Well initiation service system with packer control system
The well initiation service system with a multi-resettable packer assembly and ESP addresses the inefficiencies and limitations of existing ESP systems in hydrocarbon well development, enhancing operational efficiency and enabling operation in challenging environments.
Patent Information
- Application Number
- PCT/US2024/048291
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-09-28
- Filing Date
- 2024-09-25
- Publication Date
- 2025-04-03
AI Technical Summary
Existing hydrocarbon well development methods, particularly those using electrical submersible pumping systems (ESPs), face challenges such as time-consuming unloading processes, complex logistics, inefficient packer system operations, and limitations in high hydrogen sulfide (H2S) environments.
A well initiation service system incorporating a bottom hole assembly (BHA) with a multi-resettable packer assembly and an electrical submersible pump (ESP) that can be deployed in production tubing. The system includes a stroker tool for compressing and decompressing the packer, a port sub for hydraulic connection, and sensors for real-time data measurement, enabling efficient well unloading and natural flow initiation.
The system significantly enhances operational efficiency by reducing the need for multiple packer settings, handling high temperatures and solids debris, and enabling operation in high H2S wells, thus facilitating effective well unloading and natural flow initiation.