Problem

High current electrical switches face challenges in heat management, as they generate excessive heat when carrying high currents, leading to potential damage due to inadequate heat dissipation, especially when cables are undersized for the expected current ratings, resulting in reversed heat flow and temperature increases.

Innovation Solution

The design incorporates a short high electrical current path with high conductivity and a direct heat conduction path to a thermally conductive heat sink using a bus bar thermal bridge and thermally conductive interface material, ensuring efficient heat transfer away from heat-generating components and reducing the risk of thermal runaway.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Loss of energy

If cables are selected based only on maximum continuous current rating, then cable cost is reduced, but heat dissipation capability is insufficient leading to excessive switch temperature

Engineering Contradiction:
Core Design Contradiction:
Loss of energyVSQuantity of substance

Solution Approach 1:

The patent extracts the heat dissipation function from the cable and assigns it to a dedicated heat sink. The cable is sized only for current carrying capacity, while the heat sink handles thermal management. This separation allows the cable to be smaller and cheaper while the heat sink provides sufficient heat dissipation capability.

Inventive Principle:
Principle #2Taking out (Extraction)

Solution Approach 2:

The patent introduces a heat sink as an intermediary component between the switch and the ambient environment. This heat sink acts as a thermal mediator that efficiently conducts heat away from the switch components, enabling better heat dissipation without requiring oversized cables.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Loss of energy

If cable size is increased to improve heat dissipation, then heat transfer capability is improved, but cost of metal material increases

Engineering Contradiction:
Core Design Contradiction:
Loss of energyVSQuantity of substance

Solution Approach 1:

The patent extracts the heat dissipation function from the cable and assigns it to a dedicated heat sink. The cable is sized only for current carrying capacity, while the heat sink handles thermal management. This separation allows the cable to be smaller and cheaper while the heat sink provides sufficient heat dissipation capability.

Inventive Principle:
Principle #2Taking out (Extraction)

Solution Approach 2:

The heat sink serves multiple functions: it acts as a thermal management component for the switch, provides a mounting structure for the switch, and facilitates heat dissipation to the ambient environment. This multi-functionality consolidates what would otherwise require multiple separate components.

Inventive Principle:
Principle #6Universality (Multi-functionality)

3Object-generated harmful factors

If interface resistance between cable terminals and switch terminals is reduced, then heat generation is reduced, but manufacturing cost increases

Engineering Contradiction:
Core Design Contradiction:
Object-generated harmful factorsVSEase of manufacture

Solution Approach 1:

The patent acknowledges that some heat generation at interfaces is inevitable, but converts this potential harm into a benefit by designing the heat sink to efficiently capture and dissipate this heat. The heat that would otherwise damage components is redirected to the heat sink, allowing standard manufacturing practices to be used without requiring expensive low-resistance interfaces.

Inventive Principle:
Principle #22Blessing in disguise (Convert harm into benefit)

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

This solution effectively maintains the switch and connected components at safe temperatures, allowing operation beyond rated maximum continuous current without damage, reducing energy consumption and material costs by using less expensive switching devices and preventing heat from being transferred back into cables.

Implementation Method 1

a direct heat conduction path to a thermally conductive heat sink using a bus bar thermal bridge and thermally conductive interface material

Methodology Applied
Scientific EffectHeat conduction: Conduction (thermal)

Implementation Method 2

a thermally conductive heat sink... ensuring efficient heat transfer away from heat-generating components

Methodology Applied
Scientific EffectHeat sink: Heat Sink

Data Source

PatentUS10700043B1Solid state power switch with optimized heat sink configuration
Publication Date: 2020.06.30
  • US10700043B1 patent drawing
  • US10700043B1 patent drawing
  • US10700043B1 patent drawing

AI summary

A high current, solid state, electrical switch has switch terminal blocks on opposite sides of one or more arrays of parallel connected, solid state, high current, power switching devices mounted on a support. A first terminal of each switching device of each array is directly electrically and thermally bonded to a switch terminal block. A bus bar thermal bridge is directly electrically and thermally bonded to a second terminal of the switching device of each array. A thermally conductive heat sink panel is contoured in alignment with, and has a surface in spaced juxtaposition from, a surface of the bus bar thermal bridge and from surfaces of each of the switch terminal blocks. A thermally conductive, electrically insulating thermal interface material thermally contacts and extends between all said surfaces for conducting heat from the switch terminal blocks and from the thermal bridge to the heat sink panel.