High-altitude pulley for long linear structure decoration

By installing U-shaped tracks on the top surface of the long linear structure, the high-altitude pulley can move freely in the horizontal direction, solving the problems of low construction efficiency and high cost in the decoration construction of long linear structures, and achieving efficient and safe construction results.

CN222667547UActive Publication Date: 2025-03-25CHINA RAILWAY 13TH BUREAU GRP 6TH ENG COMPANY +1
0 Cites 0 Cited by

Patent Information

Application Number
CN202420815633.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-19
Publication Date
2025-03-25
Estimated Expiration
2034-04-19

AI Technical Summary

Technical Problem

In long-linear structural decoration construction, the construction efficiency is low and the construction cost is high. The foundation bearing capacity and quality control requirements of traditionally equipped decorative construction scaffolds have strict requirements, which increases the construction difficulty and cost.

Method used

A high-altitude pulley for long linear structure decoration is designed. By installing a U-shaped track on the top of the linear structure, the pulley walks on the track, achieving free movement in the horizontal direction and reaching various construction work surfaces.

Benefits of technology

It improves construction efficiency, reduces construction costs, enhances construction safety, and is highly usable.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The utility model relates to the technical field of high-altitude tackles, and discloses a high-altitude tackle for long linear structure decoration, which comprises a linear concrete structure, a steel structure beam is arranged outside the linear concrete structure, the top of the steel structure beam is fixedly connected with two steel structure sub-beams, two groups of working platforms are arranged on both sides of the steel structure beam, and the working platforms are fixedly connected with the linear concrete structure. U-shaped rails are fixedly mounted at the tops of the linear concrete structures, and wheel structures are arranged between the two steel structure sub-beams and at the bottoms of the two sides of the steel structure beams. Compared with an existing traditional decorative scaffold, due to the fact that the base face for erecting the scaffold needs to meet the certain bearing capacity requirement, certain investment is needed for base face treatment, and certain construction operation time is occupied; strictly controlling the building quality of the decorative scaffold; and relatively high measure cost, scaffold mounting and dismounting operators, turnover material rental cost, transportation cost and the like are input for the decoration construction of the structure.
Need to check novelty before this filing date? Find Prior Art