A method and device for determining coupling relationship of ultra-high voltage AC and DC transmission capacity of receiving end system

The method and device address the lack of unified calculation for AC/DC transmission capacity in UHV grids by determining AC and DC power limits under DC faults, enhancing safety and stability through conservative operation mode analysis and constraint satisfaction.

CN111969636BActive Publication Date: 2024-12-06STATE GRID CORPORATION OF CHINA +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010730821.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-07-27
Publication Date
2024-12-06
Estimated Expiration
2040-07-27

AI Technical Summary

Technical Problem

There is no unified calculation method for the coupling relationship of AC and DC transmission capacity of large UHV AC/DC hybrid power grids under DC faults, leading to safety and stability issues such as UHV AC line disconnection, steady-state low voltage, and power angle instability.

Method used

A method and device for determining the coupling relationship of ultra-high voltage AC and DC transmission capabilities by analyzing the sensitivity of the AC/DC hybrid receiving-end power grid, adopting a conservative operation mode, and calculating AC and DC power limits under different DC fault scenarios while satisfying safety and stability constraints.

Benefits of technology

Enables efficient calculation of AC and DC transmission capacity coupling relationships, improving safety and stability, reducing manpower and material resources, and providing optimal security control strategies.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111969636B_ABST
    Figure CN111969636B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and device for determining the coupling relationship of ultra-high voltage AC and DC transmission capacity of a receiving end system, which solves the problem of the need for a method for calculating the coupling relationship of ultra-high voltage AC and DC transmission capacity of a receiving end system constrained by a DC fault. When the ultra-high voltage AC and DC receiving end system is constrained by a DC fault, the AC and DC transmission capacity coupling relationship can be calculated to determine the AC and DC transmission power, which can significantly improve the calculation efficiency, save manpower and material resources, and create obvious economic benefits.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of safe and stable operation of power grids, and specifically to a method for determining the coupling relationship of ultra-high voltage AC and DC transmission capabilities of a receiving system, and also to a device for determining the coupling relationship of ultra-high voltage AC and DC transmission capabilities of a receiving system. Background Art

[0002] With the large-scale development of UHV DC, power shock caused by DC faults has become a key factor affecting the safe and stable operation of the power system. With the continuous increase in UHV DC power, after a disturbance or lockout fault occurs in UHV DC, large-scale power will be transferred through the UHV AC section, causing the UHV AC line to produce a heavy current load phenomenon, and even exceed the static stability limit or thermal stability limit of the AC line, resulting in the disconnection of the AC line. Large-scale power transfer may lead to steady-state low voltage of the UHV AC busbar and the AC busbar of the receiving end main grid, and may also cause problems such as power angle instability and frequency oscillation in the UHV AC / DC system.

[0003] In order to avoid safety and stability issues such as UHV AC line disconnection or steady-state low voltage of UHV AC busbars and AC busbars of receiving-end main grid caused by DC faults, it is necessary to set limits on DC transmission power and AC section transmission power. However, in the simulation calculation of actual power grids, there is no unified calculation method for the coupling relationship of AC and DC transmission capacity of large UHV AC / DC hybrid power grids under DC faults. It is urgent to study the calculation method of the coupling relationship of UHV AC / DC transmission capacity of receiving-end systems constrained by DC faults. Summary of the invention

[0004] In order to solve the problem of the need for a method for calculating the coupling relationship of ultra-high voltage AC and DC transmission capacity of a receiving system constrained by DC faults. The present application provides a method for determining the coupling relationship of ultra-high voltage AC and DC transmission capacity of a receiving system, comprising:

[0005] Determining the ultra-high voltage AC and DC power of the AC / DC hybrid receiving-end power grid under the initial operation mode of the power grid;

[0006] Calculate the coupling relationship of AC and DC transmission capacity and the UHV AC and DC power limits of the power grid under any DC fault while satisfying different UHV DC system safety and stability constraints;

[0007] The AC / DC transmission capacity coupling relationship and the UHV AC / DC power of the power grid are calculated under different DC faults while satisfying the safety and stability constraints of the UHV AC / DC system.

[0008] Preferably, determining the ultra-high voltage AC and DC power of the AC / DC hybrid receiving-end power grid under the initial operation mode of the power grid includes:

[0009] By analyzing the sensitivity of the AC / DC hybrid receiving-end power grid, it is determined that the power grid adopts a conservative operation mode;

[0010] Under the conservative operation mode, the UHV AC power of the power grid is determined to be P AC0 、UHV DC power is P DC0 .

[0011] Preferably, calculating the coupling relationship of AC and DC transmission capabilities and the UHV AC and DC power limits of the power grid under any DC fault while satisfying different UHV DC system safety and stability constraints includes:

[0012] Under any DC fault, when the AC / DC safety and stability constraint condition i (i=1, 2, 3, ..., n) is met, the UHV AC / DC has no coupling constraint transmission capacity relationship; at this time, the UHV AC power of the power grid is P AC0 、UHV DC power is P DC0 ;

[0013] Under any DC fault, when the AC / DC safety and stability constraint condition i (i=1, 2, 3, ..., n) is not met, there is a coupling constraint transmission capacity relationship between the UHV AC and DC; under the coupling constraint transmission capacity relationship between the UHV AC and DC, the UHV AC power remains unchanged, and the UHV DC power is reduced. When the AC / DC safety and stability constraint condition i (i=1, 2, 3, ..., n) is met, the UHV AC power of the AC / DC hybrid receiving-end power grid is determined to be P AC0 、UHV DC power is P DCi ; Under the condition that there is a coupling constraint on the transmission capacity of UHV AC and DC, the UHV DC power remains unchanged, and the UHV AC power is reduced. When the AC and DC safety and stability constraint condition i (i = 1, 2, 3, ..., n) is met, the UHV AC power of the AC / DC hybrid receiving-end power grid is determined to be P ACi 、UHV DC power is P DC0 .

[0014] Preferably, it also includes:

[0015] Under any DC fault, if the mode flow satisfies the AC / DC safety and stability constraint condition i (i = 1, 2, 3, ..., n), the UHV AC / DC has no coupling constraint transmission capacity relationship; at this time, the UHV AC power of the power grid is P AC0 、UHV DC power is P DC0 ;

[0016] Under any DC fault, if the mode power flow does not meet the AC / DC safety and stability constraint condition i (i = 1, 2, 3, ..., n), the UHV AC / DC power during pre-control is P AC0 ,min{P DC1,P DC2 ,…,P DCn}, when pre-controlling UHV AC power, the UHV AC and DC power is min{P AC1 ,P AC2 ,…,P ACn},P DC0 ; Under any DC fault, if the safety and stability constraints from 1 to i are satisfied, and the safety and stability constraints from i+1 to n are not satisfied, the safety and stability constraints from i+1 to n lead to the existence of coupling constraints on the transmission capacity of the UHV AC and DC. When the UHV DC power is pre-controlled, the UHV AC and DC power is P AC0 ,min{P DCi+1 ,P DCi+2 ,…,P DCn}, when pre-controlling UHV AC power, the UHV AC and DC power is min{P ACi+1 ,P ACi+2 ,…,P ACn},P DC0 .

[0017] Preferably, it also includes:

[0018] Under any DC fault, when the AC / DC safety and stability constraint condition i (i = 1, 2, 3, ..., n) is met, if there is no coupling restriction on the transmission capacity of the UHV AC / DC, the UHV AC / DC power is P AC0 , P DC0 ;

[0019] If there is a coupling relationship between UHV AC and DC that restricts the transmission capacity, the AC power P AC0 When P is unchanged, DCj =min{P DC1 ,P DC2 ,…,P DCn} or P DCj =min{P DCi+1 ,P DCi+2 ,…,P DCn}, the DC power needs to be reduced to P DCj , the UHV AC / DC power is P AC0 , P DCj ; DC power P DC When P is unchanged, ACj =min{P AC1 ,P AC2 ,…,P ACn} or P ACj =min{P ACi+1 ,P ACi+2 ,…,P ACn}, then the AC power needs to be reduced to P ACj , the UHV AC / DC power is P ACj, P DC0 .

[0020] Preferably, calculating the AC / DC transmission capacity coupling relationship and the UHV AC / DC power of the power grid under different DC faults while satisfying the safety and stability constraints of the UHV AC / DC system includes:

[0021] Calculate the power grid under different DC faults, the mode flow meets the UHV AC / DC safety and stability constraint condition i (i = 1, 2, 3, ..., n), and when there are m DC faults, if there is no coupling restriction on the transmission capacity of the UHV AC / DC, the UHV AC / DC power is P AC0 , P DC0 ;

[0022] If there is a coupling relationship between UHV AC and DC that restricts the transmission capacity, the AC power P AC0 When the DC power is constant, the DC power needs to be reduced to The UHV AC / DC power is P AC0 , DC power P DC0 When it remains unchanged, the AC power needs to be reduced to The UHV AC / DC power is P DC0 .

[0023] The present application also provides a device for determining coupling relationship of ultra-high voltage AC and DC transmission capabilities of a receiving-end system, comprising:

[0024] An initial operation mode determination unit determines the ultra-high voltage AC and DC power of the AC / DC hybrid receiving-end power grid under the initial operation mode of the AC / DC hybrid receiving-end power grid;

[0025] A coupling relationship and limit calculation unit, which calculates the coupling relationship of AC and DC transmission capacity and the UHV AC and DC power limits of the power grid under any DC fault while satisfying different UHV DC system safety and stability constraints;

[0026] The coupling relationship and limit calculation unit calculates the AC / DC transmission capacity coupling relationship and the UHV AC / DC power of the power grid under different DC faults while satisfying the safety and stability constraints of the UHV AC / DC system.

[0027] Preferably, the initial operation mode determination unit includes:

[0028] The operation mode determination subunit determines that the power grid adopts a conservative operation mode by analyzing the sensitivity of the AC / DC hybrid receiving-end power grid;

[0029] The AC / DC power determination subunit determines the ultra-high voltage AC power of the power grid as P under the conservative operation mode. AC0 、UHV DC power is PDC0 .

[0030] Preferably, the coupling relationship and limit calculation unit includes:

[0031] The AC / DC power determination subunit, under any DC fault, satisfies the AC / DC safety and stability constraint condition i (i=1, 2, 3, ..., n), and the UHV AC / DC has no coupling constraint transmission capacity relationship; at this time, the UHV AC power of the power grid is P AC0 、UHV DC power is P DC0 ;

[0032] The AC / DC power determination subunit, under any DC fault, when the AC / DC safety and stability constraint condition i (i=1, 2, 3, ..., n) is not met, the UHV AC / DC has a coupling constraint transmission capacity relationship; under the coupling constraint transmission capacity relationship of the UHV AC / DC, the UHV AC power remains unchanged, the UHV DC power is reduced, and when the AC / DC safety and stability constraint condition i (i=1, 2, 3, ..., n) is met, the UHV AC power of the AC / DC hybrid receiving-end power grid is determined to be P AC0 、UHV DC power is P DCi ; Under the condition that there is a coupling constraint on the transmission capacity of UHV AC and DC, the UHV DC power remains unchanged, and the UHV AC power is reduced. When the AC and DC safety and stability constraint condition i (i = 1, 2, 3, ..., n) is met, the UHV AC power of the AC / DC hybrid receiving-end power grid is determined to be P ACi 、UHV DC power is P DC0 .

[0033] Preferably, the coupling relationship and limit calculation unit includes:

[0034] The AC / DC power determination subunit calculates that the power grid meets the UHV AC / DC safety and stability constraint condition i (i=1, 2, 3, ..., n) under different DC faults, and when there are m DC faults, if there is no coupling restriction on the transmission capacity of the UHV AC / DC, the UHV AC / DC power is P AC0 , P DC0 ;

[0035] AC and DC power determination subunit, if there is a coupling restriction between the UHV AC and DC transmission capacity, the AC power P AC0 When the DC power is constant, the DC power needs to be reduced to The UHV AC / DC power is DC power P DC0 When it remains unchanged, the AC power needs to be reduced to The UHV AC / DC power is P DC0 . BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 It is a flow chart of a method for determining coupling relationship of ultra-high voltage AC and DC transmission capacity of a receiving-end system provided by the present application;

[0037] Figure 2 It is a schematic diagram of the calculation process of the coupling relationship of the ultra-high voltage AC and DC transmission capacity of the receiving system under a certain DC fault constraint and under a certain ultra-high voltage AC and DC safety and stability constraint condition provided by the present application;

[0038] Figure 3 This is a schematic diagram of a Qing-Yu DC receiving system provided by this application;

[0039] Figure 4 It is a schematic diagram of a device for determining the coupling relationship of ultra-high voltage AC and DC transmission capabilities of a receiving-end system provided in the present application. DETAILED DESCRIPTION

[0040] Many specific details are described in the following description to facilitate a full understanding of the present application. However, the present application can be implemented in many other ways than those described herein, and those skilled in the art can make similar generalizations without violating the connotation of the present application, so the present application is not limited by the specific implementation disclosed below.

[0041] Figure 1 This is a flow chart of a method for determining the coupling relationship of ultra-high voltage AC and DC transmission capacity of a receiving system provided by the present application. Figure 1 The method provided in this application is described in detail.

[0042] Step S101, determining the ultra-high voltage AC and DC power of the AC / DC hybrid receiving-end power grid under the initial operation mode of the power grid.

[0043] Problems such as the transfer of power flow in UHV AC / DC lines after a DC fault, steady-state low voltage of the AC busbar in the UHV AC busbar and the DC receiving-end main grid are related to many factors, such as DC power level, reactive power compensation method, nearby line power flow, unit operating status, safety control and generator cutting strategy, etc. By analyzing the sensitivity of the AC / DC hybrid receiving-end power grid, it is determined that the power grid adopts a conservative operating mode to ensure that various possibilities are covered.

[0044] In the initial operation mode, the load level of the DC receiving end, the power level of the UHV AC line section, the power level of the AC line section and the DC line section at the DC receiving end under study should be considered;

[0045] Considering the severe mode, after the static stability limit of the UHV AC bus is determined, the static stability reserve factor K calculated according to the power angle criterion is p The lower limit should be 15%;

[0046] Considering the severe conditions, the bus voltage at the key nodes of the 500kV voltage level (the reference voltage is 525kV, the same below) of the UHV AC bus should be reduced to 0.95-0.96pu, and the AC bus voltage at the key nodes of 500kV after the DC fault should be maintained above 0.9pu;

[0047] DC faults include bipolar lockout, commutation failure acceleration section verification, bipolar restart failure, etc. The safety and control strategies include modulation and other DC power related to the receiving end, cutting off the DC receiving end load and other measures.

[0048] Under the conservative operation mode, the UHV AC power of the power grid is determined to be P AC0 、UHV DC power is P DC0 .

[0049] Step S102, calculating the coupling relationship of AC and DC transmission capabilities and the UHV AC and DC power limits of the power grid under any DC fault while satisfying different UHV DC system safety and stability constraints.

[0050] Under any DC fault, when the AC / DC safety and stability constraint condition i (i=1, 2, 3, ..., n) is met, the UHV AC / DC has no coupling constraint transmission capacity relationship; at this time, the UHV AC power of the power grid is P AC0 、UHV DC power is P DC0 .

[0051] Under any DC fault, when the AC / DC safety and stability constraint condition i (i=1, 2, 3, ..., n) is not met, there is a coupling relationship between the UHV AC and DC that restricts the transmission capacity. In this case, it is necessary to pre-control the UHV DC power or the UHV AC power.

[0052] Pre-control of UHV DC power: In the initial operation mode, the UHV AC power remains unchanged, and the UHV DC power is reduced. After the power flow of the new mode converges, the transient stability calculation under the DC fault is re-performed to determine whether the simulation results meet the safety and stability constraint condition i. If not, the UHV DC power is further reduced until the safety and stability constraint condition i is met. The UHV AC and DC power at this time is determined to be P AC0 , P DCi ;

[0053] Pre-control of UHV AC power: In the initial operation mode, the UHV DC power remains unchanged, and the UHV AC power is reduced. After the power flow of the new mode converges, the transient stability calculation under the DC fault is re-performed to determine whether the simulation results meet the safety and stability constraint condition i. If not, the UHV AC power is further reduced until the safety and stability constraint condition i is met. The UHV AC and DC power at this time is determined to be P ACi , P DC0 .

[0054] Under any DC fault, whether the mode power flow meets all safety and stability constraints can be divided into three cases:

[0055] (a) When all safety and stability constraints are met, it means that the UHV AC and DC have no coupling constraints on the transmission capacity under the DC fault. The UHV AC and DC power is P AC0 , P DC0 ;

[0056] (b) When all safety and stability constraints are not met, it means that each safety and stability constraint under the DC fault will lead to a coupling relationship between the UHV AC and DC that restricts the transmission capacity. At this time, the UHV AC and DC power is P when the UHV DC power is pre-controlled. AC0 ,min{P DC1 ,P DC2 ,…,P DCn}, when pre-controlling UHV AC power, the UHV AC and DC power is min{P AC1 ,P AC2 ,…,P ACn},P DC0 .

[0057] (c) When the safety and stability constraints from 1 to i are satisfied, but the safety and stability constraints from i+1 to n are not satisfied, it means that the safety and stability constraints from i+1 to n under this DC fault will lead to a coupling relationship between the UHV AC and DC that restricts the transmission capacity. At this time, the UHV AC and DC power is P when the UHV DC power is pre-controlled. AC0 ,min{P DCi+1 ,P DCi+2 ,…,P DCn}, when pre-controlling UHV AC power, the UHV AC and DC power is min{P ACi+1 ,P ACi+2 ,…,P ACn},P DC0 .

[0058] Under any DC fault, when the AC / DC safety and stability constraint condition i (i = 1, 2, 3, ..., n) is met, if there is no coupling restriction on the transmission capacity of the UHV AC / DC, the UHV AC / DC power is P AC0 , P DC0 ;

[0059] If there is a coupling relationship between UHV AC and DC that restricts the transmission capacity, the AC power P AC0 When P is unchanged, DCj =min{P DC1 ,P DC2 ,…,P DCn} or P DCj =min{P DCi+1 ,PDCi+2 ,…,P DCn}, the DC power needs to be reduced to P DCj , the UHV AC / DC power is P AC0 , P DCj ; DC power P DC When P is unchanged, ACj =min{P AC1 ,P AC2 ,…,P ACn} or P ACj =min{P ACi+1 ,P ACi+2 ,…,P ACn}, then the AC power needs to be reduced to P ACj , the UHV AC / DC power is P ACj , P DC0 .

[0060] Step S103, calculating the AC / DC transmission capacity coupling relationship and the UHV AC / DC power of the power grid under different DC faults while satisfying the safety and stability constraints of the UHV AC / DC system.

[0061] According to whether there is a coupling-constrained transmission capacity relationship when UHV AC / DC meets the safety and stability constraints under DC faults, it can be divided into the following two cases:

[0062] (a) When there is no coupling constraint on transmission capacity, the UHV AC / DC power is P AC0 , P DC0 .

[0063] (b) When there is a coupling constraint on the transmission capacity, the AC power P AC0 When P is unchanged, DCj =min{P DC1 ,P DC2 ,…,P DCn} or P DCj =min{P DCi+1 ,P DCi+2 ,…,P DCn}, the DC power needs to be reduced to P DCj , the UHV AC / DC power is P AC0 , P DCj ; DC power P DC When P is unchanged, ACj =min{P AC1 ,P AC2 ,…,P ACn} or P ACj =min{P ACi+1 ,P ACi+2 ,…,P ACn}, then the AC power needs to be reduced to PACj , the UHV AC / DC power is P ACj , P DC0 .

[0064] Under the security control measures, the AC / DC transmission capacity coupling relationship under the security control measures can be calculated according to step S102 and step S103 to determine the UHV AC / DC power. Then, the effects of different security control measures are analyzed to provide the optimal security control strategy.

[0065] Will attach Figure 2 The calculation process can be applied to the engineering practice of calculating the coupling relationship of ultra-high voltage AC and DC transmission capacity of the receiving system constrained by DC faults, which can constitute the best implementation example for specific applications.

[0066] by Figure 3 Taking the Qing-Yu DC receiving-end system shown in the figure as an example, a method for calculating the coupling relationship of the ultra-high voltage AC / DC transmission capacity of a receiving-end system constrained by a DC fault proposed in the present invention is described.

[0067] Step 1: Determine the initial operation mode: Henan load 40 million kilowatts, Qinghai-Henan DC dual-low 4 million kilowatts, Tianzhong DC 6.5 million kilowatts, Changnan Line southward transmission 4.2 million kilowatts, Hubei to Henan 300,000 kilowatts.

[0068] In the initial mode, the power transmitted to the south of the Changnan Line is 4.2 million kilowatts. The 500kV bus voltages in Changzhi, Nanyang and Jingmen are 500kV, 505kV and 505kV respectively. Under DC fault, the 500kV bus voltages in Changzhi, Nanyang and Jingmen should not be lower than 0.9pu.

[0069] Step 2: Calculate the coupling relationship between Qingyu DC and Changnan Line under the DC bipolar blocking fault, while satisfying the constraints of Changnan Line not being disconnected and Changnanjing not being under voltage.

[0070] Under the initial operation mode, the Changnan Line will not be decoupled; considering that the steady-state voltage of the 500kV busbars in Changzhi, Nanyang and Jingmen is not less than 0.9pu, and the Qinghai-Henan DC is 4 million kilowatts, it is necessary to pre-control the Changnan Line's southward transmission power to no more than 3.5 million kilowatts; the Changnan Line's southward transmission power is 4.2 million kilowatts, and it is necessary to pre-control the Qinghai-Henan DC transmission power to 3.5 million kilowatts.

[0071] In summary: considering the bipolar locking fault, when the two constraints of Changnan Line not being decoupled and Changnanjing not having low voltage are met, there is a coupling relationship between Qingyu DC and Changnan Line: Qingyu DC is 4 million kilowatts, and it is necessary to pre-control the Changnan Line's southward transmission power to not exceed 3.5 million kilowatts; Changnan Line's southward transmission power is 4.2 million kilowatts, and it is necessary to pre-control the Qingyu DC transmission power to 3.5 million kilowatts.

[0072] Step 3: Calculate the coupling relationship between the Qinghai-Henan DC and the Changnan Line under the conditions that the Qinghai-Henan DC is locked after four consecutive commutation failures, and the bipolar fails to restart after two full voltages and one reduced voltage, while satisfying the constraints that the Changnan Line is not decoupled and the Changnan-Jingjing Line is not under-voltage.

[0073] Considering the lockout fault after four consecutive commutation failures of the Qinghai-Henan DC, when the two constraints of not de-energizing the Changnan Line and not reducing the voltage of the Changnan-Jingdong Line are met, there is a coupling relationship between the Qinghai-Henan DC and the Changnan Line: the Qinghai-Henan DC is 4 million kilowatts, and the power transmitted to the south by the Changnan Line needs to be pre-controlled to not exceed 4 million kilowatts; the power transmitted to the south by the Changnan Line is 4.2 million kilowatts, and the power transmitted to the south by the Qinghai-Henan DC needs to be pre-controlled to 3.5 million kilowatts.

[0074] Considering the Qinghai-Henan DC bipolar fault of two full voltage and one voltage reduction and restart failure, when the two constraints of Changnan Line not being decoupled and Changnan-Jingding not being under voltage are met, there is a coupling relationship between the Qinghai-Henan DC and the Changnan Line: the Qinghai-Henan DC is 4 million kilowatts, and the Changnan Line's southward transmission power needs to be pre-controlled to not exceed 3.9 million kilowatts; the Changnan Line's southward transmission power is 4.2 million kilowatts, and the Qinghai-Henan DC transmission power needs to be pre-controlled to 3.6 million kilowatts.

[0075] In summary: considering bipolar lockout, lockout after 4 consecutive commutation failures, and bipolar 2 full voltage and 1 voltage reduction restart failure faults, when the two constraints of Changnan Line not being decoupled and Changnan Jing not having low voltage are met, there is a coupling relationship between Qingyu DC and Changnan Line: Qingyu DC has a capacity of 4 million kilowatts, and it is necessary to pre-control the Changnan Line's southward transmission power to no more than 3.5 million kilowatts; Changnan Line's southward transmission power is 4.2 million kilowatts, and it is necessary to pre-control the Qingyu DC transmission power to 3.5 million kilowatts.

[0076] Step 4: Under the control measures of the 1 million kW Three Gorges DC, calculate the coupling relationship between the Qinghai-Henan DC and the Changnan Line under the conditions of bipolar blocking, blocking after four consecutive commutation failures, and bipolar two full voltage and one reduced voltage restart failure, while satisfying the constraints of no decoupling of the Changnan Line and no low voltage of the Changnan-Jingjing Line.

[0077] In the initial operation mode, after the 1 million kW safety control measures of the Three Gorges DC were adjusted, the Qingyu DC experienced bipolar blocking, blocking after 4 consecutive commutation failures, and bipolar 2 full voltage 1 voltage reduction restart failure. The simulation results showed that the Changnan line was not decoupled and the Changnanjing line was not undervoltage. This shows that in this case, there is no coupling relationship between the Qingyu DC and the Changnan line.

[0078] Based on the same inventive concept, the present application also provides a device for determining the coupling relationship of the ultra-high voltage AC and DC transmission capabilities of the receiving system, such as Figure 4 As shown, including:

[0079] The initial operation mode determining unit 410 determines the ultra-high voltage AC and DC power of the AC / DC hybrid receiving-end power grid under the initial operation mode of the power grid;

[0080] A coupling relationship and limit calculation unit 420 is configured to calculate the coupling relationship of AC and DC transmission capabilities and the UHV AC and DC power limits of the power grid under any DC fault while satisfying different UHV DC system safety and stability constraints;

[0081] The coupling relationship and limit calculation unit 430 calculates the AC / DC transmission capacity coupling relationship and the UHV AC / DC power of the power grid under different DC faults while satisfying the safety and stability constraints of the UHV AC / DC system.

[0082] Preferably, the initial operation mode determination unit includes:

[0083] The operation mode determination subunit determines that the power grid adopts a conservative operation mode by analyzing the sensitivity of the AC / DC hybrid receiving-end power grid;

[0084] The AC / DC power determination subunit determines the ultra-high voltage AC power of the power grid as P under the conservative operation mode. AC0 、UHV DC power is P DC0 .

[0085] Preferably, the coupling relationship and limit calculation unit includes:

[0086] The AC / DC power determination subunit, under any DC fault, satisfies the AC / DC safety and stability constraint condition i (i=1, 2, 3, ..., n), and the UHV AC / DC has no coupling constraint transmission capacity relationship; at this time, the UHV AC power of the power grid is P AC0 、UHV DC power is P DC0 ;

[0087] The AC / DC power determination subunit, under any DC fault, when the AC / DC safety and stability constraint condition i (i=1, 2, 3, ..., n) is not met, the UHV AC / DC has a coupling constraint transmission capacity relationship; under the coupling constraint transmission capacity relationship of the UHV AC / DC, the UHV AC power remains unchanged, the UHV DC power is reduced, and when the AC / DC safety and stability constraint condition i (i=1, 2, 3, ..., n) is met, the UHV AC power of the AC / DC hybrid receiving-end power grid is determined to be P AC0 、UHV DC power is P DCi ; Under the condition that there is a coupling constraint on the transmission capacity of UHV AC and DC, the UHV DC power remains unchanged, and the UHV AC power is reduced. When the AC and DC safety and stability constraint condition i (i = 1, 2, 3, ..., n) is met, the UHV AC power of the AC / DC hybrid receiving-end power grid is determined to be P ACi 、UHV DC power is P DC0 .

[0088] Preferably, the coupling relationship and limit calculation unit includes:

[0089] The AC / DC power determination subunit calculates that the power grid meets the UHV AC / DC safety and stability constraint condition i (i=1, 2, 3, ..., n) under different DC faults, and when there are m DC faults, if there is no coupling restriction on the transmission capacity of the UHV AC / DC, the UHV AC / DC power is P AC0 , P DC0 ;

[0090] AC and DC power determination subunit, if there is a coupling restriction between the UHV AC and DC transmission capacity, the AC power P AC0 When the DC power is constant, the DC power needs to be reduced to The UHV AC / DC power is DC power P DC0 When it remains unchanged, the AC power needs to be reduced to The UHV AC / DC power is P DC0 .

[0091] The present application provides a method and device for determining the coupling relationship of ultra-high voltage AC and DC transmission capacity of a receiving system, which solves the problem of the need for a method for calculating the coupling relationship of ultra-high voltage AC and DC transmission capacity of a receiving system constrained by a DC fault. When the ultra-high voltage AC and DC receiving system is constrained by a DC fault, the AC and DC transmission capacity coupling relationship can be calculated to determine the AC and DC transmission power, which can significantly improve the calculation efficiency, save manpower and material resources, and create significant economic benefits.

[0092] The above contents are further detailed descriptions of the present invention in combination with specific preferred embodiments, and it cannot be determined that the specific implementation of the present invention is limited to these descriptions. For ordinary technicians in the technical field to which the present invention belongs, several simple deductions or substitutions can be made without departing from the concept of the present invention, which should be regarded as falling within the protection scope of the present invention.

Claims

1. A method for determining the coupling relationship of ultra-high voltage AC and DC transmission capacity of a receiving system. It is characterized in that include: Determining the ultra-high voltage AC and DC power of the AC / DC hybrid receiving-end power grid under the initial operation mode of the power grid; Calculate the coupling relationship of AC and DC transmission capacity and the UHV AC and DC power limits of the power grid under any DC fault while satisfying different UHV DC system safety and stability constraints, including: Under any DC fault, when the AC / DC safety and stability constraint condition i is met, the UHV AC / DC has no coupling constraint transmission capacity relationship; at this time, the UHV AC power of the power grid is P AC0 、UHV DC power is P DC0 ; Under any DC fault, when the AC / DC safety and stability constraint condition i is not met, there is a coupling constraint transmission capacity relationship between UHV AC and DC; under the coupling constraint transmission capacity relationship between UHV AC and DC, the UHV AC power remains unchanged, and the UHV DC power is reduced. When the AC / DC safety and stability constraint condition i is met, the UHV AC power of the AC / DC hybrid receiving-end power grid is determined to be P AC0 、UHV DC power is P DCi ; Under the condition that there is a coupling constraint on the transmission capacity of UHV AC and DC, the UHV DC power remains unchanged, and the UHV AC power is reduced. When the AC and DC safety and stability constraint condition i is met, the UHV AC power of the AC / DC hybrid receiving-end power grid is determined to be P ACi 、UHV DC power is P DC0 ; Calculating the AC / DC transmission capacity coupling relationship and the UHV AC / DC power of the power grid under different DC faults while satisfying the safety and stability constraints of the UHV AC / DC system, including: Calculate the power grid under different DC faults, the mode flow meets the UHV AC / DC safety and stability constraint condition i, and when there are m DC faults, if there is no coupling restriction on the transmission capacity of UHV AC / DC, the UHV AC / DC power is P AC0 , P DC0 ; If there is a coupling relationship between UHV AC and DC that restricts the transmission capacity, the AC power P AC0 When the DC power is constant, the DC power needs to be reduced to The UHV AC / DC power is P AC0 , DC power P DC When it remains unchanged, the AC power needs to be reduced to The UHV AC / DC power is P DC0 .

2. The method according to claim 1, It is characterized in that Determining the ultra-high voltage AC and DC power of the AC / DC hybrid receiving-end power grid under the initial operation mode of the power grid includes: By analyzing the sensitivity of the AC / DC hybrid receiving-end power grid, it is determined that the power grid adopts a conservative operation mode; Under the conservative operation mode, the UHV AC power of the power grid is determined to be P AC0 、UHV DC power is P DC0 .

3. The method according to claim 1, It is characterized in that Also includes: Under any DC fault, if the mode flow satisfies the AC / DC safety and stability constraint condition i, the transmission capacity relationship of UHV AC / DC without coupling constraint; At this time, the UHV AC power of the power grid is P AC0 、UHV DC power is P DC0 ; Under any DC fault, if the mode power flow does not meet the AC / DC safety and stability constraint condition i, the UHV AC / DC power during pre-control is P AC0 , min{P DC1 , P DC2 ,…,P DCn }, when pre-controlling UHV AC power, the UHV AC and DC power is min{P AC1 , P AC2 ,…,P ACn }, P DC0 ; Under any DC fault, if the safety and stability constraints from 1 to i are satisfied, and the safety and stability constraints from i+1 to n are not satisfied, the safety and stability constraints from i+1 to n lead to the existence of coupling constraints on the transmission capacity of the UHV AC and DC. When the UHV DC power is pre-controlled, the UHV AC and DC power is P AC0 , min{P DCi+1 , P DCi+2 ,…,P DCn }, when pre-controlling UHV AC power, the UHV AC and DC power is min{P ACi+1 , P ACi+2 ,…,P ACn }, P DC0 .

4. The method according to claim 1 or 3, It is characterized in that Also includes: Under any DC fault, when the AC / DC safety and stability constraint condition i is met, if there is no coupling restriction on the transmission capacity of the UHV AC / DC, the UHV AC / DC power is P AC0 , P DC0 ; If there is a coupling relationship between UHV AC and DC that restricts the transmission capacity, the AC power P AC0 When P is unchanged, DCj =min{P DC1 , P DC2 ,…,P DCn } or P DCj =min{P DCi+1 , P DCi+2 ,…,P DCn }, the DC power needs to be reduced to P DCj , the UHV AC / DC power is P AC0 , P DCj ; DC power P DC0 When P is unchanged, ACj =min{P AC1 , P AC2 ,…,P ACn } or P ACj = mn{P ACi+1 , P ACi+2 ,…,P ACn }, then the AC power needs to be reduced to P ACj , the UHV AC / DC power is P ACj , P DC0 .

5. A device for determining the coupling relationship of ultra-high voltage AC and DC transmission capacity of a receiving system, It is characterized in that include: An initial operation mode determination unit determines the ultra-high voltage AC and DC power of the AC / DC hybrid receiving-end power grid under the initial operation mode of the AC / DC hybrid receiving-end power grid; The first coupling relationship and limit calculation unit calculates the coupling relationship of AC and DC transmission capabilities and the UHV AC and DC power limits of the power grid under any DC fault while satisfying different UHV DC system safety and stability constraints, including: The first AC / DC power determination subunit, under any DC fault, when the AC / DC safety and stability constraints are met, the UHV AC / DC has no coupling constraint transmission capacity relationship; at this time, the UHV AC power of the power grid is P AC0 、UHV DC power is P DC0 ; The second AC / DC power determination subunit, under any DC fault, when the AC / DC safety and stability constraint condition i is not met, the UHV AC / DC has a coupling constraint transmission capacity relationship; under the coupling constraint transmission capacity relationship between the UHV AC / DC, the UHV AC power remains unchanged, and the UHV DC power is reduced. When the AC / DC safety and stability constraint condition i is met, the UHV AC power of the AC / DC hybrid receiving-end power grid is determined to be P AC0 、UHV DC power is P DCi ; Under the condition that there is a coupling constraint on the transmission capacity of UHV AC and DC, the UHV DC power remains unchanged, and the UHV AC power is reduced. When the AC and DC safety and stability constraint condition i is met, the UHV AC power of the AC / DC hybrid receiving-end power grid is determined to be P ACi 、UHV DC power is P DC0 ; The second coupling relationship and limit calculation unit calculates the AC / DC transmission capacity coupling relationship and the UHV AC / DC power of the power grid under different DC faults while satisfying the safety and stability constraints of the UHV AC / DC system, including: The first AC / DC power determination subunit calculates that the power grid meets the UHV AC / DC safety and stability constraint condition i under different DC faults, and when there are m DC faults, if there is no coupling restriction on the transmission capacity of the UHV AC / DC, the UHV AC / DC power is P AC0 , P DC0 ; The second AC / DC power determination subunit, if the UHV AC / DC has a coupling restriction on the transmission capacity, the AC power P AC0 When the DC power is constant, the DC power needs to be reduced to The UHV AC / DC power is P AC0 , DC power P DC0 When it remains unchanged, the AC power needs to be reduced to The UHV AC / DC power is P DC0 .

6. The device according to claim 5, It is characterized in that The initial operation mode determination unit includes: The operation mode determination subunit determines that the power grid adopts a conservative operation mode by analyzing the sensitivity of the AC / DC hybrid receiving-end power grid; The AC / DC power determination subunit determines the ultra-high voltage AC power of the power grid as P under the conservative operation mode. AC0 、UHV DC power is P DC0 .

7. The device according to claim 5, It is characterized in that The second coupling relationship and limit calculation unit includes: The first AC / DC power determination subunit calculates that the power grid meets the UHV AC / DC safety and stability constraint condition i under different DC faults, and when there are m DC faults, if there is no coupling restriction on the transmission capacity of the UHV AC / DC, the UHV AC / DC power is P AC0 , P DC0 ; The second AC / DC power determination subunit, if the UHV AC / DC has a coupling restriction on the transmission capacity, the AC power P AC0 When the DC power is constant, the DC power needs to be reduced to The UHV AC / DC power is P AC0 , DC power P DC0 When it remains unchanged, the AC power needs to be reduced to The UHV AC / DC power is P DC0 .