Oil-immersed power transformer
By designing pre-assembled seats and adjustment mechanisms in oil-immersed power transformers, the installation position deviation problem caused by large weight and large volume during installation is solved, and a more efficient installation process is achieved.
Patent Information
- Application Number
- CN202420831552.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-22
- Publication Date
- 2025-03-25
- Estimated Expiration
- 2034-04-22
AI Technical Summary
During installation, existing oil-immersed transformers are easy to shake during lifting due to their large weight and large volume, resulting in deviations in installation position, which requires repeated adjustments, which is time-consuming and labor-intensive, and affects installation efficiency.
An oil-immersed power transformer is designed, using a pre-installed seat and an adjustment mechanism, which is aligned with the base through the limit hole of the pre-installed seat to complete the installation of the pre-installed seat. Then, the L-shaped bearing plate and threaded rod are used to adjust the installation position of the transformer to ensure accurate installation.
Through the design of pre-installed seats and adjustment mechanisms, the situation where the transformer position needs to be adjusted during lifting is avoided, the installation deviation caused by shaking is reduced, the installation efficiency is improved, and time and effort is saved.