Pneumatic conveying method and system for hot direct reduction iron

By adopting the design of a bolt transmitter and a along-range booster in the pneumatic conveying system, the problem of easy wear and breakage of the gas pipeline conveying equipment is solved, and lower conveying losses and higher production efficiency are achieved.

CN119038196AActive Publication Date: 2024-11-29MCC SOUTH (XIANGTAN) IRON & STEEL ENG TECH CO LTD +1

Patent Information

Application Number
CN202411358772.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-27
Publication Date
2024-11-29
Estimated Expiration
2044-09-27

AI Technical Summary

Technical Problem

When the existing gas pipeline conveying method pneumatically conveys heat to the arc furnace, the equipment is prone to wear and break, and there is a problem of high energy consumption.

Method used

A pneumatic conveying method including a bolt transmitter and a along-course booster is designed. By setting a triple inclined pipe and a pulsed gas source valve group in the conveying pipeline, discontinuous material bolts are formed by using the airflow to reduce material to the conveying pipeline. For friction on the inner wall, a along-course booster is set to reduce the friction coefficient, and when blocking materials, use a combination of a clear air source valve group and a along-course booster to clear the block.

Benefits of technology

Significantly reduces wear on the inner wall of the pipe during the transportation process, reduces the risk of chokes and crushing, improves production efficiency, and reduces the cleaning time and improves the reliability of the system by optimizing gas pressure control and spraying technology. and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119038196A_ABST
    Figure CN119038196A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of pneumatic conveying, in particular to a pneumatic conveying method and system for hot direct reduction iron materials. A conventional gas pipeline conveying method is used for pneumatically conveying HRDI materials into an electric arc furnace, and the problems that equipment is prone to abrasion and breakage exist. In order to solve the problems, the pneumatic conveying method for the hot direct reduction iron material is provided, through the design of a plug forming transmitter structure, the axis of a three-inclined-pipe bent pipe section at the bottom of the plug forming transmitter is designed to form an included angle not larger than 20 degrees with the axis of a straight pipe section in the direction opposite to the material conveying direction; and meanwhile, by combining the combined action of the pulse gas source valve group and the plug forming gas source valve group, discontinuous material plugs are formed in the conveying pipeline, so that the abrasion of the materials to the inner wall of the conveying pipeline in the pneumatic conveying process is remarkably reduced, and the phenomena of blocking and crushing of the hot direct reduction iron materials in the conveying pipeline are remarkably reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pneumatic conveying, and in particular to a pneumatic conveying method and system for hot direct reduced iron materials. Background Art

[0002] Direct reduced iron is a high-quality charge for electric furnaces and converters, and is suitable for producing high-quality steel and special steel. Since direct reduced iron smelting does not use coke, this process is a high-quality, low-consumption, low-pollution new ironmaking process, and is also one of the world's cutting-edge steel smelting technologies.

[0003] Hot charging and hot delivery of direct reduced iron (DRI) is an important measure to reduce the electric energy consumption of electric arc furnaces. According to research results, when direct reduced iron (DRI) replaces scrap steel for electric arc furnace smelting, the direct reduced iron (DRI) furnace temperature increases by 100℃, and the electric energy can be saved by 25kw·h per ton of steel. When hot direct reduced iron (HDRI) at 700℃ is used for hot charging, the power consumption per ton of steel is reduced by 110-160kwh compared with cold DRI / HBI smelting, the smelting time can be reduced by 10-20% (about 10-15 minutes), and the electric furnace capacity can be increased by more than 15%.

[0004] Directly feeding hot direct reduced iron into electric furnace for smelting can greatly reduce power consumption and improve the production capacity of electric furnace, which provides conditions for further reducing energy consumption in vertical furnace production of hot direct reduced iron (HRDI) (600-700℃) - electric furnace short process.

[0005] In recent years, most of the newly built gas-based vertical furnace direct reduced iron-electric furnace steelmaking production lines adopt direct reduced iron hot discharge, hot transportation, and hot charging electric furnace technology. Based on the principle of "lowest transportation energy consumption and simple transportation device", there are mainly the following methods for achieving industrialized production of direct reduced iron hot transportation: gas pipeline transportation method; hot conveyor method; insulation tank method, etc.

[0006] The gas pipeline transportation method uses hot coal gas or hot nitrogen as the transport gas and uses pipelines to transport hot direct reduced iron (HDRI) in a closed manner. The process layout of gas-based vertical furnaces and electric furnaces is relatively flexible and convenient, and occupies less area; however, the maximum transportation distance of this method is ≤200m, and there are problems such as easy wear, easy jamming, easy breakage of equipment, and high energy consumption. Summary of the invention

[0007] The problem in the prior art is that the conventional gas pipeline method of pneumatically conveying HRDI materials into the electric arc furnace has the problem that the equipment is easily worn and broken. In view of the above problems, the present invention provides a method for pneumatically conveying hot direct reduced iron materials, comprising the following steps:

[0008] (1) Open the discharge gate valve at the bottom of the gas-based vertical furnace and the upper bell valve of the feeder at the same time, start feeding into the feeder, and the hot direct reduced iron enters the feeder through the discharge chute. When the hot direct reduced iron in the feeder reaches the set feed amount, close the discharge gate valve at the bottom of the gas-based vertical furnace and the upper bell valve of the feeder.

[0009] (2) Open the bell valve at the bottom of the feeder, add all the materials in the feeder into the hot direct reduced iron transmitter, then close the bell valve at the bottom of the feeder, and perform step (1) at the same time.

[0010] (3) The hot direct reduced iron transmitter comprises an upper storage tank and a bolt generator which are interconnected from top to bottom. The volume of the material in the upper storage tank is not less than 1 / 2. The material fails to fill the entire upper storage tank. After the material enters the hot direct reduced iron transmitter, a material bolt is formed in the bolt generator. The bolt generator comprises a bolt storage bin and a three-slant pipe which are interconnected from top to bottom. The three-slant pipe comprises a straight pipe section and a curved pipe section which are interconnected. The inner diameters of the straight pipe section and the curved pipe section are equal. The curved pipe section is interconnected with the bolt storage bin. The adjacent end faces of the two are sealed and fixedly connected. The axis of the adjacent end faces of the curved pipe section and the bolt storage bin is perpendicular to the ground.

[0011] The side walls of the curved pipe section and the straight pipe section are connected to each other, and the axis of the curved pipe section at the adjacent end faces of the straight pipe section forms an angle of 15-20° with the axis of the straight pipe section in the opposite direction of material conveying.

[0012] After the material enters the bend section, without external force, the material will not slide from the bend section into the conveying pipeline, and the material will form a stable material plug in the bend section.

[0013] One end of the straight pipe section is connected to the delivery pipe, and the adjacent end surfaces of the two are sealed and fixedly connected.

[0014] The other end of the straight pipe section is connected to the air intake short pipe, and the adjacent end surfaces of the two are sealed and fixedly connected.

[0015] The pulse intake valve group is connected to the straight pipe section of the three-slant pipe through the intake short pipe.

[0016] The side wall of the bolt storage bin of the bolt transmitter is provided with an air intake short pipe.

[0017] The bolt-forming gas source valve group is connected to the bolt-forming transmitter through the air intake short pipe.

[0018] A pressure transmitter is also installed on the connecting pipeline between the gas source valve group and the air inlet short pipe, which can monitor the changes of gas pressure in the delivery pipeline in real time.

[0019] According to the set automatic conveying program, first open the bolt-forming gas source valve group and the pulse gas source valve group. The bolt-forming gas source valve group sprays nitrogen into the bolt-forming transmitter. The material in the bolt-forming transmitter is sprayed by the airflow and continuously enters the conveying pipeline. The pressure transmitter installed on the bolt-forming gas source valve group monitors the gas pressure in the conveying pipeline in real time. Whenever the gas pressure in the conveying pipeline is higher than 0.4-0.42MPa, the bolt-forming gas source valve group is closed and the feeding into the conveying pipeline is stopped. Whenever the gas pressure in the conveying pipeline is lower than 0.28-0.3MPa, the bolt-forming gas source valve group is opened and the feeding into the conveying pipeline is continued. The air intake time of the pulse gas source valve group is 300-500ms, and the interval time is 2-5s.

[0020] Under the action of the pulse gas source valve group and the plug-forming gas source valve group, the hot direct reduced iron material in the hot direct reduced iron transmitter continuously enters the conveying pipeline for pneumatic conveying, and forms discontinuous material plugs in the conveying pipeline.

[0021] Whenever all the materials in the upper storage tank of the hot direct reduced iron transmitter enter the bolt transmitter, step (2) is executed.

[0022] The materials in the conveying pipeline are continuously conveyed to the solid-gas separation device, and the nitrogen is passed into the gas recovery device through the gas recovery pipeline for recovery and treatment and is reused as a nitrogen gas source;

[0023] (4) The materials in the solid-gas separation device are continuously transferred to the hot direct reduced iron storage bin, and the materials in the hot direct reduced iron storage bin are transferred to the electric arc furnace through the feeding chute.

[0024] (5) When the material in the hot direct reduced iron storage bin reaches the set amount, stop executing steps (1) and (2), wait until the material in the three-slant pipe of the bolt-forming transmitter is transferred, close the bolt-forming air source valve group, wait until all the materials in the conveying pipeline are conveyed to the hot direct reduced iron storage bin, close the pulse air source valve group, and the conveying is completed.

[0025] Preferably, the conveying pipeline is further provided with a plurality of along-the-way boosters, which are sequentially distributed along the conveying direction of the conveying pipeline, and the spacing between adjacent along-the-way boosters is 3-5m. The along-the-way boosters are interconnected with the conveying pipeline, and the along-the-way boosters are fixedly connected to the adjacent end faces of the conveying pipeline through flanges.

[0026] The along-the-line booster comprises a connecting pipe and an air source blowing device, wherein the air source blowing device is sleeved on the outer wall of the connecting pipe.

[0027] The connecting pipe is provided with an air inlet passage circumferentially, and the air inlet passage is evenly distributed on the outer wall of the connecting pipe circumferentially.

[0028] The gas source blowing device is connected to the along-the-way booster gas source valve group through a booster gas source short pipe. When the along-the-way booster gas source valve group is opened, the gas blowing device blows nitrogen into the connecting pipe through the air inlet channel on the connecting pipe. The blowing direction of the airflow is consistent with the conveying direction of the material in the conveying pipeline. The along-the-way booster and the pulse gas source valve group are opened at the same time. The along-the-way booster has a jet duration of 300-500ms each time, and the interval time is 2-3s.

[0029] Preferably, the horizontal cross-section of the air inlet channel is elliptical, and the angle between the axis of the air inlet channel and the axis of the connecting pipe along the opposite direction of material conveying is 15-25°.

[0030] Preferably, the connecting pipe is composed of a feed pipe section, a middle pipe section and a discharge pipe section which are fixedly connected in sequence, and the end surfaces of the feed pipe section, the middle pipe section and the discharge pipe section are fixedly fitted in pairs.

[0031] The adjacent end faces of the feed pipe section, the middle pipe section and the discharge pipe are all frustum surfaces, and the angle between the generatrix of the frustum surface and the axis of the connecting pipe in the opposite direction of material conveying is 15-25°.

[0032] The end surface of the feed pipe section adjacent to the middle pipe section is embedded in the end surface of the middle pipe section adjacent to it.

[0033] The end surface of the middle pipe section adjacent to the discharge pipe section is embedded in the end surface of the discharge pipe section adjacent to it.

[0034] A groove is provided on one of the adjacent end faces of the feed pipe section, the middle pipe section and the discharge pipe section. The grooves are evenly distributed along the frustum surface. The axis of the groove is equal in length and parallel to the generatrix of the frustum surface. The existence of the groove forms an air inlet channel at the adjacent end faces of the feed pipe section, the middle pipe section and the discharge pipe section.

[0035] The gas source blowing device is composed of a feed end flange, a heat-insulating shell, a gas source distribution chamber shell, a heat-insulating shell, and a discharge end flange connected in sequence.

[0036] The feed end flange is tightly and fixedly connected to the heat-insulating shell, the gas source distribution chamber shell, and the discharge end flange at two adjacent end faces.

[0037] A closed cavity is formed between the two heat-insulating shells and the outer wall of the connecting pipe, and the closed cavity is filled with heat-insulating materials.

[0038] A closed gas source distribution chamber is formed between the gas source distribution chamber shell and the inner wall of the connecting pipe, and the gas source distribution chamber is communicated with the air inlet channel on the connecting pipe.

[0039] The outer wall of the end of the feed pipe section of the connecting pipe away from the middle pipe section has a convex ring structure.

[0040] The outer wall of the end of the discharge pipe section of the connecting pipe away from the middle pipe section also has a convex ring structure.

[0041] The feed end flange and the discharge end flange are both mounted on the outer wall of the connecting pipe through a convex ring structure limit sleeve, forming a closed and fixed connection with the connecting pipe.

[0042] Sealing rings are provided between the feed end flange, the discharge end flange and the convex ring structure.

[0043] When the along-the-path booster is working, the along-the-path booster gas source valve group sprays nitrogen into the gas source distribution chamber through the booster gas source intake short pipe. The nitrogen in the gas source distribution chamber enters the connecting pipe from the intake channel on the connecting pipe under the action of gas pressure.

[0044] Preferably, the connecting pipe is made of wear-resistant silicon carbide.

[0045] Preferably, when the pressure transmitter monitors that the gas pressure is higher than 0.48-0.5MPa, it proves that blockage has occurred in the conveying pipeline. At this time, it is necessary to close the plug-forming gas source valve group, open the clearing gas source valve group, and introduce pulsed high-pressure nitrogen into the conveying pipeline. The pulse intake time is 300-500ms, and the intake interval is 1-2s. At the same time, all the along-the-way boosters on the conveying pipeline are opened. The duration of each jet of the along-the-way booster is 300-500ms, and the interval time is 2-3s. Clearing is carried out until the gas pressure in the conveying pipeline drops below 0.4-0.42MPa. After the conveying pipeline is successfully cleared, the plug-forming gas source valve group is reopened to resume normal material transportation. The clearing gas source valve group is interconnected with the straight pipe section of the triclinic tube.

[0046] Preferably, the steps of nitrogen entering the gas recovery device through the gas recovery pipeline for recovery treatment are as follows:

[0047] The gas recovery device includes a multi-tube water cooling device, a dust collector, a gas buffer tank, and a conveying gas pressurizing device which are interconnected in sequence.

[0048] The nitrogen is first cooled rapidly by a multi-tube water cooling device to reduce the gas temperature to T < 180-280 ° C, and then the gas is ultra-cleaned and filtered using a dust collector to make the dust content of the nitrogen < 5 mg / Nm 3 The filtered nitrogen is introduced into the gas buffer tank. The gas in the buffer tank is pressurized to P≥0.80-1.00MPa by the gas conveying and pressurizing device. After being heated by the gas heating device, the nitrogen continues to be used as the nitrogen source for pneumatic conveying and enters the gas source conveying pipeline. The gas buffer tank is also connected to the gas source replenishing device. According to the actual operation of the system, nitrogen is regularly replenished into the gas buffer tank through the gas source replenishing device. The dust collector is a high-temperature resistant pulse jet metal dust collector or a high-temperature resistant pulse jet ceramic filter cartridge dust collector.

[0049] Preferably, the angle formed by the axis of the curved pipe section and the axis of the straight pipe section in the opposite direction of material conveying is 15-20°.

[0050] The present invention has the following beneficial effects:

[0051] (1) The present invention designs the axis of the bottom three-inclined pipe bend section to form an angle of no more than 20° with the axis of the straight pipe section in the opposite direction of material conveying through the design of the bolt-forming transmitter structure. This design ensures that after the material enters the bend section, the material will not slide from the bend section into the conveying pipeline without external force, and the material will form a stable material plug in the bend section. The material in the bend will only slide from the bend into the conveying pipeline when it is blown by the bolt-forming pulse air source. After the pulse air source valve group and the bolt-forming pulse air source are opened at the same time, the material in the bend continues to enter the conveying pipeline. When the pressure in the conveying pipeline is higher than 0.4-0.42MPa, the bolt-forming air source valve group is closed to stop supplying fuel to the conveying pipeline. Feeding in the pipeline, at this time, the pulse gas source valve group is still in the open state, and the pulse gas source valve group sprays nitrogen to push the material forward in the conveying pipeline for pneumatic conveying. The pressure in the conveying pipeline will drop. When the gas pressure in the conveying pipeline is lower than 0.28-0.3MPa, the plug gas source valve group is opened again to continue feeding into the conveying pipeline. This operation forms a discontinuous plug in the conveying pipeline, which significantly slows down the conveying speed of the material in the conveying pipeline, thereby significantly reducing the wear and tear of the material on the inner wall of the conveying pipeline during pneumatic conveying, and also reduces the probability of serious collision between materials, effectively solving the problem of easy material jamming and easy breakage of hot direct reduced iron in the conveying pipeline;

[0052] (2) The conveying pipeline of the present invention is provided with a plurality of along-the-way boosters along the material conveying direction, the along-the-way boosters are interconnected with the conveying pipeline, the along-the-way boosters are sequentially distributed along the conveying direction of the conveying pipeline, the spacing between adjacent along-the-way boosters is 3-5m, the along-the-way boosters are interconnected with the conveying pipeline, the along-the-way boosters and the adjacent end faces of the conveying pipeline are sealed and fixedly connected by flanges, the along-the-way boosters include a connecting pipe and an air source blowing device, the air source blowing device is sleeved on the outer wall of the connecting pipe, an air inlet channel is circumferentially provided on the connecting pipe, the air inlet channel The gas injection device is evenly distributed on the outer wall of the connecting pipe in the circumferential direction. The gas injection device injects nitrogen into the connecting pipe through the air inlet channel on the connecting pipe. The injection direction of the airflow is consistent with the conveying direction of the material in the conveying pipe. The jet duration of each jet of the along-the-way booster is 300-500ms, and the intermittent time is 2-3s. After the along-the-way booster and the pulse gas source valve group are opened at the same time, the along-the-way booster intermittently injects nitrogen into the conveying pipe to form an air film between the material and the inner wall of the conveying pipe, which can further reduce the friction coefficient of the material on the inner wall of the conveying pipe and reduce the wear of the material on the inner wall of the conveying pipe;

[0053] (3) When the blockage is generated in the conveying pipeline, the booster along the way and the clearing gas source valve group are opened at the same time. The presence of the booster along the way significantly reduces the gas pressure and flow rate required to be provided by the clearing gas source valve group, effectively shortens the time used for clearing the blockage, and greatly improves production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0054] Figure 1 : A schematic structural diagram of the pneumatic conveying system used in the pneumatic conveying method for hot direct reduction of iron materials of the present invention.

[0055] Figure 2 : Figure 1 Schematic diagram of the enlarged structure of part A in the middle.

[0056] Figure 3 : A schematic diagram of the structure of the booster along the pneumatic conveying system used in the present invention.

[0057] Figure 4 : Schematic diagram of the process flow of nitrogen recovery in the pneumatic conveying method for hot direct reduced iron material used in the present invention.

[0058] Figure 5 : A schematic structural diagram of a hot direct reduced iron transmitter in a pneumatic conveying system used in a pneumatic conveying method for hot direct reduced iron material of the present invention.

[0059] In the figure, 1. gas-based vertical furnace, 2. upper storage tank, 3. short air inlet pipe, 4. discharge gate valve, 5. discharge chute, 6. bolt gas source valve group, 7. pressure transmitter, 8. double-layer bell valve feeder, 9. hot direct reduced iron transmitter, 10. conveying pipeline, 11. along-the-way booster, 12. bolt storage bin, 13. pulse gas source valve group, 14. along-the-way booster gas source valve group, 17. solid-gas separation device, 18. double-layer gate type discharger, 19. hot direct reduced iron storage bin, 20. charging chute, 21. electric arc furnace, 22. gas recovery pipeline, 23. gas recovery device, 24. gas source gas transmission pipeline, 28. material level meter, 29. Clearing gas source valve group, 1-1. Convex ring structure, 1-2. Feed pipe section, 1-3. Sealing ring, 1-4. Feed end flange, 1-5. Insulation shell, 1-6. Thermal insulation material, 1-7. Gas source distribution chamber, 1-8. Middle pipe section, 1-9. Booster gas source feed short pipe, 1-10. Inlet channel, 1-11. Booster air flow direction, 1-12. Discharge end flange, 1-13. Discharge pipe section, 2-4. Multi-tube water cooling device, 2-5. Dust collector, 2-6. Gas buffer tank, 2-7. Conveying gas pressurizing device, 2-8. Gas heating device, 2-10. Gas source replenishing device, 4-4. Bend pipe section, 4-8. Straight pipe section. DETAILED DESCRIPTION

[0060] The present invention is described in detail below with reference to the examples. However, it should be understood that the following examples are only illustrative of the embodiments of the present invention, and are not intended to limit the scope of the present invention.

[0061] like Figure 1-5 As shown, the present invention provides a pneumatic conveying system for a pneumatic conveying method of hot direct reduction iron material, and the pneumatic conveying method comprises the following steps:

[0062] (1) Open the discharge gate valve 4 at the bottom of the gas-based vertical furnace 1 and the upper bell valve of the feeder 8 at the same time, start feeding into the feeder 8, and the hot direct reduced iron enters the feeder 8 through the discharge chute 5. When the hot direct reduced iron in the feeder 8 reaches the set feeding amount, close the discharge gate valve 4 at the bottom of the gas-based vertical furnace 1 and the upper bell valve of the feeder 8. The feeder is a double-layer bell valve type feeder;

[0063] (2) Open the lower bell valve of the feeder 8, add all the materials in the feeder 8 into the hot direct reduced iron transmitter 9, then close the lower bell valve of the feeder 8, and perform step (1) at the same time.

[0064] (3) The hot direct reduced iron transmitter 9 includes an upper storage tank 2 and a bolt generator which are interconnected from top to bottom. The volume of the material in the upper storage tank 2 is not less than 1 / 2, and the material fails to fill the entire upper storage tank 2. After the material enters the hot direct reduced iron transmitter 9, a material bolt is formed in the bolt generator. The bolt generator includes a bolt storage bin 12 and a three-slant pipe which are interconnected from top to bottom. The three-slant pipe includes a straight pipe section 4-8 and a curved pipe section 4-4 which are interconnected. The inner diameters of the straight pipe section 4-8 and the curved pipe section 4-4 are equal. The curved pipe section 4-4 is interconnected with the bolt storage bin 12. The adjacent end faces of the two are sealed and fixedly connected. The axis of the adjacent end faces of the curved pipe section 4-4 and the bolt storage bin 12 is perpendicular to the ground.

[0065] The side walls of the curved pipe section 4-4 and the straight pipe section 4-8 are connected to each other, and the axis of the curved pipe section 4-4 at the adjacent end surface of the straight pipe section 4-8 forms an angle of 15-20° with the axis of the straight pipe section 4-8 in the opposite direction of material conveying.

[0066] After the material enters the curved pipe section 4-4, without external force, the material will not slide from the curved pipe section 4-4 into the conveying pipe 10, and the material will form a stable material plug in the curved pipe section 4-4.

[0067] One end of the straight pipe section 4-8 is connected to the delivery pipe 10, and the adjacent end surfaces of the two are sealed and fixedly connected.

[0068] The other end of the straight pipe section 4-8 is connected to the air intake short pipe 3, and the adjacent end surfaces of the two are sealed and fixedly connected.

[0069] The pulse intake valve group is connected to the straight pipe section 4-8 of the three oblique pipes through the intake short pipe 3.

[0070] The side wall of the bolt storage bin 12 of the bolt transmitter is provided with an air intake short pipe 3.

[0071] The thrombosis air source valve group 6 is connected to the thrombosis transmitter through the air intake short pipe 3.

[0072] A pressure transmitter 7 is also provided on the connecting pipeline between the gas source valve group 6 and the air inlet short pipe 3, which can monitor the change of gas pressure in the delivery pipeline 10 in real time.

[0073] According to the set automatic conveying program, first open the bolt-forming gas source valve group 6 and the pulse gas source valve group 13, the bolt-forming gas source valve group 6 sprays nitrogen into the bolt-forming transmitter, and the material in the bolt-forming transmitter is sprayed by the airflow and continuously enters the conveying pipeline 10. The pressure transmitter 7 installed on the bolt-forming gas source valve group 6 monitors the gas pressure in the conveying pipeline 10 in real time. Whenever the gas pressure in the conveying pipeline 10 is higher than 0.4-0.42MPa, the bolt-forming gas source valve group 6 is closed and the feeding into the conveying pipeline 10 is stopped. Whenever the gas pressure in the conveying pipeline 10 is lower than 0.28-0.3MPa, the bolt-forming gas source valve group 6 is opened and the feeding into the conveying pipeline 10 continues. The air intake time of the pulse gas source valve group 13 is 300-500ms, and the interval time is 2-5s.

[0074] Under the action of the pulse gas source valve group 13 and the plug-forming gas source valve group 6, the hot direct reduced iron material in the hot direct reduced iron transmitter 9 continuously enters the conveying pipeline 10 for pneumatic conveying, and forms a discontinuous material plug in the conveying pipeline 10.

[0075] Whenever all the materials in the upper storage tank 2 of the hot direct reduced iron transmitter 9 enter the bolt transmitter, step (2) is executed.

[0076] The materials in the conveying pipeline 10 are continuously conveyed to the solid-gas separation device 17, and the nitrogen is passed through the gas recovery pipeline 22 to the gas recovery device 23 for recovery and treatment and is continuously reused as a nitrogen gas source;

[0077] (4) The materials in the solid-gas separation device 17 are continuously transferred to the hot direct reduced iron storage bin 19, and the materials in the hot direct reduced iron storage bin 19 are transferred to the electric arc furnace 21 through the feeding chute 20.

[0078] (5) When the material in the hot direct reduced iron storage bin 19 reaches the set amount, stop executing steps (1) and (2), wait until the material in the three-slant pipe of the bolt-forming transmitter is transferred, close the bolt-forming air source valve group 6, wait until all the materials in the conveying pipeline 10 are conveyed to the hot direct reduced iron storage bin 19, close the pulse air source valve group 13, and the conveying is completed.

[0079] In a specific embodiment, the conveying pipeline 10 is further provided with a plurality of along-the-way boosters 11, which are sequentially distributed along the conveying direction of the conveying pipeline 10, and the spacing between adjacent along-the-way boosters 11 is 3-5m. The along-the-way boosters 11 are interconnected with the conveying pipeline 10, and the end faces of the along-the-way boosters 11 and the conveying pipeline 10 adjacent to each other are sealed and fixedly connected through flanges.

[0080] The along-the-line booster 11 includes a connecting pipe and an air source blowing device, wherein the air source blowing device is sleeved on the outer wall of the connecting pipe.

[0081] The connecting pipe is provided with an air inlet channel 1-10 circumferentially, and the air inlet channels 1-10 are evenly distributed on the outer wall of the connecting pipe circumferentially.

[0082] The gas source blowing device is connected to the along-the-way booster gas source valve group 14 through a booster gas source short pipe. When the along-the-way booster gas source valve group 14 is opened, the gas blowing device blows nitrogen into the connecting pipe through the air inlet channel 1-10 on the connecting pipe. The blowing direction of the airflow is consistent with the conveying direction of the material in the conveying pipeline 10. The along-the-way booster 11 and the pulse gas source valve group 13 are opened at the same time. The along-the-way booster 11 has a jetting duration of 300-500ms each time, and the interval time is 2-3s.

[0083] In a specific embodiment, the horizontal cross-section of the air inlet channel 1-10 is an ellipse, and the angle between the axis of the air inlet channel 1-10 and the axis of the connecting pipe along the opposite direction of material conveying is 15-25°.

[0084] In a specific embodiment, the connecting pipe is composed of a feed pipe section 1-2, a middle pipe section 1-8 and a discharge pipe section 1-13 which are fixedly connected in sequence, and the feed pipe section 1-2, the middle pipe section 1-8 and the discharge pipe section 1-13 are fixedly attached to each other at their adjacent end surfaces.

[0085] The adjacent end faces of the feed pipe section 1-2, the middle pipe section 1-8 and the discharge pipe are all frustum surfaces, and the angle between the generatrix of the frustum surface and the axis of the connecting pipe in the opposite direction of material conveying is 15-25°.

[0086] The end surface of the feed pipe section 1-2 adjacent to the middle pipe section 1-8 is embedded in the end surface of the middle pipe section 1-8 adjacent to it.

[0087] The end surface of the middle pipe section 1-8 adjacent to the discharge pipe section 1-13 is embedded in the end surface of the discharge pipe section 1-13 adjacent to it.

[0088] A groove is provided on one of the adjacent end faces of the feed pipe section 1-2, the middle pipe section 1-8 and the discharge pipe section 1-13, the grooves are evenly distributed along the frustum, the angle between the axes of adjacent grooves is 15-30°, the axes of the grooves are equal in length and parallel to the generatrix of the frustum, the width of the grooves is 0.3-0.4 mm, the depth of the grooves is 0.1-0.2 mm, and the existence of the grooves forms an air inlet channel 1-10 at the adjacent end faces of the feed pipe section 1-2, the middle pipe section 1-8 and the discharge pipe section 1-13.

[0089] The gas source blowing device is composed of a feed end flange 1-4, a heat-insulating shell 1-5, a gas source distribution chamber 1-7 shell, a heat-insulating shell 1-5, and a discharge end flange 1-12 connected in sequence.

[0090] The feed end flange 1-4 is tightly and fixedly connected to the heat-insulating shell 1-5, the gas source distribution chamber 1-7 shell, and the discharge end flange 1-12 at two adjacent end faces.

[0091] A closed cavity is formed between the two heat-insulating shells 1-5 and the outer wall of the connecting pipe, and the closed cavity is filled with heat-insulating materials 1-6.

[0092] A closed gas source distribution chamber 1-7 is formed between the gas source distribution chamber 1-7 shell and the inner wall of the connecting pipe, and the gas source distribution chamber 1-7 is communicated with the air inlet channel 1-10 on the connecting pipe.

[0093] The outer wall of the end of the feed pipe section 1-2 of the connecting pipe away from the middle pipe section 1-8 is provided with a convex ring structure 1-1.

[0094] The outer wall of the end of the discharge pipe section 1-13 of the connecting pipe away from the middle pipe section 1-8 also has a convex ring structure 1-1.

[0095] The feed end flange 1-4 and the discharge end flange 1-12 are both limitedly sleeved on the outer wall of the connecting pipe through the convex ring structure 1-1, forming a closed fixed connection with the connecting pipe.

[0096] Seal rings 1-3 are respectively arranged between the feed end flange 1-4 and the discharge end flange 1-12 and the convex ring structure 1-1.

[0097] When the along-the-way booster 11 is working, the along-the-way booster gas source valve group 14 sprays nitrogen to the gas source distribution chamber 1-7 through the booster gas source intake short pipe 3, and the nitrogen in the gas source distribution chamber 1-7 enters the connecting pipe from the intake channel 1-10 on the connecting pipe under the action of gas pressure.

[0098] In a specific embodiment, the connecting pipe is made of wear-resistant silicon carbide.

[0099] In a specific embodiment, when the pressure transmitter 7 monitors that the gas pressure is higher than 0.48-0.5MPa, it proves that blockage has occurred in the conveying pipeline 10. At this time, it is necessary to close the plug-forming gas source valve group 6, open the clearing gas source valve group 29, and introduce pulsed high-pressure nitrogen into the conveying pipeline 10. The pulse intake time is 300-500ms, and the intake interval is 1-2s. At the same time, all the along-the-way boosters 11 on the conveying pipeline 10 are opened. The along-the-way boosters 11 have a jet duration of 300-500ms each time, and the interval time is 2-3s. Clearing is performed until the gas pressure in the conveying pipeline 10 drops below 0.4-0.42MPa. After the conveying pipeline 10 is successfully cleared, the plug-forming gas source valve group 6 is reopened to resume normal material transportation, and the clearing gas source valve group 29 is interconnected with the straight pipe sections 4-8 of the triclinic tube.

[0100] In a specific embodiment, the steps of nitrogen entering the gas recovery device 23 through the gas recovery pipeline 22 for recovery treatment are as follows:

[0101] The gas recovery device 23 includes a multi-tube water cooling device 2-4, a dust collector 2-5, a gas buffer tank 2-6, and a conveying gas pressurizing device 2-7 which are interconnected in sequence.

[0102] The nitrogen is first rapidly cooled by the multi-tube water cooling device 2-4 to reduce the gas temperature to T < 180-280 ° C, and then the dust collector 2-5 is used to perform ultra-clean purification and filtration on the gas to make the dust content of the nitrogen < 5mg / Nm 3 The filtered nitrogen is introduced into the gas buffer tank 2-6, and the gas in the buffer tank is pressurized to P≥0.80-1.00MPa by the gas conveying and pressurizing device 2-7, and after being heated by the gas heating device 2-8, the nitrogen continues to be used as a pneumatically conveyed nitrogen source to enter the gas source gas pipeline 24. The gas buffer tank 2-6 is also connected to the gas source replenishing device 2-10. According to the actual operation of the system, nitrogen is regularly replenished into the gas buffer tank 2-6 through the gas source replenishing device 2-10.

[0103] In a specific embodiment, the angle formed by the axis of the curved pipe section 4-4 and the axis of the straight pipe section 4-8 along the opposite direction of material conveying is 15-20°.

[0104] Based on the above ideal embodiments of the present invention, the relevant staff can make various changes and modifications without departing from the technical concept of the present invention through the above description. The technical scope of the present invention is not limited to the contents of the specification, and its technical scope must be determined according to the scope of the claims.

Claims

1. A method for pneumatic conveying of hot direct reduced iron, characterized in that: The following steps are involved: (1) The gas-based vertical furnace (1) feeds into the feeder (8), and the hot direct reduced iron enters the feeder (8) through the discharge chute (5). When the hot direct reduced iron in the feeder (8) reaches a set feed amount, the feeding into the feeder (8) is stopped; (2) adding all the materials in the feeder (8) into the hot direct reduced iron transmitter (9), then stopping feeding into the hot direct reduced iron transmitter (9), and executing step (1) at the same time; (3) The hot direct reduced iron transmitter (9) comprises an upper material storage tank (2) and a bolt-forming transmitter which are interconnected from top to bottom, the bolt-forming generator comprises a bolt-forming material storage bin (12) and a three-angle tube which are interconnected from top to bottom, the three-angle tube comprises a straight pipe section (4-8) and a curved pipe section (4-4) which are interconnected, the curved pipe section (4-4) is interconnected with the bolt-forming material storage bin (12), the straight pipe section (4-8) is interconnected with the conveying pipeline (10), the axis of the curved pipe section (4-4) at the adjacent end faces of the straight pipe section (4-8) forms an angle of ≤20° with the axis of the straight pipe section (4-8) along the opposite direction of material conveying, and after the material enters the hot direct reduced iron transmitter (9), a material bolt is formed in the bolt-forming generator; (4) First, the bolt-forming gas source valve group (6) and the pulse gas source valve group (13) are opened. The bolt-forming gas source valve group (6) sprays nitrogen into the bolt-forming transmitter. The material in the bolt-forming transmitter is sprayed by the airflow and continuously enters the conveying pipeline (10). The pressure transmitter (7) installed on the bolt-forming gas source valve group (6) monitors the gas pressure in the conveying pipeline (10) in real time: when the gas pressure in the conveying pipeline (10) is higher than 0.4-0.42MPa, the bolt-forming gas source valve group (6) is closed and the feeding into the conveying pipeline (10) is stopped; When the gas pressure in the conveying pipeline (10) is lower than 0.28-0.3MPa, the plug-forming gas source valve group (6) is opened, and the material is continuously fed into the conveying pipeline (10). Under the action of the pulse gas source valve group (13) and the plug-forming gas source valve group (6), the hot direct reduced iron material in the hot direct reduced iron transmitter (9) continuously enters the conveying pipeline (10) for pneumatic conveying, and forms a discontinuous material plug in the conveying pipeline (10); (5) When all the materials in the upper storage tank (2) of the hot direct reduced iron transmitter (9) enter the bolt transmitter, step (2) is started; (6) The material in the conveying pipeline (10) is continuously conveyed to the solid-gas separation device (17), and the nitrogen is passed through the gas recovery pipeline (22) to the gas recovery device (23) for recovery and treatment and is continuously reused as a nitrogen gas source; (7) The material in the solid-gas separation device (17) is continuously transferred to the hot direct reduced iron storage bin (19), and the material in the hot direct reduced iron storage bin (19) is transferred to the electric arc furnace (21) through the feeding chute (20); (8) When the material in the hot direct reduced iron storage bin (19) reaches the set amount, stop executing steps (1) and (2), wait until the material in the three-slant pipe of the bolt-forming transmitter is transferred, close the bolt-forming air source valve group (6), wait until all the materials in the conveying pipeline (10) are conveyed to the hot direct reduced iron storage bin (19), close the pulse air source valve group (13), and the conveying is completed.

2. A method for pneumatic conveying of hot direct reduced iron materials according to claim 1, characterized in that: The volume of the material in the upper storage tank (2) is not less than 1 / 2, and the upper storage tank (2) cannot be filled entirely.

3. The method for pneumatic conveying of hot direct reduced iron materials according to claim 1, characterized in that: The conveying pipeline (10) is also provided with a plurality of along-the-way boosters (11), the along-the-way boosters (11) are sequentially distributed along the conveying direction of the conveying pipeline (10), and the along-the-way boosters (11) are interconnected with the conveying pipeline (10).

4. A method for pneumatic conveying of hot direct reduced iron materials according to claim 3, characterized in that: The along-the-way booster (11) comprises a connecting pipe and an air source blowing device, wherein the air source blowing device is sleeved on the outer wall of the connecting pipe, an air inlet channel (1-10) is circumferentially arranged on the connecting pipe, and the air inlet channels (1-10) are circumferentially evenly distributed on the outer wall of the connecting pipe, and the air source blowing device is connected to the along-the-way booster air source valve group (14) through a booster air source short pipe, and when the along-the-way booster air source valve group (14) is opened, the gas blowing device blows nitrogen into the connecting pipe through the air inlet channel (1-10) on the connecting pipe, and the blowing direction of the air flow is consistent with the conveying direction of the material in the conveying pipeline (10).

5. A method for pneumatic conveying of hot direct reduced iron materials according to claim 4, characterized in that: The connecting pipe is composed of a feed pipe section (1-2), a middle pipe section (1-8) and a discharge pipe section (1-13) which are fixedly connected in sequence; The adjacent end surfaces of the feed pipe section (1-2), the middle pipe section (1-8) and the discharge pipe section (1-13) are fixed by being engaged with each other through a round table surface; A groove is provided on one of the adjacent end surfaces of the feed pipe section (1-2), the middle pipe section (1-8) and the discharge pipe section (1-13), and the grooves are evenly distributed along the truncated cone surface, and the axes of the grooves are equal in length and parallel to the generatrix of the truncated cone surface, so that an air inlet channel (1-10) is formed at the adjacent end surfaces of the feed pipe section (1-2), the middle pipe section (1-8) and the discharge pipe section (1-13).

6. A method for pneumatic conveying of hot direct reduced iron materials according to claim 5, characterized in that: The connecting pipe is made of wear-resistant silicon carbide.

7. The method for pneumatic conveying of hot direct reduced iron materials according to claim 1, characterized in that: When the pressure transmitter (7) detects that the gas pressure is higher than 0.48-0.5MPa, the plugging gas source valve group (6) is closed, and the clearing gas source valve group (29) is opened to introduce pulsed high-pressure nitrogen into the conveying pipeline (10). The pulse intake time is 300-500ms, and the intake interval is 1-2s. At the same time, all the boosters (11) along the conveying pipeline (10) are opened. The duration of each jet of the boosters (11) along the conveying pipeline (10) is 300-500ms, and the interval time is 2-3s. The blockage is cleared until the gas pressure in the conveying pipeline (10) drops below 0.4-0.42MPa. After the conveying pipeline (10) is successfully cleared, the plugging gas source valve group (6) is reopened to resume normal material transportation. The clearing gas source valve group (29) is connected to the straight pipe section (4-8) of the three-angle tube.

8. The method for pneumatic conveying of hot direct reduced iron materials according to claim 1, characterized in that: The steps of nitrogen entering the gas recovery device (23) through the gas recovery pipeline (22) for recovery treatment are as follows: The nitrogen gas is first rapidly cooled by a multi-tube water cooling device (2-4) to reduce the gas temperature to T < 180-280°C, and then the gas is ultra-cleaned and filtered by a dust collector (2-5) to reduce the dust content of the nitrogen gas to < 5 mg / Nm 3 The filtered nitrogen is introduced into the gas buffer tank (2-6), the gas in the buffer tank is further increased in pressure to P≥0.80-1.00MPa by the gas conveying and pressurizing device (2-7), and after being heated by the gas heating device (2-8), the nitrogen continues to be used as a nitrogen source for pneumatic conveyance and enters the gas source gas pipeline (24). The gas buffer tank (2-6) is also connected to the gas source replenishing device (2-10). According to the actual operation of the system, nitrogen is regularly replenished into the gas buffer tank (2-6) through the gas source replenishing device (2-10).

9. A pneumatic conveying static pressure segmented pulse booster system, characterized in that: A pneumatic conveying method for hot direct reduced iron material as described in any one of claims 1 to 8 is used.

Citation Information

Patent Citations

  • Phase-change gas-containing powder material pipeline conveying anti-blocking device and phase-change gas-containing powder material pipeline conveying anti-blocking method

    CN116461994A

  • Integrated pulse air conveyer

    CN201485073U

  • Pulse conveying pump with forced plug formation device

    CN203392504U

  • Pulse air conveying pump

    CN205471632U

  • Pulse type external air supply aluminum oxide conveying device

    CN212475282U

Cited By

  • Safe and quality-guaranteeing recycling system and method for HDRI powder

    CN121776487A