PROMPT LIBRARY IP + R&D

Professional prompts to plan a patent search with AI.

Bring your question. Find a professional prompt to move it forward.

Find a template / make it yours
TRY A TASK
No blank-page thinking. Start with the right structure, then adapt it to your work.
Or explore the library
Free to browse and copyMake each template yoursTake your research further69 TEMPLATES
A TEMPLATE FOR THE WORK AHEAD

Find your starting point.

Choose the task. See what goes in. Know what comes out.

69 templates to start with
02 / IP · PLAN A SEARCH

Plan a prior art search

Turn a technical concept into search terms, concept groups and a repeatable search plan.

IN
Technical concept + search scope
OUT
Concept table + query variants
07 / R&D · RESEARCH A FIELD

Write a technology scouting brief

Define the need, where to look and how to screen candidates before scouting external technologies.

IN
Technical need + constraints
OUT
Scouting brief + screening criteria
12 / IP · DRAFT AND PROSECUTE

Break down a 102 / 103 rejection

Lay out each US novelty or obviousness rejection claim by claim, with the cited passages and the points to verify.

IN
Office action text + claims + cited references
OUT
Rejection-by-rejection table + checks
21 / IP · CHECK A PRODUCT

Plan a freedom-to-operate search for a product

Plan a product-focused patent search by market, launch timing and legal status, with a reproducible search log.

IN
Product features + markets + launch timing + search scope
OUT
Feature search plan + status checks + log schema
22 / IP · CHECK A PRODUCT

Prepare a design patent search for a product

Organize product views, jurisdictions and classification checks for an appearance-focused design search.

IN
Product views + design-search scope
OUT
View inventory + jurisdiction labels + classification checks
24 / IP · PLAN A SEARCH

Plan an invalidity search against a patent

Plan claim-focused patent and non-patent searches with source dates and provisional relevance tags.

IN
Target claims + patent context + cut-off and scope + known excerpts
OUT
Claim search plan + date checks + provisional evidence log
25 / R&D · ASSESS DESIGN RISK

Write a design verification test plan

Map requirements to verification activities while leaving unsupported criteria and sample sizes for the team.

IN
Requirements + design baseline + test constraints + supplied standards
OUT
Requirement-based verification matrix + unresolved criteria
26 / R&D · RESEARCH A FIELD

Plan a design of experiments for a process or product

Organize responses, factors and constraints into a conditional DOE proposal and a pre-agreed analysis plan.

IN
Response definition + factors and levels + constraints + prior evidence
OUT
Conditional design proposal + execution controls + analysis decisions
27 / R&D · REVIEW EVIDENCE

Build a requirements traceability matrix

Link supplied requirements, design elements, verification cases and results while exposing missing trace links.

IN
Requirements + design references + verification cases + result records
OUT
Bidirectional traceability matrix + coverage and orphan gaps
28 / IP + R&D · EXPLORE AN IDEA

Explain a patent to an engineering team

Explain the technical problem and mechanism while keeping described embodiments separate from exact claim wording.

IN
Patent identifier and country + exact claims + specification passages
OUT
Engineering reading guide + embodiment and claim distinctions + counsel questions
29 / IP · REVIEW EVIDENCE

Build a patent family and legal status record

Organize supplied family members and status snapshots with sources, query dates and unresolved conflicts.

IN
Member records + database family basis + jurisdictions and as-of scope
OUT
Member and status inventory + conflicting records + definition gaps
30 / R&D · ASSESS DESIGN RISK

Prepare an 8D problem-solving report

Document a reported problem through eight team-report sections, keeping action effectiveness tied to evidence.

IN
Problem record + team roles + action log + verification evidence
OUT
Eight-section 8D report + action status + verification gaps
31 / R&D · COMPARE APPROACHES

Select a design concept with a Pugh matrix

Screen specific design concepts against a datum using supplied criteria and evidence for every Pugh rating.

IN
Design concepts and datum + supplied criteria + comparative evidence
OUT
Evidence-linked Pugh matrix + sign counts + unresolved comparisons
32 / R&D · REVIEW EVIDENCE

Write an engineering test report from test records

Convert engineering test records into a source-linked report with deviations, supplied criteria and limited conclusions.

IN
Test purpose and sample records + method and conditions + any acceptance criteria
OUT
Engineering test report + separate deviation log + evidence limits
33 / IP + R&D · EXPLORE AN IDEA

Set up a competitor patent watch

Plan a recurring patent watch with supplied applicant strings, technical scope, dated sources and escalation rules.

IN
Applicant strings + known document excerpts + watch scope and cadence + review roles
OUT
Patent-watch plan + recurring briefing schema + counsel escalation rules
34 / R&D · RESEARCH A FIELD

Assess technology readiness level from evidence

Map test evidence to a supplied TRL scale and state a conditional rating interval with unresolved review conditions.

IN
Named TRL scale and verbatim definitions + technology boundary + test evidence
OUT
Requirement-to-evidence map + conditional rating interval + review gaps
35 / R&D · ASSESS DESIGN RISK

Draft PFMEA failure modes from a process flow

Draft operation-level failure chains with source-linked requirements, separate controls and blank team ratings.

IN
Process flow + operation requirements + current control-plan entries + any observations
OUT
Draft process failure chains + separate prevention and detection controls + open questions
36 / R&D · ASSESS DESIGN RISK

Build a fault tree for an undesired event

Decompose one undesired event into a qualitative AND/OR tree with visible assumptions and dependency gaps.

IN
Defined top event + system boundary + observed evidence + any dependency records
OUT
Text fault tree + source and assumption register + separate dependency and data gaps
37 / R&D · COMPARE APPROACHES

Run a value engineering function analysis

Map basic and supporting functions to supplied costs and propose alternatives with explicit verification needs.

IN
Component baseline + required functions + constraints + any explicitly allocated costs
OUT
Function and cost map + conditional alternatives + verification checklist
38 / IP + R&D · RESEARCH A FIELD

Prepare a technical due diligence brief on a technology

Prepare a technology review with sourced performance assertions, maturity evidence, dependencies and open risks.

IN
Technology and transaction boundary + performance assertions + supporting records + dependencies
OUT
Technical diligence brief + assertion-to-evidence map + risk and counsel-question registers
39 / R&D · EXPLORE AN IDEA

Generate concept options with morphological analysis

Combine subfunction options in a morphological matrix and screen concepts against explicit supplied constraints.

IN
Problem and system boundary + subfunctions + constraints + any existing solution options
OUT
Morphological matrix + incompatibility register + conditional concept shortlist
40 / IP · DRAFT AND PROSECUTE

Prepare materials for a US provisional patent application

Organize embodiments, drawing needs and open questions for US provisional application preparation with your IP counsel.

IN
Invention and embodiment notes + drawing records + prior art and disclosure history
OUT
Preparation packet + technical support gaps + questions for counsel
41 / IP · COMPARE APPROACHES

Prepare a trade secret versus patent decision review

Organize supplied facts and unanswered questions for a patent versus trade secret review without choosing a path.

IN
Technology facts + business context + confidentiality measures + disclosure records
OUT
Neutral factor record + parallel path questions for counsel
42 / R&D · ASSESS DESIGN RISK

Write an A3 problem-solving report

Draft a concise A3 report with sourced current conditions, open causal hypotheses and unverified action effects.

IN
Problem and target records + investigation notes + action plan + follow-up data if available
OUT
Concise seven-section A3 report + source and gap register
43 / R&D · REVIEW EVIDENCE

Run a lessons learned review for an R&D project

Review project records for what worked, what went wrong and next-time actions, with sources and no personal blame.

IN
Project plan + actual outcomes + decision and issue logs + improvement records if available
OUT
Source-linked lessons + executable actions + suggestions to verify + missing records
44 / R&D · RESEARCH A FIELD

Write an R&D research proposal

Draft an R&D proposal with sourced background, testable hypotheses, staged methods and unresolved commitments.

IN
Problem and supplied literature + objectives + study approach + resource and success-criterion records
OUT
Research proposal + staged deliverables + open commitments + conditional feasibility
45 / R&D · REVIEW EVIDENCE

Plan and review a gage R&R measurement system study

Plan a measurement study and review supplied gage R&R results with their methods, criteria and evidence gaps.

IN
Measured characteristic + measurement setup + study design + any precomputed results
OUT
Study plan + supplied-result review + unresolved measurement questions
46 / R&D · REVIEW EVIDENCE

Write a failure analysis report for a failed part

Document a failed part with traceable sample history, observed findings and conditional failure mechanisms.

IN
Sample custody and service history + failure records + examination sequence + any mechanism hypotheses
OUT
Failed-part analysis report + custody record + conditional mechanisms and checks
47 / R&D · RESEARCH A FIELD

Build a technology roadmap from product needs

Connect product needs to technology options, sourced maturity evidence, dependencies and supplied milestones.

IN
Product or market needs + option descriptions + maturity evidence + any planning milestones
OUT
Need-to-capability roadmap + dependencies + evidence and timing gaps
48 / R&D · COMPARE APPROACHES

Benchmark a product against competitors with test evidence

Organize product benchmarks with source types, test conditions and non-comparable values kept visible.

IN
Product configurations + metrics or needs + source records + any comparison rules
OUT
Source-qualified benchmark table + non-comparable values + follow-up evidence needs
49 / R&D · ASSESS DESIGN RISK

Prepare a preliminary hazard analysis for a design

Draft design hazard scenarios and verification questions with all risk ratings and acceptability fields left empty.

IN
Product and energy-source descriptions + use scenarios + recorded safeguards + any supplied standard clauses
OUT
Preliminary hazard register + empty rating fields + safeguard evidence gaps
50 / R&D · EXPLORE AN IDEA

Generate poka-yoke error-proofing concepts for a process step

Propose unverified error-proofing concepts for supplied process errors, with configuration-specific checks.

IN
Process steps and configurations + recorded or potential errors + current controls + any constraints
OUT
Candidate error-proofing concepts + configuration states + verification questions
51 / R&D · REVIEW EVIDENCE

Prepare an engineering change request with an impact assessment

Organize a proposed engineering change, documented impacts, verification needs and open approval decisions.

IN
Before-and-after change description + supplied rationale + item list and explicit links + any implementation records
OUT
ECR draft + documented impact register + proposed checks + open disposition and approval decisions
52 / R&D · REVIEW EVIDENCE

Plan a process capability study and review supplied Cp and Cpk results

Plan a capability study and review supplied Cp and Cpk with statistical assumptions and evidence gaps visible.

IN
Characteristic and specification limits + sampling and collection plan + assumption evidence + any supplied statistics
OUT
Capability study plan + supplied-result and assumption review + unresolved statistical checks
53 / R&D · ASSESS DESIGN RISK

Plan an accelerated life test for a component

Plan an accelerated life study with supplied stress settings and open mechanism and model verification needs.

IN
Component and use conditions + proposed stress and sample settings + mechanism checks + any model records
OUT
Conditional ALT plan + stress-specific mechanism checks + open model and team decisions
54 / IP · DRAFT AND PROSECUTE

Draft a patent abstract from claims and a description

Draft a technical abstract from supplied text, with sentence-level sources and open practitioner checks.

IN
Exact claims and text version + description passages + any supplied abstract requirements or drawing records
OUT
Abstract draft + sentence-to-source map + questions for the responsible patent practitioner
66 / R&D · REVIEW EVIDENCE

Plan a DMAIC improvement project from supplied process data

Plan and document a Six Sigma improvement project across the five DMAIC phases using supplied process records.

IN
Problem and scope + measurement records + any cause, pilot and control notes
OUT
DMAIC phase plan + separate action tracks + evidence needed before each transition
67 / R&D · EXPLORE AN IDEA

Build a SIPOC table for a process from supplied process notes

Build a SIPOC table from supplied notes that you can paste into a spreadsheet or diagramming tool.

IN
Process boundaries and steps + supplied parties, inputs, outputs and customer requirements
OUT
SIPOC table for a spreadsheet or diagram tool + open classification questions
A FEW GOOD PROMPTS. ONE CONNECTED TASK.

Start with a collection.

Follow a focused sequence, from the first question to your next research step.

PATSNAP EUREKA / CONTINUE

A good start.
A deeper next step.

Take your question further in Patsnap Eureka, a source-backed AI platform for IP and R&D work.

Explore Patsnap Eureka ↗
PATSNAP OPEN / BUILD

Bring the capability
into your workflow.

Explore patent data and AI APIs for your own applications and research workflows.

Explore Patsnap Open ↗

Help us improve

Something wrong, out of date, or missing on this page? Tell us and it goes straight to the team that maintains it.