Power system auxiliary service ratio planning method, device and terminal equipment
By building a quantitative model of distributed resource characteristics and a typical scenario set of auxiliary service markets, combined with power system operation rules, the allocation planning problem of demand-side distributed resources in auxiliary service bidding is solved, and resource value is maximized and energy efficiency is achieved. Improvement.
Patent Information
- Application Number
- CN202110808355.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-07-16
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2041-07-16
AI Technical Summary
The existing technology cannot effectively utilize the allocation planning of demand-side distributed resources in different auxiliary service bids, resulting in the inability to maximize the resource value, resulting in waste of energy and low yields of aggregators.
By building a distributed resource characteristic quantitative model, the adaptability indicators between resources and auxiliary services are determined, combined with the typical scenario set of auxiliary service market and the power system operation rules, a power system auxiliary service ratio planning model is built to achieve optimal resource allocation Compare planning.
The resource value of different varieties of distributed resources in bidding for different auxiliary service has been maximized, energy utilization efficiency and aggregator benefits have been improved, and energy waste has been avoided.
Smart Images

Figure CN113641944B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power system operation, and in particular to a method, device and terminal equipment for planning auxiliary service ratio of a power system. Background Art
[0002] Power system ancillary services refer to a series of services required to maintain the safe and stable operation of the power system or restore system safety, as well as to ensure the supply of electric energy and meet the requirements of voltage and frequency quality. Power ancillary services usually include peak regulation, frequency regulation, standby, reactive power regulation, black start and other services. Different types of ancillary services have different technical requirements, which may include the required minimum capacity, response duration, regulation rate, etc.
[0003] Demand-side distributed resources, including industrial, commercial, residential loads, distributed energy storage, electric vehicles, distributed power generation, etc., have flexible and adjustable potential that can be integrated by distributed resource aggregators and participate in transactions in the power ancillary service market. However, the response characteristics of demand-side distributed resources vary. How to solve the problems of the existing technology that the allocation planning of different types of distributed resources in different ancillary service bids cannot maximize the value of resources, lead to energy waste, and low aggregator allocation efficiency and yield, etc., based on the characteristics of demand-side distributed resources themselves, is crucial to fully realize the value of demand-side resources and improve the power system operation guarantee system. Summary of the invention
[0004] In view of this, an embodiment of the present invention provides a method for auxiliary service ratio planning of a power system, which realizes maximization of resource value of different types of distributed resources in different auxiliary service bidding ratio planning.
[0005] In order to achieve the above object, the present invention adopts the following technical scheme:
[0006] In a first aspect, an embodiment of the present invention provides a method for power system auxiliary service ratio planning, comprising: constructing a distributed resource characteristic quantification model according to the physical operation characteristics of the distributed resources; determining the fitness index between different distributed resources and auxiliary services based on the distributed resource characteristic quantification model; constructing a typical scenario set of the auxiliary service market; constructing a power system auxiliary service ratio planning model based on the fitness index, the typical scenario set of the auxiliary service market and the power system operation rules; and performing ratio planning of distributed resources required for auxiliary services in the power system based on the power system auxiliary service ratio planning model.
[0007] Based on the first aspect, in some embodiments, determining the adaptability index between different distributed resources and auxiliary services based on the distributed resource characteristic quantification model includes: determining the adaptability index between different distributed resources and auxiliary services based on the physical characteristics of various distributed resources obtained from the distributed resource characteristic quantification model from the duration performance Response speed performance Reliability performance The performance requirements of the auxiliary service on the resource are quantified in three dimensions, and the fitness index is calculated according to the quantification results; the expression for calculating the fitness index is:
[0008]
[0009] in, is the fitness index matrix for time period t, which is an i-row and j-column matrix, where the value of the i-th row and j-th column is the score of resource j providing service i; are the duration performance, response speed performance, and reliability performance of the j-th resource bidding for the i-th service in time period t, and their value ranges are [0,1]; ω 1 ,ω 2 ,ω 3 is the weight of each performance score in the total score, ω 1 +ω 2 +ω 3 =1.
[0010] Based on the first aspect, in some embodiments, for electric vehicle EV resources and energy storage system ESS resources, the duration performance The calculation formula is:
[0011]
[0012]
[0013]
[0014] Wherein, j = EV, ESS represents the resource type, i = Syn, NonSyn represents the auxiliary service type, Syn and NonSyn represent spinning reserve and non-spinning reserve respectively, are the durations of the up-frequency modulation and down-frequency modulation services provided by resource j in period t, is the available charge and discharge capacity of resource j in period t, are the minimum and maximum available battery capacities of resource j, respectively; is the charge and discharge power of resource j at time t; D i the minimum duration required for ancillary service i;
[0015] For residential user demand response DR resources, the calculation formula for the duration performance is:
[0016]
[0017] Among them, d t is the actual duration of the distributed resource, and Reg represents the frequency regulation auxiliary service.
[0018] Based on the first aspect, in some embodiments, the response speed performance The calculation formula is:
[0019]
[0020] Among them, RT i The minimum response speed required for auxiliary service i, is the actual response speed of resource j.
[0021] Based on the first aspect, in some embodiments, the reliability performance The calculation formula is:
[0022]
[0023] i=Reg,Syn,NonSyn,j=EV,ESS,DR
[0024] When the probability that resource j can reliably provide a certain auxiliary service is greater than or equal to the reliability required by the service, is 1; when the probability that resource j can reliably provide a certain auxiliary service is less than the reliability required by the service, is the ratio of the actual reliability probability to the required reliability; where, is the actual response volume of auxiliary service i that resource j can provide, is the bid amount of resource j for ancillary service i, is the probability that resource j can reliably provide the bid capacity; Rel i Minimum reliability required for ancillary service i.
[0025] Based on the first aspect, in some embodiments, the conditional risk value constraint includes: the profit of the distributed resource aggregator is not less than its expected value;
[0026] R≥R expect
[0027]
[0028] Among them, R is the profit obtained by the aggregator, R expectis the profit that the aggregator expects to obtain, TP is the total revenue of the aggregator, CVaR is the value at risk, and β is the risk aversion coefficient; is the revenue of the aggregator in the day-ahead ancillary services market, is the total cost of various resources, is the aggregator's profit in the real-time market; ξ is the risk value when the confidence level is α; the aggregator's profit in the ancillary service day-ahead market is
[0029]
[0030] in, is the day-ahead market electricity price of ancillary service i at time t in a typical ancillary service scenario, is the bid amount of the day-ahead market for service i at time t in a typical ancillary service scenario; the revenue of the aggregator in the real-time ancillary service market is
[0031]
[0032] in, is the electricity price when auxiliary service i is called at time t in a typical auxiliary service scenario, The penalty for ancillary service i not providing service according to the declared capacity at time t in a typical ancillary service scenario. and The proportion of distributed resources called by aggregators and the proportion of unsatisfied declared capacity; the total cost of various resources for:
[0033]
[0034] in, is the total cost of various resources, For the cost of electric vehicles, is the energy storage cost, Residential user demand response costs, is the cost of distributed generator sets.
[0035] In the second aspect, an embodiment of the present invention provides a device, including: a first model construction module, used to construct a distributed resource characteristic quantitative model according to the physical operation characteristics of the distributed resources; an indicator calculation module, used to determine the fitness index between different distributed resources and auxiliary services based on the distributed resource characteristic quantitative model; a scenario construction module, used to construct a typical scenario set of the auxiliary service market; a second model construction module, used to construct a power system auxiliary service ratio planning model based on the fitness index, the typical scenario set of the auxiliary service market and the power system operation rules; a ratio planning module, used to perform ratio planning of distributed resources required for auxiliary services in the power system based on the power system auxiliary service ratio planning model.
[0036] In a third aspect, an embodiment of the present invention provides a terminal device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the steps of the power system auxiliary service ratio planning method as described in any one of the first aspects above are implemented.
[0037] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the power system auxiliary service ratio planning method as described in any one of the above-mentioned first aspects are implemented.
[0038] In an embodiment of the present invention, a method for power system auxiliary service ratio planning is provided, and a power system auxiliary service ratio planning model based on a fitness index, a typical scenario set of an auxiliary service market, and power system operation rules is established. The uncertainty in the auxiliary service market bidding process is converted into model constraints through the typical scenario set of the auxiliary service market, and superimposed on the model objective function based on the fitness index. The optimal ratio combination of different distributed resources in the real-time market is obtained by calculation, and a planning decision that maximizes the value of resources in the auxiliary service market bidding process is realized. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0040] Figure 1 It is a flowchart of a method for planning the ratio of auxiliary services in a power system provided by an embodiment of the present invention;
[0041] Figure 2It is a schematic diagram of the structure of a power system auxiliary service ratio planning device provided by an embodiment of the present invention;
[0042] Figure 3 It is a schematic diagram of a terminal device provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0043] The present invention will be described more clearly below in conjunction with specific embodiments. The following embodiments will help those skilled in the art to further understand the effects of the present invention, but are not intended to limit the present invention in any form. It should be noted that, for those of ordinary skill in the art, several variations and improvements may be made without departing from the concept of the present invention. These all belong to the protection scope of the present invention.
[0044] In order to make the purpose, technical solutions and advantages of the present invention more clear, specific embodiments will be described below in conjunction with the accompanying drawings.
[0045] An embodiment of the present invention provides a method for planning the ratio of auxiliary services in a power system, such as Figure 1 As shown, the power system auxiliary service ratio planning method may include steps 101 to 105.
[0046] Step 101: construct a distributed resource characteristic quantification model according to the physical operation characteristics of the distributed resources.
[0047] When bidding for auxiliary services, there are many types of distributed resources that can be used, including energy storage systems, electric vehicles, industrial and commercial users, residential users, distributed generators, etc. This embodiment is described by taking energy storage systems, electric vehicles, residential users, and distributed generators as examples.
[0048] Step 1011: Constructing a quantitative model of energy storage system characteristics
[0049] The physical characteristics of the energy storage system ESS can be described by the state of charge, charge and discharge power, and battery aging characteristics, thereby constructing a characteristic quantitative model of the energy storage system. Among them, the state of charge refers to the percentage of the current power in the total power, that is, the current available charge and discharge capacity of the energy storage system. The available charge and discharge capacity of the ESS at time t is The actual charging and discharging power of the energy storage system at time t is In addition, battery aging in energy storage systems will increase the bidding cost of the aggregator, which can be described as a function of discharge depth and discharge rate.
[0050] Step 1012: Constructing a quantitative model of electric vehicle characteristics
[0051] Electric vehicles (EV) can also interact with the power grid in a two-way manner. When the grid load is too high, the electric vehicle energy storage feeds the grid; when the grid load is low, the electric vehicle can be used to store the excess power generated by the grid. The active power consumed by the battery port of the electric vehicle during the charging process is approximately a constant value. The charging power increases rapidly to its calibrated rated charging power 1 to 2 minutes after the start of charging. The physical characteristics of electric vehicles can be described by charge and discharge capacity and charge and discharge power. Among them, the state of charge of an electric vehicle refers to the percentage of the current power in the total power, that is, the current available charge and discharge capacity of the electric vehicle. The available charge and discharge capacity of the electric vehicle at time t is The charging and discharging power of the electric vehicle at time t is Since each electric vehicle has a different itinerary and arrives and leaves the charging station at different times, when considering the available capacity of electric vehicles participating in auxiliary services, it is necessary to consider not only the battery status and charging and discharging status of the electric vehicles currently connected to the charging station, but also the electric vehicles newly connected and leaving at this moment. The power demand of a single electric vehicle is defined as
[0052] Step 1013: Constructing a quantitative model of residential user characteristics
[0053] Residential users refer to residential users who participate in demand response (DR), mainly considering their temperature control load. Through the adjustable temperature range and adjustable time of a single user, we can obtain the duration, response speed, aggregate capacity and other information of the ancillary services that the aggregator can provide. Among them, the duration refers to the time that the service can be continuously provided after responding to the regulation signal of a certain ancillary service; the response speed is the time from receiving the regulation signal sent by the market to starting to provide the service; the aggregate capacity refers to the demand response capacity aggregated by the aggregator that can be used to participate in the ancillary service.
[0054] Step 1014: Constructing a quantitative model of distributed generator characteristics
[0055] Distributed generators include distributed wind turbines and distributed photovoltaic units. Assuming that the aggregator does not have control over the distributed generators, but the distributed generators follow a "take-or-pay" contract, that is, the contract cannot be changed in the event of changes in market electricity prices or unit output, and the user still has to pay according to the contract if the usage in the contract is not reached; if the unit does not reach the corresponding output, the user needs to be compensated.
[0056] Step 102: Based on the distributed resource characteristic quantification model, determine the compatibility index between different distributed resources and auxiliary services.
[0057] In the embodiment of the present invention, different types of auxiliary services may include peak load auxiliary services, frequency regulation auxiliary services, spinning reserve services, non-spinning reserve services, etc. This embodiment takes frequency regulation auxiliary services (Regulation, Reg), spinning reserve services (Synchronized Reserve, Syn), and non-spinning reserve services (Non-Synchronized Reserve, NonSyn) as examples for description.
[0058] The function of frequency regulation service is to maintain the frequency stability of the power system. It has high requirements on the response speed of resources. For traditional units, it is generally required that the units can respond to control signals and increase or decrease output within 5 minutes. Both spinning reserve and non-spinning reserve provide spare capacity for the system. Spinning reserve means running synchronously with the power grid and responding to regulation signals within 10 minutes. Non-spinning reserve is not usually turned on, but needs to be able to be put into operation quickly after receiving the control signal. The requirement for non-spinning reserve is also to respond to regulation signals within 10 minutes.
[0059] In an embodiment of the present invention, the requirements of auxiliary services for resources are quantified from the performance of three dimensions: duration, response speed, and reliability, and the fitness index is calculated based on the quantified results. Duration refers to the time required by a certain auxiliary service, and the resources participating in the bid need to be able to continuously provide the service. Response speed refers to the time from the issuance of a control signal to the beginning of the resource response, which can also be called delay time. Reliability refers to the probability that a resource can reliably provide a certain service. The probability that the amount of auxiliary services provided in actual operation is not less than the bid amount should be greater than a certain value.
[0060] By determining the compatibility index between different distributed resources and different types of ancillary services, a numerical quantitative standard is provided to measure the value of different distributed resources for different types of ancillary services, thereby providing the premise and basis for planning the ratio and capacity of different types of distributed resources in different ancillary service bids and achieving the optimal ratio between ancillary services and distributed resources.
[0061] In the embodiment of the present invention, it is assumed that the market needs I types of auxiliary services, there are J types of resources, and the adaptability of the j-th resource bidding for the i-th service in time period t (t = [1, 2, ..., 24]) is The adaptability index of each resource providing auxiliary services can be comprehensively measured from the three dimensions of duration, response speed, and reliability performance. The expression for calculating the adaptability index is:
[0062]
[0063] in, is the fitness index matrix for time period t, which is an i-row and j-column matrix, where the value of the i-th row and j-th column is the score of resource j providing service i; are the duration, response speed, and reliability performance of the j-th resource bidding for the i-th service in time period t, and their value ranges are [0,1]; ω 1 ,ω 2 ,ω 3 is the weight of each performance score in the total score, ω 1 +ω 2 +ω 3 =1.
[0064] For different types of auxiliary services, the specific calculation methods of these three performances are as follows:
[0065] (1) Duration performance
[0066] For both types of resources, electric vehicles and energy storage systems, their response duration can be calculated by the ratio of available power to the charging and discharging power.
[0067]
[0068]
[0069]
[0070] Wherein, j = EV, ESS represents the resource type, i = Syn, NonSyn represents the auxiliary service type, Syn and NonSyn represent spinning reserve and non-spinning reserve respectively, are the durations of the up-frequency modulation and down-frequency modulation services provided by resource j in period t, is the available charge and discharge capacity of resource j in period t, are the minimum and maximum available battery capacities of resource j, respectively; is the charge and discharge power of resource j at time t; D i The minimum duration required for ancillary service i.
[0071] For residential user demand response resources, the duration performance is:
[0072]
[0073] Among them, d t is the actual duration of the distributed resource, and Reg represents the frequency regulation auxiliary service.
[0074] (2) Response speed performance
[0075]
[0076] Among them, RT i The minimum response speed required for auxiliary service i, is the actual response speed of resource j.
[0077] (3) Reliability performance
[0078] If the probability that resource j can reliably provide a certain auxiliary service is greater than or equal to the reliability required by the service, then Take 1; if the probability that resource j can reliably provide a certain auxiliary service is less than the reliability required by the service, then Take the ratio of the actual reliability probability to the required reliability.
[0079]
[0080] in, is the actual response volume of auxiliary service i that resource j can provide, is the bid amount of resource j for ancillary service i, is the probability that resource j can reliably provide the bid capacity; Rel i Minimum reliability required for ancillary service i.
[0081] The actual duration d of the above distributed resource t , Actual response speed and the actual response volume of the ancillary services provided The value of a physical quantity is an estimate. When aggregators make ex ante bidding decisions, they can use the historical response data of distributed resources and use the average method to estimate the actual response to obtain the estimate. This method first selects the historical load data of Y days before the estimated demand response day, removes the days with the highest and lowest response levels from these Y days, and uses the X days with the load level ranked in the middle to calculate the average of their response as the physical quantity value of the actual demand response day.
[0082]
[0083] in, is the estimated value of each physical quantity (duration, response speed, ancillary service quantity) in the actual demand response day period t, are the historical response data of the corresponding physical quantities, and Mid(X,Y,d) is the set of X days with the middle response level among the Y days before the d-th demand response day.
[0084] Through the above process, we can get the fitness index matrix of each resource relative to each service. Thus, the state space of the bidding resource ratio combination of the distributed resource aggregator is formed. For each resource, it can only participate in a certain type of auxiliary service. Therefore, if it is assumed that the number of service types that resource j can bid for at time t is n j , then the number of possible resource ratio combination state spaces is
[0085] Step 103: Construct a set of typical scenarios for the auxiliary service market.
[0086] In terms of time scale, the ancillary service market is divided into the day-ahead market and the real-time market. In the day-ahead market, the aggregator determines the bid amount for different types of ancillary services in the day-ahead market based on the day-ahead electricity price level and the predicted resource response capacity. In the real-time market, if the aggregator fails to provide the capacity it declared the day before, the unmet portion will be fined. If the demand response volume provided by the aggregator is greater than the capacity declared the day before, the excess will result in a waste of resources. The process of aggregators participating in the bidding in the ancillary service market will be affected by a variety of uncertainties. How to plan the allocation strategy of different resources under the influence of a variety of uncertain factors is crucial to fully realizing the value of demand-side resources. This embodiment takes the uncertainty of electricity prices and the generation of uncertainty in the output of distributed resources as examples for explanation.
[0087] Step 1031: Use the Latin hypercube sampling method to simulate the uncertainty of different ancillary service market electricity prices and distributed resource output to generate an initial scenario set.
[0088] Specifically, considering the uncertainty of electricity prices and the uncertainty of distributed resource output, we construct an uncertainty initial scenario set W 0 Assuming that the electricity price is not correlated with the randomness of resources, the uncertainty initial scenario set W 0 The probability of a scenario ω=(ν,τ) occurring is ρ ω =ρ ν ρ τ , where ρ ν represents the probability of the electricity price scenario ν occurring, ρ τ Represents the probability of occurrence of uncertainty τ in distributed resource output.
[0089] Step 1032: Based on the spectral clustering algorithm and classification accuracy, the initial scene set is reduced to form a typical scene set NS c and Γ c .
[0090] Step 10321: Perform similarity clustering on the scenes based on the spectral clustering algorithm.
[0091] ① Construct similarity matrix S through similarity function i,j =[s] i,j, the similarity function can be used as the Euclidean distance S i,j =||x i -x j || 2 , S i,j Represents scene x i With x j The distance between
[0092] ② Reconstruct the similarity matrix through the ε-nearest method to obtain the adjacency matrix W i,j .
[0093]
[0094] ③Based on the adjacency matrix W i,j Calculate the order matrix D i,j And the Laplace matrix L i,j .
[0095]
[0096] L=DW (11)
[0097] Among them, ω i,j is the adjacency matrix W i,j Elements of Represents the sum of the weights of the edges connecting a certain point to other points.
[0098] ④ For the Laplace matrix L i,j Standardize and calculate the first k eigenvalues and their corresponding eigenvectors.
[0099] ⑤ Use the Gaussian mixture model to cluster the rows of the matrix composed of k vectors to obtain a set of Ns typical uncertainty scenarios, the cluster center of each scenario, and the probability of occurrence.
[0100] Step 10322: Based on the classification accuracy evaluation, whether the typical scene clusters obtained after similarity clustering meet the clustering target requirements.
[0101] The classification accuracy (Davies-Bouldin Index, DBI) is two clusters C i ,C j The ratio of the sum of the average distance avg(C) between the scenes to the distance μ between the two cluster centers. The smaller the accuracy, the better the effect of scene reduction after clustering. If DBI is greater than the upper limit ξ, clustering needs to be performed again until the clustering target requirements are met.
[0102]
[0103]
[0104]
[0105] Step 104: Construct a power system ancillary service ratio planning model based on the fitness index, the typical scenario set of the ancillary service market and the power system operation rules.
[0106] Based on the typical scenarios of the ancillary service market and the power system operation rules, constraints are constructed. The constraints include minimum fitness threshold constraints, conditional risk value constraints, power balance constraints, energy storage device constraints, and distributed resource capacity constraints.
[0107] Construct the maximum overall fitness function based on the fitness index;
[0108] The maximum overall fitness function is used as the objective function of the power system ancillary service ratio planning model, and the minimum fitness threshold constraint, conditional risk value constraint, electricity balance constraint, energy storage device constraint and distributed resource capacity constraint are used as constraints of the objective function to construct the power system ancillary service ratio planning model.
[0109] This model uses the conditional risk value theory to transform the uncertainty in the bidding process of the ancillary service market into conditional risk value constraints, and establishes a function with the goal of maximizing the value of distributed resources under uncertainty factors. The variables of the objective function in the model are the bidding volume and planning ratio combination between different types of distributed resources and ancillary services, which helps to maximize the value of resources and improve the resource provision efficiency of distributed resource aggregators.
[0110] The objective function is to maximize the value of resources in the bidding scheme decided by the aggregator, that is, the maximum overall fitness function between distributed resources and ancillary services. The maximum overall fitness function is constructed based on the fitness index:
[0111]
[0112] Among them, S total For overall fitness.
[0113] The constraints include:
[0114] (1) The minimum adaptability threshold constraint for each distributed resource bidding for different types of auxiliary services:
[0115]
[0116] Among them, μ is a binary variable indicating whether a certain auxiliary service can be bid. is the required fitness level for auxiliary service i, that is, only bidders with a fitness level higher than this are suitable for bidding for this service.
[0117] (2) Conditional risk value constraint: Under the conditional risk value constraint, the profit of distributed resource aggregators is not less than their expected value.
[0118] R≥R expect (15)
[0119]
[0120] Among them, R is the profit obtained by the aggregator, R expect is the profit that the aggregator expects to obtain, TP represents the total return of the aggregator, CVaR represents the value at risk, and β represents the risk aversion coefficient. The larger β is, the more risk-averse it tends to be and the more conservative the strategy is; represents the revenue of the aggregator in the day-ahead ancillary services market, Represents the cost of various resources, represents the aggregator's profit in the real-time market; ξ represents the risk value when the confidence level is α.
[0121] The aggregator’s revenue from the ancillary service day-ahead market is
[0122]
[0123] in, represents the day-ahead market electricity price of ancillary service i at time t in a typical ancillary service scenario, represents the bid amount in the day-ahead market for service i at time t in a typical ancillary service scenario.
[0124] The revenue of the aggregator in the real-time market for ancillary services is
[0125]
[0126] in, represents the electricity price when auxiliary service i is called at time t in a typical auxiliary service scenario, represents the penalty for auxiliary service i not providing service according to the declared capacity at time t in a typical auxiliary service scenario, and It indicates the proportion of aggregators calling a certain distributed resource and the proportion of unmet declared capacity.
[0127] Total cost of each resource type for
[0128]
[0129] in, represents the total cost of various resources, For the cost of electric vehicles, is the energy storage cost, Residential user demand response costs, is the cost of distributed generator sets.
[0130] (3) Power balance constraints
[0131] The cumulative ancillary service capacity provided by various resources should be equal to the total bid amount.
[0132]
[0133] in It represents the amount of service i provided by resource j at time t under the typical auxiliary service scenario set.
[0134] (4) Distributed resource capacity constraints
[0135] ① Energy constraints and power balance constraints for energy storage systems
[0136]
[0137]
[0138] In the formula, and represents the charging and discharging power of energy storage system r at time t in the aggregated energy storage system, and Represents the charging and discharging efficiency of the energy storage system r at time t in the aggregated energy storage system.
[0139]
[0140]
[0141] The above formula represents the constraint of the upper limit of charge and discharge power.
[0142]
[0143] In the formula, Represents the charging and discharging energy of the energy storage system at time t.
[0144]
[0145] The above formula represents the daily charge and discharge times limit, where M represents the maximum daily charge times.
[0146]
[0147] The above formula represents the limit of ESS bidding amount.
[0148] ②Energy constraints and power balance constraints for electric vehicles
[0149] Assuming that the aggregator aggregates V electric vehicles, the total charging and discharging power at time t is the sum of the charging and discharging power of these V electric vehicles at time t.
[0150]
[0151]
[0152] In the formula, and represents the charging and discharging power of the vth vehicle among the aggregated electric vehicles at time t, and It represents the charging and discharging efficiency of the vth vehicle among the aggregated electric vehicles at time t.
[0153]
[0154]
[0155] The above formula represents the constraint of the upper limit of charge and discharge power.
[0156]
[0157]
[0158] In the formula, represents the charge and discharge energy of the electric vehicle at time t, represents the charge and discharge amount of the electric vehicle arriving at the charging pile at time t, It represents the charge and discharge amount of the electric vehicle leaving the charging station at time t.
[0159]
[0160] The above formula represents the limit on the bidding quantity of electric vehicles.
[0161] Step 105: Based on the model, the distributed resources required for auxiliary services in the power system are planned.
[0162] According to the model calculation results, a combination of different distributed resources is selected to meet the needs of ancillary services. Through scientific planning, the value of resources is maximized, which greatly avoids energy waste.
[0163] See also Figure 2 An embodiment of the present invention provides a power system auxiliary service ratio planning device 30, including: a first model construction module 310, an indicator calculation module 320, a scenario construction module 330, a second model construction module 340 and a ratio planning module 350.
[0164] The first model building module 310 is used to build a distributed resource characteristic quantification model according to the physical operation characteristics of the distributed resources.
[0165] The index calculation module 320 is used to determine the compatibility index between different distributed resources and auxiliary services based on the distributed resource characteristic quantification model.
[0166] The scenario construction module 330 is used to construct a typical scenario set of the auxiliary service market.
[0167] The second model building module 340 is used to build a power system auxiliary service ratio planning model based on the fitness index, the typical scenario set of the auxiliary service market and the power system operation rules.
[0168] The ratio planning module 350 is used to perform ratio planning of distributed resources required for auxiliary services in the power system based on the power system auxiliary service ratio planning model.
[0169] Figure 3 Schematic diagram of a terminal device provided by an embodiment of the present invention. Figure 3 As shown, the terminal device 4 of this embodiment includes: a processor 40, a memory 41, and a computer program 42 stored in the memory 41 and executable on the processor 40, such as a power system auxiliary service ratio planning program. When the processor 40 executes the computer program 42, the steps in the above-mentioned power system auxiliary service ratio planning method embodiment are implemented, such as Figure 1 Alternatively, when the processor 40 executes the computer program 42, the functions of each module / unit in the above-mentioned device embodiments are realized, for example, Figure 2 The functions of modules 310 to 350 are shown.
[0170] Exemplarily, the computer program 42 may be divided into one or more modules / units, which are stored in the memory 41 and executed by the processor 40 to complete the present invention. The one or more modules / units may be a series of computer program instruction segments capable of completing specific functions, which are used to describe the execution process of the computer program 42 in the terminal device 4. For example, the computer program 42 may be divided into a first model construction module, an indicator calculation module, a scenario construction module, a second model construction module, and a ratio planning module.
[0171] The terminal device 4 may be a computing device such as a desktop computer, a notebook, a PDA, or a cloud server. The terminal device may include, but is not limited to, a processor 40 and a memory 41. Those skilled in the art will appreciate that Figure 3It is only an example of the terminal device 4 and does not constitute a limitation on the terminal device 4. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, the terminal device may also include input and output devices, network access devices, buses, etc.
[0172] The processor 40 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.
[0173] The memory 41 may be an internal storage unit of the terminal device 4, such as a hard disk or memory of the terminal device 4. The memory 41 may also be an external storage device of the terminal device 4, such as a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc. equipped on the terminal device 4. Further, the memory 41 may also include both an internal storage unit and an external storage device of the terminal device 4. The memory 41 is used to store the computer program and other programs and data required by the terminal device. The memory 41 may also be used to temporarily store data that has been output or is to be output.
[0174] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated into a processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of the present invention. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0175] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0176] Those skilled in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0177] In the embodiments provided by the present invention, it should be understood that the disclosed devices / terminal equipment and methods can be implemented in other ways. For example, the device / terminal equipment embodiments described above are only schematic. For example, the division of the modules or units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0178] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0179] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0180] If the integrated module / unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium. It should be noted that the content contained in the computer-readable medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, computer-readable media do not include electric carrier signals and telecommunication signals.
[0181] The embodiments described above are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should all be included in the protection scope of the present invention.
Claims
1. A method for planning the ratio of auxiliary services in a power system, characterized in that: include: According to the physical operation characteristics of distributed resources, a quantitative model of distributed resource characteristics is constructed; Based on the distributed resource characteristic quantification model, determining the adaptability index between different distributed resources and auxiliary services; Construct a set of typical scenarios for the auxiliary service market; Based on the fitness index, the typical scenario set of the ancillary service market and the power system operation rules, a power system ancillary service ratio planning model is constructed; Based on the power system auxiliary service ratio planning model, the distributed resources required for the auxiliary services in the power system are planned; The determining of the adaptability index between different distributed resources and auxiliary services based on the distributed resource characteristic quantification model includes: Based on the physical characteristics of various distributed resources obtained in the distributed resource characteristic quantification model, the duration performance , Response speed performance , reliability performance Quantifying the performance requirements of the auxiliary service on the resources in three dimensions, and calculating the fitness index according to the quantification results; The expression for calculating the fitness index is: in, yes The fitness index matrix of the time period is a OK A matrix of columns, where Line The column value is resource Services Ratings; , , In the time period Time Resource bidding The duration performance, response speed performance, and reliability performance of the service are all in the range of [0,1]; , , is the weight of each performance score in the total score, ; For electric vehicle EV resources and energy storage system ESS resources, the duration performance The calculation formula is: in, Characterizes the resource type, Characterize the auxiliary service type, Syn、NonSyn Represents spinning reserve and non-spinning reserve respectively. , They are Time period resources Duration of up- and down-modulation services provided, for Time period resources Available charge and discharge capacity, , Respectively, resources Minimum and maximum available battery capacity; for Time resources The charge and discharge power; For auxiliary services Minimum duration required; D RegDown The minimum duration required for the downward frequency modulation auxiliary service, D Regup Indicates the minimum duration required for the upward frequency regulation ancillary service; For residential user demand response DR resources, the calculation formula for the duration performance is: in, is the actual duration of the distributed resource, Reg stands for Frequency Regulation Ancillary Services; The response speed performance The calculation formula is: in, For auxiliary services The minimum response speed required, For resources The actual response speed; The reliability performance The calculation formula is: When resources When the probability of reliable provision of an ancillary service is greater than or equal to the required reliability of the service, is 1; when the resource When the probability of reliable provision of an ancillary service is less than the reliability required by the service, is the ratio of the actual reliability probability to the required reliability; where, For resources Ability to actually provide auxiliary services The response amount, For resources For auxiliary services The bidding amount, For resources the probability that the bid capacity can be reliably provided; For auxiliary services Minimum reliability required; The power system ancillary service ratio planning model is constructed based on the fitness index, the ancillary service market typical scenario set and the power system operation rules, including: Constructing constraint conditions based on the typical scenario set of the ancillary service market and the power system operation rules, wherein the constraint conditions include minimum fitness threshold constraint, conditional risk value constraint, power balance constraint, energy storage device constraint, and distributed resource capacity constraint; Constructing a maximum overall fitness function based on the fitness index; The maximum overall fitness function is used as the objective function of the power system auxiliary service ratio planning model, and the minimum fitness threshold constraint, the conditional risk value constraint, the electricity balance constraint, the energy storage device constraint, and the distributed resource capacity constraint are used as constraints of the objective function to construct the power system auxiliary service ratio planning model.
2. The power system auxiliary service ratio planning method according to claim 1, characterized in that: The conditional VaR constraints include: The profits of distributed resource aggregators are not less than their expectations; in, The profit for the aggregator, is the profit that the aggregator expects to obtain, is the total revenue of the aggregator, is the risk value, is the risk aversion coefficient; is the revenue of the aggregator in the day-ahead ancillary services market, is the total cost of various resources, for the aggregators’ earnings in the real-time market; The confidence level is Value at risk when The aggregator’s revenue from the ancillary service day-ahead market is : in, In typical auxiliary service scenarios Time assistance service The day-ahead market electricity price, Typical scenarios for auxiliary services Time service The bid volume in the day-ahead market; The revenue of the aggregator in the real-time market for ancillary services is : in, Typical scenarios for auxiliary services Time assistance service The electricity price when it is called, Typical scenarios for auxiliary services Time assistance service Penalties for failure to provide services according to declared capacity, and The proportion of distributed resources called for by aggregators and the proportion of declared capacity not met; Total cost of various resources for: in, is the total cost of various resources, For the cost of electric vehicles, is the energy storage cost, Residential user demand response costs, is the cost of distributed generator sets.
3. A power system auxiliary service ratio planning device, characterized in that: include: A first model building module is used to build a distributed resource characteristic quantification model according to the physical operation characteristics of the distributed resources; An index calculation module, used to determine the compatibility index between different distributed resources and auxiliary services based on the distributed resource characteristic quantification model; Scenario building module, used to build a typical scenario set for the auxiliary service market; A second model building module is used to build a power system auxiliary service ratio planning model based on the fitness index, the typical scenario set of the auxiliary service market and the power system operation rules; A ratio planning module, used for performing ratio planning of distributed resources required for auxiliary services in the power system based on the power system auxiliary service ratio planning model; The indicator calculation module includes: Based on the physical characteristics of various distributed resources obtained in the distributed resource characteristic quantification model, the duration performance , Response speed performance , reliability performance Quantifying the performance requirements of the auxiliary service on the resources in three dimensions, and calculating the fitness index according to the quantification results; The expression for calculating the fitness index is: in, yes The fitness index matrix of the time period is a OK A matrix of columns, where Line The column value is resource Services Ratings; , , In the time period Time Resource bidding The duration performance, response speed performance, and reliability performance of the service are all in the range of [0,1]; , , is the weight of each performance score in the total score, ; For electric vehicle EV resources and energy storage system ESS resources, the duration performance The calculation formula is: in, Characterizes the resource type, Characterize the auxiliary service type, Syn、NonSyn Represents spinning reserve and non-spinning reserve respectively. , They are Time period resources Duration of up- and down-modulation services provided, for Time period resources Available charge and discharge capacity, , Respectively, resources Minimum and maximum available battery capacity; for Time resources The charge and discharge power; For auxiliary services Minimum duration required; D RegDown The minimum duration required for the downward frequency modulation auxiliary service, D Regup Indicates the minimum duration required for the upward frequency regulation ancillary service; For residential user demand response DR resources, the calculation formula for the duration performance is: in, is the actual duration of the distributed resource, Reg stands for Frequency Regulation Ancillary Services; The response speed performance The calculation formula is: in, For auxiliary services The minimum response speed required, For resources The actual response speed; The reliability performance The calculation formula is: When resources When the probability of reliable provision of an ancillary service is greater than or equal to the required reliability of the service, is 1; when the resource When the probability of reliable provision of an ancillary service is less than the reliability required by the service, is the ratio of the actual reliability probability to the required reliability; where, For resources Ability to actually provide auxiliary services The response amount, For resources For auxiliary services The bidding amount, For resources the probability that the bid capacity can be reliably provided; For auxiliary services Minimum reliability required; The second model building module includes: Constructing constraint conditions based on the typical scenario set of the ancillary service market and the power system operation rules, wherein the constraint conditions include minimum fitness threshold constraint, conditional risk value constraint, power balance constraint, energy storage device constraint, and distributed resource capacity constraint; Constructing a maximum overall fitness function based on the fitness index; The maximum overall fitness function is used as the objective function of the power system auxiliary service ratio planning model, and the minimum fitness threshold constraint, the conditional risk value constraint, the electricity balance constraint, the energy storage device constraint, and the distributed resource capacity constraint are used as constraints of the objective function to construct the power system auxiliary service ratio planning model.
4. A terminal device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the power system auxiliary service ratio planning method as described in any one of claims 1 to 2 are implemented.
5. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the power system auxiliary service ratio planning method as described in any one of claims 1 to 2 are implemented.