Seismic wave cross-hole tomography detection boulder stratum underground diaphragm wall and construction method

Through seismic wave cross-hole tomography detection technology and beaded locust formation blasting pre-decomposition punching technology, combined with the blasting hole pressure relief and air exhaust covering at the top of the blasting hole and the square hammer brush wall cleaning technology, the problem of underground continuous wall construction in complex locust formations is solved, and efficient and stable construction results are achieved.

CN119843646AActive Publication Date: 2025-04-18HANGZHOU JIANGRUN TECH LIMITED +1
6 Cites 1 Cited by

Patent Information

Application Number
CN202510315318.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-18
Publication Date
2025-04-18
Estimated Expiration
2045-03-18

AI Technical Summary

Technical Problem

In complex lone stone formations, the construction of underground continuous walls is difficult, which makes it difficult to ensure the construction progress and quality, and traditional processes are difficult to adapt to the requirements of high vibration control and displacement settlement.

Method used

Seismic wave cross-hole tomography detection technology is used to form dense detection paths by burying PE tubes to calculate and deduce the distribution of lonely stones; then blasting pre-decomposition punching of beaded locust strata, and pressure relief and air discharge covering technology of the top opening of the blasting hole and square hammer brush wall cleaning technology are used to ensure the safety and quality of construction.

Benefits of technology

It realizes efficient detection and treatment of the lonely stone formation, improves the progress of underground continuous wall trough formation, reduces construction difficulty, and ensures the stability of the trough wall and construction quality.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention relates to a seismic wave cross-hole tomography detection boulder stratum underground diaphragm wall and a construction method. The construction method comprises the following steps of boulder detection, blasting pre-decomposition punching of a bead-shaped boulder stratum, pressure and air release covering of a top opening of a blasting hole, and wall brushing and groove cleaning through a square hammer. The method has the advantages that the seismic wave cross-hole tomography equipment is utilized, dense detection paths are formed in the measurement area, then the boulder distribution condition in the measurement area is calculated and deduced, the method has the advantages of being good in reliability, high in intuition and high in accuracy, and efficient and high-quality diaphragm wall construction is guaranteed; the blasting hole drilling construction is performed after the boulder position information in the diaphragm wall range is detected, and then the explosive is loaded according to a discontinuous method, that is, the explosive is only placed at the boulder position, so that the purpose of pre-blasting decomposition is achieved, the grooving progress is greatly improved, the construction difficulty is reduced, and the stability of the groove wall is effectively guaranteed.