Method for simulating and reinforcing floating damage of mucky coast glass fiber reinforced plastic pipeline
By simulating the dynamic process of floating up the fiberglass pipes in silt, monitoring the floating support force and using telescopic springs and alloy pipe clamps to reinforce the structure, the problems of floating and damage of pipelines in silted coasts are solved, and the safety and stability of the pipeline and construction efficiency are achieved. Improvement.
Patent Information
- Application Number
- CN202411180604.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2044-08-27
AI Technical Summary
In silty coasts, fiberglass pipelines are prone to deviate from the installation position or partially float due to floating support during the construction and operation periods, and are prone to impact damage, resulting in safety hazards. The existing reinforcement methods are not sufficient to deal with such accidents.
By simulating the dynamic process of the pipe floating in the silt, the changes in the floating support force are monitored, and a reinforcement method is proposed based on the measured results. The reinforcement structure is adopted for the retractable pressure spring and alloy pipe clamp reinforcement structure, and a soft connection is formed with arc-shaped high-elastic rubber to ensure that the pipe is Stability under the action of floating and support force.
Effectively monitor and prevent the dynamic process of floating up the pipeline in the silt, provide reinforcement measures, ensure the safety and stability of the pipeline during the construction and operation period, reduce the risk of fracture, and provide precise control time and load data for subsequent construction.
Smart Images

Figure CN119043650A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of water intake and drainage engineering, relates to water intake and drainage engineering on muddy coasts, and in particular to a method for simulating the floating damage of glass fiber reinforced plastic pipelines on muddy coasts and reinforcing them. Background Art
[0002] With the development of modern science and technology, all walks of life have higher and higher requirements for materials. Single material performance can no longer meet the needs of production and social development. In the muddy coastal water supply and drainage project, glass fiber reinforced plastic pipes (RPM pipes for short) have a series of advantages such as good corrosion resistance, anti-fouling, heat resistance, anti-freezing, light weight, high strength, low friction resistance, high transportation capacity, etc., and can be applied to different types of acids, alkalis, salts and a variety of oils, seawater and organic solvents. Especially in seawater, no cathodic corrosion protection and other anti-corrosion measures are required, and no secondary pollution will be caused to water and other media. In addition, its relative density is only 1.8~2.1×10 3 kg / m 3 , that is, the weight is only 1 / 3 of steel pipes or ductile iron pipes, 1 / 5 of cast iron pipes, and 1 / 10 of concrete pipes. These advantages have led to the application of FRP pipes in more and more coastal power stations and industrial discharge drainage projects. When used under good geological conditions, FRP pipes have strong adaptability to the boundary, but in muddy coasts with a large amount of mud, especially in offshore construction, when the density of FRP pipes after water injection is close to that of seawater, under the buoyancy of the water-sand mixture, it is very easy to deviate from the installation position and partially float. If piles and pipe clamps are easily used to fix the pipes at this time, since FRP pipes are mainly composed of resin, glass fiber, and silicone, they are generally brittle materials with low impact resistance. Once impacted, it is easy to cause pipe damage, or even engineering accidents such as rupture, which also brings great challenges to subsequent construction. In addition, during the operation period after the construction of the FRP pipeline is completed, in addition to the static pressure of the protective layer soil and the upper water body, it will also be subjected to external waves and water flow cyclic loads. Especially in the typhoon season, the cyclic wave load may cause the muddy seabed to liquefy and float the pipeline, directly threatening the safety of the pipeline. Therefore, it is very important to solve the floating engineering accidents that may occur in the construction and operation periods of the FRP pipeline in the muddy coast to ensure the safety of the pipeline structure. Summary of the invention
[0003] The problem to be solved by the present invention is to provide a method for simulating and reinforcing the floating damage of fiberglass reinforced plastic pipelines on muddy coasts, simulate the test conditions of pipelines during construction and operation periods, monitor the dynamic process of pipeline floating in mud over time, solve the problems in the background technology, and propose an effective reinforcement method based on the results of the measured buoyancy force, ultimately achieving the safety and stability of pipelines in muddy coasts.
[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: a method for simulating the floating damage and reinforcement of a glass fiber reinforced plastic pipeline on a muddy coast, simulating the test conditions of the pipeline during the construction period and the operation period, and monitoring the dynamic process of the pipeline floating in the mud changing with time, including the following steps:
[0005] Step 1: Determine the main test parameters, including the density and size of the FRP pipes; the number and method of placement in the foundation trench, the cross-sectional type of the foundation trench excavation, the density and siltation rate of the engineering sea area silt, the parameters of the floating stone cover layer on the pipe, the wave elements and water flow velocity in the external cyclic load, and the design water level;
[0006] Step 2: Set the scale of the model test, and design the water tank required for the test according to the scale, and equip it with corresponding functions to form a circulating flow. Set a test base trench in the middle of the water tank as the test section, and make sludge and pipes according to the test scale and put them into the test section base trench in sequence;
[0007] Step 3: Conduct a flotation failure test of the FRP pipe in the sludge to monitor the dynamic process of the pipe floating in the sludge over time. By deploying monitoring equipment in the water tank in advance, record the dynamic response of the pipe floating and the magnitude of the buoyancy force on the pipe as the sludge settling rate in the foundation trench gradually increases and the external cyclic load continues to act.
[0008] Step 4: Set up emergency reinforcement structure for the FRP pipe floating in the silt, and carry out test verification to ensure that the reinforced structure is stable.
[0009] Furthermore, in step four, a reinforcement structure is installed on the side of the construction vessel where the sand and gravel covering layer is dumped. According to the longitudinal length of the pipeline, a total of two identical reinforcement structures, namely 1# and 2#, are installed at the bow and stern of the construction vessel, forming an "n"-shaped structure, in which the middle cross bar is a freely rotating mechanical arm, and the two sides of the cross bar are designed as synchronously retractable telescopic compression springs.
[0010] Furthermore, a certain pull-out force G is set in advance for the telescopic compression spring control interface. According to the buried depth of the pipeline in the silt, the telescopic compression spring automatically moves downward to the specified height, and the pull-out force G is always kept greater than the buoyancy force F of the pipeline. A pipe clamp is set at the head of the telescopic compression spring. The calculation formula of the pull-out force G is as follows:
[0011] G = k1*γ0*S*L;
[0012] Where: G is the amplitude of the pipeline reinforcement structure, unit: kN / m; k1 is the proportionality coefficient, set to 2.63; γ0 is the gravity of water, unit: kN / m 3 , L is the spacing of different emergency pipe clamps, unit: m, S is the cross-sectional area of the pipeline, unit: m 2 .
[0013] Furthermore, the pipe clamp is an inverted "U"-shaped structure and is made of alloy material. In the range where the pipe clamp is in direct contact with the outer wall of the pipe, an arc-shaped high-elastic rubber is arranged to form a soft connection. After the backfill of the pipeline section is completed, the reinforcement structure and the construction ship are withdrawn at the same time, and the construction of the next section of the pipeline is continued with the construction ship until the pipeline laying of the entire project is completed.
[0014] Furthermore, in step one, during the operation period of the pipeline, artificial backfilling of rocks or blocks is used to cover the top of the pipeline. The backfill can be divided into three layers from bottom to top, namely, a crushed stone backfill layer 0.3m higher than the top of the pipe, a dry-mixed concrete layer and a block stone facing layer.
[0015] Furthermore, in step three, during the construction period, the test was conducted only under the influence of silt deposition in the high-sand-content water bodies in the external seawater, simulating the siltation and silting of a large amount of silt in the silty coastal seawater. The steps were as follows: the pipeline was freely placed in the foundation trench, and according to the siltation rate of the engineering area, the prepared mud-water mixture was poured at fixed intervals to observe when the thickness of the silt siltation in the foundation trench reached a certain value, at which point the pipeline would float. The initial marks set on the glass observation windows on both sides of the test water tank and the wave force collection system were used for monitoring, and the results were recorded. The analysis results were as follows: there was a fact of floating damage in the pipeline in the silt. When the thickness of the silt siltation in the foundation trench reached 0.4 m, the pipeline began to float. The dynamic process of pipeline floating was divided into four stages, namely, the initial stable stage → the slow start-up stage → the rapid floating stage → the oscillation equilibrium stable stage. The time taken for the entire floating process was counted.
[0016] Furthermore, in step three, during the construction period, the pipeline was freely placed in the foundation trench under the influence of the free sedimentation of the high-sand-content water body and the floating test group superimposed with the influence of the backfilled sediment from the artificial construction. The experimental data were observed and recorded, and it was concluded that under different mud-water mixture densities and backfilling methods, the pipeline floated. The faster the backfilling and the greater the density of the silt, the faster the pipeline floated, that is, the floating of both sides of the pipeline was greater than that of a single layer. At the same time, the buoyancy of the pipeline under different working conditions was measured and the values were recorded, and it was concluded that the force was only related to the density of the silt.
[0017] Furthermore, during the operation period, after the backfill above the pipeline in the foundation trench was completed, the test group was subjected to only external wave and current cyclic loads, and the results were observed and recorded. Under different wave heights, the pipeline did not float after being subjected to the ballasting of the upper covering layer. The conclusions were drawn: a. The buoyancy force on the pipeline is directly proportional to the wave height and period, and inversely proportional to the water depth; b. The pressure distribution on the outer wall of the pipeline is greater at the top than at the bottom, and the force on the wave-facing side is greater than the force on the wave-back side.
[0018] Furthermore, in step three, corresponding measuring and monitoring instruments and equipment are installed, including a total force sensor for measuring the buoyancy of the pipeline, a displacement meter for measuring the thickness of the sediment in the foundation trench over time, an external circulating load carrier height and water flow velocity measurement sensor, as well as a pipeline buoyancy movement measuring instrument and test image recording equipment, and test water level monitoring.
[0019] Compared with the prior art, the present invention has the following advantages and positive effects.
[0020] 1. The method of the present invention is to design a test water tank of a certain size in the laboratory to simulate the dynamic evolution of the pipeline floating in the silt during the construction period when the pipeline is in the foundation trench and a large amount of silt is silted back, and during the operation period when the FRP pipeline is covered by soil and subjected to external waves and water flow cyclic loads, and measure the change in the buoyancy during the floating period. Based on the results of the measured buoyancy, an effective reinforcement method is proposed, and the goal of safety and stability of pipelines in muddy coasts is finally achieved. The present invention not only solves practical problems in major domestic water intake and drainage projects, but also provides technical support and basic data for the widespread use of FRP pipelines with smooth inner walls, no secondary pollution, and reduced leakage and chlorine consumption in the future as people's living standards continue to improve and there are requirements for drinking water and environmental protection.
[0021] 2. The present invention simulates the sediment siltation test in seawater to determine the fact that the pipeline in the silt has a floating fracture, and further obtains that when the silt accumulation thickness in the foundation trench reaches 0.4m, the pipeline begins to float. The research results can provide a technical basis for the subsequent precise implementation of the floating node control of the pipeline in the foundation trench. The dynamic process of the pipeline floating in the silt can be divided into four stages, namely, the initial stable stage → slow start-up stage → rapid floating stage → oscillation equilibrium stable stage. It is further obtained that the time spent in the floating stage is in the range of 60min to 120min. The result can provide precise control time for the subsequent setting of the reinforcement construction period.
[0022] 3. During the simulation process of the present invention, during the construction period, the pipeline in the foundation trench is backfilled (silted) with silt of different densities and methods into the foundation trench by simulating the rate of the artificial backfill (silting) at the site. It is determined that when the backfilling method is the same and the density of the backfilled silt is large, the buoyancy force on the pipeline wall is large and the pipeline is easy to float. It is further obtained that the maximum buoyancy force on the pipeline is less than 60kN / m. The results can be used for the implementation of reinforcement measures for the subsequent pipeline and clarify the magnitude of load control.
[0023] 4. During the simulation process of the present invention, the pipeline in the foundation trench during the operation period is determined by simulating the external wave and water flow cycle load: ① The buoyancy force on the pipeline is proportional to the external wave height and period, and inversely proportional to the water depth. At the same time, the maximum buoyancy force at this time is less than 15kN / m; ② The pressure distribution on the outer wall of the pipeline has a rule that the top is greater than the bottom, and the wave-facing side is greater than the wave-back side, which also provides accurate data for the load control of the subsequent implementation of reinforcement measures.
[0024] 5. After multi-angle data detection and statistics, the present invention finally derived an empirical formula for the buoyancy of the pipeline in sludge based on the test results, which provides a reference for the construction and operation design of similar pipeline projects, and can improve the work efficiency of designers by more than 70%. This invention not only solves practical problems in major domestic water intake and drainage projects, but also provides technical support and basic data for the promotion and application of lightweight fiberglass reinforced plastic pipelines to other fields such as drinking water transportation, and is expected to produce positive social and economic benefits in related fields. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the accompanying drawings:
[0026] Figure 1 It is a test simulation method and flow chart in an embodiment of the present invention;
[0027] Figure 2 Schematic diagram of the cross section of the foundation trench excavation and the placement of pipelines during the construction period in an embodiment of the present invention; wherein; (a) is a plan view, (b) is a vertical view;
[0028] Figure 3 It is a schematic diagram of placing the glass fiber reinforced plastic pipe in the base trench during the operation period in an embodiment of the present invention;
[0029] Figure 4 Schematic diagram of the test box manufacturing and model placement in the embodiment of the present invention; wherein (a) is a plan view, and (b) is a vertical view;
[0030] Figure 5 Schematic diagram of the pipe floating up as the thickness of the silt increases in the embodiment of the present invention; wherein (a) is a schematic diagram simulating the silt deposition in the foundation trench, (b) is a schematic diagram simulating the floating up of the pipe in the foundation trench, and (c) is a schematic diagram of monitoring the floating up process of the pipe in the silt;
[0031] Figure 6 It is a schematic diagram of the floating process of the glass pipe and the relationship between the buoyancy force under the conditions of different backfill densities and sediment siltation rates in the embodiment of the present invention;
[0032] Figure 7 This is a schematic diagram of the pressure distribution at the moment when the buoyancy force on the outer side of the pipeline is maximum under the action of wave and current cyclic load in an embodiment of the present invention;
[0033] Figure 8 Schematic diagram of a novel emergency pipeline reinforcement structure proposed in an embodiment of the present invention; wherein (a) is a schematic diagram of the elevation of the novel reinforcement structure, and (b) is a schematic diagram of the plane of the novel reinforcement structure;
[0034] Fig. 9 It is a schematic diagram of a verification test of a new emergency pipeline reinforcement structure in an embodiment of the present invention.
[0036] 1. Fiberglass pipe; 2. Telescopic compression spring; 3. Cross bar; 5. Press control interface; 6. Pipe clamp; 7. Rubber pad. DETAILED DESCRIPTION
[0037] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.
[0038] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and the like are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", and the like may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.
[0039] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.
[0040] The specific embodiments of the present invention are described in detail below with reference to the accompanying drawings.
[0041] Aiming at the technical problem that lightweight FRP pipes will float and break due to adverse factors such as large amount of silt backfilling, artificial backfilling and external wave and current loads in the foundation trench of the drainage project pipeline during the construction period, the present invention proposes a method for simulating and reinforcing the floating damage of FRP pipes on muddy coasts, that is, using experimental simulation means to simulate the dynamic process of pipe floating in silt, obtain the size and distribution of the buoyancy force on the pipe, propose effective reinforcement measures, reduce the risk of pipe floating and breaking, and achieve safety and stability of lightweight FRP pipes in silt; the technology not only solves practical problems in water supply and drainage projects, but also provides technical support and basic data for the promotion and application of lightweight FRP pipes to other fields such as drinking water transportation.
[0042] The simulation and reinforcement method of the floating damage of the FRP pipeline in the muddy coast simulates the test conditions of the pipeline during the construction and operation periods, and monitors the dynamic process of the pipeline floating in the mud over time, including the following steps:
[0043] Step 1: Determine the main test parameters, including the density and size of the FRP pipe 1; the number and method of placement in the foundation trench, the cross-sectional type of the foundation trench excavation, the density and siltation rate of the engineering sea area silt, the parameters of the floating block cover layer on the pipeline, the wave elements (including wave height and period) and the water flow velocity (including flow velocity size and direction) in the external cyclic load; the design water level;
[0044] Step 2: Set the scale of the model test, and design the water tank required for the test according to the scale, and equip it with corresponding functions to form a circulating flow. Set a test base trench in the middle of the water tank as the test section, and make sludge and pipes according to the test scale and put them into the test section base trench in sequence;
[0045] Step 3: Conduct a flotation failure test of the FRP pipe in the sludge to monitor the dynamic process of the pipe floating in the sludge over time. By deploying monitoring equipment in the water tank in advance, record the dynamic response of the pipe floating and the magnitude of the buoyancy force on the pipe as the sludge settling rate in the foundation trench gradually increases and the external cyclic load continues to act.
[0046] Step 4: Set up emergency reinforcement structure for the FRP pipe floating in the silt, and carry out test verification to ensure that the reinforced structure is stable.
[0047] Preferably, in step 4, the reinforcement structure is installed on the side of the construction ship where the sand and gravel covering layer is dumped. According to the longitudinal length of the pipeline, a total of two identical reinforcement structures, namely 1# and 2#, are installed at the bow and stern of the construction ship, forming an "n"-shaped structure, in which the middle crossbar 3 is a freely rotating mechanical arm, and the two sides of the crossbar are designed as synchronously retractable telescopic compression springs 2. A coaxial hollow cylinder is arranged outside the telescopic compression spring 2 to guide and limit the telescopic compression spring 2. The lower end of the telescopic compression spring 2 close to the construction ship is arranged on the construction ship. Preferably, a certain pull-out force G is set in advance for the control interface of the telescopic compression spring. According to the buried depth of the pipeline in the silt, the telescopic compression spring automatically moves downward to the specified height, and the pull-out force G is always kept greater than the buoyancy force F of the pipeline. A pipe clamp is set at the head of the telescopic compression spring. The calculation formula of the pull-out force G is as follows:
[0048] G = k1*γ0*S*L;
[0049] Where: G is the amplitude of the pipeline reinforcement structure, unit: kN / m; k1 is the proportionality coefficient, set to 2.63; γ0 is the gravity of water, unit: kN / m 3 , L is the spacing of different emergency pipe clamps, unit: m, S is the cross-sectional area of the pipeline, unit: m 2 .
[0050] Preferably, the pipe clamp is an inverted "U"-shaped structure and is made of alloy material. An arc-shaped high-elastic rubber is arranged within the range where the pipe clamp is in direct contact with the outer wall of the pipeline to form a soft connection. After the backfill of the pipeline section is completed, the reinforcement structure and the construction vessel are withdrawn at the same time, and the construction of the next section of the pipeline is continued with the construction vessel until the pipeline laying of the entire project is completed.
[0051] Preferably, in step one, during the operation period of the pipeline, artificial backfilling of rocks or blocks is used to cover the top of the pipeline, and the backfill can be divided into three layers from bottom to top, namely, a crushed stone backfill layer 0.3m higher than the top of the pipe, a dry-mixed concrete layer and a block stone facing layer.
[0052] Preferably, in step three, the construction period test is conducted, and only the floating test group is affected by the siltation of high-sand-content water bodies in the external seawater, simulating the siltation and silting of a large amount of silt in the silty coastal seawater. The steps are as follows: the pipeline is freely placed in the foundation trench, and the prepared mud-water mixture is dumped at fixed intervals according to the siltation rate of the engineering area. It is observed that when the thickness of the silt siltation in the foundation trench reaches a certain value, the pipeline will float. The initial marks set on the glass observation windows on both sides of the test water tank and the wave force collection system are used for monitoring, and the results are recorded. The analysis results are as follows: there is a fact of floating damage in the pipeline in the silt. When the thickness of the silt siltation in the foundation trench reaches 0.4m, the pipeline begins to float. The dynamic process of pipeline floating is divided into 4 stages, namely, the initial stable stage → the slow start-up stage → the rapid floating stage → the oscillation equilibrium stable stage, and the time used for the entire floating process is counted.
[0053] Preferably, in step three, during the construction period, the pipeline is freely placed in the foundation trench under the effect of free sedimentation of high-sand-content water bodies outside, and the floating test group is superimposed on the effect of artificial backfilling of sediment. The experimental data is observed and recorded, and it is concluded that under different mud-water mixture densities and backfilling methods, the pipeline floats, and the faster the backfilling and the greater the density of the silt, the faster the pipeline floats, that is, the floating of both sides of the pipeline is greater than that of a single layer. At the same time, the buoyancy of the pipeline under different working conditions is measured and the values are recorded, and it is concluded that the force is only related to the density of the silt.
[0054] Preferably, during the operation period, after the backfill above the pipeline in the foundation trench is completed, only the test group is subjected to the external wave and current cyclic load, and the results are observed and recorded. Under the action of different wave heights, the pipeline does not float after being subjected to the ballast of the upper covering layer. It is concluded that: a. The buoyancy force on the pipeline is proportional to the wave height and period, and inversely proportional to the water depth; b. The pressure distribution on the outer wall of the pipeline is greater at the top than at the bottom, and the force on the wave-facing side is greater than the force on the wave-back side. Preferably, in step three, corresponding measuring and monitoring instruments and equipment are installed, including a total force sensor for measuring the buoyancy force on the pipeline, a displacement meter for measuring the thickness of the sediment in the foundation trench over time, an external cyclic load carrier height and water flow velocity measurement sensor, as well as a pipeline floating movement measuring instrument and test image recording equipment, and test water level monitoring.
[0055] Example:
[0056] Step 1: Determine the main test parameters: ① The density of the FRP pipe is 1.8-2.1×103kg / m3, the length of each section is 12m, and the inner diameter is The wall thickness is 7.25mm; ② The cross-section of the foundation trench excavation is as follows: the bottom elevation of the foundation trench is -8.54m, the top mud surface elevation is -3.0m, the bottom width of the foundation trench is 12.0m, the slopes on both sides are 1:2, a single A pipe is placed in the foundation trench, and the comparison test group is to place A and B pipes side by side, and the distance between the outer walls of the two pipes is 2.0m; the cross-section of the pipeline and foundation trench excavation is shown in Figure 2 ③ The parameters during the implementation of the project are: during the construction period, the density of the silt in the project sea area is ρ = 1.3 × 103 kg / m3, and the comparison test group is ρ = 1.5 × 103 kg / m3; the natural sedimentation rate of the silt in the seawater is 0.2 m / month; during the operation period of the pipeline, the pipeline is covered with artificial backfilling blocks or blocks. The backfill can be divided into three layers from bottom to top, which are 40-60 mm crushed stone backfill layer (0.3 m higher than the top of the pipe), 0.3 m thick dry mixed concrete layer and 1 m thick 250-300 kg block stone protective layer. For details, see Figure 3; ④ External cyclic load parameters, i.e. wave elements, including wave height H = 0.6m, 0.8m, 1.0m, 1.2m, 1.4m, period T = 4.5s, 5.4s, 6.3s, 7.2s, 8.0s, and water flow velocity v = 0.5m / s and 1.0m / s; ⑤ Design water level d parameter, 1.4m, 1.8m, 2.2m, 2.6m above the mud surface.
[0057] Step 2: Preparation of test facilities. Based on the basic parameters in step 1, determine that the scale of the simulated model test is 1:20. Based on this scale, design a rectangular test water tank with the dimensions of: length × width × height = 68m × 1.0m × 1.0m. Install a wave maker on one side of the water tank. It is a motor servo-driven push-plate absorption wave maker with the wave-making capacity of: maximum wave-making water depth 1.0m, wave height 0-35cm, period 0.5-5.0s. Design flow-making equipment at the other end to form a circulating flow with a maximum flow rate of 2.0m / s; and excavate a test foundation trench 32m away from the wave maker as the test section. See the layout of the test water tank and test model for details. Figure 4 The silt and pipes were made according to the test scale: ① Using a soil mixer, two types of silt (mud-water mixture) with densities ρ = 1.3 × 103 kg / m3 and 1.5 × 103 kg / m3 were made; ② According to the size and density of the FRP pipe, the pipe on the model was made, and the finished pipe and silt were placed in the test section foundation trench in turn, as shown in the figure. Figure 4 .
[0058] Step 3: Calibration and pre-test debugging of measurement and monitoring test equipment. After the model is made in step 2, the corresponding measurement and monitoring instruments and equipment are installed, including the total force sensor for measuring the buoyancy of the pipeline, the displacement meter for measuring the thickness of the sediment in the foundation trench over time, the external circulating load carrier height and water flow velocity measurement sensor, as well as the pipeline buoyancy movement measurement instrument and test image recording equipment, and the test water level monitoring.
[0059] Step 4: Conduct the test of the flotation of the FRP pipe in the silt. ① Construction period test, at this time, the pipe is placed freely in the foundation trench, and is only affected by the siltation of the high sand content water body in the external seawater. In order to simulate the siltation and siltation of a large amount of silt in the silt coastal seawater, and according to the siltation rate of the project area of 0.2m / month, a 1500ml container is used on the model, and the prepared mud-water mixture is poured every 3 minutes. See the details. Figure 5 (a) Observe when the thickness of the sediment in the foundation trench reaches a certain value, then the pipeline will float up. At this time, the initial mark set on the glass observation windows on both sides of the test water tank and the wave force collection system are used for monitoring. For details, see Figure 5(b)(c), the results recorded by the monitoring equipment show that: as the silt deposition rate increases, the pipeline in the silt gradually undergoes a floating damage event. Therefore, this test verifies the fact that the pipeline in the silt has floating damage, and further finds that when the thickness of the silt deposition in the foundation trench reaches 0.4m, the pipeline begins to float. At the same time, the pipeline floating dynamic process can be divided into 4 stages, namely the initial stable stage → slow start stage → rapid floating stage → oscillation equilibrium stable stage. The entire floating process takes 60min to 120min, which also provides precise control time for the specific implementation of subsequent reinforcement measures.
[0060] ② During the construction period, the pipeline was placed freely in the foundation trench. At this time, it was not only affected by the free sedimentation of the high-sand-content water body outside, but also superimposed with the artificial construction backfill sediment to speed up the progress. Figure 6 It can be seen from the force on the pipeline that the pipeline also floats. The faster the backfilling and the greater the density of the silt, the faster the pipeline floats, that is, the floating of both sides of the pipeline is greater than that of a single layer. At the same time, the buoyancy force values of the pipeline under different working conditions are measured and shown in Table 1. From the results in the table, it can be seen that the force is only related to the density of the silt. The maximum buoyancy force measured is less than 60kN / m. The results can be used for the subsequent reinforcement measures of the pipeline and clarify the magnitude of load control;
[0061] Table 1 Comparison of stress results of FRP pipes with different densities and backfilling methods
[0062]
[0063]
[0064] ③ During the operation period, after the backfill above the pipeline in the foundation trench was completed, the test group was only subjected to the external wave and current cyclic load. Under the action of different wave heights, it was observed from the test that the pipeline did not float up after being subjected to the ballast of the upper covering layer, which was also verified by the engineering site examples. At this time, the pipeline force results were measured and shown in Table 2, and the distribution of the pressure around the pipe wall is shown in Figure 7 From the results in the figure and table, we can see that: a. The buoyancy force on the pipeline is proportional to the wave height and period, and inversely proportional to the water depth, and the maximum buoyancy force is less than 15kN / m; b. The pressure distribution on the outer wall of the pipeline has the rule that the top is greater than the bottom, and the wave-facing side is greater than the wave-back side, which also provides precise control of the load for the subsequent implementation of reinforcement measures;
[0065] In order to further prove the possibility of pipeline floating, the test results of pipeline buoyancy force were obtained, and the force balance analysis of the pipeline was carried out, that is, the buoyancy force and the dead weight of the pipeline + the dead weight of the covering layer were verified. The weight of the FRP pipe given by the design is 1.8t / m, and the underwater weight is 0.8t / m, and the backfill stone (Note: The underwater weight of the stone is 7.0kN / m 3 The weight of the ballast pipeline part under the orientation of the rocks in the foundation trench is 39.32t / m. The maximum buoyancy force on the pipeline under different test groups is 1.5-3.0t / m, which is less than the sum of the weight of the underwater FRP pipe and the backfill rocks, 40.12t / m. Therefore, it can be obtained that the pipeline can remain stable under the protection of backfill rocks, which is consistent with the test results.
[0066] Table 2 Results of maximum wave force on pipeline under different wave heights
[0067]
[0068] Step 5: Based on the buoyancy force and distribution of the pipeline obtained in step 4, a new emergency measure to strengthen the structure was proposed for the floating event of the FRP pipeline during construction in the silt. Figure 8As can be seen from the figure: ① The entire reinforcement structure can be directly installed on the side of the construction ship where the sand and gravel covering layer is dumped. At this time, the safety of the pipeline can be ensured while the construction is in progress, which not only saves costs but also speeds up the construction progress. The implementation process of the entire reinforcement structure is as follows: first, according to the longitudinal length of the pipeline, a total of two identical reinforcement structure devices (i.e., 1# and 2#, see the figure mark) are installed at the bow and stern of the construction ship. The entire reinforcement structure device is similar to an "n" shape, in which the middle cross bar is a freely rotating mechanical arm, and the two sides of the cross bar are designed to be synchronously retractable telescopic compression springs 2. For the telescopic compression springs 2 installed on the side of the ship, in order to resist the buoyancy F of the pipeline in the silt, it is necessary to set a certain pull-out force G in advance for the press control interface 5 of the telescopic compression spring. The magnitude of the pull-out force is calculated based on the length L of the pipeline placed during construction and the results of the test measurement, that is, the maximum buoyancy force on the pipeline is 60kN / m, and the pull-out force G is calculated. The formula is G = L * 60kN / m. After setting the G value, its telescopic compression spring 2 will automatically move downward to the specified height according to the buried depth of the pipeline in the silt, and always keep the pull-out force G greater than the buoyancy force F of the pipeline, thereby ensuring the stability of the pipeline; ② For installation on the pipeline side, an inverted "U"-shaped alloy material pipe clamp 6 is set at the head of its compression spring, and its width is 1.0m along the longitudinal direction of the pipeline. The "U"-shaped height design can include 2 / 3 of the outer diameter of the pipeline. At the same time, because the lightweight glass fiber reinforced plastic pipe is brittle, a 20cm thick arc-shaped high-elastic rubber pad 7 is set within the range of direct contact between the pipe clamp 6 and the outer wall of the pipeline to form a soft connection, thereby further maintaining the safety and stability of the pipeline. ③ When the backfill soil of the pipeline section is completed, that is, the ballast weight of the backfill soil meets the requirements for pipeline stability, the new reinforcement structure is withdrawn at the same time as the construction ship, and the construction of the next section of the pipeline section is continued with the construction ship until the pipeline of the entire project is laid.
[0069] (2) Model test verification of the reinforcement structure was carried out. In order to verify the effectiveness of the proposed reinforcement structure, a corresponding physical model test verification was carried out. That is, in the test water tank, a pipe clamp with a certain G value set in advance was used to restrict the pipes in the foundation trench. The stability under the continuous action of sediment deposition and external cyclic loads was tested. The model test results are shown in Fig. 9 The verification test results show that no matter the pipeline is in a free state during the construction period or in an operating state, under the continuous long-term action of external sediment deposition and cyclic loads, the glass pipe in the silt can remain stable under the action of the newly proposed emergency reinforcement structure.
[0070] (3) The empirical calculation formula for the pull-out force G of the new reinforcement structure was derived. In order to prevent the pipeline from floating up and causing uneven longitudinal force, which may lead to pipeline rupture accidents, a certain number of pull-out piles need to be designed in the longitudinal direction of the pipeline. The pull-out force values of the piles with different spacings depend on the buoyancy force on the pipeline and the combined force of its own weight and the water in the pipeline. However, it is often difficult to determine the value of the buoyancy force. From the test results, it can be seen that the buoyancy force can be taken as the maximum value of the buoyancy force of the pipeline to achieve dynamic equilibrium during the construction period of the test and the overall buoyancy force under the action of waves. For the convenience of engineering use, the empirical formula for the pull-out pile force value is derived based on the above buoyancy test results as follows:
[0071] G = k1*γ0*S*L;
[0072] Where: G is the amplitude of the pipeline reinforcement structure (kN / m); k1 is the proportionality coefficient, which is 2.63 calculated from the test data; L is the spacing of different emergency pipe clamps (m); S is the cross-sectional area of the pipeline (m 2 ).
[0073] According to the derived empirical formula, when the distance L between two adjacent emergency pipe clamps and the cross-sectional area S of the pipeline are known in engineering, the above empirical formula can be substituted to obtain the G value of the pipeline reinforcement structure. After G is input into the telescopic compression spring control interface, the pipeline reinforcement function can be realized. Therefore, this achievement not only ensures the safety of the pipeline, but also directly improves the work efficiency of designers by 70%.
[0074] In summary, the present invention, by simulating the floating test of lightweight FRP pipes in silt, reveals the fact that there are floating fractures in the pipes in silt, and further clarifies the conclusions that the floating node begins when the silt thickness reaches 0.4m, the floating time is within 120min, and the maximum buoyancy during the floating process is within 60kN / m. The test results can provide technical support for the subsequent precise control of the floating events of lightweight FRP pipes. At the same time, a new emergency reinforcement measure and method is proposed, and an empirical calculation formula for the pull-out force G of the new reinforcement structure is derived. The model test verifies that the effect is significant. This measure ensures the stability and safety of the pipes in the silt, and improves the work efficiency of the designers. Therefore, this invention not only solves the practical problem of floating of muddy coastal pipes in water intake and drainage projects, but also provides technical support for the promotion and application of lightweight FRP pipes to other fields. It is expected to produce positive social and economic benefits in related fields.
[0075] Although the preferred embodiments of the patent are described above in conjunction with the accompanying drawings, this patent is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of this patent, ordinary technicians in this field can also make many forms without departing from the scope of protection of the purpose of this patent and the claims, all of which fall within the scope of protection of this patent.
Claims
1. The method for simulating the flotation damage and reinforcement of FRP pipelines on muddy coasts simulates the test conditions of pipelines during construction and operation, and monitors the dynamic process of pipeline flotation in mud over time. It is characterized by: The following steps are included: Step 1: Determine the main test parameters, including the density and size of the FRP pipes; the number and method of placement in the foundation trench, the cross-sectional type of the foundation trench excavation, the density and siltation rate of the engineering sea area silt, the parameters of the floating stone cover layer on the pipe, the wave elements and water flow velocity in the external cyclic load, and the design water level; Step 2: Set the scale of the model test, and design the water tank required for the test according to the scale, and equip it with corresponding functions to form a circulating flow. Set a test base trench in the middle of the water tank as the test section, and make sludge and pipes according to the test scale and put them into the test section base trench in sequence; Step 3: Conduct a flotation failure test of the FRP pipe in the sludge to monitor the dynamic process of the pipe floating in the sludge over time. By deploying monitoring equipment in the water tank in advance, record the dynamic response of the pipe floating and the magnitude of the buoyancy force on the pipe as the sludge settling rate in the foundation trench gradually increases and the external cyclic load continues to act. Step 4: Set up emergency reinforcement structure for the FRP pipe floating in the silt, and carry out test verification to ensure that the reinforced structure is stable.
2. The method for simulating and reinforcing the floating damage of glass fiber reinforced plastic pipelines on muddy coasts according to claim 1 is characterized in that: In step 4, the reinforcement structure is installed on the side of the construction vessel where the sand and gravel covering layer is dumped. According to the longitudinal length of the pipeline, a total of two identical reinforcement structures, namely 1# and 2#, are installed at the bow and stern of the construction vessel to form an "n"-shaped structure, in which the middle crossbar is a freely rotating mechanical arm, and the two sides of the crossbar are designed as synchronously retractable telescopic compression springs.
3. The method for simulating and reinforcing the floating damage of glass fiber reinforced plastic pipelines on muddy coasts according to claim 2 is characterized in that: A certain pull-out force G is set in advance for the telescopic compression spring control interface. According to the buried depth of the pipeline in the silt, the telescopic compression spring automatically moves downward to the specified height, and always keeps the pull-out force G greater than the buoyancy force F of the pipeline. A pipe clamp is set at the head of the telescopic compression spring. The calculation formula of the pull-out force G is as follows: G = k1*γ0*S*L; Where: G is the amplitude of the pipeline reinforcement structure, unit: kN / m; k1 is the proportionality coefficient, set to 2.63; γ0 is the gravity of water, unit: kN / m 3 , L is the spacing of different emergency pipe clamps, unit: m, S is the cross-sectional area of the pipeline, unit: m 2 .
4. The method for simulating and reinforcing the floating damage of glass fiber reinforced plastic pipelines on muddy coasts according to claim 3 is characterized in that: The pipe clamp is an inverted "U"-shaped structure made of alloy material. In the range where the pipe clamp is in direct contact with the outer wall of the pipeline, an arc-shaped high-elastic rubber is set to form a soft connection. After the backfill of the pipeline section is completed, the reinforcement structure and the construction ship are withdrawn at the same time, and the construction of the next section of the pipeline will continue with the construction ship until the pipeline laying of the entire project is completed.
5. The method for simulating and reinforcing the floating damage of glass fiber reinforced plastic pipelines on muddy coasts according to claim 1 is characterized in that: In step one, during the operation period of the pipeline, artificial backfilling of rocks or blocks is used to cover the top of the pipeline. The backfill can be divided into three layers from bottom to top, namely, a crushed stone backfill layer 0.3m higher than the top of the pipe, a dry-mixed concrete layer and a block stone facing layer.
6. The method for simulating and reinforcing the floating damage of glass fiber reinforced plastic pipelines on muddy coasts according to claim 1 is characterized in that: In step three, the construction period test, only the floating test group affected by the siltation of high-sand water bodies in the external seawater, simulates the siltation and silting of a large amount of silt in the silty coastal seawater. The steps are as follows: the pipeline is freely placed in the foundation trench, and according to the siltation rate of the project area, the prepared mud and water mixture is dumped at fixed intervals to observe when the thickness of the silt siltation in the foundation trench reaches a certain value, and the pipeline will float. The initial marks set on the glass observation windows on both sides of the test water tank and the wave force collection system are used for monitoring and recording the results. The analysis results are as follows: the pipeline in the silt has the fact of floating damage. When the thickness of the silt siltation in the foundation trench reaches 0.4m, the pipeline begins to float. The dynamic process of pipeline floating is divided into 4 stages, namely, the initial stable stage → slow start-up stage → rapid floating stage → oscillation equilibrium stable stage, and the time used for the entire floating process is counted.
7. The method for simulating and reinforcing the floating damage of glass fiber reinforced plastic pipelines on muddy coasts according to claim 1 is characterized in that: In step three, during the construction period, the pipeline was freely placed in the foundation trench under the influence of free sedimentation of high-sand-content water bodies from the outside and the floating test group was superimposed on the influence of backfilling sediment from artificial construction. The experimental data were observed and recorded, and it was concluded that under different mud-water mixture densities and backfilling methods, the pipeline floated. The faster the backfilling and the greater the density of the silt, the faster the pipeline floated, that is, the floating of both sides of the pipeline was greater than that of a single layer. At the same time, the buoyancy of the pipeline under different working conditions was measured and the values were recorded, and it was concluded that the force was only related to the density of the silt.
8. The method for simulating and reinforcing the floating damage of glass fiber reinforced plastic pipelines on muddy coasts according to claim 1 is characterized by: During the operation period, after the backfill above the pipeline in the foundation trench was completed, the test group was subjected to only external wave and current cyclic loads, and the results were observed and recorded. Under different wave heights, the pipeline did not float after being subjected to the ballasting of the upper covering layer. The conclusions were drawn: a. The buoyancy force on the pipeline is proportional to the wave height and period, and inversely proportional to the water depth; b. The pressure distribution on the outer wall of the pipeline is greater at the top than at the bottom, and the force on the wave-facing side is greater than the force on the wave-back side.
9. The method for simulating and reinforcing the floating damage of glass fiber reinforced plastic pipelines on muddy coasts according to claim 1 is characterized in that: In step three, install the corresponding measuring and monitoring instruments and equipment, including the total force sensor for measuring the buoyancy of the pipeline, the displacement meter for measuring the thickness of the sediment in the foundation trench over time, the external circulating load carrier height and water flow velocity measurement sensor, as well as the pipeline buoyancy movement measurement instrument and test image recording equipment, and the test water level monitoring.
Citation Information
Patent Citations
Device for measuring buoyancy force of glass steel tube in water tank
CN108534943A
Model test device for simulating anti-floating effect of anchor rod of shield tunnel
CN214748841U
Fixing device for preventing glass reinforced plastic pipe from floating upwards during concrete pouring
CN217105835U
Steel cable hovering type immersed tunnel
CN221461273U
Improvements in marine HOSE with floats
GB1277364A
Cited By
Submarine pipeline trench backfilling process simulation device and method under different complex natural conditions
CN121499006A