Tool for quickly and safely replacing bushing transformer
By designing a assembly and combining tooling, using hydraulic jacks, manual hoists and pulleys, the rapid and safe replacement of the leakage plate transformer is achieved, and the problem that existing tooling cannot replace the leakage plate transformer safely and quickly, significantly improving the replacement Efficiency and safety.
Patent Information
- Application Number
- CN202420046739.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-09
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-01-09
AI Technical Summary
The existing tooling cannot quickly and safely replace the leaky plate transformer with a compact installation position and a large weight, which poses major safety risks and low replacement efficiency.
A combination of assembly tools is designed, including a lifting part, a frame, a transport vehicle, a slide, a lifting part and a lifting frame seat. The transformer is safe and fast replacement through hydraulic jacks, manual hoists and pulleys, and the lifting is adopted. -The transfer-lift-lifting method of moving vehicles simplifies the operation process.
The transformer replacement is achieved within 45 minutes, which reduces the labor intensity of maintenance personnel, eliminates major risks during the replacement process, improves work efficiency, and reduces the cost of purchasing spare parts due to the self-processing and production.
Smart Images

Figure CN222126261U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of transformer replacement, in particular to a tool for quickly and safely replacing a leaky plate transformer. Background Art
[0002] As the company's production line technology is continuously optimized, the wire drawing and leaky plate layout are all using new process layouts, which are quite different from the traditional production line, making the original leaky plate transformer tooling unusable. Because the installation position of the leaky plate transformer is relatively compact, the various water, gas, and impregnation agent pipelines are densely arranged behind the second floor of the wire drawing, and the transformer is blocked by the wire drawing air duct, so it cannot be replaced with a manual hoist or crane. In addition, the leaky plate transformer is heavy. If the maintenance personnel replace the transformer by manual dismantling and replacement, there will be major safety risks.
[0003] Therefore, how to provide a tool that can quickly and safely replace the leaky plate transformer has become a technical problem that technical personnel in this field urgently need to solve. Utility Model Content
[0004] In order to solve the problem of replacing the leaky plate transformer, a safe and fast replacement device for the leaky plate transformer is specifically designed to solve the major safety risks in the replacement process and improve the replacement efficiency of maintenance personnel.
[0005] Combined with the on-site situation of the leaky plate transformer on the production line, after repeated testing, discussion, simulation, revision and demonstration, it was decided to use the assembly and combination method to process the tooling, and use the existing resources to make a set of safe, efficient and practical tooling by ourselves. The specific technical solution is as follows:
[0006] A tool for quickly and safely replacing a leaky plate transformer, comprising a lifting portion, which, when in use, is located below the leaky plate transformer to be replaced and is used to lift up the leaky plate transformer to be replaced, and also comprises a frame, which, when in use, is located on the left side of the leaky plate transformer to be replaced, the internal space of the frame is equipped with a transport vehicle that can move in the up and down directions, the frame is provided with a slideway protruding outward on a side close to the leaky plate transformer to be replaced, the slideway is located below the leaky plate transformer to be replaced and is provided with a through space for the free end of the lifting portion to pass through, the internal space of the frame is connected to the slideway so that the transport vehicle can enter the slideway from the internal space or enter the internal space from the slideway, An embedding space is formed on the transport vehicle in the left and right directions so that the part of the lifting portion corresponding to the embedding space can be located in the embedding space when the transport vehicle enters the slide. The transport vehicle entering the slide is located below the lifted-up leak-plate transformer to be replaced. The transport vehicle also includes a crossbeam, which is erected above the transport vehicle that carries the leak-plate transformer to be replaced and is located at the lower position of the internal space, and the crossbeam extends to the left outside the frame. A lifting portion that moves left and right along the crossbeam is provided on the crossbeam, and the free end of the lifting portion is used to connect the leak-plate transformer to be replaced, so that the leak-plate transformer to be replaced can be transported from the internal space to a position outside the frame on the left side of the frame.
[0007] Preferably, the lifting part comprises a hydraulic jack and a lifting rod connected from bottom to top, and a supporting platform is provided at the upper end of the lifting rod for abutting the leaky plate transformer to be replaced.
[0008] Preferably, it also includes two L-shaped plates of the same shape, which are symmetrically and detachably installed at the front and rear positions on the left side of the frame. The two L-shaped plates have horizontal sides arranged facing each other to jointly form a slideway for carrying the transport vehicle, and the space between the two horizontal sides forms the through space.
[0009] Preferably, the frame includes four columns arranged in a vertical direction, with two columns located in the front aligned left and right, two columns located in the rear aligned left and right, two columns located on the left aligned front and back, and two columns located on the right aligned front and back.
[0010] Preferably, it also includes a lifting frame seat, which is located in the internal space of the frame and is used to carry the transport vehicle. The lifting frame seat is provided with pulleys at the upper and lower positions facing each column. Each pulley is slidably arranged on the corresponding column. The top ends of the two front columns are connected by a front cross plate, and the top ends of the two rear columns are connected by a rear cross plate. Manual hoists are installed on the front and rear cross plates, and manual hoist hanging points are arranged at the positions of the lifting frame seat corresponding to each manual hoist.
[0011] Preferably, two U-shaped fixed slide grooves arranged in the front-to-back direction are formed on the top of the lifting frame seat, and two rows of moving wheels arranged in the front-to-back direction and corresponding to the U-shaped fixed slide grooves are installed on the bottom of the transport vehicle.
[0012] Preferably, it also includes a movable ladder frame, wherein a mounting beam is arranged between the front and rear columns on the right side, the height of the mounting beam corresponds to the top of the movable ladder frame, one end of the cross beam is mounted on the mounting beam, and the other end is mounted on the top of the movable ladder frame.
[0013] Preferably, the lifting part comprises a lifting pulley and a manual hoist installed on the lifting pulley, the lifting pulley can move left and right along the beam, and the manual hoist is used to connect the leaky plate transformer to be replaced.
[0014] The tooling for quickly and safely replacing a leaky plate transformer provided by the utility model has the following technical effects:
[0015] 1. The tooling adopts an assembled structure and has functions such as safe lifting, translation, and hoisting, realizing one machine with multiple uses and effectively overcoming the complex on-site environment.
[0016] 2. The structure and operation of this tooling are relatively simple. The transformer is replaced by jacking-transport vehicle translation-lifting-hoisting, so that two people can complete the replacement work. After practice, the transformer replacement operation can be completed quickly within 45 minutes. Compared with the traditional production line, the replacement time is reduced by 130 minutes.
[0017] 3. Because the whole process of replacing the transformer with this tool is operated by machine, the labor intensity of maintenance personnel is greatly saved, the major risks of replacing the transformer are effectively eliminated, and the work efficiency is greatly improved.
[0018] 4. The whole set of tooling is manufactured by ourselves, without purchasing any spare parts from outside, so the production cost is low.
[0019] 5. The interchangeability of the leak plate compressor is fully considered during the design and production of the tooling. The specification requirements of domestic and imported leak plate transformers are fully considered during the design process, so that one machine can be used for multiple purposes and different regular leak plate compressors can be quickly replaced through the tooling. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a schematic diagram of the on-site environment;
[0021] Figure 2 A schematic diagram of a specific implementation of a tooling for quickly and safely replacing a leaky plate transformer;
[0022] Figure 3It is a schematic diagram of the structure of the enlarged lifting frame and the transport vehicle;
[0023] Figure 4 It is the initial state before the replacement operation;
[0024] Figure 5 Transformer replacement instructions Figure 1 ;
[0025] Figure 6 Transformer replacement instructions Figure 2 ;
[0026] Figure 7 Transformer replacement instructions Figure 3 ;
[0027] Figure 8 Transformer replacement instructions Figure 4 ;
[0028] Fig. 9 Transformer replacement instructions Figure 5 .
[0029] Figure 1-9 The accompanying drawings are denoted as follows:
[0030] 1. Transformer with leaky plate to be replaced; 2. Air-conditioning outlet; 3. Main pipeline of wetting agent system; 4. Compressed air, spray water, process circulating water pipes and electrode water pipes; 5. Frame; 6. Transport vehicle; 7. Through-space; 8. Crossbeam; 9. Hydraulic jack; 10. Lifting rod; 11. L-shaped plate; 12. Lifting frame seat; 13. Pulley; 14. Manual hoist; 15. Manual hoist hanging point; 16. U-shaped fixed slide; 17. Movable ladder frame; 18. Erection beam; 19. Lifting pulley; 20. Column. DETAILED DESCRIPTION
[0031] like Figure 1-9As shown, the utility model provides a tool for quickly and safely replacing a leaky plate transformer, comprising a lifting portion, which is located below the leaky plate transformer 1 to be replaced and is used to lift the leaky plate transformer 1 to be replaced when in use, and also comprises a frame 5, which is located on the left side of the leaky plate transformer 1 to be replaced when in use, and the internal space of the frame 5 is equipped with a transport vehicle 6 that can move in the up and down directions, and the frame 5 is provided with a slideway protruding outward on one side close to the leaky plate transformer 1 to be replaced, and the slideway is located below the leaky plate transformer 1 to be replaced and is provided with a through space 7 for the free end of the lifting portion to pass through, and the internal space of the frame 5 is connected to the slideway so that the transport vehicle 6 can enter the slideway from the internal space or enter the interior from the slideway The transport vehicle 6 has an embedded space formed on it along the left and right directions so that when the transport vehicle 6 enters the slide, the part of the lifting portion corresponding to the embedded space can be located in the embedded space. The transport vehicle 6 entering the slide is located below the lifted-up leak-plate transformer 1 to be replaced. The transport vehicle 6 also includes a crossbeam 8, which is erected above the transport vehicle 6 that carries the leak-plate transformer 1 to be replaced and is located at the lower position of the internal space, and the crossbeam 8 extends to the left outside the frame 5. A lifting portion that moves left and right along the crossbeam 8 is provided on the crossbeam 8, and the free end of the lifting portion is used to connect the leak-plate transformer 1 to be replaced, so that the leak-plate transformer 1 to be replaced can be transported from the internal space to a position outside the frame 5 on the left side of the frame 5.
[0032] In a specific implementation manner, the lifting portion includes a hydraulic jack 9 and a lifting rod 10 connected from bottom to top, and a supporting platform is provided at the upper end of the lifting rod 10 for abutting against the leaky plate transformer 1 to be replaced.
[0033] In a specific embodiment, it also includes two L-shaped plates 11 of the same shape, which are symmetrically and detachably installed at the front and rear positions on the left side of the frame 5. The two L-shaped plates 11 have horizontal sides arranged opposite to each other and together form a slideway for carrying the transport vehicle 6. The space between the two horizontal sides forms the through space 7.
[0034] like Figure 1-9 As shown, the frame 5 includes four columns 20 arranged in the vertical direction, the two columns 20 located in the front are aligned left and right, the two columns 20 located in the rear are aligned left and right, the two columns 20 located on the left are aligned front and back, and the two columns 20 located on the right are aligned front and back.
[0035] In a specific embodiment, it also includes a lifting frame seat 12, which is located in the internal space of the frame 5 and is used to carry the transport vehicle 6. The lifting frame seat 12 is equipped with pulleys 13 at the upper and lower positions facing each column 20. Each pulley 13 is slidably set on the corresponding column 20. The top ends of the two front columns 20 are connected by a front cross plate, and the top ends of the two rear columns 20 are connected by a rear cross plate. Manual hoists 14 are installed on the front and rear cross plates, and manual hoist hanging points 15 are set at the positions of the lifting frame seat 12 corresponding to each manual hoist 14.
[0036] In a specific embodiment, two U-shaped fixed slide grooves 16 arranged in the front-to-back direction are formed on the top of the lifting frame seat 12, and two rows of moving wheels arranged in the front-to-back direction and corresponding to the U-shaped fixed slide grooves 16 are installed on the bottom of the transfer vehicle 6.
[0037] like Figure 2 As shown, it also includes a movable ladder frame 17, and a mounting beam 18 is arranged between the front and rear columns 20 on the right side. The height of the mounting beam 18 corresponds to the top of the movable ladder frame 17, and one end of the cross beam 8 is mounted on the mounting beam 18, and the other end is mounted on the top of the movable ladder frame 17.
[0038] In a specific implementation, the lifting part includes a lifting pulley 19 and a manual hoist installed on the lifting pulley 19, the lifting pulley 19 can move left and right along the beam 8, and the manual hoist is used to connect the leaky plate transformer 1 to be replaced.
[0039] Figure 1 The schematic diagram of the on-site environment shows that, as described in the background technology section of this application, the environment for installing the leaky plate transformer is relatively complex. Air conditioning outlets 2, main pipelines of the infiltrant system 3, compressed air, spray water, process circulation water pipes, electrode water pipes 4, etc. are arranged around the leaky plate transformer.
[0040] The specific replacement implementation plan and steps are as follows:
[0041] 1. First, move the tooling parts to the replacement point and complete the assembly, including the installation of the frame 5, the L-shaped plate 11, the lifting frame seat 12, the transport vehicle 6, the manual hoist 14, etc.
[0042] 2. Use the manual hoist 14 to control the lifting frame 12 to lift the transport vehicle 6 to the same height as the transformer, manually remove the transformer fixing screws, and move the transformer backward 200 mm.
[0043] 3. Use the hydraulic jack 9 to raise the leaky plate transformer by 50 mm, slide the transport vehicle 6 under the transformer, then release the hydraulic jack 9, the transformer falls on the transport vehicle 6, and the manual transport vehicle 6 moves to the lifting frame seat 12.
[0044] 4. Use the manual hoist 14 to lower to the lifting frame seat 12, then install the movable ladder frame 17 and the beam 8, hang the hoist on the lifting pulley 19 on the beam 8, move the transformer away from the transport vehicle 6, and finally slide the transformer to the outside of the frame 5, slowly lower the transformer with the hoist to complete the transformer disassembly work, and then reverse the operation to complete the transformer installation work.
[0045] The specific process can be seen in Figure 4-9 .
Claims
1. A tool for quickly and safely replacing a leaky transformer, characterized in that: The utility model comprises a lifting part, which is located below the leakage plate transformer to be replaced and is used to lift the leakage plate transformer to be replaced when in use, and also comprises a frame, which is located on the left side of the leakage plate transformer to be replaced when in use, and a transport vehicle that can move in the up and down directions is installed in the internal space of the frame, and a slideway is provided on a side of the frame close to the leakage plate transformer to be replaced, which is protruding outward, and the slideway is located below the leakage plate transformer to be replaced and is provided with a through space for the free end of the lifting part to pass through, and the internal space of the frame is connected to the slideway so that the transport vehicle can enter the slideway from the internal space or enter the internal space from the slideway, and the left and right edges of the transport vehicle are An embedded space is formed in the direction so that when the transport vehicle enters the slide, the part of the lifting portion corresponding to the embedded space can be located in the embedded space, and the transport vehicle entering the slide is located below the lifted-up leak-plate transformer to be replaced. It also includes a crossbeam, which is erected above the transport vehicle that carries the leak-plate transformer to be replaced and is located at the lower position of the internal space, and the crossbeam extends to the left outside the frame, and a lifting portion is provided on the crossbeam that moves left and right along the crossbeam, and the free end of the lifting portion is used to connect the leak-plate transformer to be replaced, so that the leak-plate transformer to be replaced can be transported from the internal space to a position outside the frame on the left side of the frame.
2. The tooling for quickly and safely replacing a leaky plate transformer according to claim 1 is characterized in that: The lifting part includes a hydraulic jack and a lifting rod which are connected from bottom to top, and a supporting platform is arranged at the upper end of the lifting rod for abutting against the leaky plate transformer to be replaced.
3. The tooling for quickly and safely replacing a leaky plate transformer according to claim 2 is characterized in that: It also includes two L-shaped plates of the same shape, which are symmetrically and detachably installed at the front and rear positions on the left side of the frame. The two L-shaped plates have horizontal sides arranged opposite to each other to form a slideway for carrying the transport vehicle, and the space between the two horizontal sides forms the through space.
4. The tooling for quickly and safely replacing a leaky plate transformer according to claim 3 is characterized in that: The frame includes four columns arranged in a vertical direction, wherein two columns at the front are aligned left and right, two columns at the rear are aligned left and right, two columns at the left are aligned front and back, and two columns at the right are aligned front and back.
5. The tooling for quickly and safely replacing a leaky plate transformer according to claim 4 is characterized in that: It also includes a lifting frame seat, which is located in the internal space of the frame and is used to carry the transport vehicle. The lifting frame seat is provided with pulleys at the upper and lower positions facing each column. Each pulley is slidably arranged on the corresponding column. The top ends of the two columns located in the front are connected by a front cross plate, and the top ends of the two columns located in the rear are connected by a rear cross plate. Manual hoists are installed on the front and rear cross plates, and manual hoist hanging points are arranged at the positions of the lifting frame seat corresponding to each manual hoist.
6. The tooling for quickly and safely replacing a leaky plate transformer according to claim 5 is characterized in that: Two U-shaped fixed slide grooves arranged in the front-to-back direction are formed on the top of the lifting frame seat, and two rows of moving wheels arranged in the front-to-back direction and corresponding to the U-shaped fixed slide grooves are installed on the bottom of the transport vehicle.
7. The tooling for quickly and safely replacing a leaky plate transformer according to claim 6 is characterized in that: It also includes a movable ladder frame, a mounting beam is arranged between the front and rear columns on the right side, the height of the mounting beam corresponds to the top of the movable ladder frame, one end of the crossbeam is mounted on the mounting beam, and the other end is mounted on the top of the movable ladder frame.
8. The tooling for quickly and safely replacing a leaky plate transformer according to claim 7 is characterized in that: The lifting part comprises a lifting pulley and a manual hoist installed on the lifting pulley, the lifting pulley can move left and right along the crossbeam, and the manual hoist is used to connect the leaky plate transformer to be replaced.