Method for predicting content of free calcium oxide in cement clinker
Through the data-driven modeling method based on auxiliary variable data, the channel attention mechanism and LSTM model are used to realize the rapid on-site analysis of the free calcium oxide content of cement clinker, solving the problem of time-consuming and low accuracy of traditional methods, and realizing cement Real-time prediction and accurate guidance of clinker.
Patent Information
- Application Number
- CN202411022832.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-11-15
AI Technical Summary
In the prior art, the measurement of free calcium oxide content of cement clinker is difficult to achieve rapid on-site analysis, and the traditional methods are time-consuming and require professional equipment and technology.
Using a data-driven modeling method based on auxiliary variable data, the channel attention mechanism module and neural network model are constructed by collecting multi-dimensional auxiliary variable data and free calcium oxide content data of multiple sampling periods, and the channel attention mechanism module and neural network model are constructed, using the long and short-term memory network (LSTM) for Data processing and prediction, select the time delay and feature importance with the optimal correlation for data processing, and build the optimal prediction model.
Real-time prediction of free calcium oxide content of cement clinker is achieved, solving the problems of time-consuming and low accuracy of traditional methods, meeting the needs of rapid and accurate, and can guide production in real time, improving prediction accuracy.
Smart Images

Figure CN118969150A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of cement clinker production, in particular to a method for predicting the free calcium oxide content of cement clinker. Background Art
[0002] The free calcium oxide content in cement clinker is one of the main indicators for measuring the quality of cement clinker. Traditionally, the measurement of free calcium oxide content in cement clinker usually uses chemical titration method and calcification method. These methods have high accuracy and strong reliability, but the analysis process is time-consuming and requires professional chemical technology and equipment, which limits its application in rapid on-site analysis. In order to solve the above-mentioned direct measurement problems, a soft measurement technology that relies on auxiliary variables to achieve measurement effects is proposed, and thus a data-driven modeling method for real-time data of free calcium oxide content in cement clinker comes into being. Summary of the invention
[0003] The invention provides a method for predicting the free calcium oxide content in cement clinker, so as to solve the problem that it is difficult to realize rapid on-site analysis of the free calcium oxide content in the cement clinker production process in the prior art.
[0004] In order to achieve the above object, the technical solution adopted by the present invention is:
[0005] The method for predicting the free calcium oxide content of cement clinker comprises the following steps:
[0006] Step 1, collecting auxiliary variable data of multiple sampling periods in a continuous time in the cement production line and free calcium oxide content data of multiple sampling periods, wherein each sampling period samples multi-dimensional auxiliary variable data;
[0007] Determine the correlation between the sampled auxiliary variable data and free calcium oxide data in different time periods in continuous time, and select the auxiliary variable data and free calcium oxide content data of several sampling periods in the time period when the correlation is the largest as sample data;
[0008] Then, the auxiliary variable data and the free calcium oxide content data in the sample data are constructed into normalized matrices respectively, and the auxiliary variable data normalized matrix and the free calcium oxide content data normalized matrix are combined into a new matrix as a data set;
[0009] Step 2: Construct a channel attention mechanism module, input the data set obtained in step 1 into the channel attention mechanism module, and process it through the channel attention module to highlight the importance of the features of the data in the data set;
[0010] Step 3, dividing the data in the data set processed in step 2 into a training set, a test set, and a validation set, and using the training set, the test set, and the validation set to train a neural network model to obtain the optimal step length when the evaluation index of the neural network model is optimal after training;
[0011] Step 4: using the training set and the test set divided in step 3, respectively train different neural network models, and set the training step length of each neural network model to the optimal step length obtained in step 3; after training, compare and analyze the prediction results of each neural network model according to the evaluation index, and select a neural network model with the best evaluation index as the final prediction model for free calcium oxide content;
[0012] Step 5: Collect auxiliary variable data in the cement production line and input them into the final prediction model of free calcium oxide content obtained in step 4, and obtain the prediction result of free calcium oxide content by predicting the final prediction model of free calcium oxide content.
[0013] In a further step 1, different time periods are set in continuous time as sliding window lengths, and the Pearson correlation coefficient of the auxiliary variable data and the free calcium oxide data is calculated for each sliding window length, and the correlation between the auxiliary variable data and the free calcium oxide data is determined by the Pearson correlation coefficient.
[0014] Furthermore, the neural network model in step 3 is a long short-term memory network LSTM.
[0015] Furthermore, the multiple neural network models in step 4 include long short-term memory networks LSTM, CB-LSTM, SE-LSTM, and CB-SE-LSTM.
[0016] Furthermore, the optimal step length in step 3 is 40.
[0017] Furthermore, the evaluation indicators in steps 3 and 4 include the degree of fit R 2 , root mean square error RMSE, mean absolute error MAE and the maximum error MAXE between the predicted value and the true value.
[0018] The present invention provides a method for predicting the free calcium oxide content in cement clinker based on CB-SE-LSTM. The method can fully consider the time lag between each auxiliary variable and the free calcium oxide content in cement clinker, select the time lag with the best correlation, perform data processing according to the importance of auxiliary variable characteristics, and compare and construct the optimal prediction model, thereby improving the prediction accuracy of the model and providing an accurate basis for predicting the free calcium oxide content in cement clinker.
[0019] Compared with the prior art, the present invention has the following advantages:
[0020] 1. Compared with the conventional direct detection method of the free calcium oxide content of cement clinker, the present invention predicts the free calcium oxide content in real time through a data-driven modeling method, which solves the problem that the traditional chemical analysis method is time-consuming, requires professional chemical analysis technology and equipment, and is not suitable for rapid online analysis. It meets the actual needs of accuracy and speed, and guides production in real time.
[0021] 2. In view of the fact that in the new dry cement burning process, the data is disturbed and anomalies occur due to the huge amount of data and various influencing factors such as equipment, working conditions, and environment, which leads to inaccurate prediction results of the free calcium oxide content in cement clinker, the present invention proposes to use SE blocks to extract data features, so as to adaptively adjust the weights of convolution channels, assign large weights to important channels so that the information in important channels can be more fully learned, and solve the problem of low prediction accuracy of conventional models.
[0022] 3. The present invention takes into account the time delay problem between free calcium oxide and auxiliary variables, and uses the long short-term memory gate neural network (LSTM) to better capture the dynamic changes in time series data, and processes the auxiliary variables and the free calcium oxide content of cement clinker as time series, thereby improving the model's ability to handle time series problems. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 This is the prediction curve of free calcium oxide content in cement clinker by CB-SE-LSTM model when the step length is 40 in the embodiment of the present invention. DETAILED DESCRIPTION
[0024] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0025] This embodiment discloses a method for predicting the free calcium oxide content of cement clinker, comprising the following steps:
[0026] Step 1: Data collection and preprocessing. The process is as follows:
[0027] Step 1.1: From the cement production line, sample the cement production line in a continuous time according to the sampling period t. 1 Collect m n-dimensional auxiliary variable data and sample them according to the sampling period t 2 Collect h free calcium oxide content data, where t 1 < <t 2 ; Let the n-dimensional auxiliary variable data of the i-th time sampling point be the row vector a i , the free calcium oxide content data at the jth time sampling point is the column vector b j , where i∈[1,m], j∈[1,h], and m / t 1 =h / t 2 ;
[0028] In the present embodiment, taking the online prediction of free calcium oxide content in cement clinker of the new dry cement manufacturing method of cement plant as an example, according to the Pearson correlation coefficient calculation result between known free calcium oxide in cement clinker and auxiliary variables, the decomposition furnace outlet temperature, decomposition furnace coal feeding amount, raw material feeding amount, tertiary air temperature, kiln tail smoke chamber temperature, kiln head coal feeding amount, kiln head hood temperature, kiln main machine current, kiln head hood negative pressure and F2 fan grate pressure are selected as auxiliary variables. The Pearson correlation coefficient of each auxiliary variable and free calcium oxide is shown in Table 1.
[0029] Table 1 Pearson correlation coefficients between auxiliary variables and free calcium oxide
[0030]
[0031]
[0032] Specifically, the auxiliary variable data of 322 days (from January 2022 to July 2023) in the DCS are obtained with a sampling period of 5s, and the free calcium oxide content data of cement clinker manually collected and tested at intervals of 2h on the same date are obtained. Due to the high frequency of auxiliary variable data collection (5s), the amount of data is huge. In addition, due to the influence of equipment wear and aging, abnormal working conditions and changes in the on-site environment, there are interference information and outliers in the detected auxiliary variables and free calcium oxide content data, so filtering and outlier removal are required. The interference noise is filtered, that is, each data point is replaced by the average value of the data point in the 5s time window. For outliers, here refers to abnormal data caused by downtime, which are directly deleted.
[0033] Step 1.2, select different time periods from the above continuous time as the sliding window length, and calculate the Pearson correlation coefficient between the average value of each auxiliary variable data in the time period and the free calcium oxide content data according to each selected sliding window length x, and select the window length x′ according to the sliding window length when the correlation coefficient is the highest, and x′ is used as the lag time segment between the measurement time of the auxiliary variables of each part of the decomposition furnace, rotary kiln and grate cooler and the measurement time of the free calcium oxide.
[0034] Taking the online prediction of free calcium oxide content in cement clinker of the new dry process cement production process in the cement plant as an example, 17,280 data items and 12 free calcium oxide content data items can be collected for each auxiliary variable in one day. When the sliding window length x is set to 2 minutes, the auxiliary variable data of the same dimension in the auxiliary variable data of multiple sampling periods included in the sliding window length are processed by averaging. Where: d′ mnis the average value of the auxiliary variable corresponding to one free calcium oxide content data in different time segments within 2h (collection period of free calcium oxide); d′ 11 Represents the average value of the auxiliary variable within the first 2 minutes (i.e. 00:00~00:02); d′ 12 It represents the average value of the auxiliary variable within the second 2 minutes (i.e. 00:02-00:04); and so on. 1n It represents the average value of the auxiliary variable within the nth 2 minutes (the maximum value of n is 60, i.e. 01:58-02:00), and m is the number of free calcium oxide data obtained in one day, with a maximum value of 12.
[0035] Then, the correlation between the first n-1 columns and the nth column in the matrix D is calculated, and the correlation coefficient r between the first n-1 columns and the nth column in the matrix D is calculated by the Pearson correlation calculation formula.
[0036] The Pearson correlation calculation formula is expressed as:
[0037]
[0038] In the formula,
[0039] x i ,y i is the sample value, in this case x i refer to Each element of y i refer to every element of
[0040] is the sample mean, in this case refer to The average value of the elements in each column vector, refer to The average value of all elements in ;
[0041] r is the Pearson correlation coefficient. The r value range is [-1,1], r>0 indicates positive correlation, r<0 indicates negative correlation, and the larger the absolute value of r, the stronger the correlation.
[0042] Then set the sliding window length x to 4 minutes, 8 minutes, etc. to obtain different correlation coefficients r.
[0043] After obtaining the correlation coefficient r, sort by the correlation coefficient r. Since the auxiliary variable data in the entire time may be related to the free calcium oxide content measured at the previous moment, the current moment, and the next moment, it is necessary to analyze the correlation to determine which part of the auxiliary variable data is related to the free calcium oxide content at the current moment, so it is necessary to obtain the lag time segment through correlation analysis. According to the r with the largest absolute value of the correlation coefficient, the lag time segment between the measurement time of the auxiliary variables of each part of the preheater, decomposition furnace, rotary kiln and grate cooler and the measurement time of the free calcium oxide content is clarified. Table 2 shows the lag time with the highest correlation of each auxiliary variable selected.
[0044] Table 2 Lag time interval between the measurement time of each auxiliary variable and the measurement time of free calcium oxide
[0045]
[0046] Take the sample subset of the lag time segment with the largest correlation coefficient As a data set, C * is the data set used as the subsequent input prediction model. Each column in is the average value of the decomposition furnace outlet temperature, decomposition furnace coal feeding amount, raw meal feeding amount, tertiary air temperature, kiln tail smoke chamber temperature, kiln head coal feeding amount, kiln head hood temperature, kiln main machine current, kiln head hood negative pressure and F2 fan grate pressure data within the corresponding lag time with the largest correlation coefficient. Each element in is the average value of the auxiliary variable in the lag time section within every 2 hours (i.e. the sampling period of free calcium oxide). The data is the free calcium oxide content.
[0047] Step 1.3: Calculate C * The row vector a i The pth feature a in i×p The normalized value a i ' ×p , construct auxiliary variable data normalization matrix A = (a i ' ×p ) m×n , calculate C * Column vector b j The jth feature b j×1 The normalized value b j ' ×1 , construct the output variable, that is, the free calcium oxide content data normalization matrix B = (b j ' ×q )h ×1 , p∈[1,n];
[0048] In this embodiment, the normalized value is calculated by formula (2):
[0049]
[0050] In the formula,
[0051] a i×p In this case, C * Auxiliary variables and data that have not been normalized in a i ' ×p is the normalized value, max(a i×p )、min(a i×p ) is a i×p The maximum and minimum values of all data of the corresponding feature.
[0052] Since the sampling periods of free calcium oxide content data and auxiliary variable data are different, the present embodiment uses the free calcium oxide content data sampling period t 2 t 2 The auxiliary variable data within the time period is processed by averaging, and the matrix A′ is obtained by taking the average of the auxiliary variables within a sampling period of the free calcium oxide content data. i =[a i ″ ×1 ,a i ″ ×2 ,…,a i ″ ×n ], thus obtaining h results And corresponding to h free calcium oxide content data normalization matrix B = (b j ' ×1 ) h×1 , where a i×x is the mean of the xth auxiliary variable in the ith sampling period, A′ i Represents the result of taking the average in the i-th sampling period.
[0053] Step 1.4, combine the normalized matrix A of all n-dimensional auxiliary variable data with the normalized matrix B of free calcium oxide content data to form a new matrix C, C = (A, B);
[0054] Step 2: Build a channel attention mechanism module:
[0055] Includes input, channel compression, channel excitation, rescaling and output.
[0056] Step 2.1: Input part
[0057] The input variables and the number of channels are used as input to this module, and the input variable sequence is expanded into a three-dimensional feature map X∈R H×W×C , where H is the height, W is the width, and C is the number of channels.
[0058] Step 2.2: Channel compression
[0059] Use Global Average Pooling to compress X into a feature map Z of size 1×1×C. The calculation process is as follows: The result of this calculation is a vector Z, which represents the average of the global spatial information of X in all channels, where Z c is the global average of the c-th channel.
[0060] Step 2.3: Channel excitation part
[0061] Map Z to a lower dimension R through the first fully connected layer C / r , where r is the ratio of reducing the number of channels. Then the nonlinearity is increased by the ReLU activation function f(·): U = f(W 1 Z+b 1 ), where W 1 ∈R (C / r)×C and b 1 ∈R C / r are the weight matrix and bias vector respectively, and U is the feature after excitation.
[0062] Then map U back to the original channel dimension R through the second fully connected layer C , and generate the weight of each channel through the sigmoid activation function g(·): S = g(W 2 U+b 2 ), where W 2 ∈R C×(C / r) and b 2 ∈R C is the weight matrix and bias vector of the second fully connected layer, and S is the importance weighting factor of each channel, whose value is between 0 and 1.
[0063] Step 2.4, recalibration part
[0064] Apply the weighting factor S to each channel of the original input feature X to obtain the recalibrated feature map X', X'i,j,c = S c ·Xi,j,c, where S c is the weight of the cth channel obtained by the channel excitation step.
[0065] Step 2.5: Output
[0066] The output feature map X' after channel recalibration has the same dimension as the input feature map X.
[0067] In this example, the shape of the input feature tensor is (11,3573,C), where 11 is the total number of input and output variables, 3573 is the total number of data processed in step 1, and C represents the number of channels. The input feature tensor is expanded by one dimension to become a four-dimensional tensor with a shape of (1,11,3573,C). The four-dimensional tensor is then subjected to a global average pooling operation to average all elements of each feature channel to obtain a feature map with a shape of (1,1,C). The input feature tensor and the feature tensor output by the SE module are element-by-element multiplied to achieve feature recalibration, that is, the weight of each channel is multiplied by the corresponding input feature. The first dimension in the result is compressed to obtain a tensor with a shape of (11,3573,C), which is the output result.
[0068] Step 3: Divide the auxiliary variable data and free calcium oxide content data obtained after processing in step 2 into a training set, a test set and a validation set in the same proportion.
[0069] In this example, the data set is divided into training set, test set and validation set in the ratio of 87:3:10, that is, the auxiliary variable data of all dimensions are divided into training data, test data and validation data in the ratio of 87:3:10; all free calcium content data are also divided into training data, test data and validation data in the ratio of 87:3:10. Then, the training set is constructed with the auxiliary variable training data and the training data of free calcium content data divided as above, the test set is constructed with the auxiliary variable test data and the test data of free calcium content data divided as above, and the validation set is constructed with the auxiliary variable validation data and the validation data of free calcium content data divided as above.
[0070] Then, a neural network model is trained using the divided training set, test set and validation set to determine the optimal step length under the model, and the optimal step length is then used for the training of multiple subsequent models. In this embodiment, the neural network model adopts a long short-term memory network LSTM model.
[0071] Set different step sizes, and put the obtained training set into the long short-term memory network LSTM model for training. During training, the model is trained with the training set to obtain the predicted data, and the predicted data and the test set data are compared with the divided test set data to obtain the fit R. 2 , root mean square error RMSE, mean absolute error MAE and the maximum error MAXE between the predicted value and the true value. 2 The model closest to 1 and with the smallest error was taken as the preliminary prediction model for free calcium oxide.
[0072] Among them, the fitting degree R 2 The calculation formula is:
[0073]
[0074] In formula (3), is the predicted data; i is the actual value in the test set. The numerator in represents the residual sum of squares, which is the sum of squares of the differences between the model predicted values and the actual values. The denominator in represents the total sum of squares, that is, the sum of the squares of the differences between the actual values and their means, so R 2 The closer it is to 0, the poorer the model fit is. 2 The closer it is to 1, the better the fitting effect.
[0075] The calculation formula of root mean square error RMSE is:
[0076]
[0077] In formula (4), is the predicted data; i is the actual value in the test set. The root mean square error is the square root of the ratio of the square of the deviation between the predicted value and the true value to the number of samples n, which measures the deviation between the model's predicted value and the actual value. Since the error is amplified when it is squared and then summed, it is very sensitive to large errors.
[0078] The calculation formula for the mean absolute error MAE is:
[0079]
[0080] In formula (5), is the predicted data; i is the actual value in the test set. The mean absolute error is the average of the absolute errors between the predicted values and the actual values. It is a more stable measure of error and will not be overly affected by larger errors.
[0081] Taking the online prediction of free calcium oxide content in cement clinker of the new dry process cement production process in the cement plant as an example, the prediction model of free calcium oxide content in cement clinker trained above was used to test the prediction accuracy of different step lengths in 3704 groups of sample data, and the step lengths Step = 5, Step = 10, Step = 15, Step = 20, Step = 30, Step = 40, Step = 50 and Step = 60 were selected to verify the appropriate step length, and the other model parameters were kept unchanged. The fit, root mean square error, mean absolute error and maximum error between the predicted value and the true value of the prediction effect under different window lengths are shown in Table 3.
[0082] Table 3 Evaluation indicators of prediction effect under different step lengths
[0083]
[0084] From the calculation and analysis of Table 3, it can be seen that when the step size is selected as Step=5, 10, 15, 20, and 30, the prediction of the free calcium oxide content in cement clinker has a low degree of fit. This is mainly because a smaller step size will result in a smaller amplitude of each parameter update, which will slow down the convergence speed. At the same time, the root mean square error and mean absolute error are also larger. Because the number of iterations is limited, the model may not be able to fully fit the data. With the increase of the step size, the degree of fit of the prediction of the free calcium oxide content in cement clinker is improved. When Step=50 and 60, the degree of fit begins to decline. When Step=40, the degree of fit is the largest and the error is low, and the prediction accuracy of its model is the highest. From the above analysis, the experimental results show that the optimal step size is 40.
[0085] Step 4: Using the step size 40 determined in step 3, the training set divided in step 3 is put into multiple neural network prediction models for prediction, the prediction results are compared and analyzed, and the one with the best prediction performance evaluation index is selected as the final prediction model for free calcium oxide content.
[0086] In this embodiment, multiple neural network prediction models include long short-term memory network LSTM, CB-LSTM, SE-LSTM, CB-SE-LSTM, and the obtained training set is put into the long short-term memory network LSTM, CB-LSTM, SE-LSTM, and CB-SE-LSTM for training. During training, each model is trained with the training set to obtain prediction data, and the divided auxiliary variable data is used as the test set data. The prediction data and the test set data are compared to obtain the fit R 2 , root mean square error RMSE, mean absolute error MAE and the maximum error MAXE between the predicted value and the true value. 2 The model closest to 1 and with the smallest error is taken as the final prediction model for free calcium oxide content.
[0087] Taking the online prediction of free calcium oxide content in cement clinker of the new dry process cement production process in the cement plant as an example, the test set is put into the prediction model for prediction, and the prediction results of each model when Step = 40 are finally obtained as shown in Table 4.
[0088] Table 4 Prediction results of each model when Step = 40
[0089]
[0090] From the prediction results in Table 4, it can be seen that the CB-SE-LSTM prediction model has high fitting degree and prediction accuracy. Since the CB-SE-LSTM prediction model combines classification, weighting and SE modules, it improves the model's ability to process category features of different importance. At the same time, the introduction of the attention mechanism can adaptively adjust the channel weights to enhance the model's prediction ability, thereby improving its prediction accuracy. Therefore, the CB-SE-LSTM model is selected as the final prediction model for free calcium oxide content. Figure 1 The prediction curve of f-CaO content in cement clinker by CB-SE-LSTM model when Step=40 is given.
[0091] Step 5: Collect auxiliary variable data in the cement production line and input them into the final prediction model of free calcium oxide content (i.e., CB-SE-LSTM model) obtained in step 4, and obtain the prediction result of free calcium oxide content by the final prediction model of free calcium oxide content.
[0092] The preferred embodiments of the present invention are described in detail above in conjunction with the accompanying drawings. The embodiments described in the present invention are merely descriptions of the preferred embodiments of the present invention, and do not limit the concept and scope of the present invention. The various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction, and such combinations should also be regarded as the contents disclosed in the present disclosure as long as they do not violate the concept of the present invention. In order to avoid unnecessary repetition, the present invention will not further describe various possible combinations.
[0093] The present invention is not limited to the specific details of the above-mentioned embodiments. Within the technical concept of the present invention and without departing from the design concept of the present invention, various modifications and improvements made to the technical solution of the present invention by technical personnel in this field should fall within the protection scope of the present invention. The technical contents for which protection is sought in the present invention have been fully recorded in the claims.
Claims
1. Prediction method of free calcium oxide content in cement clinker, It is characterized in that The following steps are involved: Step 1, collecting auxiliary variable data of multiple sampling periods in a continuous time in the cement production line and free calcium oxide content data of multiple sampling periods, wherein each sampling period samples multi-dimensional auxiliary variable data; Determine the correlation between the sampled auxiliary variable data and free calcium oxide data in different time periods in continuous time, and select the auxiliary variable data and free calcium oxide content data of several sampling periods in the time period when the correlation is the largest as sample data; Then, the auxiliary variable data and the free calcium oxide content data in the sample data are respectively constructed into normalized matrices, and the auxiliary variable data normalized matrix and the free calcium oxide content data normalized matrix are combined into a new matrix as a data set; Step 2: Construct a channel attention mechanism module, input the data set obtained in step 1 into the channel attention mechanism module, and process it through the channel attention module to highlight the importance of the features of the data in the data set; Step 3, dividing the data in the data set processed in step 2 into a training set, a test set, and a validation set, and using the training set, the test set, and the validation set to train a neural network model to obtain the optimal step length when the evaluation index of the neural network model is optimal after training; Step 4: using the training set and the test set divided in step 3, respectively train different neural network models, and set the training step length of each neural network model to the optimal step length obtained in step 3; after training, compare and analyze the prediction results of each neural network model according to the evaluation index, and select a neural network model with the best evaluation index as the final prediction model for free calcium oxide content; Step 5: Collect auxiliary variable data in the cement production line and input them into the final prediction model of free calcium oxide content obtained in step 4, and obtain the prediction result of free calcium oxide content by predicting the final prediction model of free calcium oxide content.
2. The method for predicting free calcium oxide content in cement clinker according to claim 1, It is characterized in that In step 1, different time periods are set as sliding window lengths in continuous time, and the Pearson correlation coefficient of the auxiliary variable data and the free calcium oxide data at each sliding window length is calculated. The correlation between the auxiliary variable data and the free calcium oxide data is determined by the Pearson correlation coefficient.
3. The method for predicting free calcium oxide content in cement clinker according to claim 1, It is characterized in that The neural network model described in step 3 is a long short-term memory network LSTM.
4. The method for predicting free calcium oxide content in cement clinker according to claim 3, It is characterized in that The multiple neural network models in step 4 include long short-term memory networks LSTM, CB-LSTM, SE-LSTM, and CB-SE-LSTM.
5. The method for predicting free calcium oxide content in cement clinker according to claim 3 or 4, It is characterized in that The optimal step length described in step 3 is 40.
6. The method for predicting free calcium oxide content in cement clinker according to claim 3 or 4, It is characterized in that The evaluation indicators in steps 3 and 4 include the degree of fit R 2 , root mean square error RMSE, mean absolute error MAE and the maximum error MAXE between the predicted value and the true value.
Citation Information
Patent Citations
Power station boiler flue gas oxygen content prediction method based on time sequence characteristics and LSTM network
CN114676906A
Cement clinker f-Cao self-adaptive prediction method
CN116663303A
Ultrasonic diagnosis auxiliary system based on deep learning
CN118155832A
Cited By
Method for predicting process parameters of rotary cement kiln based on mechanism and data collaboration
CN119920346A
A Prediction Method for Process Parameters of Cement Rotary Kiln Based on the Collaboration of Mechanism and Data
CN119920346B