Auxiliary device for laying color steel plate

By designing auxiliary devices for laying color steel plates, the problem of construction workers lacking a point of leverage during the laying process was solved, thus improving the convenience and safety of operation.

CN224351889UActive Publication Date: 2026-06-12BAOSTEEL ENGINEERING CONSTRUCTION CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
BAOSTEEL ENGINEERING CONSTRUCTION CO LTD
Filing Date
2025-05-06
Publication Date
2026-06-12

AI Technical Summary

Technical Problem

During the installation of color steel plates, construction workers lack a point of leverage, making operation inconvenient and increasing the burden of carrying tools, which poses safety hazards.

Method used

An auxiliary device for laying color steel plates was designed, including a ladder-shaped main body, a support beam, hooks, reinforcing members, support members, and suspension members. The hooks connect the steel grid purlins and suspend tools. Construction workers have a foothold on the ladder, and their legs are supported by the support members, reducing the burden.

🎯Benefits of technology

It provides a stable point of leverage, reduces the workload of construction workers, improves safety, and makes operation more convenient.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224351889U_ABST
    Figure CN224351889U_ABST
Patent Text Reader

Abstract

This utility model discloses an auxiliary device for laying color steel plates, comprising: a ladder-shaped main body; a support beam connected to the top of the ladder-shaped main body; at least two hooks, one hook connected to the ladder-shaped main body and the support beam, and the other hook connected to the support beam, with the hooks spaced apart for hooking and connecting purlins on the steel grid frame; a reinforcing member connected between the side wall of the ladder-shaped main body and the support beam; a support member connected to the ladder-shaped main body near the bottom of the ladder-shaped main body, with a first space between the support member and the ladder-shaped main body, the first space accommodating the legs of the construction worker, and the support member supporting the construction worker; and a hanging member connected to the ladder-shaped main body and positioned between the support beam and the support member for hanging the construction worker's tool bag; thereby overcoming the technical problems of lack of leverage points during operation, inconvenient operation, increased burden on construction workers due to the carrying of tools, and potential safety hazards.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the technical field of equipment for space frame construction, specifically an auxiliary device for laying color steel plates. Background Technology

[0002] Space frames are widely used in steel structures, such as roof trusses, crane beams, bridges, cranes, offshore oil platforms, and power plant coal sheds, where steel space frames are often used as the main load-bearing structural components.

[0003] Among them, the steel grid frame of the dry coal shed is a commonly used load-bearing structure in power plant coal sheds. It is generally composed of purlins, bolt balls, high-strength bolts, etc. The steel grid frame is usually arched. After the steel grid frame is assembled, a layer of color steel plate needs to be laid on the outer wall of the steel grid frame. Since the steel grid frame is arched, when laying the color steel plate, the construction workers need to wear safety ropes and be suspended on the steel grid frame by hanging ropes. When the color steel plate is lifted to the installation position by a crane, the construction workers use tools (such as wrenches, electric drills, hammers, screws, etc.) to connect the color steel plate to the outer wall of the steel grid frame.

[0004] There are some shortcomings in the construction process. Because the construction workers are suspended on the steel grid by ropes, there is no point of leverage when operating, which makes the operation inconvenient. The tools they carry increase the burden on the construction workers and also pose safety hazards. Utility Model Content

[0005] In view of the above-mentioned shortcomings in the related technologies, the purpose is to provide an auxiliary device for laying color steel plates, so as to solve the technical problems in the related technologies that there is no point of leverage during operation, the operation is inconvenient, the tools carried increase the burden on construction workers, and there are safety hazards.

[0006] The technical solution to achieve the objective is: an auxiliary device for laying color steel sheets, comprising:

[0007] Ladder-shaped main body;

[0008] A support beam is attached to the top of the ladder-shaped main body;

[0009] At least two hooks are provided, one of which is connected to the ladder-shaped main body and the support beam, and the other is connected to the support beam. The hooks are spaced apart and are used to hook and connect the purlins on the steel grid frame.

[0010] A reinforcing member is connected between the side wall of the ladder-shaped main body and the supporting beam;

[0011] A support member is connected to the ladder-shaped main body and is located near the bottom of the ladder-shaped main body. There is a first space between the support member and the ladder-shaped main body. The first space accommodates the legs of the construction worker, and the support member supports the construction worker.

[0012] And a suspension component, connected to the ladder-shaped main body and positioned between the support beam and the support component, for suspending the tool bag of the construction worker.

[0013] Furthermore: the ladder-shaped main body includes two vertical main rods, arranged in parallel at intervals;

[0014] And several horizontal bars, arranged in parallel and spaced apart between the vertical main bars.

[0015] Furthermore: the supporting beam is a section of square tube or a section of square steel.

[0016] Furthermore: the hook includes: a hook body, one side of which is connected to the support beam, or to the support beam and the vertical main rod;

[0017] A nut is attached to the other side of the hook body;

[0018] And a threaded pin, which, after being threadedly connected to the nut, has a second space between itself and the hook body, and the purlin is connected at the second space.

[0019] Furthermore: the reinforcing member includes: a first rod, spaced apart from the vertical main rod, one end of which is connected to the support beam;

[0020] The second rod has one end perpendicularly connected to the vertical main rod and the other end connected to the first rod. There is a third space between the second rod, the first rod, and the vertical main rod.

[0021] And a third rod, one end of which is connected to the vertical main rod, and the other end of which is connected to the first rod and the second rod, and there is a fourth space between the third rod, the second rod and the vertical main rod.

[0022] Furthermore, the support member includes a first semi-circular curved support connected to the vertical main rod, and having the first space between it and the ladder-shaped main body.

[0023] Furthermore, the partial cross-section of the first semi-circular curved support is an "L" shaped structure.

[0024] Furthermore, it also includes a rubber pad, connected to the first semi-circular curved support, for contacting the construction worker.

[0025] Furthermore: the suspension component includes: a second semi-circular arc-shaped bending support, connected to the vertical main rod, and having a fifth space between it and the ladder-shaped main body;

[0026] And two fourth rods, symmetrically arranged, connecting the second semi-circular curved support and the vertical main rod.

[0027] Furthermore, it also includes a cross plate, connected between the second semi-circular curved support and the fourth rod, having a sixth space between it and the second semi-circular curved support.

[0028] The above technical solution has the following beneficial effects: An auxiliary device for laying color steel plates, compared with related technologies, is provided with a ladder-shaped main body, a support beam, hooks, reinforcing members, supporting members and suspension members;

[0029] In use, the hook is attached to the purlin on the steel mesh frame. The construction worker is secured with a safety rope, and the worker's tool bag is suspended on the hanging part. The worker's legs are in the first space, with their feet on the ladder-like main body and their buttocks in contact with the support, thus providing the worker with a point of leverage. This makes the operation relatively convenient, reduces the burden on the worker, and is relatively safe.

[0030] This overcomes the technical problems of lack of leverage points, inconvenient operation, increased burden on construction workers due to the use of tools, and potential safety hazards. It achieves the technical effect of providing leverage points, making operation relatively convenient, reducing the burden on construction workers, and ensuring relative safety, thus demonstrating its practicality. Attached Figure Description

[0031] Figure 1 This is one of the schematic diagrams of the overall assembly structure;

[0032] Figure 2 This is the second schematic diagram of the overall assembly structure;

[0033] Figure 3 This is the third schematic diagram of the overall assembly structure;

[0034] Figure 4 This is the fourth schematic diagram of the overall assembly structure;

[0035] In the diagram: 10. Ladder-shaped main body, 10-1. Vertical main rod, 10-2. Horizontal rod, 20. Support beam, 30. Hook and hanger, 30-1. Hook body, 30-2. Nut, 30-3. Threaded pin, 30-4. Second space, 40. Reinforcing member, 40-1. First rod, 40-2. Second rod, 40-3. Third space, 40-4. Third rod, 40-5. Fourth space, 50. Support member, 51. First space, 50-1. First semi-circular curved support, 50-2. Rubber pad, 60. Suspension member, 60-1. Second semi-circular curved support, 60-11. Fifth space, 60-2. Fourth rod, 60-3. Horizontal plate, 60-31. Sixth space, 100. Purlin. Detailed Implementation

[0036] To make the content easier to understand, the following detailed description is provided with reference to specific embodiments and accompanying drawings;

[0037] An auxiliary device for laying color steel plates solves the technical problems in related technologies, such as lack of a leverage point, inconvenient operation, increased burden on construction workers due to the need for carrying tools, and potential safety hazards. This device can be manufactured and used, achieving the positive effects of providing a leverage point, relatively convenient operation, reduced burden on construction workers, and relative safety. The overall concept is as follows:

[0038] Implementation

[0039] like Figure 1 , Figure 2 , Figure 3 , Figure 4 As shown; an auxiliary device for laying color steel sheets, comprising:

[0040] 10 ladder-shaped main body;

[0041] Support beam 20 is connected to the top of the ladder-shaped main body 10;

[0042] At least two hooks 30, one hook 30 is connected to the ladder-shaped main body 10 and the support beam 20, and the other hook 30 is connected to the support beam 20. The hooks 30 are spaced apart and are used to hook and connect the purlins 100 on the steel grid frame.

[0043] A reinforcing member 40 is connected between the side wall of the ladder-shaped main body 10 and the support beam 20;

[0044] A support member 50 is connected to the ladder-shaped main body 10 and is located near the bottom of the ladder-shaped main body 10. A first space 51 is provided between the support member 50 and the ladder-shaped main body 10. The first space 51 accommodates the legs of the construction worker and the support member 50 supports the construction worker.

[0045] And a suspension component 60, connected to the ladder-shaped main body 10, is disposed between the support beam 20 and the support component 50, for suspending the tool bag of the construction worker;

[0046] Specifically, during implementation, the support beam 20 and the reinforcing member 40 improve the structural strength. The purlins 100 on the steel grid are hooked and connected by the hook member 30. Construction workers are tied with safety ropes, and their tool bags are suspended on the suspension member 60. The construction workers' legs are in the first space 51, their feet are on the ladder-like main body 10, and their buttocks are in contact with the support member 50. This provides the construction workers with a point of leverage, making the operation relatively convenient, reducing the burden on the construction workers, and making it relatively safe.

[0047] Another implementation method:

[0048] like Figure 1 , Figure 2 , Figure 3 , Figure 4 As shown; in implementation, the ladder-shaped main body 10 includes: two vertical main rods 10-1, arranged in parallel and spaced apart; and several horizontal rods 10-2, arranged in parallel and spaced apart between the vertical main rods 10-1;

[0049] The vertical main rod 10-1 is a section of circular pipe;

[0050] The horizontal bar 10-2 is a section of round tube, and there are four of them. They are welded to the vertical main bar 10-1 to form a "ladder-like" structure, which makes it easier for construction workers to step on the horizontal bar 10-2 and have a foothold, making the operation relatively convenient.

[0051] Another implementation method:

[0052] like Figure 1 , Figure 2 , Figure 3 , Figure 4 As shown; in practice, the support beam 20 is a section of square tube or a section of square steel, which is welded to the vertical main rod 10-1, improving the structural strength and facilitating the connection of the hook and hanger 30;

[0053] Another implementation method:

[0054] like Figure 1 , Figure 2 , Figure 3 , Figure 4As shown; in implementation, the hook and hanger 30 includes: a hook body 30-1, one side of which is connected to the support beam 20, or to the support beam 20 and the vertical main rod 10-1; a nut 30-2, connected to the other side of the hook body 30-1; and a threaded pin 30-3, which, after being threadedly connected to the nut 30-2, has a second space 30-4 between itself and the hook body 30-1, and the purlin 100 is connected at the second space 30-4;

[0055] The hook body 30-1 has a hook-shaped structure and is welded to the support beam 20, or to the support beam 20 and the vertical main rod 10-1, which is conducive to hooking the purlin 100 and is relatively convenient to use;

[0056] Nut 30-2 is a hexagonal nut, which is welded to hook body 30-1;

[0057] The threaded pin 30-3 is a hexagonal bolt. After being threadedly connected to the nut 30-2, it passes through the other side of the hook body 30-1 and presses against one side of the hook body 30-1. A second space 30-4 is formed between the threaded pin 30-3 and the hook body 30-1. The second space 30-4 is conducive to connecting the purlin 100, which increases the reliability of the connection with the purlin 100 and makes assembly relatively convenient.

[0058] The system is equipped with two hooks 30, which are spaced apart, improving the reliability and safety when hooking with the purlin 100.

[0059] Another implementation method:

[0060] like Figure 1 , Figure 2 , Figure 3 , Figure 4 As shown; in implementation, the reinforcing member 40 includes: a first rod 40-1, spaced apart from the vertical main rod 10-1, with one end connected to the support beam 20; a second rod 40-2, one end of which is perpendicularly connected to the vertical main rod 10-1, and the other end of which is connected to the first rod 40-1, with a third space 40-3 between the second rod 40-2, the first rod 40-1, and the vertical main rod 10-1; and a third rod 40-4, one end of which is connected to the vertical main rod 10-1, and the other end of which is connected to the first rod 40-1 and the second rod 40-2, with a fourth space 40-5 between the third rod 40-4, the second rod 40-2, and the vertical main rod 10-1;

[0061] The first rod 40-1 is a section of round tube, which is welded to the support beam 20; the second rod 40-2 is a section of round tube, which is welded to the vertical main rod 10-1 and the first rod 40-1; the third rod 40-4 is a section of round tube, which is welded to the vertical main rod 10-1, the first rod 40-1 and the second rod 40-2.

[0062] The third space 40-3 is a square space;

[0063] The fourth space, 40-5, is a triangular space;

[0064] The reinforcement 40 not only improves the connection strength between the vertical main rod 10-1 and the support beam 20, but also allows the wires on tools to pass through the third space 40-3 and the fourth space 40-5 formed by the reinforcement. The wires are supported and relatively safe. For example, the wires on the electric drill can be passed through the third space 40-3 and the fourth space 40-5, and the wires can be laid on the second rod 40-2, which is conducive to the operation of construction workers and relatively safe.

[0065] Another implementation method:

[0066] like Figure 1 , Figure 2 , Figure 3 , Figure 4 As shown; in implementation, the support member 50 includes: a first semi-circular arc-shaped bending support 50-1, connected to the vertical main rod 10-1, and having the first space 51 between it and the ladder-shaped main body 10;

[0067] Preferably, the partial cross-section of the first semi-circular arc-shaped bending support 50-1 is an "L"-shaped structure, which is welded to the vertical main rod 10-1. For example, the first semi-circular arc-shaped bending support 50-1 is made of angle steel bent into an "L"-shaped cross-section, which increases the contact area with the buttocks of the construction worker, making it easier for the construction worker to sit down and relatively comfortable.

[0068] It also includes: a rubber pad 50-2, which is connected to the first semi-circular curved support 50-1 and is used to contact the construction worker; the rubber pad 50-2 is relatively soft and provides better comfort when the construction worker's buttocks come into contact with the rubber pad 50-2.

[0069] The first space 51 is provided to accommodate the legs of construction workers. Their feet can be placed on the horizontal bar 10-2, which provides a foothold and makes operation relatively convenient.

[0070] Another implementation method:

[0071] like Figure 1 , Figure 2 , Figure 3 , Figure 4 As shown; in implementation, the suspension member 60 includes: a second semi-circular arc-shaped bending support 60-1, connected to the vertical main rod 10-1, and having a fifth space 60-11 between it and the ladder-shaped main body 10; and two fourth rods 60-2, symmetrically arranged, connected between the second semi-circular arc-shaped bending support 60-1 and the vertical main rod 10-1;

[0072] The second semi-circular curved support 60-1 is made of flat steel bent and welded to the vertical main rod 10-1;

[0073] The fourth rod 60-2 is a section of circular tube, which is welded to the second semi-circular arc-shaped bending support 60-1 and the vertical main rod 10-1, thereby improving the structural strength;

[0074] It also includes: a horizontal plate 60-3, which is connected between the second semi-circular curved support 60-1 and the fourth rod 60-2, and has a sixth space 60-31 between it and the second semi-circular curved support 60-1; the horizontal plate 60-3 is a rectangular strip structure, which is welded to the second semi-circular curved support 60-1 and the fourth rod 60-2 to improve the structural strength;

[0075] When in use, a traction hook is connected to the shoulder strap of the construction worker's tool bag. The tool bag is then hung on the second semi-circular curved support 60-1 or the horizontal plate 60-3 by the traction hook. This makes the tool bag relatively easy to use, reduces the burden on construction workers, and is relatively safe.

[0076] In the description, it should be understood that the terms "up", "down", "left", "right", "front", "back", etc., indicate the orientation or positional relationship based on the positional relationship shown in the accompanying drawings, and are only for the convenience or simplification of the description, rather than indicating a specific orientation that must be present; the operation process described in the embodiments is not an absolute usage step, and corresponding adjustments can be made in actual use;

[0077] Unless otherwise defined, the technical or scientific terms used herein shall have the ordinary meaning as understood by one of ordinary skill in the art; the words “first,” “second,” and similar terms used in the specification and claims do not indicate any order, quantity, or importance, but are merely used to distinguish different components, and similarly, the words “a” or “a” and similar terms do not determine a quantity limitation, but rather indicate the presence of at least one, as determined by the content of the embodiments;

[0078] The above description is only a preferred embodiment, but the scope of protection is not limited thereto. Any equivalent substitutions or modifications made by those skilled in the art within the scope of the disclosed technology, based on the technical solution and inventive concept, should be included within the scope of protection.

Claims

1. An auxiliary device for laying color steel sheets, characterized in that, include: Ladder-shaped main body; A support beam is attached to the top of the ladder-shaped main body; At least two hooks are provided, one of which is connected to the ladder-shaped main body and the support beam, and the other is connected to the support beam. The hooks are spaced apart and are used to hook and connect the purlins on the steel grid frame. A reinforcing member is connected between the side wall of the ladder-shaped main body and the supporting beam; A support member is connected to the ladder-shaped main body and is located near the bottom of the ladder-shaped main body. There is a first space between the support member and the ladder-shaped main body. The first space accommodates the legs of the construction worker, and the support member supports the construction worker. And a suspension component, connected to the ladder-shaped main body and positioned between the support beam and the support component, for suspending the tool bag of the construction worker.

2. The auxiliary device for laying color steel plates according to claim 1, characterized in that: The ladder-shaped main body includes: two vertical main poles, arranged in parallel at intervals; And several horizontal bars, arranged in parallel and spaced apart between the vertical main bars.

3. The auxiliary device for laying color steel plates according to claim 2, characterized in that: The supporting beam is a section of square tube or a section of square steel.

4. The auxiliary device for laying color steel plates according to claim 3, characterized in that: The hook includes: a hook body, one side of which is connected to the support beam, or to the support beam and the vertical main rod; A nut is attached to the other side of the hook body; And a threaded pin, which, after being threadedly connected to the nut, has a second space between itself and the hook body, and the purlin is connected at the second space.

5. The auxiliary device for laying color steel plates according to claim 4, characterized in that: The reinforcing member includes: a first rod, which is spaced apart from the vertical main rod, and one end is connected to the support beam; The second rod has one end perpendicularly connected to the vertical main rod and the other end connected to the first rod. There is a third space between the second rod, the first rod, and the vertical main rod. And a third rod, one end of which is connected to the vertical main rod, and the other end of which is connected to the first rod and the second rod, and there is a fourth space between the third rod, the second rod and the vertical main rod.

6. The auxiliary device for laying color steel plates according to claim 5, characterized in that: The supporting component includes: a first semi-circular curved support connected to the vertical main rod, having the first space between it and the ladder-shaped main body.

7. The auxiliary device for laying color steel plates according to claim 6, characterized in that: The partial cross-section of the first semi-circular curved support is an "L" shaped structure.

8. The auxiliary device for laying color steel plates according to claim 7, characterized in that: Also includes: A rubber pad, attached to the first semi-circular curved support, is used to contact the construction worker.

9. An auxiliary device for laying color steel plates according to claim 8, characterized in that: The suspension component includes: a second semi-circular curved support, connected to the vertical main rod, and having a fifth space between it and the ladder-shaped main body; And two fourth rods, symmetrically arranged, connecting the second semi-circular curved support and the vertical main rod.

10. An auxiliary device for laying color steel plates according to claim 9, characterized in that: Also includes: A horizontal plate connects the second semi-circular curved support and the fourth rod, and has a sixth space between it and the second semi-circular curved support.