 and the indoor heat exchanger 6 can be an evaporator and a condenser. In summer working conditions, the fresh air heat exchanger 3 and the indoor heat exchanger 6 are evaporators. In winter working conditions, the fresh air heat exchanger 3 and the indoor heat exchanger 6 are condensers.
[0031] refer to Figure 2 The exhaust heat exchanger 5 and the outdoor heat exchanger 8 can be a condenser and an evaporator. In summer working conditions, the exhaust heat exchanger 5 and the outdoor heat exchanger 8 are condensers, and in winter working conditions, the exhaust heat exchanger 5 and the outdoor heat exchanger 8 are evaporators.
[0032] refer to Figure 2 The first throttle valve 4 and the second throttle valve 7 can be solenoid valves and capillaries. The first throttle valve 4 and the second throttle valve 7 are preferably solenoid valves. The solenoid valves can respond to control signals in a very short time and are very fast in switching operations. Since the switch is controlled by the electromagnetic principle, precise flow and pressure control can be achieved, which is suitable for applications requiring precise control.
[0033] refer to Figure 2 A support plate 9 is provided on the surface of the compressor 1. The number of the support plates 9 is several and they are arranged linearly. By providing the support plates 9, when in use, the support plates 9 can support the compressor 1 and improve the stability of the compressor 1.
[0034] refer to Figure 2 The four-way valve 2 is provided with a switch assembly 10 for controlling the opening and closing of the four-way valve 2. By providing the switch assembly 10, the switch assembly 10 can control the four-way valve 2 when in use.
[0035] refer to Figure 2 The fresh air heat exchanger 3, the exhaust air heat exchanger 5, the indoor heat exchanger 6 and the outdoor heat exchanger 8 are all provided with a mounting plate 11, and the mounting plate 11 is provided with a mounting hole 12. By setting the mounting plate 11 and the mounting hole 12, and through the cooperation of the mounting plate 11 and the mounting hole 12, the fresh air heat exchanger 3, the exhaust air heat exchanger 5, the indoor heat exchanger 6 and the outdoor heat exchanger 8 can be installed and fixed.
[0036] Brief description of the use process: In the summer refrigeration cycle, when only exhaust air cooling is recovered, the indoor heat exchanger 6, the outdoor heat exchanger 8 and the second throttle valve 7 are closed, and the exhaust gas of the compressor 1 flows through the four-way valve 2 to the exhaust air heat exchanger 5 for condensation. The liquid working medium is throttled by the first throttle valve 4 and evaporates and absorbs heat in the fresh air heat exchanger 3. The gaseous working medium flows through the four-way valve 2 and then returns to the compressor 1; In the summer refrigeration cycle, when only indoor refrigeration is performed and there is no exhaust air cooling recovery, the fresh air heat exchanger 3, the exhaust air heat exchanger 5 and the first throttle valve 4 are closed, and the exhaust gas of the compressor 1 flows through the four-way valve 2 to the outdoor heat exchanger 8 for condensation. The liquid working medium is throttled by the second After throttling by the throttle valve 7, the gaseous working medium evaporates and absorbs heat in the indoor heat exchanger 6, and the gaseous working medium flows through the four-way valve 2 and then returns to the compressor 1; in the summer refrigeration cycle, when the indoor refrigeration and exhaust air cooling capacity recovery are performed at the same time, the exhaust gas of the compressor 1 flows through the four-way valve 2, one way to the outdoor heat exchanger 8 to condense the liquid working medium after throttling by the second throttle valve 7, and then evaporates and absorbs heat in the indoor heat exchanger 6, and the other way to the exhaust air heat exchanger 5 to condense, the liquid working medium throttled by the first throttle valve 4 evaporates and absorbs heat in the fresh air heat exchanger 3, and the gaseous working medium flowing out of the indoor heat exchanger 6 and the fresh air heat exchanger 3 is mixed, and then flows through the four-way valve 2 and then returns to the compressor In the machine 1; in the winter heating cycle, when only the exhaust heat recovery is performed, the indoor heat exchanger 6, the outdoor heat exchanger 8 and the second throttle valve 7 are closed, and the exhaust gas of the compressor 1 flows through the four-way valve 2 to the fresh air heat exchanger 3 for condensation. The liquid working medium is throttled by the first throttle valve 4 and evaporates and absorbs heat in the exhaust heat exchanger 5. The gaseous working medium flows through the four-way valve 2 and then returns to the compressor 1; in the winter heating cycle, when only indoor heating is performed and there is no exhaust heat recovery, the fresh air heat exchanger 3, the exhaust heat exchanger 5 and the first throttle valve 4 are closed, and the exhaust gas of the compressor 1 flows through the four-way valve 2 to the indoor heat exchanger 6 for condensation. The liquid working medium is throttled by the second throttle valve 7. After throttling, it evaporates and absorbs heat in the outdoor heat exchanger 8, and the gaseous working medium flows through the four-way valve 2 and then returns to the compressor 1; in the winter heating cycle, when the indoor heating and exhaust heat recovery are in operation, the exhaust gas of the compressor 1 flows through the four-way valve 2, one way to the indoor heat exchanger 6 to condense the liquid working medium, and the other way to the fresh air heat exchanger 3 to condense, and the liquid working medium is throttled by the first throttle valve 4 and then evaporates and absorbs heat in the exhaust heat exchanger 5. The gaseous working medium flowing out of the outdoor heat exchanger 8 and the exhaust heat exchanger 5 is mixed, flows through the four-way valve 2 and then returns to the compressor 1.
[0037] This specific embodiment is merely an explanation of the present invention and is not a limitation of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to the present embodiment as needed, but such modifications are protected by patent law as long as they are within the scope of the claims of the present invention.
Claims
1. An exhaust air full heat recovery air conditioning system for hospital combined normal and emergency conditions, comprising a compressor (1), a four-way valve (2), a fresh air heat exchanger (3), a first throttle valve (4), an exhaust air heat exchanger (5), an indoor heat exchanger (6), a second throttle valve (7) and an outdoor heat exchanger (8), characterized in that: The compressor (1) is provided with an exhaust port (101) and an intake port (102); a first pipeline (L1) is provided between the exhaust port (101) and the four-way valve (2); a second pipeline (L2) is provided between the fresh air heat exchanger (3) and the four-way valve (2); a third pipeline (L3) is provided between the fresh air heat exchanger (3) and the first throttle valve (4); a fourth pipeline (L4) is provided between the exhaust air heat exchanger (5) and the other end of the first throttle valve (4); and the exhaust air heat exchanger (5) and the four-way valve (2) are connected to the compressor (1). A fifth pipeline (L5) is arranged between the four-way valve (2) and the air intake port (102), a sixth pipeline (L6) is arranged between the second pipeline (L2) and the indoor heat exchanger (6), an eighth pipeline (L8) is arranged between the indoor heat exchanger (6) and the second throttle valve (7), a ninth pipeline (L9) is arranged between the second throttle valve (7) and the outdoor heat exchanger (8), and a tenth pipeline (L10) is arranged between the outdoor heat exchanger (8) and the fifth pipeline (L5).
2. According to claim 1, the exhaust full heat recovery air conditioning system for hospital emergency and emergency conditions is characterized by: The fresh air heat exchanger (3) and the indoor heat exchanger (6) may be an evaporator and a condenser.
3. The exhaust heat recovery air conditioning system for hospital emergency and emergency conditions according to claim 1 is characterized by: The exhaust air heat exchanger (5) and the outdoor heat exchanger (8) may be a condenser and an evaporator.
4. The exhaust heat recovery air conditioning system for hospital emergency and emergency conditions according to claim 1 is characterized in that: The first throttle valve (4) and the second throttle valve (7) may be solenoid valves and capillaries.
5. The exhaust heat recovery air conditioning system for hospital emergency and emergency conditions according to claim 1 is characterized in that: The surface of the compressor (1) is provided with a support plate (9), and the support plates (9) are in multiple numbers and are arranged linearly.
6. The exhaust heat recovery air conditioning system for hospital emergency and emergency conditions according to claim 1 is characterized in that: The four-way valve (2) is provided with a switch assembly (10) for controlling the opening and closing of the four-way valve (2).
7. The exhaust full heat recovery air conditioning system for hospital emergency and emergency conditions according to claim 1 is characterized by: The fresh air heat exchanger (3), the exhaust air heat exchanger (5), the indoor heat exchanger (6) and the outdoor heat exchanger (8) are all provided with a mounting plate (11), and the mounting plate (11) is provided with a mounting hole (12).