Method for quickly replacing tundish with high-carbon steel in slab continuous casting
By controlling the matching of the tonnage of the middle bag and the casting speed and the adjustment of the cooling water flow of the crystallizer, the problems of tail billets and joint billets during continuous casting of high-carbon steel are solved, and the stability and production capacity of the fast replacement of high-carbon steel is achieved.
Patent Information
- Application Number
- CN202510669338.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-05-23
- Publication Date
- 2025-08-15
AI Technical Summary
During the continuous casting of high-carbon steel, the tail blank is prone to falling off when the casting is stopped normally, and there is a problem of the joint steel or the cast blank not leaving during the quick replacement of the middle bag, which affects the operating rate and production capacity of the casting machine.
By controlling the matching of the tonnage of the middle package and the casting speed, including slowly reducing and increasing the casting pulling speed, and adjusting the cooling water flow rate of the wide and narrow surface of the crystallizer, we ensure that the surface of the high-carbon steel casting billet is uniformly cooled and avoiding local cooling transitions and excessive shrinkage.
The stability of the fast replacement of high-carbon steel in the middle is achieved, the problems of block dropping and joint blanks are solved, and the operation rate and economic benefits of the casting machine are improved.