A kind of uninterruptible power supply automatic operation simulation verification device

By designing a continuous electric self-initiating operation simulation verification device, using voltage air opening and circuit control technology, the problem of disassembly and separation of the self-initiating device in the existing technology is solved, and the calibration without power outage is achieved The verification sum visually displays the verification results, improving the detection efficiency.

CN110412390BActive Publication Date: 2024-12-03YINCHUAN POWER SUPPLY COMPANY OF STATE GRID NINGXIA ELECTRIC POWER
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN201910815823.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-08-30
Publication Date
2024-12-03
Estimated Expiration
2039-08-30

AI Technical Summary

Technical Problem

The fixed inspection of the self-injection device in the prior art requires disassembly and separation for offline inspection, and the circuit breaker jump and closing test cannot be performed in the operating equipment, and the switch position is not intuitively displayed, which limits the progress of simulation experiments.

Method used

A continuous electrical self-loading operation simulation verification device is designed, and the secondary voltage is collected through the voltage of bus No. I and bus No. II, combined with voltage loss detection, DC control, AC control and timing circuit, it can achieve the When interfering with the busbar operation, the self-projection device is checked and the signal light is used to display the results.

Benefits of technology

The self-projection device is detected without power outage, which simplifies the verification process, improves the detection efficiency, and displays the results through the signal light to visually display the verification results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110412390B_ABST
    Figure CN110412390B_ABST
Patent Text Reader

Abstract

The present invention proposes a non-interruptible standby automatic switching operation simulation verification device, comprising a primary voltage circuit breaker of bus No. I, a secondary voltage circuit breaker of bus No. I, a primary voltage circuit breaker of bus No. II, a secondary voltage circuit breaker of bus No. II, and a verification instrument. The standby automatic switching device collects the secondary voltage of bus No. I through the primary voltage circuit breaker of bus No. I, and collects the secondary voltage of bus No. II through the primary voltage circuit breaker of bus No. II. The verification instrument is connected in series with the secondary voltage circuit breaker of bus No. I to collect the secondary voltage of bus I. The verification instrument is connected in series with the secondary voltage circuit breaker of bus No. II to collect the secondary voltage of bus II. The verification instrument, the secondary voltage circuit breaker of bus No. I, the secondary voltage circuit breaker of bus No. II and the standby automatic switching device are connected in parallel. The present invention can be verified at any time without interfering with the work or load of bus No. 1 and bus No. 2, and the secondary voltage circuit breaker of bus No. I is used to isolate the standby automatic switching and the verification device from the bus, without power outage detection.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of electric power technology, and in particular to an uninterruptible power supply type standby automatic operation simulation verification device. Background Art

[0002] Due to the constraints of the system operation mode, the switches involved in the backup automatic switching device are all operating equipment, and once tripped, power will be lost. When the backup automatic switching device is switching, the program action executed inside the backup automatic switching device is: the loss of pressure action of the backup automatic switching device being disconnected from bus No. 1, and then the switching action of connecting to bus No. 2; or the loss of pressure action of the backup automatic switching device being disconnected from bus No. 2, and then the switching action of connecting to bus No. 1. Although these two action processes are very fast, they also take time, for example, 2-3s. In order to regularly test the backup automatic switching device, it is necessary to simulate the internal program of the backup automatic switching device. However, due to the limitations of the operating equipment, the device is not allowed to perform circuit breaker tripping and closing tests, and the positions of each switch cannot be displayed intuitively.

[0003] In the prior art, the solution for regular inspection of the standby automatic start-up device is to disassemble and separate the standby automatic start-up device from the operating equipment. The disadvantage of this method is that it uses offline detection. Summary of the invention

[0004] It is necessary to propose a non-stop standby automatic operation simulation verification device.

[0005] A non-stop standby automatic switching operation simulation verification device comprises a No. I bus primary voltage circuit breaker, a No. I bus secondary voltage circuit breaker, a No. II bus primary voltage circuit breaker, a No. II bus secondary voltage circuit breaker, and a verification instrument. The standby automatic switching device collects the secondary voltage of the No. I bus through the No. I bus primary voltage circuit breaker, collects the secondary voltage of the No. II bus through the No. II bus primary voltage circuit breaker, the verification instrument is connected in series with the No. I bus secondary voltage circuit breaker to collect the secondary voltage of the No. I bus, the verification instrument is connected in series with the No. II bus secondary voltage circuit breaker to collect the secondary voltage of the No. II bus, and the verification instrument, the No. I bus secondary voltage circuit breaker, the No. II bus secondary voltage circuit breaker and the standby automatic switching device are connected in parallel;

[0006] The calibration instrument is internally provided with a pressure loss detection circuit, a DC control circuit, an AC control circuit, a display circuit, and a timing circuit. The pressure loss detection circuit includes a first pressure loss relay and a second pressure loss relay. The first pressure loss relay is connected to the No. I bus secondary voltage circuit breaker to synchronize with the No. I bus secondary voltage circuit breaker, and the second pressure loss relay is connected to the No. II bus secondary voltage circuit breaker ZK21 to synchronize with the No. II bus secondary voltage circuit breaker ZK21.

[0007] The DC control circuit is externally connected to a DC power supply. The DC control circuit includes a first DC relay, a second DC relay, and a third DC relay. The normally open node of the first DC relay is connected to the normally open node of the first pressure loss relay, the normally open node of the second DC relay is connected to the normally open node of the second pressure loss relay, and the normally open node of the third DC relay is connected to the node of the standby automatic switching disconnector.

[0008] The timing circuit includes a first time relay, a second time relay, and a third time relay. The first time relay is connected to the first pressure loss relay, and the first time relay is also connected to the No. 1 busbar cut-off node of the standby automatic transfer. The second time relay is connected to the second pressure loss relay, and the second time relay is also connected to the No. 2 busbar cut-off node of the standby automatic transfer. The third time relay is connected to both the first pressure loss relay and the second pressure loss relay, and the third time relay is also connected to the disconnecting switch node of the standby automatic transfer.

[0009] The AC control circuit is externally connected to AC power, and the AC control circuit includes a first AC relay, a second AC relay, and a third AC relay. The first AC relay, the second AC relay, and the third AC relay are respectively connected to the first DC relay, the second DC relay, and the third DC relay to operate synchronously with the first DC relay, the second DC relay, and the third DC relay. The display circuit includes signal light No. 1 red, signal light No. 1 green, signal light No. 2 red, signal light No. 2 green, signal light No. 3 red, and signal light No. 3 green. The normally closed contact of the first AC relay is connected to signal light No. 1 red, the normally open contact of the first AC relay is connected, the normally closed contact of the second AC relay is connected to signal light No. 2 red, the normally open contact of the second AC relay is connected to signal light No. 2 green, the normally closed contact of the third AC relay is connected to signal light No. 3 green, and the normally open contact of the third AC relay is connected to signal light No. 3 red, so as to realize synchronous display of the signal lights.

[0010] Preferably, the first DC relay, the second DC relay and the third DC relay are self-holding relays.

[0011] The present invention can be verified at any time without interfering with the work or load of bus No. 1 and bus No. 2, and the secondary voltage circuit breaker of bus No. 1 is used to isolate the standby automatic switching and verification device from the bus, without the need for power outage detection. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 This is a schematic diagram of a non-stop standby automatic operation simulation verification device.

[0013] Figure 2 To calibrate the internal circuit diagram of the instrument.

[0014] Figure 3 This is the DC control circuit diagram.

[0015] Figure 4 This is the AC control circuit diagram.

[0016] Figure 5 To display the circuit diagram.

[0017] In the figure: bus No. I primary voltage circuit breaker ZK1, bus No. I secondary voltage circuit breaker ZK11, bus No. II primary voltage circuit breaker ZK2, bus No. II secondary voltage circuit breaker ZK21, disconnect switch ZK3, first undervoltage relay SY1, second undervoltage relay SY2, first DC relay ZJ1, second DC relay ZJ2, third DC relay ZJ3, first AC relay JJ1, second AC relay JJ2, third AC relay JJ3. DETAILED DESCRIPTION

[0018] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0019] An embodiment of the present invention provides an uninterruptible standby automatic switching operation simulation verification device, which is characterized by: comprising a primary voltage circuit breaker ZK1 of bus No. I, a secondary voltage circuit breaker ZK11 of bus No. I, a primary voltage circuit breaker ZK2 of bus No. II, a secondary voltage circuit breaker ZK21 of bus No. II, and a verification instrument. The standby automatic switching device collects the secondary voltage of bus No. I through the primary voltage circuit breaker ZK1 of bus No. I, and collects the secondary voltage of bus No. II through the primary voltage circuit breaker ZK2 of bus No. II. The verification instrument is connected in series with the secondary voltage circuit breaker ZK11 of bus No. I to collect the secondary voltage of bus I. The verification instrument is connected in series with the secondary voltage circuit breaker ZK21 of bus No. II to collect the secondary voltage of bus II. The verification instrument, the secondary voltage circuit breaker ZK11 of bus No. I, the secondary voltage circuit breaker ZK21 of bus No. II are connected in parallel with the standby automatic switching device; Figure 1 ;

[0020] The calibration instrument is internally provided with a pressure loss detection circuit, a DC control circuit, an AC control circuit, a display circuit, and a timing circuit. The pressure loss detection circuit includes a first pressure loss relay SY1 and a second pressure loss relay SY2. The first pressure loss relay SY1 is connected to the No. I bus secondary voltage circuit breaker ZK11 to synchronize with the No. I bus secondary voltage circuit breaker ZK11, and the second pressure loss relay SY2 is connected to the No. II bus secondary voltage circuit breaker ZK21 to synchronize with the No. II bus secondary voltage circuit breaker ZK21; Figure 2 ;

[0021] The DC control circuit is connected to an external DC power supply (for example, it can be drawn from the panel of the stopped device), and the DC control circuit includes a first DC relay ZJ1, a second DC relay ZJ2, and a third DC relay ZJ3. The normally open node of the first DC relay ZJ1 is connected to the normally open node of the first pressure loss relay SY1 to detect the pressure loss action of bus No. 1, the normally open node of the second DC relay ZJ2 is connected to the normally open node of the second pressure loss relay SY2 to detect the pressure loss action of bus No. 2, and the normally open node of the third DC relay ZJ3 is connected to the node of the standby automatic switch ZK3 to detect the action of the standby automatic switch being connected to bus No. 1 or bus No. 2; Figure 3 ;

[0022] The timing circuit includes a first time relay, a second time relay, and a third time relay. The first time relay is connected to the first pressure loss relay SY1 to receive the pressure loss signal of bus No. 1, thereby starting the first time relay to start the timing action. The first time relay is also connected to the No. 1 bus cut-off node of the standby automatic switch to receive the action signal of the automatic switch to cut off bus No. 1, thereby pausing the timing action of the first time relay, thereby realizing the recording of the action time from the standby automatic switch to determine the pressure loss of bus No. 1 to the tripping of the first-level voltage circuit breaker ZK1 of bus No. 1. After the whole action is completed once, it is maintained until the maintenance personnel record the time and disconnect the FG reset button to restore to the original state. The second time relay is connected to the second pressure loss relay SY2 to receive the pressure loss signal of bus No. 2, thereby starting the second time relay to start the timing action. The second time relay is also connected to The No. 2 busbar of the standby automatic switch is cut off and connected to the node to receive the action signal of the automatic switch to cut off the No. 2 busbar, thereby suspending the timing action of the second time relay, thereby realizing the recording of the action time from the standby automatic switch to determine the loss of pressure on the No. 2 busbar to the tripping of the primary voltage circuit breaker ZK2 of the No. II busbar. The third time relay is connected to the first pressure loss relay SY1 and the second pressure loss relay SY2 to receive the pressure loss signal of the No. 1 busbar or the pressure loss signal of the No. 2 busbar synchronously with the first time relay and the second time relay, thereby starting the timing. The third time relay is also connected to the disconnecting switch ZK3 node of the standby automatic switch to receive the action information of the standby automatic switch being connected to the No. 1 busbar or the No. 2 busbar, thereby suspending the timing action of the third time relay; the third time relay records the total time from the standby automatic switch to determine the loss of pressure to the final closing of the disconnecting switch ZK3 to complete the input of the standby power supply; Figure 2 ;

[0023] The AC control circuit is connected to an external AC power supply, and the AC control circuit includes a first AC relay JJ1, a second AC relay JJ2, and a third AC relay JJ3. The first AC relay JJ1, the second AC relay JJ2, and the third AC relay JJ3 are connected to the first DC relay ZJ1, the second DC relay ZJ2, and the third DC relay ZJ3, respectively, so as to operate synchronously with the first DC relay ZJ1, the second DC relay ZJ2, and the third DC relay ZJ3. The display circuit includes a red signal light No. 1 and a red signal light No. 1. Green, No. 2 signal light red, No. 2 signal light green, No. 3 signal light red, No. 3 signal light green, the normally closed contact of the first AC relay JJ1 is connected to the No. 1 signal light red, the normally open contact of the first AC relay JJ1 is connected, the normally closed contact of the second AC relay JJ2 is connected to the No. 2 signal light red, the normally open contact of the second AC relay JJ2 is connected to the No. 2 signal light green, the normally closed contact of the third AC relay JJ3 is connected to the No. 3 signal light green, and the normally open contact of the third AC relay JJ3 is connected to the No. 3 signal light red, so as to realize the synchronous display of the signal lights. Figure 4 , 5 .

[0024] The present invention can be verified at any time without interfering with the work or load of bus No. 1 and bus No. 2, and the secondary voltage circuit breaker ZK11 of bus No. 1 is used to isolate the standby automatic switching and verification device from the bus, without the need for power outage detection.

[0025] In the present invention, the loss of pressure on bus No. 1 and bus No. 2 is simulated by operating the disconnection of the primary voltage circuit breaker ZK1 of bus No. I and the primary voltage circuit breaker ZK2 of bus No. II. Then, before the standby automatic switch is put into use, it is necessary to disconnect the control circuit breaker of the pressure-losing bus for a second time. Although the standby automatic switch is isolated in this experiment, the internal logic process of the standby automatic switch is still being executed. Therefore, when the experimenter disconnects to simulate bus No. 1 and bus No. 2, the standby automatic switch synchronously detects the bus pressure loss. This signal triggers the internal logic of the standby automatic switch. The standby automatic switch operates according to the internally set time constant. When the standby bus is connected, it is necessary to confirm again that the pressure-losing bus has been disconnected. Therefore, the standby automatic switch still issues an action to trip the primary voltage circuit breaker ZK1 of bus No. I, but the primary voltage circuit breaker ZK1 of bus No. I in this device is not actually executed. This process is to allow the standby automatic switch to simulate the process of its own logic work, so as to detect the time of the standby automatic switch switching.

[0026] Furthermore, the first DC relay ZJ1, the second DC relay ZJ2, and the third DC relay ZJ3 are self-holding relays.

[0027] The modules or units in the device of the embodiment of the present invention may be combined, divided or deleted according to actual needs.

[0028] What is disclosed above is only a preferred embodiment of the present invention, which certainly cannot be used to limit the scope of rights of the present invention. A person skilled in the art can understand that all or part of the processes of the above embodiments and equivalent changes made according to the claims of the present invention still fall within the scope of the invention.

Claims

1. A non-stop standby automatic operation simulation verification device, characterized in that: It includes a primary voltage circuit breaker for bus No. I, a secondary voltage circuit breaker for bus No. I, a primary voltage circuit breaker for bus No. II, a secondary voltage circuit breaker for bus No. II, and a calibration instrument. The backup automatic switching device collects the secondary voltage of bus No. I through the primary voltage circuit breaker for bus No. I, and collects the secondary voltage of bus No. II through the primary voltage circuit breaker for bus No. II. The calibration instrument is connected in series with the secondary voltage circuit breaker for bus No. I to collect the secondary voltage of bus I. The calibration instrument is connected in series with the secondary voltage circuit breaker for bus No. II to collect the secondary voltage of bus II. The calibration instrument, the secondary voltage circuit breaker for bus No. I, the secondary voltage circuit breaker for bus No. II and the backup automatic switching device are connected in parallel; The calibration instrument is internally provided with a pressure loss detection circuit, a DC control circuit, an AC control circuit, a display circuit, and a timing circuit. The pressure loss detection circuit includes a first pressure loss relay and a second pressure loss relay. The first pressure loss relay is connected to the No. I bus secondary voltage circuit breaker to synchronize with the No. I bus secondary voltage circuit breaker, and the second pressure loss relay is connected to the No. II bus secondary voltage circuit breaker to synchronize with the No. II bus secondary voltage circuit breaker; The DC control circuit is externally connected to a DC power supply. The DC control circuit includes a first DC relay, a second DC relay, and a third DC relay. The normally open node of the first DC relay is connected to the normally open node of the first pressure loss relay, the normally open node of the second DC relay is connected to the normally open node of the second pressure loss relay, and the normally open node of the third DC relay is connected to the node of the standby automatic switching disconnector. The timing circuit includes a first time relay, a second time relay, and a third time relay. The first time relay is connected to the first pressure loss relay to receive the pressure loss signal of bus No. 1, thereby starting the first time relay to start the timing action. The first time relay is also connected to the No. 1 bus cut-off node of the standby automatic switch to receive the action signal of the standby automatic switch to cut off the No. 1 bus, thereby suspending the timing action of the first time relay; the second time relay is connected to the second pressure loss relay to receive the pressure loss signal of bus No. 2, thereby starting the second time relay to start the timing action. The second time relay is also connected to the No. 2 bus cut-off node of the standby automatic switch to receive the action signal of the standby automatic switch to cut off the No. 2 bus, thereby suspending the timing action of the second time relay; the third time relay is connected to both the first pressure loss relay and the second pressure loss relay to synchronously receive the No. 1 bus pressure loss signal or the No. 2 bus pressure loss signal with the first time relay and the second time relay, thereby starting the timing. The third time relay is also connected to the disconnecting switch node of the standby automatic switch to receive the action information of the standby automatic switch being connected to bus No. 1 or bus No. 2, thereby suspending the timing action of the third time relay; The AC control circuit is connected to an external AC power, and the AC control circuit includes a first AC relay, a second AC relay, and a third AC relay. The first AC relay, the second AC relay, and the third AC relay are respectively connected to the first DC relay, the second DC relay, and the third DC relay to operate synchronously with the first DC relay, the second DC relay, and the third DC relay. The display circuit includes signal light No. 1 red, signal light No. 1 green, signal light No. 2 red, signal light No. 2 green, signal light No. 3 red, and signal light No. 3 green. The normally closed contact of the first AC relay is connected to signal light No. 1 red, the normally open contact of the first AC relay is connected, the normally closed contact of the second AC relay is connected to signal light No. 2 red, the normally open contact of the second AC relay is connected to signal light No. 2 green, the normally closed contact of the third AC relay is connected to signal light No. 3 green, and the normally open contact of the third AC relay is connected to signal light No. 3 red, so as to realize the synchronous display of the signal lights.

2. A non-interruptible automatic standby operation simulation verification device, characterized in that: The first DC relay, the second DC relay and the third DC relay are self-holding relays.

Citation Information

Patent Citations

  • Verification device for operation logic and switching tripping and closing time-delay fixed value of spare power automatic switching device

    CN105182134A

  • Uninterruptible power type spare power automatic switching operation simulation verification device

    CN210863900U