Iron phosphate wastewater discharge treatment device
By dividing the pipelines of the iron phosphate wastewater discharge treatment device into the upper and lower halfs, and using a modular design to replace the blocked lower half of the pipeline, the problem of sewage and blockage of the equipment is solved, and the normal operation of the equipment and efficient treatment of wastewater is achieved.
CN222684453UActive Publication Date: 2025-03-28SICHUAN YUNING NEW ENERGY MATERIALS CO LTD
0 Cites 0 Cited by
Patent Information
- Application Number
- CN202420872068.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-25
- Publication Date
- 2025-03-28
- Estimated Expiration
- 2034-04-25
AI Technical Summary
Technical Problem
Iron phosphate wastewater discharge treatment device is prone to pipeline congestion during use, resulting in abnormal equipment operation and low wastewater treatment efficiency.
Method used
A modular iron phosphate wastewater discharge treatment device was designed. By dividing the pipe into the upper and lower halfs and connecting it with pipe connectors, it is convenient to replace the lower half of the pipe to solve the blockage problem.
Benefits of technology
It has achieved rapid resolution of pipeline sewage and congestion problems, ensured the normal operation of equipment and the effective treatment of wastewater, and reduced maintenance costs and workload.
✦ Generated by Eureka AI based on patent content.
Abstract
The utility model relates to the technical field of iron phosphate wastewater treatment, in particular to an iron phosphate wastewater discharge treatment device which comprises a device main body, a device first layer, a device interlayer, a fixing plate, a device second layer and a device bottom plate. The upper half portion, namely the inlet end and the outlet end, of the pipeline is changed, the lower half portion, namely the liquid conducting portion of the pipeline, of the pipeline is installed on the second layer of the device, when the pipeline is blocked, the upper half portion and the lower half portion of the pipeline are separated, then the second layer of the device is taken out, and a new lower half portion of the pipeline is installed again. And finally, the pipeline is mounted in the device main body again, then the upper half part and the lower half part of the pipeline are connected, and the ferric phosphate wastewater discharge treatment device performs wastewater treatment again, so that the effect of rapidly solving the problem that the pipeline of the ferric phosphate wastewater discharge treatment device is polluted and blocked is achieved.
Need to check novelty before this filing date? Find Prior Art