Terminal, base station and communication method

By implementing cross-carrier scheduling and dynamic secondary cell management in wireless communication terminals, the resource shortage for control signals in multi-RAT systems is addressed, improving system performance.

JP7648066B2Active Publication Date: 2025-03-18NTT DOCOMO INC
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
JP2024067412
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2024-04-18
Publication Date
2025-03-18
Estimated Expiration
2040-07-06

AI Technical Summary

Technical Problem

In wireless communication systems where multiple Radio Access Technologies (RATs) coexist on a single carrier, there is a shortage of resources for sending and receiving control signals, limiting system performance.

Method used

A terminal is equipped with signaling for cross-carrier scheduling, enabling or disabling secondary cells, and transmitting control information via the primary cell. The controller assumes that the channel in the primary cell is scheduled with control information, allowing efficient use of resources.

Benefits of technology

This solution alleviates the lack of resources for control signal transmission and reception in multi-RAT systems, enhancing system performance and flexibility.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007648066000003
    Figure 0007648066000003
  • Figure 0007648066000004
    Figure 0007648066000004
  • Figure 0007648066000005
    Figure 0007648066000005
Patent Text Reader

Abstract

To alleviate a shortage of resources for transmitting and receiving control signals when multiple RATs (Radio Access Technologies) coexist on a single carrier in a wireless communication system.SOLUTION: A terminal includes a receiving unit that receives signaling including an information element related to cross-carrier scheduling, signaling to enable or disable a secondary cell, and control information via a primary cell, a control unit that assumes that a channel in the primary cell is scheduled by the control information when the information element related to cross-carrier scheduling is set to a value indicating that scheduling is performed from another cell and when the receiving unit receives signaling to disable the secondary cell, and a communication unit that performs transmission or reception using the channel in the primary cell.SELECTED DRAWING: Figure 12
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a terminal, a base station, and a communication method in a wireless communication system. [Background technology]

[0002] For NR (New Radio) (also known as "5G"), the successor system to LTE (Long Term Evolution), technologies are being considered that satisfy the requirements of a large-capacity system, high-speed data transmission speed, low latency, simultaneous connection of a large number of terminals, low cost, low power consumption, etc. (e.g., Non-Patent Document 1).

[0003] Dynamic spectrum sharing (DSS), a technology that allows LTE and NR to coexist in the same band, is under study (e.g., Non-Patent Document 2). By allowing different RATs (Radio Access Technologies) to coexist on a single carrier, it becomes possible to flexibly respond to traffic demands at the time of system generation switchover. [Prior art documents] [Non-patent literature]

[0004] [Non-Patent Document 1] 3GPP TS 38.300 V15.8.0(2019-12) [Non-Patent Document 2] 3GPP TSG RAN Meeting#86 RP-192678(2019-12) Summary of the Invention [Problem to be solved by the invention]

[0005] In the current DSS specifications, resources for transmitting and receiving control signals are set for each LTE terminal and NR terminal. Since the resources on which control signals can be allocated are specified in advance and the systems coexist on a single carrier, it is expected that there will be a shortage of resources for transmitting and receiving control signals compared to when the systems are operated independently on separate carriers.

[0006] The present invention has been made in consideration of the above points, and is capable of alleviating the shortage of resources for transmitting and receiving control signals when multiple RATs (Radio Access Technologies) coexist on a single carrier in a wireless communication system. [Means for solving the problem]

[0007] According to the disclosed technology, a terminal is provided that has a receiving unit that receives signaling including an information element related to cross-carrier scheduling, signaling to enable or disable a secondary cell, and control information via a primary cell, a control unit that assumes that a channel in the primary cell is scheduled by the control information when the information element related to cross-carrier scheduling is set to a value indicating that it is scheduled from another cell and when the receiving unit receives signaling to disable the secondary cell, and a communication unit that performs transmission or reception using the channel in the primary cell. Effect of the Invention

[0008] According to the disclosed technique, in a wireless communication system, when a plurality of radio access technologies (RATs) are made to coexist on a single carrier, it is possible to alleviate a shortage of resources for transmitting and receiving control signals. [Brief description of the drawings]

[0009] [Figure 1] 1 is a diagram illustrating an example of a configuration of a wireless communication system according to an embodiment of the present invention. [Diagram 2]FIG. 1 is a diagram illustrating an example of downlink channel allocation using DSS. [Diagram 3] FIG. 1 is a diagram showing an example of uplink channel allocation using DSS. [Figure 4] FIG. 1 is a diagram showing an example (1) of frequency allocation in DSS. [Diagram 5] FIG. 13 is a diagram showing an example (2) of frequency allocation in DSS. [Figure 6] FIG. 1 is a diagram illustrating an example of a channel arrangement for the LTE downlink. [Figure 7] A diagram showing an example of channel allocation for the NR downlink. [Figure 8] FIG. 1 is a diagram showing an example of channel allocation for LTE and NR downlinks using DSS. [Figure 9] FIG. 13 is a diagram for explaining an example of cross-carrier scheduling. [Figure 10] FIG. 2 is a diagram for explaining an example (1) of cross-carrier scheduling in an embodiment of the present invention. [Figure 11] FIG. 13 is a diagram for explaining an example of specifications related to cross-carrier scheduling. [Figure 12] FIG. 11 is a diagram for explaining an example (2) of cross-carrier scheduling in an embodiment of the present invention. [Figure 13] FIG. 11 is a sequence diagram for explaining an example (2) of cross-carrier scheduling in the embodiment of the present invention. [Figure 14] FIG. 11 is a diagram showing an example (1) of a specification change related to cross-carrier scheduling in an embodiment of the present invention. [Figure 15] FIG. 13 is a diagram showing an example (2) of a specification change related to cross-carrier scheduling in an embodiment of the present invention. [Figure 16] FIG. 2 is a diagram for explaining an example of MAC-CE in an embodiment of the present invention. [Figure 17] FIG. 11 is a diagram for explaining an example (3) of cross-carrier scheduling in an embodiment of the present invention. [Figure 18]FIG. 11 is a sequence diagram for explaining an example (3) of cross-carrier scheduling in the embodiment of the present invention. [Figure 19] 2 is a diagram illustrating an example of a functional configuration of a base station 10 according to an embodiment of the present invention. [Figure 20] 2 is a diagram illustrating an example of a functional configuration of a terminal 20 according to an embodiment of the present invention. [Figure 21] 2 is a diagram illustrating an example of a hardware configuration of a base station 10 or a terminal 20 according to an embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. Note that the embodiment described below is an example, and the embodiment to which the present invention is applied is not limited to the following embodiment.

[0011] In the operation of the wireless communication system according to the embodiment of the present invention, existing technologies are used as appropriate. However, the existing technologies are, for example, existing LTE, but are not limited to existing LTE. In addition, the term "LTE" used in this specification has a broad meaning including LTE-Advanced and systems after LTE-Advanced (e.g., NR) unless otherwise specified.

[0012] In the embodiment of the present invention described below, terms such as SS (Synchronization signal), PSS (Primary SS), SSS (Secondary SS), PBCH (Physical broadcast channel), PRACH (Physical random access channel), PDCCH (Physical Downlink Control Channel), PDSCH (Physical Downlink Shared Channel), PUCCH (Physical Uplink Control Channel), and PUSCH (Physical Uplink Shared Channel) used in existing LTE are used. This is for convenience of description, and similar signals, functions, etc. may be called by other names. In addition, the above-mentioned terms in NR correspond to NR-SS, NR-PSS, NR-SSS, NR-PBCH, NR-PRACH, etc. However, even if a signal is used in NR, it is not necessarily specified as "NR-".

[0013] Furthermore, in the embodiment of the present invention, the duplexing method may be a time division duplex (TDD) method, a frequency division duplex (FDD) method, or another method (for example, flexible duplex, etc.).

[0014] Furthermore, in the embodiment of the present invention, when radio parameters, etc. are "configured," this may mean that predetermined values ​​are pre-configured, or that radio parameters notified from base station 10 or terminal 20 are configured.

[0015] Fig. 1 is a diagram showing an example of the configuration of a wireless communication system according to an embodiment of the present invention. As shown in Fig. 1, the wireless communication system according to the embodiment of the present invention includes a base station 10 and a terminal 20. Although Fig. 1 shows one base station 10 and one terminal 20, this is an example, and there may be a plurality of each.

[0016] The base station 10 is a communication device that provides one or more cells and performs wireless communication with the terminal 20. The physical resources of a wireless signal are defined in a time domain and a frequency domain, and the time domain may be defined by the number of OFDM (Orthogonal Frequency Division Multiplexing) symbols, and the frequency domain may be defined by the number of subcarriers or the number of resource blocks. The base station 10 transmits a synchronization signal and system information to the terminal 20. The synchronization signal is, for example, NR-PSS and NR-SSS. The system information is, for example, transmitted by NR-PBCH and is also called broadcast information. The synchronization signal and system information may be called SSB (SS / PBCH block). As shown in FIG. 1, the base station 10 transmits a control signal or data to the terminal 20 in DL (Downlink) and receives a control signal or data from the terminal 20 in UL (Uplink). Both the base station 10 and the terminal 20 can transmit and receive signals by performing beamforming. In addition, both the base station 10 and the terminal 20 can apply communication by MIMO (Multiple Input Multiple Output) to DL or UL. In addition, both the base station 10 and the terminal 20 may communicate via a secondary cell (SCell: Secondary Cell) and a primary cell (PCell: Primary Cell) by CA (Carrier Aggregation). Furthermore, the terminal 20 may communicate via a primary cell of the base station 10 and a primary secondary cell group cell (PSCell: Primary Secondary cell group Cell) of another base station 10 by DC (Dual Connectivity).

[0017] The terminal 20 is a communication device equipped with a wireless communication function, such as a smartphone, a mobile phone, a tablet, a wearable terminal, a communication module for M2M (Machine-to-Machine), etc. As shown in Fig. 1, the terminal 20 receives control signals or data from the base station 10 in DL and transmits control signals or data to the base station 10 in UL, thereby utilizing various communication services provided by the wireless communication system. The terminal 20 also receives various reference signals transmitted from the base station 10, and performs measurement of the propagation path quality based on the reception results of the reference signals.

[0018] Below, we will explain an example of DSS (Dynamic Spectrum Sharing) technology that allows LTE and NR to coexist in the same band. DSS technology allows different RATs (Radio Access Technologies) to coexist on a single carrier, making it possible to flexibly respond to traffic demands during the system generation transition period. DSS technology makes it possible to operate different RATs on a single carrier.

[0019] FIG. 2 is a diagram showing an example of downlink channel arrangement by DSS. The time domain shown in FIG. 2 corresponds to one subframe of LTE. As shown in FIG. 2, in the downlink, "LTE-CRS (Cell specific reference signal)", "LTE-PDCCH", and "LTE-PDSCH" are transmitted as LTE signals or channels. Also, as shown in FIG. 2, in the downlink, "NR-PDCCH" and "NR-PDSCH" are transmitted as NR channels. For example, although not shown, "NR-PDSCH" may include a resource in which DM-RS (Demodulation reference signal) is arranged. For example, as shown in FIG. 2, "LTE-CRS" may be arranged adjacent to "NR-PDSCH".

[0020] Fig. 3 is a diagram showing an example of uplink channel allocation by DSS. As shown in Fig. 3, uplink channels or signals of LTE and NR are allocated sharing a frequency band. As shown in Fig. 3, for example, from low frequency to high frequency, "NR-PUCCH", "LTE-PUCCH", "LTE-PRACH", "LTE-PUSCH", "NR-PUSCH", "NR-PRACH", "LTE-PUSCH", "LTE-PUCCH", and "NR-PUCCH" are allocated in this order. Also, "LTE-SRS (Sounding Reference Signal)" or "NR-SRS" may be allocated in the frequency domain where "LTE-PUSCH", "NR-PUSCH" and "NR-PRACH" are allocated.

[0021] Fig. 4 is a diagram showing an example (1) of frequency allocation in DSS. As shown in Fig. 4, a BS (Base station) provides LTE in carrier #1, LTE and NR in carrier #2, NR in carrier #3, and NR in carrier #4.

[0022] For example, for an NR UE (User Equipment), an LTE PCell (Primary Cell) may be arranged on carrier #1, an NR PSCell (Primary Secondary Cell) on carrier #2, an SCell (Secondary Cell) on carrier #3, and an SCell on carrier #4, as in pattern 1 shown in FIG. 4. Also, for example, for an NR UE, an LTE PCell and an NR PSCell may be arranged on carrier #2, an SCell on carrier #3, and an SCell on carrier #4, as in pattern 2 shown in FIG. Also, for example, for an NR UE, an NR PCell may be arranged on carrier #2, an SCell on carrier #3, and an SCell on carrier #4, as in pattern 3 shown in FIG. 4.

[0023] For example, for an LTE UE, an LTE PCell may be arranged on carrier #1 as in pattern 1 shown in Fig. 4. Also, for example, for an LTE UE, an LTE PCell may be arranged on carrier #2 as in pattern 2 shown in Fig. 4. Also, for example, for an LTE UE, an LTE PCell may be arranged on carrier #1 and an LTE SCell may be arranged on carrier #2 as in pattern 3 shown in Fig. 4. Also, for example, for an LTE UE, an LTE SCell may be arranged on carrier #1 and an LTE PCell may be arranged on carrier #2 as in pattern 4 shown in Fig. 4.

[0024] 5 is a diagram showing an example (2) of frequency allocation in DSS. As shown in FIG. 5, BS provides LTE and NR in carrier #1, NR in carrier #2, and NR in carrier #3.

[0025] For example, for an NR UE, an LTE PCell and an NR SCell may be arranged on carrier #1, an NR PSCell on carrier #2, and an NR SCell on carrier #3, as in pattern 1 shown in Figure 5. Also, for example, for an NR UE, an LTE PCell and an NR PSCell may be arranged on carrier #1, an NR PSCell on carrier #2, and an NR SCell on carrier #3, as in pattern 2 shown in Figure 5. Also, for example, for an NR UE, an NR PCell may be arranged on carrier #1, an NR PSCell on carrier #2, and an NR SCell on carrier #3, as in pattern 3 shown in Figure 5.

[0026] For example, for an LTE UE, an LTE PCell may be arranged in carrier #1, as in pattern 1 shown in FIG.

[0027] Table 1 shows examples of LTE and NR synchronization signals or reference signals according to their purpose.

[0028] [Table 1]

[0029] As shown in Table 1, signals are defined in LTE and NR for the same or similar purposes. The purpose may mean the use. For rough synchronization, LTE-PSS / SSS is used in LTE, and NR-PSS / SSS is used in NR. For highly accurate synchronization, CRS is used in LTE, and NR-TRS is used in NR. NR-TRS may be called NR-CSI (Channel State Information)-RS for tracking. For downlink propagation path estimation, LTE-CRS / CSI-RS is used in LTE, and NR-CSI-RS is used in NR. For uplink propagation path estimation, LTE-SRS is used in LTE, and NR-SRS is used in NR. For phase noise estimation, no signal for the purpose is set in LTE, and NR-PT (Phase tracking)-RS is used in NR. For data decoding, LTE-CRS / DM-RS is used in LTE, and NR-DM-RS is used in NR. For broadcast signal decoding, CRS is used in LTE, and NR-PBCH-DM-RS is used in NR.

[0030] Even if the names are the same, the configurations of the physical signals may be different. For example, the configurations of the physical signals of the CSI-RS in LTE and the CSI-RS in NR are different.

[0031] Fig. 6 is a diagram showing an example of channel arrangement in the LTE downlink. The time domain shown in Fig. 6 corresponds to one subframe of LTE, and the frequency domain corresponds to one resource block. As shown in Fig. 6, LTE-CRS is transmitted as a reference signal, and LTE-PDCCH is transmitted as a control signal.

[0032] Figure 7 is a diagram showing an example of channel allocation for the NR downlink. The time domain shown in Figure 7 corresponds to one NR slot, the frequency domain corresponds to one resource block, and the subcarrier interval is 15 kHz. As shown in Figure 7, NR-DM-RS is transmitted as a reference signal, and NR-PDCCH is transmitted as a control signal.

[0033] Figure 8 is a diagram showing an example of channel allocation for LTE and NR downlinks using DSS. In the current DSS specifications, signals with the same purpose are transmitted to LTE terminals and NR terminals, respectively. As shown in Figure 8, when LTE signals and NR signals are transmitted, respectively, overhead increases and resources for transmitting data decrease.

[0034] In addition, since the resources for LTE-PDCCH and the resources for NR-PDCCH overlap in the first 1 to 3 symbols of a slot, when DSS is set, the resources for LTE-PDCCH or NR-PDCCH are limited compared to when DSS is not set. For example, the resources for LTE-PDCCH and NR-PDCCH are reduced compared to when DSS is not set, so that LTE-PDCCH is placed in 2 symbols and NR-PDCCH is placed in 1 symbol.

[0035] Furthermore, in the current standard specifications, only the own cell can schedule a primary cell (PCell (Primary Cell)) or a primary secondary cell group cell (PSCell (Primary SCG Cell)) (hereinafter, a primary cell or a primary secondary cell group cell is referred to as a P(S)Cell). In other words, a PDCCH in a secondary cell (SCell (Secondary Cell)) cannot schedule a PDSCH or a PUSCH in a P(S)Cell. Therefore, when carrier aggregation is performed when DSS is applied, there is a concern that the PDCCH resource of the P(S)Cell may be insufficient.

[0036] Therefore, the shortage of PDCCH resources in the P(S)Cell is reduced by cross-carrier scheduling. Fig. 9 is a diagram for explaining an example of cross-carrier scheduling. In Fig. 9, the P(S)Cell is arranged in CC#x, the SCell in CC#y, and other SCells in CC#z. As shown in Fig. 9, conventional cross-carrier scheduling schedules the PDSCH or PUSCH of an SCell by the PDCCH of the P(S)Cell, or schedules the PDSCH or PUSCH of another SCell by the PDCCH of the SCell.

[0037] Fig. 10 is a diagram for explaining an example (1) of cross-carrier scheduling in an embodiment of the present invention. Meanwhile, in the cross-carrier scheduling in the embodiment of the present invention, as shown in Fig. 10, in addition to scheduling of the PDSCH or PUSCH of an SCell by the PDCCH of the P(S)Cell and scheduling of the PDSCH or PUSCH of another SCell by the PDCCH of the SCell, it is possible to perform scheduling of the PDSCH or PUSCH of the P(S)Cell by the PDCCH of the SCell.

[0038] Fig. 11 is a diagram for explaining an example of specifications related to cross-carrier scheduling. As described above, the PDSCH or PUSCH of the P(S)Cell may be cross-carrier scheduled by the PDCCH of the SCell. When the information element "schedulingCellInfo" related to cross-carrier scheduling shown in Fig. 11 is set to "other", terminal 20 may assume that the PDSCH or PUSCH of the SCell or P(S)Cell is scheduled.

[0039] "schedulingCellInfo" shown in FIG. 11 is an information element for setting related to cross-carrier scheduling, and may be set for each cell. When "schedulingCellInfo" is set to "other", it indicates that the target cell is scheduled by another cell. When "schedulingCellInfo" is set to "own", it indicates that the target cell is scheduled by the own cell. Furthermore, "cif-Presence" is an information element indicating whether cross-carrier scheduling is performed when the own cell performs scheduling. For example, when "cif-Presence" is "true", the value of CIF (carrier indicator field) for scheduling the own cell may be "0". "schedulingCellID" is an information element indicating which cell performs scheduling for the own cell when scheduling is performed by another cell. Information indicating a cell may be "ServCellIndex". When scheduling is performed from another cell, "cif-InschedulingCell" indicates the value of the CIF corresponding to the own cell that is included in the control information (eg, Downlink Control Information (DCI)) of the other cell, and may be a value from 1 to 7.

[0040] Fig. 12 is a diagram for explaining an example (2) of cross-carrier scheduling in an embodiment of the present invention. In Fig. 12, a P(S)Cell is placed in CC#x, and an SCell is placed in CC#y. For example, it is assumed that "schedulingCellInfo" is set to "other", "schedulingCellID" is set to "n1", and "cif-InschedulingCell" is set to "n2" for a P(S)Cell in a certain terminal 20. Note that "n2" does not have to be 0, and may be set to a value that is not normally used and indicates a P(S)Cell.

[0041] Here, as shown in Fig. 12, when an SCell (ServCellIndex=n1) is activated by a MAC-CE (Medium Access Control - Control Element), it may be assumed that the PDSCH or PUSCH of the P(S)Cell configured in the terminal 20 is cross-carrier scheduled by DCI with a CIF of "n2" in the SCell (ServCellIndex=n1). Note that when an SCell (ServCellIndex=n1) is activated by a MAC-CE, it may be replaced when the SCell (ServCellIndex=n1) is dormant.

[0042] Note that it may be assumed that the CIF included in the DCI of the SCell is 0 bits when the PDSCH or PUSCH of the P(S)Cell is scheduled. This is because there is one P(S)Cell configured in terminal 20. That is, when the CIF included in the DCI of the SCell is 0 bits, terminal 20 may assume that the PDSCH or PUSCH of the P(S)Cell is scheduled, and when the CIF included in the DCI of the SCell is "n2" indicated by "cif-InschedulingCell", terminal 20 may assume that the PDSCH or PUSCH of the P(S)Cell is scheduled.

[0043] On the other hand, as shown in Fig. 12, when an SCell (ServCellIndex = n1) is deactivated by a MAC-CE, "schedulingCellInfo" configured in the P(S)Cell may be changed from "other" to "own." In other words, it may be assumed that the PDSCH or PUSCH of the P(S)Cell configured in the terminal 20 is scheduled by the DCI of the P(S)Cell.

[0044] Fig. 13 is a sequence diagram for explaining an example (2) of cross-carrier scheduling in the embodiment of the present invention. An example of operation related to the cross-carrier scheduling shown in Fig. 12 will be explained using Fig. 13.

[0045] In step S11, in the P(S)Cell set in the terminal 20, the base station 10 sets schedulingCellInfo=other (schedulingCellId=n1, cif-InSchedulingCell=n2).

[0046] Next, the terminal 20 determines whether or not the SCell (ServCellIndex=n1) has been enabled by the base station 10. If the SCell has been enabled (YES in S12), the process proceeds to step S13, and if the SCell has not been enabled (NO in S12), the process proceeds to step S14. In step S12, the case where the SCell has not been enabled may also refer to the case where the SCell has been disabled.

[0047] In step S13, terminal 20 assumes that the PDSCH or PUSCH of the P(S)Cell is cross-carrier scheduled by the DCI of the SCell (ServCellIndex=n1). The CIF included in the DCI may be n2 or 0 bit.

[0048] On the other hand, in step S14, terminal 20 replaces schedulingCellInfo=other with own, and assumes that the PDSCH or PUSCH of the P(S)Cell is scheduled by the DCI of the P(S)Cell.

[0049] The terminal 20 performs communication using the PDSCH or PUSCH of the scheduled P(S)Cell.

[0050] Here, Table 2 shows an example of specification changes related to cross-carrier scheduling.

[0051] [Table 2]

[0052] As shown in Table 2, the operation indicated by "other" is defined only as a cell that is scheduled by the PDCCH of another cell. That is, the cell in which "other" is set is not limited to the SCell, and "other" may be set to the P(S)Cell.

[0053] Fig. 14 is a diagram showing an example (1) of specification changes related to cross-carrier scheduling in the embodiment of the present invention. Terminal 20 may assume that both "own" and "other" are set in "schedulingCellInfo". As shown in Fig. 14, "own" and "other" may not be exclusively selected, and both may be configurable. In other words, P(S)Cell may be configurable for both scheduling by its own cell and scheduling by SCell.

[0054] FIG. 15 is a diagram showing an example (2) of specification changes related to cross-carrier scheduling in an embodiment of the present invention. Terminal 20 may be able to set any one of "own", "other" and "conditions" in "schedulingCellInfo". As shown in FIG. 15, information elements included in both "own" and "other" are set in "conditions". In other words, P(S)Cell may be able to set both scheduling by its own cell and scheduling by SCell. Note that the name "conditions" is an example, and similar settings may be performed by information elements with other names.

[0055] Fig. 16 is a diagram for explaining an example of a MAC-CE in an embodiment of the present invention. Terminal 20 may assume that activation, deactivation, or dormancy is signaled by the MAC-CE during cross-carrier scheduling. As shown in Fig. 16, the MAC-CE may perform signaling indicating activation or deactivation and signaling indicating dormancy for Cell#x, which is an SCell.

[0056] For example, when signaling indicating valid or invalid is not notified and signaling indicating dormancy is notified with 1 indicating dormancy, Cell#x may transition to the dormant state. Also, when signaling indicating valid or invalid is notified with 1 indicating valid and signaling indicating dormancy is notified with 1 indicating dormancy, terminal 20 may transition to the dormant state. Note that the above signaling is not limited to MAC-CE and may be performed by L1 indication.

[0057] 17 is a diagram for explaining an example (3) of cross-carrier scheduling in the embodiment of the present invention. When cross-carrier scheduling is configured, terminal 20 may determine an SCell for scheduling the PDSCH or PUSCH of the P(S)Cell based on the SCell's status (activation / deactivation / dormant).

[0058] When a DCI is configured in an SCell in a dormant state, such as an SCell placed in CC#4 shown in Fig. 17, the terminal 20 may assume that the cell scheduled by the DCI is a P(S)Cell. The terminal 20 may assume that the CIF of the DCI is 0 bits, or may assume that the value is set in advance by "cif-InschedulingCell". Note that "schedulingCellInfo" set in the P(S)Cell may be "own", or may be read as "other" when the DCI is received.

[0059] On the other hand, when DCI is not configured for a SCell in a dormant state, the "schedulingCellInfo" configured for the P(S)Cell may be assumed to be "own". Note that when the "schedulingCellInfo" configured for the P(S)Cell is "other", it may be read as "own".

[0060] As described above, since the DCI of the SCell in the dormant state is used to schedule the P(S)Cell, one of the multiple SCells can be dynamically selected to schedule the P(S)Cell. Note that, for example, in the case where multiple SCells are simultaneously dormant, a priority order for scheduling the P(S)Cell among multiple SCells may be set or defined in advance.

[0061] FIG. 17 also shows an example in which cross-carrier scheduling is performed on an SCell allocated to CC#2 by DCI of an SCell allocated to CC#1. That is, in an SCell allocated to CC#2, "schedulingCellID" may be set to "2" and "cif-InschedulingCell" may be set to "3". As described above, CIF may correspond to the same value as ServCellIndex. However, in an SCell that schedules a P(S)Cell, CIF=0 may indicate the own cell, CIF=a predefined special value may indicate the P(S)Cell, or CIF may indicate the P(S)Cell when it is 0 bit.

[0062] Furthermore, when cross-carrier scheduling is configured, an SCell for scheduling the PDSCH or PUSCH of the P(S)Cell may be determined based on an L1 notification indicating dormancy or non-dormancy. For example, when an SCell transitions to a dormant state by an L1 notification, the terminal 20 may assume that the cell scheduled by the DCI of the SCell is the P(S)Cell. The terminal 20 may assume that the CIF of the DCI is 0 bits, or may assume that the value is set in advance by "cif-InschedulingCell".

[0063] Fig. 18 is a sequence diagram for explaining an example (3) of cross-carrier scheduling in the embodiment of the present invention. An example of operation related to the cross-carrier scheduling shown in Fig. 17 will be explained using Fig. 18.

[0064] In step S21, the terminal 20 judges whether or not a dormant SCell has been configured by the base station 10. If a dormant SCell has been configured (YES in S21), the terminal 20 proceeds to step S22, and if a dormant SCell has not been configured (YES in S22), the terminal 20 proceeds to step S23.

[0065] In step S22, terminal 20 assumes that the PDSCH or PUSCH of the P(S)Cell is cross-carrier scheduled by DCI set in the SCell in the idle state.

[0066] On the other hand, in step S23, terminal 20 assumes that schedulingCellInfo=own is set in the P(S)Cell, and assumes that the PDSCH or PUSCH of the P(S)Cell is scheduled by the DCI of the P(S)Cell.

[0067] The terminal 20 performs communication using the PDSCH or PUSCH of the scheduled P(S)Cell.

[0068] In addition, if cross-carrier scheduling is not configured for a P(S)Cell configured in terminal 20 (for example, schedulingCellInfo=own is configured for the P(S)Cell), it may be assumed that terminal 20 does not receive the PDCCH of the SCell when suspension is signaled to the SCell configured in that terminal 20.

[0069] The embodiments of the present invention can be applied regardless of whether it is an uplink, a downlink, a transmission, or a reception. Uplink signals and channels and downlink signals and channels can be read interchangeably. Uplink feedback information and downlink control signaling can be read interchangeably.

[0070] In the above-mentioned embodiment, the signaling from the base station 10 to the terminal 20 or the signaling from the terminal 20 to the base station 10 is not limited to an explicit method, and may be notified by an implicit method. Also, the signaling may not be performed and may be uniquely defined in the specification.

[0071] In the above-mentioned embodiment, the signaling from the base station 10 to the terminal 20 or the signaling from the terminal 20 to the base station 10 may be signaling of different layers such as RRC signaling, signaling by MAC-CE, or signaling by DCI, or may be signaling by broadcast information (MIB (Master Information Block), SIB (System Information Block)). Also, for example, RRC signaling and signaling by DCI may be combined, RRC signaling and signaling by MAC-CE may be combined, or RRC signaling, signaling by MAC-CE, and signaling by DCI may be combined.

[0072] In the above-mentioned embodiment, LTE and NR have been described, but they may be applied between a communication system beyond NR (for example, referred to as "6G"). For example, the above-mentioned embodiment may be applied to a coexistence technology of NR and 6G.

[0073] The above-described embodiments can be combined with each other. The features shown in the above-described embodiments can be combined with each other in various combinations. The combinations are not limited to the specific combinations disclosed.

[0074] According to the above-described embodiment, the base station 10 and the terminal 20 can schedule the PDSCH or PUSCH of the P(S)Cell by the PDCCH of the SCell, depending on the state of the SCell.

[0075] That is, in a wireless communication system, when a plurality of RATs (Radio Access Technologies) are made to coexist on a single carrier, it is possible to alleviate the shortage of resources for transmitting and receiving control signals.

[0076] (Device configuration) Next, a functional configuration example of the base station 10 and the terminal 20 that execute the processes and operations described above will be described. The base station 10 and the terminal 20 include functions for implementing the above-mentioned embodiments. However, the base station 10 and the terminal 20 may each include only a part of the functions in the embodiments.

[0077] <Base station 10> Fig. 19 is a diagram showing an example of the functional configuration of base station 10 in the embodiment of the present invention. As shown in Fig. 19, base station 10 has a transmitting unit 110, a receiving unit 120, a setting unit 130, and a control unit 140. The functional configuration shown in Fig. 19 is merely an example. The functional divisions and names of the functional units may be any names as long as they can execute the operations related to the embodiment of the present invention.

[0078] The transmitting unit 110 includes a function of generating a signal to be transmitted to the terminal 20 side and transmitting the signal wirelessly. The transmitting unit 110 also transmits an inter-network node message to another network node. The receiving unit 120 includes a function of receiving various signals transmitted from the terminal 20 and acquiring, for example, information of a higher layer from the received signal. The transmitting unit 110 also has a function of transmitting NR-PSS, NR-SSS, NR-PBCH, DL / UL control signals, etc. to the terminal 20. The receiving unit 120 also receives an inter-network node message from another network node.

[0079] The setting unit 130 stores preset setting information and various setting information to be transmitted to the terminal 20. The content of the setting information is, for example, information related to the setting of the DSS.

[0080] The control unit 140 performs control related to setting of DSS as described in the embodiment. The control unit 140 also controls communication by DSS. The control unit 140 also executes control related to scheduling including cross-carrier scheduling. A functional unit related to signal transmission in the control unit 140 may be included in the transmitting unit 110, and a functional unit related to signal reception in the control unit 140 may be included in the receiving unit 120.

[0081] <Terminal 20> Fig. 20 is a diagram showing an example of a functional configuration of terminal 20 in an embodiment of the present invention. As shown in Fig. 20, terminal 20 has transmitting unit 210, receiving unit 220, setting unit 230, and control unit 240. The functional configuration shown in Fig. 20 is merely an example. The functional divisions and names of the functional units may be any names as long as they can execute the operations related to the embodiment of the present invention.

[0082] The transmitter 210 creates a transmission signal from the transmission data and transmits the transmission signal wirelessly. The receiver 220 wirelessly receives various signals and acquires a higher layer signal from the received physical layer signal. The receiver 220 also has a function of receiving NR-PSS, NR-SSS, NR-PBCH, DL / UL / SL control signals, and the like transmitted from the base station 10. For example, the transmitter 210 transmits a PSCCH (Physical Sidelink Control Channel), a PSSCH (Physical Sidelink Shared Channel), a PSDCH (Physical Sidelink Discovery Channel), a PSBCH (Physical Sidelink Broadcast Channel), and the like to another terminal 20 as D2D communication, and the receiver 220 receives the PSCCH, the PSSCH, the PSDCH, or the PSBCH, and the like from the other terminal 20.

[0083] The setting unit 230 stores various setting information received from the base station 10 by the receiving unit 220. The setting unit 230 also stores setting information that is set in advance. The content of the setting information is, for example, information related to the setting of DSS.

[0084] The control unit 240 performs control related to the setting of DSS as described in the embodiment. The control unit 240 also controls communication by DSS. The control unit 240 also executes control related to scheduling including cross-carrier scheduling. A functional unit related to signal transmission in the control unit 240 may be included in the transmitting unit 210, and a functional unit related to signal reception in the control unit 240 may be included in the receiving unit 220.

[0085] (Hardware configuration) The block diagrams (FIGS. 19 and 20) used to explain the above embodiments show functional blocks. These functional blocks (components) are realized by any combination of at least one of hardware and software. Furthermore, the method of realizing each functional block is not particularly limited. That is, each functional block may be realized using one device that is physically or logically combined, or may be realized using two or more devices that are physically or logically separated and directly or indirectly connected (e.g., using wires, wirelessly, etc.). The functional blocks may be realized by combining the one device or the multiple devices with software.

[0086] Functions include, but are not limited to, judgment, determination, judgment, calculation, computation, processing, derivation, investigation, search, confirmation, reception, transmission, output, access, resolution, selection, selection, establishment, comparison, assumption, expectation, consideration, broadcasting, notifying, communicating, forwarding, configuring, reconfiguring, allocation, mapping, assignment, etc. For example, a functional block (component) that performs the function of transmission is called a transmitting unit or a transmitter. In either case, as described above, there is no particular limitation on the method of realization.

[0087] For example, the base station 10, the terminal 20, etc. in an embodiment of the present disclosure may function as a computer that performs processing of the wireless communication method of the present disclosure. Fig. 21 is a diagram showing an example of a hardware configuration of the base station 10 and the terminal 20 according to an embodiment of the present disclosure. The above-mentioned base station 10 and the terminal 20 may be physically configured as a computer device including a processor 1001, a storage device 1002, an auxiliary storage device 1003, a communication device 1004, an input device 1005, an output device 1006, a bus 1007, etc.

[0088] In the following description, the term "apparatus" can be interpreted as a circuit, a device, a unit, etc. The hardware configuration of the base station 10 and the terminal 20 may be configured to include one or more of the devices shown in the figure, or may be configured to exclude some of the devices.

[0089] Each function in the base station 10 and the terminal 20 is realized by loading a specific software (program) onto hardware such as a processor 1001, a memory device 1002, etc., so that the processor 1001 performs calculations, controls communications by the communication device 1004, and controls at least one of reading and writing of data in the memory device 1002 and the auxiliary memory device 1003.

[0090] The processor 1001 controls the entire computer by running, for example, an operating system. The processor 1001 may be configured as a central processing unit (CPU) including an interface with peripheral devices, a control device, an arithmetic unit, a register, etc. For example, the above-mentioned control unit 140, control unit 240, etc. may be realized by the processor 1001.

[0091] Moreover, the processor 1001 reads out a program (program code), a software module, data, or the like from at least one of the auxiliary storage device 1003 and the communication device 1004 to the storage device 1002, and executes various processes according to the program. As the program, a program that causes a computer to execute at least a part of the operations described in the above-mentioned embodiment is used. For example, the control unit 140 of the base station 10 shown in FIG. 19 may be realized by a control program stored in the storage device 1002 and operated by the processor 1001. Also, for example, the control unit 240 of the terminal 20 shown in FIG. 20 may be realized by a control program stored in the storage device 1002 and operated by the processor 1001. Although the above-mentioned various processes have been described as being executed by one processor 1001, they may be executed by two or more processors 1001 simultaneously or sequentially. The processor 1001 may be implemented by one or more chips. The program may be transmitted from a network via a telecommunication line.

[0092] The storage device 1002 is a computer-readable recording medium, and may be configured by at least one of, for example, a Read Only Memory (ROM), an Erasable Programmable ROM (EPROM), an Electrically Erasable Programmable ROM (EEPROM), a Random Access Memory (RAM), etc. The storage device 1002 may also be called a register, a cache, a main memory (primary storage device), etc. The storage device 1002 can store a program (program code), software modules, etc. that are executable to implement a communication method according to an embodiment of the present disclosure.

[0093] The auxiliary storage device 1003 is a computer-readable recording medium, and may be, for example, at least one of an optical disk such as a CD-ROM (Compact Disc ROM), a hard disk drive, a flexible disk, a magneto-optical disk (e.g., a compact disk, a digital versatile disk, a Blu-ray (registered trademark) disk), a smart card, a flash memory (e.g., a card, a stick, a key drive), a floppy (registered trademark) disk, a magnetic strip, etc. The above-mentioned storage medium may be, for example, a database, a server, or other suitable medium including at least one of the storage device 1002 and the auxiliary storage device 1003.

[0094] The communication device 1004 is hardware (transmission and reception device) for performing communication between computers via at least one of a wired network and a wireless network, and is also called, for example, a network device, a network controller, a network card, a communication module, etc. The communication device 1004 may be configured to include a high-frequency switch, a duplexer, a filter, a frequency synthesizer, etc., in order to realize at least one of, for example, Frequency Division Duplex (FDD) and Time Division Duplex (TDD). For example, a transmission and reception antenna, an amplifier unit, a transmission and reception unit, a transmission line interface, etc. may be realized by the communication device 1004. The transmission and reception unit may be implemented as a transmission unit and a reception unit that are physically or logically separated from each other.

[0095] The input device 1005 is an input device (e.g., a keyboard, a mouse, a microphone, a switch, a button, a sensor, etc.) that accepts input from the outside. The output device 1006 is an output device (e.g., a display, a speaker, an LED lamp, etc.) that performs output to the outside. The input device 1005 and the output device 1006 may be integrated into one device (e.g., a touch panel).

[0096] In addition, each device such as the processor 1001 and the storage device 1002 is connected by a bus 1007 for communicating information. The bus 1007 may be configured using a single bus, or may be configured using different buses between each device.

[0097] Furthermore, the base station 10 and the terminal 20 may be configured to include hardware such as a microprocessor, a digital signal processor (DSP), an application specific integrated circuit (ASIC), a programmable logic device (PLD), a field programmable gate array (FPGA), etc., and some or all of the functional blocks may be realized by the hardware. For example, the processor 1001 may be implemented using at least one of these pieces of hardware.

[0098] (Summary of the embodiment) As described above, according to an embodiment of the present invention, there is provided a terminal having a receiving unit that receives signaling to suspend a secondary cell and control information via the secondary cell, a control unit that assumes that a channel in a primary cell is scheduled by the control information when the receiving unit receives signaling to enable the secondary cell, and a communication unit that performs transmission or reception using the channel in the primary cell.

[0099] With the above configuration, the base station 10 and the terminal 20 can schedule the PDSCH or PUSCH of the P(S)Cell by the PDCCH of the SCell according to the state of the SCell. That is, in a wireless communication system, when multiple RATs (Radio Access Technologies) coexist on a single carrier, it is possible to alleviate a shortage of resources for transmitting and receiving control signals.

[0100] The primary cell and the secondary cell may be operated on the same carrier as different RATs (Radio access technologies). With this configuration, when multiple RATs coexist on a single carrier, the base station 10 and the terminal 20 can schedule the PDSCH or PUSCH of the P(S)Cell by the PDCCH of the SCell according to the state of the SCell.

[0101] The control unit may assume that the channel in the primary cell is scheduled by the primary cell itself if the receiving unit does not receive signaling to suspend the secondary cell. With this configuration, the base station 10 and the terminal 20 can schedule the PDSCH or PUSCH of the P(S)Cell by the PDCCH of the P(S)Cell according to the state of the SCell.

[0102] The signaling to suspend the secondary cell may be a Layer 1 notification. With this configuration, the base station 10 and the terminal 20 can switch between scheduling the PDSCH or PUSCH of the P(S)Cell by the PDCCH of the P(S)Cell and scheduling the PDSCH or PUSCH of the P(S)Cell by the PDCCH of the P(S)Cell, depending on the state transition of the SCell by the L1 notification.

[0103] Furthermore, according to an embodiment of the present invention, there is provided a base station having a transmitter that transmits signaling to suspend a secondary cell and control information via the secondary cell, a control unit that schedules a channel in a primary cell using the control information when the transmitter transmits signaling to enable the secondary cell, and a communication unit that performs transmission or reception using the channel in the primary cell.

[0104] With the above configuration, the base station 10 and the terminal 20 can schedule the PDSCH or PUSCH of the P(S)Cell by the PDCCH of the SCell according to the state of the SCell. That is, in a wireless communication system, when multiple RATs (Radio Access Technologies) coexist on a single carrier, it is possible to alleviate a shortage of resources for transmitting and receiving control signals.

[0105] Furthermore, according to an embodiment of the present invention, there is provided a communication method in which a terminal executes a reception procedure for receiving signaling to suspend a secondary cell and control information via the secondary cell, a control procedure for assuming that a channel in a primary cell is scheduled by the control information when signaling to suspend the secondary cell is received by the reception procedure, and a communication procedure for performing transmission or reception using the channel in the primary cell.

[0106] With the above configuration, the base station 10 and the terminal 20 can schedule the PDSCH or PUSCH of the P(S)Cell by the PDCCH of the SCell according to the state of the SCell. That is, in a wireless communication system, when multiple RATs (Radio Access Technologies) coexist on a single carrier, it is possible to alleviate a shortage of resources for transmitting and receiving control signals.

[0107] (Supplementary embodiment) Although the embodiment of the present invention has been described above, the disclosed invention is not limited to such an embodiment, and those skilled in the art will understand various modifications, modifications, alternatives, replacements, and the like. Although the description has been given using specific numerical examples to facilitate understanding of the invention, unless otherwise specified, those numerical values ​​are merely examples and any appropriate values ​​may be used. The division of items in the above description is not essential to the present invention, and matters described in two or more items may be used in combination as necessary, and matters described in one item may be applied to matters described in another item (as long as there is no contradiction). The boundaries of functional units or processing units in the functional block diagram do not necessarily correspond to the boundaries of physical parts. The operations of multiple functional units may be physically performed by one part, or the operations of one functional unit may be physically performed by multiple parts. The order of the processing procedures described in the embodiment may be changed as long as there is no contradiction. For convenience of the processing description, the base station 10 and the terminal 20 have been described using functional block diagrams, but such devices may be realized by hardware, software, or a combination thereof. The software operated by the processor possessed by the base station 10 in accordance with an embodiment of the present invention and the software operated by the processor possessed by the terminal 20 in accordance with an embodiment of the present invention may each be stored in a random access memory (RAM), flash memory, read only memory (ROM), EPROM, EEPROM, register, hard disk (HDD), removable disk, CD-ROM, database, server or any other suitable storage medium.

[0108] Furthermore, the notification of information is not limited to the aspects / embodiments described in the present disclosure, and may be performed using other methods. For example, the notification of information may be performed by physical layer signaling (e.g., Downlink Control Information (DCI), Uplink Control Information (UCI)), higher layer signaling (e.g., Radio Resource Control (RRC) signaling, Medium Access Control (MAC) signaling, broadcast information (Master Information Block (MIB), System Information Block (SIB)), other signals, or a combination of these. Furthermore, the RRC signaling may be called an RRC message, and may be, for example, an RRC Connection Setup message, an RRC Connection Reconfiguration message, or the like.

[0109] Each aspect / embodiment described in the present disclosure may be applied to at least one of systems using LTE (Long Term Evolution), LTE-A (LTE-Advanced), SUPER 3G, IMT-Advanced, 4G (4th generation mobile communication system), 5G (5th generation mobile communication system), FRA (Future Radio Access), NR (new Radio), W-CDMA (registered trademark), GSM (registered trademark), CDMA2000, UMB (Ultra Mobile Broadband), IEEE 802.11 (Wi-Fi (registered trademark)), IEEE 802.16 (WiMAX (registered trademark)), IEEE 802.20, UWB (Ultra-WideBand), Bluetooth (registered trademark), and other suitable systems, and next-generation systems extended based on these. In addition, a combination of multiple systems (e.g., a combination of at least one of LTE and LTE-A and 5G, etc.) may be applied.

[0110] The steps, sequences, flow charts, etc. of each aspect / embodiment described herein may be reordered unless inconsistent. For example, the methods described in this disclosure present elements of various steps using an example order, and are not limited to the particular order presented.

[0111] In this specification, a specific operation performed by the base station 10 may be performed by its upper node in some cases. In a network consisting of one or more network nodes having the base station 10, it is clear that various operations performed for communication with the terminal 20 may be performed by at least one of the base station 10 and other network nodes other than the base station 10 (e.g., MME or S-GW, etc., but are not limited to these). Although the above example illustrates a case in which there is one other network node other than the base station 10, the other network node may be a combination of multiple other network nodes (e.g., MME and S-GW).

[0112] The information or signals described in the present disclosure may be output from a higher layer (or a lower layer) to a lower layer (or a higher layer), or may be input / output via multiple network nodes.

[0113] The input and output information may be stored in a specific location (e.g., memory) or may be managed using a management table. The input and output information may be overwritten, updated, or added to. The output information may be deleted. The input information may be transmitted to another device.

[0114] In the present disclosure, the determination may be made based on a value represented by one bit (0 or 1), a Boolean value (true or false), or a numerical comparison (e.g., comparison with a predetermined value).

[0115] Software shall be construed broadly to mean instructions, instruction sets, code, code segments, program code, programs, subprograms, software modules, applications, software applications, software packages, routines, subroutines, objects, executable files, threads of execution, procedures, functions, etc., whether referred to as software, firmware, middleware, microcode, hardware description language, or otherwise.

[0116] Additionally, software, instructions, information, etc. may be transmitted or received over a transmission medium. For example, if the software is transmitted from a website, server, or other remote source using wired and / or wireless technologies (such as coaxial cable, fiber optic cable, twisted pair, Digital Subscriber Line (DSL)), and / or wireless technologies (such as infrared, microwave, etc.), then these wired and / or wireless technologies are included within the definition of transmission media.

[0117] The information, signals, etc. described in this disclosure may be represented using any of a variety of different technologies. For example, the data, instructions, commands, information, signals, bits, symbols, chips, etc. that may be referred to throughout the above description may be represented by voltages, currents, electromagnetic waves, magnetic fields or magnetic particles, optical fields or photons, or any combination thereof.

[0118] In addition, the terms described in this disclosure and the terms necessary for understanding this disclosure may be replaced with terms having the same or similar meanings. For example, at least one of a channel and a symbol may be a signal (signaling). Also, a signal may be a message. Also, a component carrier (CC) may be called a carrier frequency, a cell, a frequency carrier, etc.

[0119] As used in this disclosure, the terms "system" and "network" are used interchangeably.

[0120] In addition, the information, parameters, etc. described in the present disclosure may be represented using absolute values, may be represented using relative values ​​from a predetermined value, or may be represented using other corresponding information. For example, a radio resource may be indicated by an index.

[0121] The names used for the above-mentioned parameters are not limiting in any way. Moreover, the formulas using these parameters may differ from those explicitly disclosed in this disclosure. The various channels (e.g., PUCCH, PDCCH, etc.) and information elements may be identified by any suitable names, and therefore the various names assigned to these various channels and information elements are not limiting in any way.

[0122] In the present disclosure, terms such as "base station (BS)", "wireless base station", "base station device", "fixed station", "NodeB", "eNodeB (eNB)", "gNodeB (gNB)", "access point", "transmission point", "reception point", "transmission / reception point", "cell", "sector", "cell group", "carrier", "component carrier", etc. may be used interchangeably. A base station may also be referred to by terms such as a macro cell, a small cell, a femto cell, a pico cell, etc.

[0123] A base station can accommodate one or more (e.g., three) cells. When a base station accommodates multiple cells, the entire coverage area of ​​the base station can be divided into multiple smaller areas, and each smaller area can also be provided with communication services by a base station subsystem (e.g., a small indoor base station (RRH: Remote Radio Head). The term "cell" or "sector" refers to a part or the entire coverage area of ​​a base station and / or a base station subsystem that provides communication services in this coverage.

[0124] In this disclosure, the terms "Mobile Station (MS)", "user terminal", "User Equipment (UE)", "terminal", etc. may be used interchangeably.

[0125] A mobile station may also be referred to by those skilled in the art as a subscriber station, mobile unit, subscriber unit, wireless unit, remote unit, mobile device, wireless device, wireless communication device, remote device, mobile subscriber station, access terminal, mobile terminal, wireless terminal, remote terminal, handset, user agent, mobile client, client, or some other suitable terminology.

[0126] At least one of the base station and the mobile station may be called a transmitting device, a receiving device, a communication device, etc. At least one of the base station and the mobile station may be a device mounted on a moving body, the moving body itself, etc. The moving body may be a vehicle (e.g., a car, an airplane, etc.), an unmanned moving body (e.g., a drone, an autonomous vehicle, etc.), or a robot (manned or unmanned). At least one of the base station and the mobile station may include a device that does not necessarily move during communication operation. For example, at least one of the base station and the mobile station may be an IoT (Internet of Things) device such as a sensor.

[0127] Furthermore, the base station in the present disclosure may be read as a user terminal. For example, each aspect / embodiment of the present disclosure may be applied to a configuration in which communication between a base station and a user terminal is replaced with communication between a plurality of terminals 20 (which may be called, for example, D2D (Device-to-Device) or V2X (Vehicle-to-Everything)). In this case, the terminal 20 may be configured to have the functions of the base station 10 described above. Furthermore, terms such as "uplink" and "downlink" may be read as terms corresponding to terminal-to-terminal communication (for example, "side"). For example, an uplink channel, a downlink channel, etc. may be read as a side channel.

[0128] Similarly, a user terminal in the present disclosure may be read as a base station. In this case, the base station may be configured to have the functions of the above-mentioned user terminal.

[0129] As used in this disclosure, the terms "determining" and "determining" may encompass a wide variety of actions. "Determining" and "determining" may include, for example, judging, calculating, computing, processing, deriving, investigating, looking up, search, inquiry (e.g., searching in a table, database, or other data structure), ascertaining, and the like. "Determining" and "determining" may also include receiving (e.g., receiving information), transmitting (e.g., sending information), input, output, accessing (e.g., accessing data in a memory), and the like. In addition, "judgment" and "decision" can include considering resolving, selecting, choosing, establishing, comparing, etc., to be a "judgment" or "decision." In other words, "judgment" and "decision" can include considering some action to be a "judgment" or "decision." In addition, "judgment" can be interpreted as "assuming," "expecting," "considering," etc.

[0130] The terms "connected," "coupled," or any variation thereof, refer to any direct or indirect connection or coupling between two or more elements, and may include the presence of one or more intermediate elements between two elements that are "connected" or "coupled" to each other. The coupling or connection between elements may be physical, logical, or a combination thereof. For example, "connected" may be read as "access." As used in this disclosure, two elements may be considered to be "connected" or "coupled" to each other using at least one of one or more wires, cables, and printed electrical connections, as well as electromagnetic energy having wavelengths in the radio frequency range, microwave range, and optical (both visible and invisible) range, as some non-limiting and non-exhaustive examples.

[0131] The reference signal may be abbreviated as RS (Reference Signal) and may be called a pilot depending on the applicable standard.

[0132] As used in this disclosure, the phrase "based on" does not mean "based only on," unless expressly stated otherwise. In other words, the phrase "based on" means both "based only on" and "based at least on."

[0133] Any reference to an element using a designation such as "first," "second," etc., used in this disclosure does not generally limit the quantity or order of those elements. These designations may be used in this disclosure as a convenient method of distinguishing between two or more elements. Thus, a reference to a first and a second element does not imply that only two elements may be employed or that the first element must precede the second element in some way.

[0134] The "means" in the configuration of each of the above devices may be replaced with "part," "circuit," "device," etc.

[0135] When the terms "include," "including," and variations thereof are used in this disclosure, these terms are intended to be inclusive, similar to the term "comprising." Further, when used in this disclosure, the term "or" is not intended to be an exclusive or.

[0136] A radio frame may be composed of one or more frames in the time domain. Each of the one or more frames in the time domain may be called a subframe. A subframe may further be composed of one or more slots in the time domain. A subframe may have a fixed time length (e.g., 1 ms) that is independent of numerology.

[0137] The numerology may be communication parameters that apply to the transmission and / or reception of a signal or channel, such as, for example, at least one of a subcarrier spacing (SCS), a bandwidth, a symbol length, a cyclic prefix length, a transmission time interval (TTI), a number of symbols per TTI, a radio frame structure, a particular filtering operation that the transceiver performs in the frequency domain, a particular windowing operation that the transceiver performs in the time domain, etc.

[0138] A slot may be composed of one or more symbols (such as an Orthogonal Frequency Division Multiplexing (OFDM) symbol, a Single Carrier Frequency Division Multiple Access (SC-FDMA) symbol, etc.) in the time domain. A slot may be a time unit based on numerology.

[0139] A slot may include multiple minislots. Each minislot may be composed of one or multiple symbols in the time domain. A minislot may also be called a subslot. A minislot may be composed of fewer symbols than a slot. A PDSCH (or PUSCH) transmitted in a time unit larger than a minislot may be called PDSCH (or PUSCH) mapping type A. A PDSCH (or PUSCH) transmitted using a minislot may be called PDSCH (or PUSCH) mapping type B.

[0140] A radio frame, a subframe, a slot, a minislot, and a symbol each represent a time unit for transmitting a signal. The radio frame, the subframe, the slot, the minislot, and the symbol may each be referred to by a different name.

[0141] For example, one subframe may be called a transmission time interval (TTI), multiple consecutive subframes may be called a TTI, or one slot or one minislot may be called a TTI. That is, at least one of the subframe and the TTI may be a subframe (1 ms) in the existing LTE, a period shorter than 1 ms (for example, 1-13 symbols), or a period longer than 1 ms. Note that the unit expressing the TTI may be called a slot, a minislot, or the like, instead of a subframe.

[0142] Here, TTI refers to, for example, the minimum time unit for scheduling in wireless communication. For example, in an LTE system, a base station performs scheduling to allocate wireless resources (such as frequency bandwidth and transmission power that can be used by each terminal 20) to each terminal 20 in TTI units. Note that the definition of TTI is not limited to this.

[0143] The TTI may be a transmission time unit for a channel-encoded data packet (transport block), a code block, a code word, etc., or may be a processing unit for scheduling, link adaptation, etc. When a TTI is given, the time interval (e.g., the number of symbols) in which a transport block, a code block, a code word, etc. are actually mapped may be shorter than the TTI.

[0144] In addition, when one slot or one minislot is called TTI, one or more TTIs (i.e., one or more slots or one or more minislots) may be the minimum time unit of scheduling. Also, the number of slots (minislots) constituting the minimum time unit of scheduling may be controlled.

[0145] A TTI having a time length of 1 ms may be called a normal TTI (TTI in LTE Rel. 8-12), a normal TTI, a long TTI, a normal subframe, a normal subframe, a long subframe, a slot, etc. A TTI shorter than a normal TTI may be called a shortened TTI, a short TTI, a partial or fractional TTI, a shortened subframe, a short subframe, a minislot, a subslot, a slot, etc.

[0146] In addition, a long TTI (e.g., a normal TTI, a subframe, etc.) may be interpreted as a TTI having a time length exceeding 1 ms, and a short TTI (e.g., a shortened TTI, etc.) may be interpreted as a TTI having a TTI length shorter than the TTI length of a long TTI and equal to or greater than 1 ms.

[0147] A resource block (RB) is a resource allocation unit in the time domain and the frequency domain, and may include one or more consecutive subcarriers in the frequency domain. The number of subcarriers included in an RB may be the same regardless of the numerology, for example, 12. The number of subcarriers included in an RB may be determined based on the numerology.

[0148] In addition, the time domain of the RB may include one or more symbols and may be one slot, one minislot, one subframe, or one TTI in length. Each of one TTI, one subframe, etc. may be composed of one or more resource blocks.

[0149] Note that one or more RBs may be called a physical resource block (PRB), a sub-carrier group (SCG), a resource element group (REG), a PRB pair, an RB pair, or the like.

[0150] Furthermore, a resource block may be composed of one or more resource elements (REs). For example, one RE may be a radio resource region of one subcarrier and one symbol.

[0151] A Bandwidth Part (BWP), which may also be referred to as a fractional bandwidth, may represent a subset of contiguous common resource blocks (RBs) for a numerology on a carrier, where the common RBs may be identified by an index of the RBs relative to a common reference point of the carrier. PRBs may be defined in a BWP and numbered within the BWP.

[0152] The BWP may include a BWP for UL (UL BWP) and a BWP for DL ​​(DL BWP). One or more BWPs may be configured for a UE within one carrier.

[0153] At least one of the configured BWPs may be active, and the UE may not expect to transmit or receive a given signal / channel outside the active BWP. Note that the terms "cell", "carrier", etc. in this disclosure may be replaced with "BWP".

[0154] The above-mentioned structures of radio frames, subframes, slots, minislots, symbols, etc. are merely examples. For example, the number of subframes included in a radio frame, the number of slots per subframe or radio frame, the number of minislots included in a slot, the number of symbols and RBs included in a slot or minislot, the number of subcarriers included in an RB, the number of symbols in a TTI, the symbol length, the cyclic prefix (CP) length, etc. may be changed in various ways.

[0155] In this disclosure, where articles have been added due to translation, such as a, an, and the in English, the disclosure may include that the nouns following these articles are in the plural form.

[0156] In the present disclosure, the term "A and B are different" may mean "A and B are different from each other." The term may also mean "A and B are each different from C." Terms such as "separate" and "coupled" may also be interpreted in the same way as "different."

[0157] Each aspect / embodiment described in this disclosure may be used alone, in combination, or switched according to execution. In addition, notification of specific information (e.g., notification that "X is the case") is not limited to being done explicitly, but may be done implicitly (e.g., not notifying the specific information).

[0158] In addition, the DCI in the present disclosure is an example of control information. The transmitting unit 210 and the receiving unit 220 are an example of a communication unit.

[0159] Although the present disclosure has been described in detail above, it is clear to those skilled in the art that the present disclosure is not limited to the embodiments described in the present disclosure. The present disclosure can be implemented in modified and altered forms without departing from the spirit and scope of the present disclosure as defined by the claims. Therefore, the description of the present disclosure is intended to be illustrative and does not have any limiting meaning on the present disclosure. [Explanation of symbols]

[0160] 10 base station 110 Transmitter 120 Receiving unit 130 Setting section 140 Control section 20 Terminals 210 Transmitter 220 Receiving unit 230 Setting section 240 Control Unit 1001 Processor 1002 Storage device 1003 Auxiliary storage device 1004 Communication equipment 1005 Input Device 1006 Output device

Claims

1. A receiving unit that receives signaling including an information element related to cross-carrier scheduling, signaling for enabling or disabling a secondary cell, and control information via a primary cell; a control unit that assumes that a channel in a primary cell is scheduled by the control information when the information element related to the cross-carrier scheduling is set to a value indicating that the channel is scheduled from another cell and when the receiving unit receives a signaling to disable the secondary cell; A terminal having a communication unit that performs transmission or reception using the channel in the primary cell.

2. A transmitter that transmits signaling including information elements related to cross-carrier scheduling, signaling for enabling or disabling a secondary cell, and control information via a primary cell; a control unit that assumes that a channel in a primary cell is scheduled by the control information when the information element related to the cross-carrier scheduling is set to a value indicating that the channel is scheduled from another cell and when the transmission unit transmits signaling to disable the secondary cell; A base station having a communication unit that performs transmission or reception using the channel in the primary cell.

3. receiving signaling including an information element related to cross-carrier scheduling, signaling for enabling or disabling a secondary cell, and control information via a primary cell; a procedure for assuming that a channel in a primary cell is scheduled by the control information when the information element related to the cross-carrier scheduling is set to a value indicating that the channel is scheduled by another cell and when a signaling for disabling the secondary cell is received; A communication method in which a terminal executes a procedure of transmitting or receiving using the channel in the primary cell.

Citation Information

Patent Citations

  • Winding device for covering material and tea field management method using the same

    JP2019000012A

  • Method and apparatus for performing uplink transmission in a wireless communication system

    US20150245347A1