Construction template and supporting device for new high-speed railway bridge protection wall

By using I-beams and wooden wedges to fix the formwork at the drainage holes, the problem of drilling and reinforcement on bridges was solved, achieving hole-free support, reducing maintenance costs and preventing formwork bulging.

CN224363201UActive Publication Date: 2026-06-16ANHUI PROVINCE WANNAI INTERCITY FUHUAI RAILWAY CO LTD +2

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
ANHUI PROVINCE WANNAI INTERCITY FUHUAI RAILWAY CO LTD
Filing Date
2025-04-30
Publication Date
2026-06-16

AI Technical Summary

Technical Problem

Existing technologies for reinforcing protective walls with formwork require drilling holes in the bridge, increasing bridge maintenance costs.

Method used

A new type of formwork and support device for the construction of protective walls for high-speed railway bridges is adopted. The formwork is fixed by I-beams and wooden wedges at the drainage holes, avoiding drilling holes on the beam surface. The formwork is supported and limited by I-beams, pads, fixing connectors and other components.

🎯Benefits of technology

This method eliminates the need to drill holes in the beam surface to fix the formwork, reducing maintenance costs and preventing formwork bulging.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
Patent Text Reader

Abstract

The application discloses a novel high-speed railway bridge protection wall construction formwork and a supporting device, the supporting device comprises a first supporting assembly on one side of a beam surface top construction formwork, a plurality of second supporting assemblies are arranged on the other side of the construction formwork, a plurality of equidistant parallel arranged drainage holes are arranged on the beam surface, the first supporting assembly comprises: a first I-shaped steel, which is arranged at the top of the plurality of drainage holes, the first I-shaped steel is arranged on one side of the construction formwork, a plurality of through grooves are formed in the first I-shaped steel, and the plurality of through grooves are arranged at the top of the plurality of drainage holes; a second I-shaped steel is arranged in the through groove, the second I-shaped steel is inserted into the inside of the drainage hole and is in contact with the inner wall of the side of the drainage hole away from the construction formwork, the second I-shaped steel is fixed in the through groove by being inserted into the through groove and the through groove on the first I-shaped steel and cooperating with the wooden wedge in the through groove, so that the first I-shaped steel and the cushion block can fix the protection wall formwork, the supporting can be performed without punching holes on the beam surface, and the maintenance cost is reduced.
Need to check novelty before this filing date? Find Prior Art