Through the design of movable and fixed meter seats of sliding electronic power meter, the installation inconvenience caused by different transformer sizes in high supply and low meters is solved, error-free wiring and reduced risk of power theft, and the accuracy of power metering is improved. and security.

CN222167115UActive Publication Date: 2024-12-13STATE GRID SHANDONG ELECTRIC POWER CO MARKETING SERVICE CENT (MEASURING CENT)
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323080897.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-14
Publication Date
2024-12-13
Estimated Expiration
2033-11-14

AI Technical Summary

Technical Problem

In the power metering of high supply and low meter, the prior art causes inconvenience in installation due to different transformers sizes, which affects the installation accuracy of the metering device and may lead to electricity theft and measurement errors.

Method used

A sliding electronic power meter was designed, using several movable meter holders and fixed meter holders. Through removable connection and cable duct design, it can adapt to transformers of different sizes, and the electrical signal acquisition part is packaged in the fixed meter holder, canceling the Secondary circuit contacts reduce human error and the risk of power theft.

Benefits of technology

The installation of error-free wiring, wrong polarity, and wrong phase sequence is achieved, which reduces metrology errors and power theft phenomena, reduces investment and troubles in anti-powered measures, and improves the accuracy and safety of power metering.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222167115U_ABST
    Figure CN222167115U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of electric energy meters, and particularly relates to a sliding type electronic electric energy meter. The meter seat mechanism comprises a fixed meter seat and a plurality of movable meter seats, the fixed meter seat is fixedly connected with the electric energy metering display device, and each interactive meter seat is detachably connected with the electric energy metering display device; the cable pipe is fixedly connected with the electric energy metering display device and arranged on one side close to the meter seat mechanism, and a cable groove is formed in the cable pipe. According to the utility model, a plurality of movable gauge stands are arranged, so that the problems in the metering device installation process are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of electric energy meters, and in particular relates to a sliding type electronic electric energy meter. Background Art

[0002] The statements in this section merely provide background technical information related to the present invention and do not necessarily constitute prior art.

[0003] Transformers are essential equipment for power supply, and the amount of electricity used is measured through fixed energy metering devices. In high-voltage power supply systems, when the total capacity of the transformer is 630kVA or less, electricity can be measured on the low-voltage side, which is called high supply and low metering; that is, from high-voltage power supply to users, the electric energy metering device is installed on the low-voltage side of the user's power transformer to implement low-voltage metering; the loss of the power transformer is in front of the metering device and is not included in the metering data.

[0004] In the high supply and low metering, the metering device is installed on the secondary side of the transformer, which consists of a transformer and an electric energy meter. The measured voltage can be directly connected to the electric energy meter, and the measured current needs to be converted into a 5A standard signal through a current transformer and connected to the electric energy meter to achieve electric energy measurement. In the existing metering devices, due to the different sizes of transformers from different manufacturers, it will bring installation inconveniences during installation; the performance of the metering device is directly related to the accuracy of electric energy measurement. If the metering device is not installed properly, there will be electricity theft. Utility Model Content

[0005] In order to solve the above problems, the utility model proposes a sliding electronic electric energy meter, which solves the difficult problems in the installation process of the metering device by arranging a plurality of movable meter seats.

[0006] According to some embodiments, the first solution of the utility model provides a sliding electronic energy meter, which adopts the following technical solution:

[0007] A sliding electronic electric energy meter, comprising:

[0008] Electric energy metering and display device;

[0009] A meter stand mechanism, comprising a fixed meter stand and a plurality of movable meter stands, wherein the fixed meter stand is fixedly connected to the electric energy metering display device, and each of the movable meter stands is detachably connected to the electric energy metering display device;

[0010] A cable tube is fixedly connected to the electric energy metering display device and is arranged on a side close to the meter seat mechanism. A cable groove is provided on the cable tube.

[0011] As a further technical limitation, cables are arranged in the cable tube.

[0012] As a further technical limitation, a fixing block is provided on the movable table base.

[0013] Furthermore, the fixing block is provided with a mounting sleeve hole, and the movable table seat is sleeved on the cable tube through the mounting sleeve hole.

[0014] Furthermore, the aperture size of the mounting sleeve hole matches that of the cable tube.

[0015] Furthermore, a connecting piece is provided in the installation sleeve hole, and the size and position of the connecting piece match the cable groove.

[0016] Furthermore, a first movable connecting piece is provided in the movable table base, and the first movable connecting piece is electrically connected to the connecting piece.

[0017] As a further technical limitation, the fixed meter stand is connected to the electric energy metering display device via a fixed bracket.

[0018] Furthermore, a second movable connecting piece is arranged in the fixed table seat, and the second movable connecting piece is electrically connected to the cable arranged in the cable groove.

[0019] As a further technical limitation, the electric energy metering and display device adopts an electric energy meter.

[0020] Compared with the prior art, the beneficial effects of the utility model are:

[0021] The utility model can well adapt to different transformer sizes through the designed movable meter base. At the same time, when installing, it only needs to install the movable meter base on the secondary side terminal of the distribution transformer, without the phenomenon of wrong wiring, wrong polarity and wrong phase sequence. A connecting piece is arranged in the installation sleeve hole of the movable meter base, and no special mutual inductor is needed. The electric quantity is directly read and the secondary circuit contact is cancelled, thereby reducing the artificial measurement error. The electric signal collection part is encapsulated in the fixed meter base, so that the occurrence of electricity theft is eliminated, and the investment and trouble caused by taking anti-electricity theft measures are reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention.

[0023] Figure 1 It is a structural schematic diagram of the sliding electronic electric energy meter in the utility model;

[0024] Among them, 1. Electric energy metering display device; 2. Movable meter holder; 3. Cable tube; 4. Fixed block; 5. Fixed meter holder; 6. Fixed bracket; 7. First movable connecting piece; 8. Second movable connecting piece. DETAILED DESCRIPTION

[0025] The utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0026] It should be noted that the following detailed descriptions are all exemplary and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.

[0027] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the utility model. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0028] In the present invention, terms such as "upper", "lower", "left", "right", "front", "back", "vertical", "horizontal", "side", "bottom" and the like indicating directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings. They are relational words determined only for the convenience of describing the structural relationships of the various parts or elements of the present invention, and do not specifically refer to any part or element in the present invention and cannot be understood as limitations on the present invention.

[0029] In the present utility model, terms such as "fixed connection", "connected", "connection", etc. should be understood in a broad sense, indicating that it can be fixedly connected, integrally connected or detachably connected; it can be directly connected or indirectly connected through an intermediate medium. For relevant scientific research or technical personnel in this field, the specific meanings of the above terms in the present utility model can be determined according to specific circumstances, and they cannot be understood as limitations on the present utility model.

[0030] Example

[0031] This embodiment introduces a sliding type electronic electric energy meter.

[0032] like Figure 1 The sliding electronic energy meter shown comprises an energy metering display device 1, a movable meter seat 2, a cable tube 3, a fixed block 4, a fixed meter seat 5, a fixed bracket 6, a first movable connecting piece 7 and a second movable connecting piece 8; wherein, a plurality of movable meter seats 2 are provided.

[0033] As one or more implementation modes, the fixed meter stand 5 is fixedly connected to the electric energy metering display device 1 through a fixed bracket 6, and a second movable connecting piece 8 is arranged in the fixed meter stand, and the second movable connecting piece 8 is electrically connected to the cable arranged in the cable groove, thereby realizing the electrical connection between the metering device arranged in the fixed meter stand 5 and the electric energy metering display device 1.

[0034] As one or more implementation modes, the electric energy metering and display device 1 is provided with a cable tube 3 with cables therein, and the cable tube 3 is provided with a cable groove (not marked in the figure).

[0035] As one or more implementation modes, a fixing block 4 is provided on the movable meter seat 2, and a mounting hole (not marked in the figure) is provided on the fixing block 4, and the movable meter seat 2 is detachably connected to the electric energy metering display device 1 through the mounting hole; in order to achieve stable socket connection between the movable meter seat 2 and the electric energy metering display device 1, the mounting hole matches the size of the cable tube 3; a connecting piece (not marked in the figure) is provided in the mounting hole, and the size and position of the connecting piece match the cable groove; a first movable connecting piece 7 is provided in the movable meter seat 2, and the first movable connecting piece 7 is electrically connected to the connecting piece, thereby realizing electrical connection between the metering device set in the movable meter seat 2 and the electric energy metering display device 1.

[0036] In this embodiment, the electric energy metering and displaying device 1 adopts an electric energy meter; in other embodiments, the electric energy metering and displaying device 1 may adopt other metering devices.

[0037] The present embodiment can well adapt to different transformer sizes through the designed movable meter seat. At the same time, during installation, it is only necessary to install the movable meter seat on the secondary terminal of the distribution transformer, without the occurrence of wrong wiring, wrong polarity, and wrong phase sequence. A connecting piece is arranged in the mounting hole of the movable meter seat, and no external special mutual inductor is required. The electric quantity is directly read and the secondary circuit contact is eliminated, thereby reducing the human measurement error. The electric signal acquisition part is encapsulated inside the fixed meter seat to prevent the occurrence of electricity theft, thereby reducing the investment in anti-electricity theft measures and the trouble caused thereby.

[0038] The above description is only the preferred embodiment of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

[0039] Although the above describes the specific implementation methods of the utility model in combination with the accompanying drawings, it is not intended to limit the scope of protection of the utility model. Technical personnel in the relevant field should understand that on the basis of the technical solution of the utility model, various modifications or deformations that can be made by technical personnel in this field without creative work are still within the scope of protection of the utility model.

Claims

1. A sliding electronic energy meter, characterized in that: include: Electric energy metering and display device; A meter stand mechanism, comprising a fixed meter stand and a plurality of movable meter stands, wherein the fixed meter stand is fixedly connected to the electric energy metering display device, and each of the movable meter stands is detachably connected to the electric energy metering display device; A cable tube is fixedly connected to the electric energy metering display device and is arranged on a side close to the meter seat mechanism. A cable groove is provided on the cable tube.

2. A sliding electronic energy meter as claimed in claim 1, characterized in that: Cables are arranged in the cable tube.

3. A sliding electronic energy meter as claimed in claim 1, characterized in that: A fixing block is arranged on the movable table seat.

4. A sliding electronic energy meter as claimed in claim 3, characterized in that: The fixing block is provided with a mounting sleeve hole, and the movable table seat is sleeved on the cable tube through the mounting sleeve hole.

5. A sliding electronic energy meter as claimed in claim 4, characterized in that: The diameter of the mounting sleeve hole matches that of the cable tube.

6. A sliding electronic energy meter as claimed in claim 4, characterized in that: A connecting piece is arranged in the installation sleeve hole, and the size and position of the connecting piece are matched with the cable groove.

7. A sliding electronic energy meter as claimed in claim 6, characterized in that: A first movable connecting piece is arranged in the movable table seat, and the first movable connecting piece is electrically connected to the connecting piece.

8. A sliding electronic energy meter as claimed in claim 1, characterized in that: The fixed meter stand is connected to the electric energy metering display device via a fixed bracket.

9. A sliding electronic energy meter as claimed in claim 8, characterized in that: A second movable connecting piece is arranged in the fixed table seat, and the second movable connecting piece is electrically connected to the cable arranged in the cable groove.

10. A sliding electronic energy meter as claimed in claim 1, characterized in that: The electric energy metering and display device adopts an electric energy meter.