A performance analysis method for prefabricated assembled bridge structures based on monitoring data

Through the monitoring data preprocessing and correlation analysis model, combined with the three-time smoothing index method, the structural performance analysis of prefabricated prefabricated bridges was solved, and the problem of difficult to effectively process massive monitoring data was achieved, and the material degradation of prefabricated components and the service performance of connecting parts was achieved. The predictions improve the pertinence and security of bridge management.

CN114004467BActive Publication Date: 2024-11-26HENAN UNIVERSITY OF TECHNOLOGY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111200614.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-10-15
Publication Date
2024-11-26
Estimated Expiration
2041-10-15

AI Technical Summary

Technical Problem

The existing technology is difficult to effectively process massive monitoring data, which leads to the disconnection between bridge structure monitoring and maintenance management, and the inability to conduct comprehensive and targeted analysis and prediction, especially in the analysis and management of structural performance of prefabricated prefabricated bridges.

Method used

Short-term prediction is carried out using monitoring data preprocessing, correlation analysis model and tri-smooth smoothing index method (Holt-Winters). Through the analysis and error optimization of monitoring data correlation coefficients, a model for material degradation of prefabricated components and service performance degradation of connectors is established, and a model for degradation of the service performance of the connectors is formulated. Targeted management decisions.

Benefits of technology

The real service status analysis and short-term prediction of prefabricated bridge structures is realized, the analysis accuracy and prediction accuracy of monitoring data are improved, and more targeted maintenance decisions are helped to make more targeted maintenance decisions and reduce safety risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114004467B_ABST
    Figure CN114004467B_ABST
Patent Text Reader

Abstract

The invention discloses a method for analyzing the performance of a prefabricated and assembled bridge structure based on monitoring data, comprising the following steps: a. preprocessing of prefabricated component response monitoring data; b. a correlation analysis model for prefabricated component response monitoring data; c. short-term prediction of the correlation coefficient of the prefabricated component response monitoring data, using a cubic smoothing index method to perform short-term prediction on the Pearson correlation coefficient of the monitoring data; d. short-term prediction error of the correlation coefficient of the prefabricated component response monitoring data; e. when the Pearson correlation coefficient analysis error cannot meet the set accuracy value, repeating steps c and d, considering a higher-order smoothing index, until the Pearson correlation coefficient analysis error meets the set value; the invention can reveal the material degradation performance of each prefabricated component of an existing prefabricated and assembled bridge itself, and reveal the service performance degradation status of a connector of two adjacent prefabricated components; based on the short-term prediction, a targeted maintenance decision is made.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of intelligent monitoring and operation and maintenance of prefabricated bridges, and in particular to a method for analyzing the structural performance of prefabricated assembled bridges based on monitoring data. Background Art

[0002] At present, due to the difficulty in effectively processing massive monitoring data, the complex service performance changes of different bridges on the same transportation line, the influence of factors such as the bridge location environment, there is a common phenomenon of disconnection between monitoring data analysis and bridge structure maintenance management. The main reasons for this phenomenon are the following two aspects:

[0003] 1. Monitoring data is affected by the performance of monitoring sensors (such as sensitivity and durability), the power of the monitoring system, the Internet, the bridge environment and other factors. Monitoring data is stuck over the range and the step change phenomenon is prominent, which makes the periodicity of monitoring data worse. In most cases, researchers will subjectively select some sample data with better periodicity for analysis. In addition, the traditional analysis method of monitoring data fails to fully consider the correlation and association of monitoring data of different sensor types and different measuring points;

[0004] 2. There are many types of bridge structures, and different types usually involve a variety of different structural types. The service performance of different bridge types varies significantly and changes in complexity. It is not possible to obtain comprehensive and more targeted analysis and modeling with the help of massive monitoring data. For example, the most widely used prefabricated and assembled bridges on various dangerous transportation routes are commonly assembled T-beam bridges, assembled hollow slab bridges, assembled box girder bridges, etc. Such bridges are significantly affected by prefabricated component connectors. For example, the upper structure of the assembled beam-slab bridge is affected by wet joints, and the stress phenomenon of the single beam (slab) is prominent. It is urgent to use massive monitoring data to establish a more targeted analysis model, which will help to achieve centralized and unified management of such bridges on the same transportation route and further reduce safety risks.

[0005] Therefore, the present invention considers massive monitoring data to propose a material degradation analysis model for each prefabricated component of the prefabricated assembled bridge in service and a service performance degradation model for the connecting parts of two adjacent prefabricated components, and it is necessary to implement short-term prediction. Summary of the invention

[0006] The purpose of the present invention is to solve the problems that traditional analysis methods of monitoring data fail to fully consider the correlation and association of monitoring data of different sensor types and different measuring points, and cannot implement performance analysis, prediction and unified management decisions of a large number of prefabricated and assembled bridge structures in service. A performance analysis and prediction method for prefabricated and assembled bridge structures in service based on monitoring data is proposed. The monitoring data correlation analysis model and short-term prediction are adopted to realize the analysis of the actual service status of the prefabricated component structure, and based on the short-term prediction, more targeted maintenance and management decisions are made.

[0007] The technical solutions adopted to achieve the above objectives are:

[0008] A method for analyzing performance of a prefabricated and assembled bridge structure based on monitoring data comprises the following steps:

[0009] a. Monitoring data preprocessing

[0010] For the displacement response, micro-strain response and bridge temperature monitoring data of each prefabricated component of the prefabricated and assembled bridge structure in service, the test values, theoretical design values ​​and limit values ​​corresponding to the displacement and micro-strain of each prefabricated component of the prefabricated and assembled bridge structure in service are used as reference values. By comparing the monitoring data with the reference values, a macro judgment is made on the structural safety when the monitoring data exceeds the reference values, and the reference values ​​are used to replace some of the monitoring data that are stuck in the over-range range, and the step change monitoring data caused by the rapid passage of heavy vehicles, sensor sensitivity and other factors are replaced with the test values, so that the monitoring data is smoother;

[0011] b. Monitoring data correlation analysis model

[0012] For the displacement response, microstrain response, and bridge temperature monitoring data of each prefabricated component of the existing prefabricated and assembled bridge structure, the correlation scatter distribution diagram of the displacement response or microstrain response monitoring data of each prefabricated component of the prefabricated and assembled bridge structure is drawn, and the Pearson correlation coefficient is calculated. The correlation scatter distribution diagram of the displacement response, microstrain response, and bridge temperature monitoring data of adjacent prefabricated components is drawn, and the Pearson correlation coefficient is calculated.

[0013] c. Short-term prediction of correlation coefficient of monitoring data

[0014] The three-fold smoothing index method (Holt-Winters) is used to make short-term predictions of the Pearson correlation coefficient of monitoring data;

[0015] d. Short-term prediction error of monitoring data correlation coefficient

[0016] Considering the mean error (ME), mean absolute error (MAPE), mean percentage error (MPE), mean square error (MSE), and root mean square error (RMSE) evaluation indicators, the prediction accuracy of the Pearson correlation coefficient of the monitoring data was analyzed;

[0017] e. When the Pearson correlation coefficient analysis error cannot meet the set precision value, repeat steps c and d, considering higher-order smoothing exponents, until the Pearson correlation coefficient analysis error meets the set precision value.

[0018] Furthermore, in step a, a 0-1 regularization transformation is performed on the monitoring data after preliminary preprocessing, so that the data values ​​of different monitoring items are in the same value interval [0,1], and the different monitoring items include different units, different attributes, and different value ranges;

[0019] Furthermore, in the step c, the three-fold smoothing index method Holt-Winters first performs periodic and random decomposition on the Pearson correlation coefficient of the monitoring data, then performs data filtering, and finally performs short-term prediction and corresponding confidence interval.

[0020] The beneficial effects of the present invention are:

[0021] The present invention provides a performance analysis method for an existing prefabricated and assembled bridge structure based on monitoring data. The method comprises the following steps: drawing a scatter distribution diagram of the correlation of the displacement response or microstrain response monitoring data of each prefabricated component of the existing prefabricated and assembled bridge structure, calculating and Pearson correlation coefficient, drawing a scatter distribution diagram of the correlation of the displacement response (microstrain response, temperature) monitoring data of adjacent prefabricated components of the prefabricated and assembled bridge structure, and calculating Pearson correlation coefficient; using a cubic smoothing index method (Holt-Winters) to make a short-term prediction of the Pearson correlation coefficient of the monitoring data, and using error analysis and higher-order smoothing index to make the Pearson correlation coefficient analysis of the monitoring data reach a set accuracy; revealing the material degradation performance of the prefabricated component itself, and revealing the degradation status of the service performance of the connecting parts of two adjacent prefabricated components; helping to reveal the real service status of the structure, and formulating more targeted maintenance decisions based on short-term predictions. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic flow chart of the method of the present invention;

[0023] Figure 2 It is a schematic diagram of the original monitoring data of a prefabricated assembled beam-slab bridge structure;

[0024] Figure 3 yes Figure 2 Schematic diagram of monitoring data preprocessing effect;

[0025] Figure 4 yes Figure 2 Schematic diagram of the correlation of monitoring data;

[0026] Figure 5 yes Figure 2 Periodic and non-periodic effects of the Pearson correlation coefficient of displacement and microstrain of beam No. 5 in the same beam-slab;

[0027] Figure 6 yes Figure 2Schematic diagram of verification and prediction of Pearson correlation coefficient of displacement and microstrain of beam No. 5 in the same beam-slab;

[0028] Figure 7 yes Figure 2 Periodic and non-periodic effects of the Pearson correlation coefficient of microstrain of beams 3 and 5 in different beam-slabs;

[0029] Figure 8 yes Figure 2 Schematic diagram of short-term prediction of Pearson correlation coefficient of microstrain of beams 3 and 5 in different beam-slabs. DETAILED DESCRIPTION

[0030] The present invention is further described below in conjunction with the accompanying drawings.

[0031] like Figure 1 As shown, a method for analyzing the performance of a prefabricated and assembled bridge structure based on monitoring data comprises the following steps:

[0032] a. Monitoring data preprocessing

[0033] For the displacement response, micro-strain response and bridge temperature monitoring data of each prefabricated component of the prefabricated and assembled bridge structure in service, the test values, theoretical design values ​​and limit values ​​corresponding to the displacement and micro-strain of each prefabricated component of the prefabricated and assembled bridge structure in service are used as reference values. By comparing the monitoring data with the reference values, a macro judgment is made on the structural safety when the monitoring data exceeds the reference values, and the reference values ​​are used to replace some of the monitoring data that are stuck in the over-range range, and the step change monitoring data caused by the rapid passage of heavy vehicles, sensor sensitivity and other factors are replaced with the test values, so that the monitoring data is smoother;

[0034] Implementing 0-1 regularization transformation on the monitoring data after preliminary preprocessing so that the data values ​​of different monitoring items are in the same value interval [0,1], and the different monitoring items include different units, different attributes, and different value ranges;

[0035] b. Monitoring data correlation analysis model

[0036] For the displacement response, microstrain response, and bridge temperature monitoring data of each prefabricated component of the existing prefabricated and assembled bridge structure, the correlation scatter distribution diagram of the displacement response or microstrain response monitoring data of each prefabricated component of the prefabricated and assembled bridge structure is drawn, and the Pearson correlation coefficient is calculated. The correlation scatter distribution diagram of the displacement response, microstrain response, and bridge temperature monitoring data of adjacent prefabricated components is drawn, and the Pearson correlation coefficient is calculated.

[0037] c. Short-term prediction of correlation coefficient of monitoring data

[0038] The Holt-Winters method is used to perform short-term prediction on the Pearson correlation coefficient of the monitoring data. In the Holt-Winters method of the third smoothing index in step c, the Pearson correlation coefficient of the monitoring data is firstly subjected to periodic and random decomposition, and then data filtering is performed, and finally the short-term prediction and the corresponding confidence interval are performed.

[0039] d. Short-term prediction error of monitoring data correlation coefficient

[0040] Considering the mean error (ME), mean absolute error (MAPE), mean percentage error (MPE), mean square error (MSE), and root mean square error (RMSE) evaluation indicators, the prediction accuracy of the Pearson correlation coefficient of the monitoring data was analyzed;

[0041] e. When the Pearson correlation coefficient cannot meet the set precision value, repeat steps c and d, considering higher-order smoothing exponents, until the Pearson correlation coefficient analysis error meets the set precision value.

[0042] like Figure 1 As shown in FIG. 1 , it is a flow chart of a method for analyzing the structural performance of an in-service prefabricated assembled beam-slab bridge based on monitoring data, including monitoring data preprocessing, monitoring data smoothing processing with reference to test values, theoretical design values ​​and limit values, and monitoring data 0-1 regularization transformation can be considered to make it more visual; monitoring data correlation analysis, considering the displacement response, microstrain response and bridge temperature monitoring data of prefabricated beams and slabs, respectively drawing the correlation scatter distribution diagram of the displacement response or microstrain response monitoring data of each prefabricated beam and slab, calculating the Pearson correlation coefficient, drawing the correlation scatter distribution diagram of the displacement response (microstrain response, temperature) monitoring data of adjacent prefabricated beams and slabs, and calculating the Pearson correlation coefficient. coefficient; For short-term prediction of Pearson correlation coefficient of monitoring data, consider the third-order smoothing index method (Holt-Winters), implement periodic and random decomposition of the correlation coefficient of monitoring data, and further implement data filtering (i.e. prediction training), and finally give a short-term prediction, and point out the corresponding confidence interval; For short-term prediction error analysis of correlation coefficient of monitoring data, consider the mean error (ME), mean absolute error (MAPE), mean percentage error (MPE), mean square error (MSE), root mean square error (RMSE) evaluation indicators, and higher-order smoothing indexes, and analyze the error of Pearson correlation coefficient of monitoring data to ensure prediction accuracy.

[0043] Figure 2It is a schematic diagram of the original monitoring data of the superstructure of the prefabricated assembled beam-slab bridge on the 8th. D1~D5 represent the displacement response monitoring data of 5 prefabricated beams, M1~M5 represent the microstrain response monitoring data of 5 prefabricated beams, and T1~T5 represent the temperature monitoring data of the prefabricated beams No. 1 and No. 5 on both sides.

[0044] Figure 3 This is an illustration of the effect of D1 and D2 pre-processing on the 3-day monitoring data of the bridge's partial jam. After the pre-processing of D1 and D2 data, the periodic characteristics hidden in the original data can be observed.

[0045] Figure 4 The correlation of monitoring data with different measurement attributes and different values ​​of the bridge. The displacement and microstrain values ​​of each beam are generally scattered, and some data (such as D3 and D4, followed by M2 and M1) are concentrated in the diagonal area, showing linear changes, which can reveal a strong correlation, that is, precast beams No. 3 and No. 4 are closely connected by wet joints, which can better share traffic loads and have good lateral distribution characteristics; some data (such as D4 and M4) are approximately concentrated in the diagonal area, and locally show curve changes, that is, the material strength and stiffness changes are not synchronized, which can reveal that beam No. 4 has obvious material degradation.

[0046] Figure 5-8 yes Figure 2 The Pearson correlation coefficient of displacement and microstrain of beam No. 5 of the same beam slab, and the short-term prediction diagram of the Pearson correlation coefficient of microstrain of beam No. 3 and beam No. 5 of different beam slabs; Considering the three-time smoothing index analysis method (Holt-Winters), different time series data can be decomposed into periodic arrays and non-periodic arrays, among which the non-periodicity (randomness) is significantly greater than the periodic data, which increases the difficulty of subsequent accurate prediction. In terms of periodicity, the microstrain data increased significantly from the early morning, reaching the maximum peak at around 7 am, and then decreased significantly until around 20 pm, indicating that the busy traffic period is around 7 am, and it decreases significantly after 20 pm. Combined with video surveillance, it is consistent with the traffic volume of this section. Figure 6 and Figure 8 In the middle (left sub-figure), the thick line represents the smoothed exponential prediction, which mostly overlaps with the thin line, indicating that the prediction accuracy is good, that is, this method can be used for the subsequent prediction analysis. Figure 6 and Figure 8 In the middle (right sub-figure), the thick line is the short-term prediction effect, and the shadow is the confidence interval. The prediction result can provide a reference for more reasonable maintenance and management decisions.

[0047] This embodiment does not impose any formal limitation on the shape, material, structure, etc. of the present invention. Any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention shall fall within the protection scope of the technical solution of the present invention.

[0048] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein, but these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for analyzing the performance of a prefabricated and assembled bridge structure based on monitoring data, characterized in that: The steps include: a. Monitoring data preprocessing For the displacement response, micro-strain response and bridge temperature monitoring data of each prefabricated component of the prefabricated and assembled bridge structure in service, the test values, theoretical design values ​​and limit values ​​corresponding to the displacement and micro-strain of each prefabricated component of the prefabricated and assembled bridge structure in service are used as reference values. By comparing the monitoring data with the reference values, a macro judgment is made on the structural safety when the monitoring data exceeds the reference values, and the reference values ​​are used to replace some of the over-range stuck monitoring data; that is, the test values ​​are used to replace some of the over-range stuck and step change monitoring data caused by the rapid passage of heavy vehicles and sensor sensitivity factors, so that the monitoring data is smoother; Implementing 0-1 regularization transformation on the response monitoring data of each prefabricated component after preliminary preprocessing, so that the monitoring data values ​​of different attributes are in the same value interval [0,1], and the different monitoring items include different units, different attributes, and different value ranges; b. Monitoring data correlation analysis model For the displacement response, microstrain response, and bridge temperature monitoring data of each prefabricated component of the existing prefabricated assembled bridge structure, the correlation scatter distribution diagram of the displacement response or microstrain response monitoring data of each prefabricated component is drawn, and the Pearson correlation coefficient is calculated. The correlation scatter distribution diagram of the displacement response, microstrain response, and bridge temperature monitoring data of adjacent prefabricated components is drawn, and the Pearson correlation coefficient is calculated. c. Short-term prediction of correlation coefficient of monitoring data The three-fold smoothing index method (Holt-Winters) is used to make short-term predictions of the Pearson correlation coefficient of monitoring data; d. Short-term prediction error of monitoring data correlation coefficient Considering the mean error (ME), mean absolute error (MAPE), mean percentage error (MPE), mean square error (MSE), and root mean square error (RMSE) evaluation indicators, the prediction accuracy of the Pearson correlation coefficient of the monitoring data was analyzed; e. When the Pearson correlation coefficient analysis error cannot meet the set precision value, repeat steps c and d, considering higher-order smoothing exponents, until the Pearson correlation coefficient analysis error meets the set precision value.

2. The method for analyzing and predicting the performance of an existing prefabricated and assembled bridge structure based on monitoring data according to claim 1 is characterized in that: The three-fold smoothing index method (Holt-Winters) described in step c includes firstly performing periodic and random decomposition on the Pearson correlation coefficient of the monitoring data of each prefabricated component, then performing data filtering, and finally performing short-term prediction and corresponding confidence interval.