Intelligent project management system based on BIM

By introducing a BIM-based smart project management system in project management, we collect and analyze environmental data, video images and equipment status, and display and early warning in combination with BIM models, we solve the problems of incomplete supervision and low intelligence in the existing technology. , realizes all-round intelligent management and real-time monitoring of the project site.

CN118967017APending Publication Date: 2024-11-15CHONGQING BUILDING CLOUD TECH CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410975301.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The existing project management methods lack all-weather and full-scene monitoring and intelligent supervision, resulting in incomplete supervision, poor real-time performance, low intelligence, and difficult to accurately control the safety, quality, progress, materials, and cost indicators on the project site. .

Method used

Design a smart project management system based on BIM, collecting environmental data, video images and operation status data of construction equipment on the project site in multiple dimensions, and visually display and early warning with BIM model to achieve all-round intelligence on the project site. manage.

Benefits of technology

It realizes all-round, visual and intelligent management of the project site, can monitor and warning in real time, and improves the intelligence level and efficiency of project management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118967017A_ABST
    Figure CN118967017A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of engineering management and Internet of Things, in particular to an intelligent project management system based on BIM, and the system is provided with a first collection module, a second collection module and a third collection module, so as to collect the live data / information of a project site from multiple dimensions. Comprising environment data, video pictures and operation state data of construction operation equipment, and all-around supervision of project field personnel, vehicles and materials is realized; through the background management module, the analysis and processing of the collected live data / information can be realized, and possible abnormal or risk points can be mined; and the live data / information of the project is fused into the BIM model of the current project for associated display, so that the omnibearing, visual and intelligent management of the project site is realized.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Cited By

  • Communication engineering field management method and system and storage medium

    CN120598302A

  • Hydropower engineering inclined shaft construction comprehensive management and control system and comprehensive management and control method

    CN122152929A