Electricity, heat and gas integrated energy system and method for coordinated optimization operation control
Through cooperative game theory and Shapley value model, combined with electric-to-gas equipment and carbon capture power plants, a comprehensive energy system with coordinated operation is formed, which solves the problems of low-carbon economic operation and unfair interest distribution in the existing technology, and realizes efficient operation of the system and carbon emission reduction effects.
Patent Information
- Application Number
- CN202210108475.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-01-28
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2042-01-28
AI Technical Summary
The existing integrated energy system ignores the potential of low-carbon economic operation during optimization operation, and the benefits of each subsystem are unfairly distributed and lacks a coordinated operation mechanism, which affects the overall benefits of the system and carbon emission management.
Adopting cooperative game theory, combining P2G electrical to gas equipment, carbon capture power plants and gas thermal power plants, profit distribution is performed through Shapley value model, forming a coordinated comprehensive energy system, optimizing resource allocation and profit distribution, and improving the system's wind power consumption capacity and Carbon emission reduction effect.
The coordinated operation of various subsystems in the system has been achieved, the overall benefits have been improved, carbon emissions and carbon trading costs have been reduced, wind power consumption capacity has been improved, the cost of wind curtailment has been reduced, the rational conditions of the system have been met, and the rational conditions of the group and individuals have been improved. The economic and environmental benefits of the system.
Smart Images

Figure CN114240256B_ABST
Abstract
Description
Technical field:
[0001] The present invention relates to integrated energy optimization control technology, and in particular to an electric, thermal and gas integrated energy system and a method for coordinated optimization operation control. Background technology:
[0002] Integrated energy system, in English: Integrated energy system, abbreviated as IES, compared with the independent operation of traditional multiple energy systems, IES can achieve complementary advantages and energy flow among multiple energy sources, and has played a significant role in improving the energy utilization rate of distribution networks, improving system operation flexibility and reducing environmental pollution.
[0003] In the existing technology, the subsystems of the integrated energy system are in a non-coordinated mode. The electric energy system directly sells electricity to the grid at the grid-connected electricity price, while the power-to-gas device and carbon capture power plant purchase electricity from the grid at the industrial electricity price for natural gas production and CO2 capture.
[0004] At present, there have been many research results on the optimization operation of integrated energy systems. Most of the studies focused on the operating economy of IES and ignored the huge potential of IES in achieving carbon emission reduction. Carbon capture power plants, as ideal complementary power sources for wind power, provide an important way for the low-carbon economic operation of IES.
[0005] As the power trading system and trading model become more and more perfect, it is equally important to independently consider the benefits and costs of each subsystem within the system. The key to such problems is to ensure that the benefits of each subsystem within the system are distributed fairly and reasonably, and game theory provides a reference for such interactive decision-making problems, which are mainly divided into non-cooperative games and cooperative games. Non-cooperative games discuss the existence of Nash equilibrium points and focus on the competition phenomenon among multiple subjects. Unlike non-cooperative games, cooperative games focus on the improvement of collective interests and the fair and reasonable distribution of cooperative surplus.
[0006] Through the above analysis, we can see that the future energy system will usher in a variety of transformations and changes, especially the application of various low-carbon and clean technologies. Various transformations and changes do not exist in isolation, but complement each other and develop in a coordinated manner. Therefore, it is necessary to comprehensively consider the impact of the coordinated operation of the IES low-carbon economic operation mechanism, the use of power-to-gas equipment P2G to promote wind power consumption, and the use of cooperative game theory to improve IES benefits on IES scheduling. Summary of the invention:
[0007] The present invention proposes a method for coordinated optimization operation control of an electric, thermal and gas integrated energy system based on cooperative game, targeting an integrated energy system containing a carbon capture power plant, power-to-gas equipment, a gas boiler GB, renewable energy, battery energy storage and other equipment.
[0008] The integrated energy system includes: power grid, heat pipe network, natural gas pipe network, renewable energy system, gas thermal power plant, carbon capture power plant;
[0009] The renewable energy system includes wind power, photovoltaic power and battery energy storage;
[0010] The gas-fired thermal power plant comprises: a combined heat and power unit CHP, a power-to-gas device P2G, a gas boiler GB, and thermal energy storage;
[0011] The carbon capture power plant comprises: a thermal power unit, carbon capture and storage equipment;
[0012] The wind power or photovoltaic power is transmitted to the power grid and battery energy storage respectively;
[0013] The cogeneration unit CHP transmits electricity to the power grid, the heat network and the thermal energy storage respectively; the power-to-gas device P2G inputs electricity from the power grid, takes the carbon dioxide in the carbon capture and storage equipment as the gas source, and the generated natural gas is transmitted to the cogeneration unit CHP, the gas boiler GB and the natural gas network respectively; the gas source of the gas boiler GB is the natural gas network, and the heat is output to the thermal network or the thermal energy storage; the heat source of the thermal energy storage is the cogeneration unit CHP or the gas boiler GB, and the heat of the thermal energy storage is output to the thermal network;
[0014] The electric energy of the thermal power unit is transmitted to the power grid, and the carbon dioxide of the thermal power unit is supplied to the carbon capture and storage equipment; the carbon capture and storage equipment inputs energy from the power grid, captures and stores the carbon dioxide, and supplies it to the power-to-gas equipment P2G.
[0015] Under certain operating constraints, the decision makers of each subsystem choose their own strategies based on the information they have to maximize benefits or minimize risk costs, which is a game. In the comprehensive energy system proposed in this patent, multiple subsystems are combined into a whole system, and according to a certain distribution principle, resources are reconfigured and benefits are distributed among the subsystems within the system, which can make the system energy configuration more flexible and reasonable and generate synergistic surplus. Therefore, the present invention adopts cooperative game theory to determine the operation control of each comprehensive energy system.
[0016] Power-to-gas equipment P2G can realize the conversion of electrical energy into gas energy. Its operating constraints are:
[0017]
[0018] Among them, Q P2G,t 、V gas,t are the amount of CO2 consumed by the P2G equipment and the volume of natural gas generated, K gas is the low combustion calorific value of natural gas, η P2G is the efficiency of the power-to-gas device, α CO2is the amount of CO2 required to generate natural gas per unit of power, P P2G,t is the electrical power consumed by the power-to-gas device, P P2G,min , P P2G,max is the minimum and maximum power consumption of the power-to-gas device, P P2G,down , P P2G,up It is the lower and upper limits of the climbing rate of the power consumption of the equipment.
[0019] Operation constraints of CHP combined heat and power unit:
[0020]
[0021] Among them, G CHP,t is the total power generated by the combined heat and power unit CHP after burning natural gas, V CHP,t is the CHP air intake volume of the combined heat and power unit, H CHP,t , P CHP,t are the thermal power and electrical power generated by the combined heat and power unit CHP, are the thermal efficiency and electrical efficiency of the combined heat and power unit CHP, P CHP,max , P CHP,min are the upper and lower limits of the CHP output power of the combined heat and power unit, P CHP,up , P CHP,down It is the upper limit and lower limit of the ramp rate of the CHP output power of the cogeneration unit.
[0022] Operation constraints of gas boiler GB:
[0023]
[0024] Among them, H GB,t is the thermal power generated by the gas boiler, is the gas boiler efficiency, V GB,t is the gas boiler intake volume, H GB,min , H GB,max are the upper and lower limits of gas boiler output, H GB,up , H GB,down It is the upper and lower limits of the ramp rate of the thermal power output of the gas boiler.
[0025] Operating constraints of carbon capture power plants:
[0026]
[0027] Among them, P T,t is the actual power of the carbon capture power plant, P T,min , P T,max are the upper and lower limits of the carbon capture power plant output, P T,up , P T,downare the upper and lower limits of the ramp rate of the carbon capture power plant, P Capture,t is the electrical power consumed by the carbon capture device, are the upper and lower limits of the carbon capture device climbing, P T2C,t , P TN,t are the power supplied to the carbon capture equipment of the carbon capture power plant and the grid-connected power of the carbon capture power plant, P Cf,t , P Cr,t are the fixed energy consumption and operating energy consumption of carbon capture equipment, α c The energy consumption required for the carbon capture equipment to process a unit of CO2, is the CO2 capture and emission, λ C is the carbon emission intensity of the carbon capture power plant, is the carbon emission quota of the carbon capture power plant during period t, λ q It is the carbon emission quota per unit of electricity.
[0028] Battery energy storage and thermal energy storage operating constraints:
[0029] Battery energy storage can alleviate the contradiction between renewable energy output and load demand. Its source-load duality, time-space duality and flexible response characteristics can increase the flexibility of the power system. Its charge state indicates:
[0030]
[0031] in are the charging efficiency and discharging efficiency of the battery at time t respectively; are the charging state and discharging state of the battery at time t respectively; are the charging power and discharging power of the battery in period t respectively; They are the minimum and maximum values of the battery charge and discharge power, respectively; are the minimum state of charge and maximum state of charge of the battery respectively; S SOC,1 , S SOC,T They are the state of charge at the initial moment and the state of charge at the final moment in the battery charge and discharge cycle respectively;
[0032] Thermal storage constraints are the same as battery constraints, so they will not be elaborated on here.
[0033] There are two basic conditions for the existence of cooperative games:
[0034] Group rationality condition: that is, for the system as a whole, the overall benefit of the system after cooperation is greater than the sum of the benefits of each subsystem when operating alone.
[0035] Individual rationality condition: that is, within the system, each subsystem can obtain benefits no less than those obtained when it does not join the system as a whole.
[0036] The control method for collaboratively optimizing the above-mentioned integrated energy system includes the following processes:
[0037] Step 1: Measure the following parameters of the integrated energy system;
[0038] Power-to-gas equipment P2G: Minimum power consumption P of the power-to-gas equipment P2G P2G,min , the maximum power consumption P of the power-to-gas equipment P2G P2G,max , P2G efficiency η P2G , the amount of CO2 required to generate natural gas per unit power α CO2 ;
[0039] Combined heat and power unit CHP: The upper limit of the output power of the combined heat and power unit CHP P CHP,max , the lower limit of the CHP output power of the combined heat and power unit P CHP,min , natural gas low combustion calorific value K gas ;
[0040] Gas boiler GB: Gas boiler GB output lower limit H GB,min , gas boiler GB output upper limit H GB,max , gas boiler GB efficiency
[0041] Carbon capture power plant: Energy consumption required to process unit CO2 in carbon capture and storage equipment α c , carbon emission intensity of carbon capture power plant λ C , carbon emission quota per unit of electricity λ q ;
[0042] Battery energy storage: minimum power for charging and discharging battery energy storage Maximum power of battery energy storage charging and discharging The charging efficiency of the battery at time t The discharge efficiency of the battery at time t
[0043] Renewable energy system: wind power and photovoltaic power forecast values in the next 24 hours;
[0044] Step 2: Get relevant price factors:
[0045] Tiered electricity price: tiered electricity purchase price within 24 hours, tiered on-grid electricity price within 24 hours;
[0046] Thermal power unit operating cost coefficient, unit natural gas purchase price p Gas , carbon trading price γ C , the cost coefficient of storing unit CO2 λ CS , unit CO2 purchase price p CO2, P2G equipment operating cost coefficient λ P2G , is the conversion coefficient of network fee α Net , β Net , the penalty cost coefficient for abandoned wind units is β1, and the penalty cost coefficient for abandoned solar units is β2;
[0047] Step 3: With the goal of maximizing the overall benefit of the system, establish the objective function, which is:
[0048]
[0049] Among them, C R is the operation and maintenance cost of renewable energy power generation system, C Q The penalty cost for wind and solar curtailment, C F is the operating cost of thermal power units, C CS is the carbon sequestration cost, C Gas is the gas purchase cost of the gas-fired thermal power plant, C P2G is the operating cost of the power-to-gas equipment P2G, C Buy is the cost of purchasing electricity from the power grid, C Net is the cost of network access fee, C SE is the revenue from electricity sales, C SC is the carbon trading income; the specific calculation formula is as follows:
[0050]
[0051] Among them, α W , α pv are the operation and maintenance cost coefficients of wind and solar power generation, α S is the energy storage cost per kWh, β1 and β2 are the penalty cost coefficients for wind and solar power abandonment, a, b, c are the operating cost coefficients for thermal power units, and λ CS is the cost coefficient for storing unit CO2, p Gas is the unit natural gas purchase price, is the purchase price per unit of CO2, λ P2G is the operating cost coefficient of the power-to-gas equipment P2G, p e,t is the electricity purchase price of the power grid during period t, α Net , β Net is the conversion coefficient of network fee, p se,t is the on-grid electricity price in period t, γ C is the carbon trading price;
[0052] At this point, the benefits and costs of the renewable energy system, gas-fired thermal power plant, and carbon capture power plant are:
[0053]
[0054] Among them, C Res , CCcpp , C Gtpp are the revenues from renewable energy systems, carbon capture plants and gas-fired thermal power plants, respectively. Revenue from renewable energy systems selling electricity to other systems, are the electricity purchase costs from renewable energy systems for carbon capture power plants and gas thermal power plants, are the revenue from selling electricity to the grid from renewable energy systems, carbon capture power plants and gas-fired thermal power plants, γ E The electricity price agreed within the system;
[0055] A binary game M =<N,v> , where N is the set of subsystems, that is, N = {1,2,3…n}, for any subset of N The revenue of subsystem S is recorded as v(S), and the marginal contribution created by subsystem i participating in different subsystems S for its participation in the whole system is recorded as [v(S)-v(S\{i})], where S\{i} represents the set after element i is deleted from the set S. When the total revenue of system S is distributed, the share of each subsystem is called a payment, and the payment vector is defined It represents the sharing scheme of benefits; the benefits of the system are transferable, that is, there are transfer payments to coordinate the benefits between subsystems;
[0056] The profit distribution formula is as follows:
[0057]
[0058] Among them, W S is the weighting factor, that is, the weight of the benefits that subsystem i should receive from the whole system.
[0059] The advantages of the present invention over the prior art are:
[0060] Based on cooperative game theory, this paper constructs a comprehensive energy system including power-to-gas, carbon capture, gas boilers, thermal energy storage and other equipment. It divides IES into three main bodies: renewable energy system, carbon capture power plant and gas thermal power plant. The three have the possibility of coordinated operation, and the overall total profit of the system is distributed based on the Shapley value model, which finally proves the value of coordinated operation.
[0061] The proposed system structure fully considers the complementary coupling of energy within the system. Through the coordinated operation of carbon capture and power-to-gas (P2G) equipment, the system's wind power absorption capacity can be effectively improved, the cost of wind curtailment can be reduced, and peak shaving and valley filling can be achieved.
[0062] Compared with independent operation, the coordination of various integrated energy entities is more conducive to IES's profitability. When the RCG system operates in a coordinated manner, the system benefits are higher than those of independent operation. When the participating subsystems do not reach individual rationality, the allocation of subsystem benefits through the Shapley value method can improve the enthusiasm of the subsystems.
[0063] After the carbon capture power plant and the power-to-gas equipment P2G enter the collaborative operation mode through system collaborative operation, the system carbon emissions and carbon trading costs are significantly reduced. Compared with the independent operation mode of the carbon capture power plant or the power-to-gas equipment P2G, the system collaborative operation mode is more effective in reducing carbon emissions.
[0064] By selling electricity to carbon capture and storage equipment and power-to-gas (P2G) equipment at a negotiated electricity price, the renewable energy system can reduce its energy storage costs, increase the overall power consumption of the system, and at the same time improve its wind and solar power abandonment absorption capacity, reduce its wind and solar power abandonment penalty costs, thereby increasing the benefits of the renewable energy system;
[0065] The carbon capture power plant increases the output of the carbon capture equipment by purchasing electricity from the renewable energy system, thereby reducing its CO2 emissions and increasing the output of its thermal power units within the carbon emission quota. At the same time, by selling its gasification raw material CO2 to the power-to-gas equipment P2G, it reduces the carbon storage cost and increases the carbon trading income;
[0066] Gas-fired thermal power plants increase the output of their power-to-gas equipment (P2G) by purchasing electricity from renewable energy systems, thereby boosting the output of their combined heat and power (CHP) units and gas boilers (GB), while reducing their gas purchase costs. Description of the drawings:
[0067] Figure 1 It is a schematic diagram of the structure of the electric, heat and gas integrated energy system in an embodiment of the present invention.
[0068] Figure 2 1 is a diagram of the day-ahead forecast data of renewable energy output in an embodiment of the present invention; the horizontal axis represents a 24-hour period in a day, and the vertical axis represents power value, in MW.
[0069] Figure 3 It is a time-sharing electricity price diagram in an embodiment of the present invention. Specific implementation method:
[0070] Example:
[0071] The IES of an industrial park is the research object, and its structure is as follows Figure 1 As shown in Figure 2, the day-ahead wind and solar forecast data is as follows: Figure 2 As shown in Figure 3 As shown in Table 1, the parameters in the system are shown in Table 1.
[0072] The integrated energy system includes: power grid, heat network, natural gas network, renewable energy system, gas-fired thermal power plant, carbon capture power plant;
[0073] The renewable energy system includes wind power, photovoltaic power and lithium battery energy storage. In this embodiment, lithium iron phosphate battery is selected as the energy storage battery. Lithium battery has the advantages of high energy density, long cycle life and good safety performance, so it has broad application prospects in mitigating the fluctuation of renewable energy output.
[0074] The gas-fired thermal power plant comprises: a combined heat and power unit CHP, a power-to-gas device P2G, a gas boiler GB, and thermal energy storage;
[0075] The carbon capture power plant comprises: a thermal power unit, carbon capture and storage equipment;
[0076] The wind power or photovoltaic power is transmitted to the power grid and the lithium battery energy storage respectively;
[0077] The cogeneration unit CHP transmits electricity to the power grid, the heat network and the thermal energy storage respectively; the power-to-gas device P2G inputs electricity from the power grid, takes the carbon dioxide in the carbon capture and storage equipment as the gas source, and the generated natural gas is transmitted to the cogeneration unit CHP, the gas boiler GB and the natural gas network respectively; the gas source of the gas boiler GB is the natural gas network, and the heat is output to the thermal network or the thermal energy storage; the heat source of the thermal energy storage is the cogeneration unit CHP or the gas boiler GB, and the heat of the thermal energy storage is output to the thermal network;
[0078] The electric energy of the thermal power unit is transmitted to the power grid, and the carbon dioxide of the thermal power unit is supplied to the carbon capture and storage equipment; the carbon capture and storage equipment inputs energy from the power grid, captures and stores the carbon dioxide, and supplies it to the power-to-gas equipment P2G.
[0079] The method for collaboratively optimizing the operation and control of the above-mentioned integrated energy system includes the following process:
[0080] Step 1: Measure the following parameters of the integrated energy system;
[0081] Power-to-gas equipment P2G: Minimum power consumption P of the power-to-gas equipment P2G P2G,min , the maximum power consumption P of the power-to-gas equipment P2G P2G,max , P2G efficiency η P2G , the amount of CO2 required to generate natural gas per unit power α CO2 ;
[0082] Combined heat and power unit CHP: The upper limit of the output power of the combined heat and power unit CHP P CHP,max , the lower limit of the CHP output power of the combined heat and power unit P CHP,min , natural gas low combustion calorific value Kgas ;
[0083] Gas boiler GB: Gas boiler GB output lower limit H GB,min , gas boiler GB output upper limit H GB,max , gas boiler GB efficiency
[0084] Carbon capture power plant: Energy consumption required to process unit CO2 in carbon capture and storage equipment α c , carbon emission intensity of carbon capture power plant λ C , carbon emission quota per unit of electricity λ q ;
[0085] Lithium battery energy storage: Minimum power for charging and discharging lithium battery energy storage Maximum power of lithium battery energy storage charging and discharging Charging efficiency of lithium battery at time t Discharge efficiency of lithium battery at time t
[0086] Renewable energy system: wind power and photovoltaic power forecast values in the next 24 hours;
[0087] The specific values in this embodiment are shown in Table 1. Figure 2 , Figure 3 ;
[0088] Step 2: Get relevant price factors:
[0089] Tiered electricity price: tiered electricity purchase price within 24 hours, tiered on-grid electricity price within 24 hours;
[0090] Thermal power unit operating cost coefficient, unit natural gas purchase price p Gas , carbon trading price γ C , the cost coefficient of storing unit CO2 λ CS , purchase price per unit CO2 Power-to-gas equipment P2G operating cost coefficient λ P2G , is the conversion coefficient of network fee α Net , β Net , the penalty cost coefficient for abandoned wind units is β1, and the penalty cost coefficient for abandoned solar units is β2;
[0091] Table 1 IES unit parameters
[0092]
[0093] Step 3: With the goal of maximizing the overall benefit of the system, establish the objective function, which is:
[0094] Among them, CR is the operation and maintenance cost of renewable energy power generation system, C Q The penalty cost for wind and solar curtailment, C F is the operating cost of thermal power units, C CS is the carbon sequestration cost, C Gas is the gas purchase cost of the gas-fired thermal power plant, C P2G is the operating cost of the power-to-gas equipment P2G, C Buy is the cost of purchasing electricity from the power grid, C Net is the cost of network access fee, C SE is the revenue from electricity sales, C SC is the carbon trading income; the specific calculation formula is as follows:
[0095]
[0096] Among them, α W , α pv are the operation and maintenance cost coefficients of wind and solar power generation, α S is the energy storage cost per kWh, β1 and β2 are the penalty cost coefficients for wind and solar power abandonment, a, b, c are the operating cost coefficients for thermal power units, and λ CS is the cost coefficient for storing unit CO2, p Gas is the unit natural gas purchase price, is the purchase price per unit of CO2, λ P2G is the operating cost coefficient of the power-to-gas equipment P2G, p e,t is the electricity purchase price of the power grid during period t, α Net , β Net is the conversion coefficient of network fee, p se,t is the on-grid electricity price in period t, γ C is the carbon trading price;
[0097] At this point, the benefits and costs of the renewable energy system, gas-fired thermal power plant, and carbon capture power plant are:
[0098]
[0099] Among them, C Res , C Ccpp , C Gtpp are the revenues from renewable energy systems, carbon capture plants and gas-fired thermal power plants, respectively. Revenue from renewable energy systems selling electricity to other systems, are the electricity purchase costs from renewable energy systems for carbon capture power plants and gas thermal power plants, are the revenue from selling electricity to the grid from renewable energy systems, carbon capture power plants and gas-fired thermal power plants, γ E The electricity price agreed within the system;
[0100] A binary game M =<N,v> , where N is the set of subsystems, that is, N = {1,2,3…n}, for any subset of N The revenue of subsystem S is recorded as v(S), and the marginal contribution created by subsystem i participating in different subsystems S for its participation in the whole system is recorded as [v(S)-v(S\{i})], where S\{i} represents the set after element i is deleted from the set S. When the total revenue of system S is distributed, the share of each subsystem is called a payment, and the payment vector is defined It represents the sharing scheme of benefits; the benefits of the system are transferable, that is, there are transfer payments to coordinate the benefits between subsystems;
[0101] The profit distribution formula is as follows:
[0102]
[0103] Among them, W S is the weighting factor, that is, the weight of the benefits that subsystem i should receive from the whole system.
[0104] Table 2 Comparison of benefit and cost results Unit: 10 2 $
[0105]
[0106] In order to compare, measure and analyze the operation results of the integrated energy system under different operation modes, non-cooperative operation and the following four cooperative schemes {Res, Ccpp, Gtpp} (RCG cooperative operation), {Res, Ccpp} (RC cooperative operation), {Res, Gtpp} (RG cooperative operation), {Ctpp, Gtpp} (CG cooperative operation) are set respectively. The costs and benefits of each part are shown in Table 2. Negative numbers in the table represent benefits and positive numbers represent costs, which is the same as the following text. It can be seen from Table 2 that after cooperative operation, the total system revenue increased by $27065 compared with independent operation, and the benefits of the renewable energy system and the carbon capture power plant also increased, that is, the group rationality condition was met.
[0107] Table 3 Comparison of benefit and cost results Unit: 10 2 $
[0108]
[0109] The benefits and costs of each subsystem are shown in Table 3. It is not difficult to see from Tables 2 and 3 that when the system is in the RCG collaborative operation mode, the total benefits increase due to the reduction of wind and solar power abandonment costs and carbon sequestration costs. However, the cost of the gas thermal power plant has increased by $8089 compared with independent operation. This is because during the operation of the power-to-gas equipment P2G, the electricity cost and operation and maintenance cost are higher than the benefits obtained from producing natural gas, which leads to an increase in Gtpp costs. At this time, although the system as a whole meets the group rationality conditions, it cannot meet the individual rationality conditions. It is necessary to reasonably allocate the collaborative surplus to improve the enthusiasm of the subsystems.
[0110] According to the Shapley value allocation model, the Shapley allocation results of Res, Ccpp, and Gtpp are shown in Tables 4, 5, 6, and 7 below.
[0111] Table 4 RCG collaborative operation profit distribution based on Shapley value Unit: 10 2 $
[0112]
[0113] Table 5 Res profit distribution based on Shapley value Unit: 10 2 $
[0114]
[0115] Table 6 Ccpp profit distribution unit based on Shapley value: 10 2 $
[0116]
[0117] Table 7 Gtpp profit distribution unit based on Shapley value: 10 2 $
[0118]
[0119] It can be seen from Table 4 that under the Shapley allocation model, the benefits of each subsystem have increased, and the benefits of {Res, Ccpp, Gtpp} have increased by 20701$, 1615$, and 4749$ respectively. The system meets the overall and individual rational conditions, that is, synergy is established, and the overall system benefit has increased by 27065$ compared with independent operation.
[0120] From the overall dispatch results of the system, in the 1-7 period, the wind power output is large and the load is small. The flexible adjustment units such as the CHP unit of the power generation side and the carbon capture power plant unit are limited by the constraints of heat load demand, upper and lower limits of unit output, and climbing rate constraints, resulting in limited regulation capacity. The lithium battery on the energy storage side is subject to the upper and lower limits of charging power and climbing rate constraints, and it is also difficult to fully absorb the surplus wind power. Therefore, in the non-cooperative operation state, the system generates wind abandonment; while in the cooperative operation state, the carbon capture device and other transferable loads can be used to absorb part of the abandoned wind. Although the carbon capture power plant has a small output, low carbon emissions, and relatively low carbon capture during this period, the system can rely on the power-to-gas equipment P2G equipment to absorb the surplus wind power. Compared with the independent operation mode, the wind abandonment cost is reduced by $6317 in the RCG cooperative operation mode. The power-to-gas (P2G) equipment enables the system to absorb abandoned wind power without over-reliance on lithium batteries, further improving the system's wind and solar absorption capacity, alleviating the contradiction between renewable energy output and load demand, and achieving peak shaving and valley filling.
[0121] During the 8-10 period, the system can meet the reduced heat load demand by relying solely on the CHP output of the cogeneration unit. At the same time, due to the reduction in the CHP output of the cogeneration unit, in order to meet the increased electricity load demand, the output of the carbon capture power plant is increased, and the energy consumption of the carbon capture device also increases accordingly. Therefore, CO2 emissions have not increased. At this time, the energy consumption of the carbon capture device is provided by the wind and solar outputs.
[0122] During the period from 11 to 17, the electricity load demand is always high, and wind and solar output take priority to meet the load demand. The carbon capture device, as an adjustable load, flexibly adjusts the capture amount with the output of renewable energy. At the same time, the thermal load is small during this period, and the CHP output of the cogeneration unit is reduced, and its heat production relies on thermal energy storage for consumption.
[0123] During the period from 18 to 24, due to the significant decrease in wind and solar output, the system relies on the CHP output of the carbon capture power plant and the cogeneration unit to meet the electricity load demand. As the load demand decreases, the carbon capture device captures more. At this time, most of the wind power output is used to meet the energy consumption of the carbon capture device to reduce the system's CO2 emissions and increase the system's carbon trading revenue.
Claims
1. A method for collaborative optimization operation control of an electric, heat and gas integrated energy system, characterized in that: The process includes the following: Step 1: Measure the following parameters of the integrated energy system; Power-to-gas equipment P2G: Minimum power consumption P of the power-to-gas equipment P2G P2G,min , the maximum power consumption P of the power-to-gas equipment P2G P2G,max , P2G efficiency η P2G , the amount of CO2 required to generate natural gas per unit power α CO2 ; Combined heat and power unit CHP: The upper limit of the output power of the combined heat and power unit CHP P CHP,max , the lower limit of the CHP output power of the combined heat and power unit P CHP,min , natural gas low combustion calorific value K gas ; Gas boiler GB: Gas boiler GB output lower limit H GB,min , gas boiler GB output upper limit H GB,max , gas boiler GB efficiency Carbon capture power plant: Energy consumption required to process unit CO2 in carbon capture and storage equipment α c , carbon emission intensity of carbon capture power plant λ C , carbon emission quota per unit of electricity λ q ; Battery energy storage: minimum power for charging and discharging battery energy storage Maximum power of battery energy storage charging and discharging The charging efficiency of the battery at time t The discharge efficiency of the battery at time t Renewable energy system: wind power and photovoltaic power forecast values in the next 24 hours; Step 2: Get relevant price factors: Tiered electricity price: tiered electricity purchase price within 24 hours, tiered on-grid electricity price within 24 hours; Thermal power unit operating cost coefficient, unit natural gas purchase price p Gas , carbon trading price γ C , the cost coefficient λ for storing unit CO2 CS , purchase price per unit CO2 Power-to-gas equipment P2G operating cost coefficient λ P2G , is the conversion coefficient of network fee α Net , β Net , the penalty cost coefficient for abandoned wind units is β1, and the penalty cost coefficient for abandoned solar units is β2; Step 3: With the goal of maximizing the overall benefit of the system, establish the objective function, which is: Among them, C R is the operation and maintenance cost of renewable energy power generation system, C Q The penalty cost for wind and solar curtailment, C F is the operating cost of thermal power units, C CS is the carbon sequestration cost, C Gas is the gas purchase cost of the gas-fired thermal power plant, C P2G is the P2G operating cost, C Buy is the cost of purchasing electricity from the power grid, C Net is the cost of network access fee, C SE is the revenue from electricity sales, C SC is the carbon trading income; the specific calculation formula is as follows: Among them, α W , α pv are the operation and maintenance cost coefficients of wind and solar power generation, α S is the energy storage cost per kWh, β1 and β2 are the penalty cost coefficients for wind and solar power abandonment, a, b, c are the operating cost coefficients for thermal power units, and λ CS is the cost coefficient for storing unit CO2, p Gas is the unit natural gas purchase price, p CO2 is the purchase price per unit of CO2, λ P2G is the P2G operation cost coefficient, p e,t is the electricity purchase price of the power grid during period t, α Net , β Net is the conversion coefficient of network fee, p se,t is the on-grid electricity price in period t, γ C is the carbon trading price; At this point, the benefits and costs of the renewable energy system, gas thermal power plant, and carbon capture power plant are: Among them, C Res , C Ccpp , C Gtpp are the revenues of renewable energy systems, carbon capture plants and gas-fired thermal power plants, respectively. Revenue from selling electricity from renewable energy systems to other systems, are the electricity purchase costs from renewable energy systems for carbon capture power plants and gas thermal power plants, are the revenue from selling electricity to the grid from renewable energy systems, carbon capture power plants and gas-fired thermal power plants, γ E The electricity price agreed within the system; A binary game M =<N,v> , where N is the set of subsystems, that is, N = {1,2,3…n}, for any subset of N The revenue of subsystem S is recorded as v(S), and the marginal contribution created by subsystem i participating in different subsystems S for its participation in the whole system is recorded as [v(S)-v(S\{i})], where S\{i} represents the set after element i is deleted from the set S. When the total revenue of system S is distributed, the share of each subsystem is called a payment, and the payment vector is defined It represents the sharing scheme of benefits; the benefits of the system are transferable, that is, there are transfer payments to coordinate the benefits between subsystems; The profit distribution formula is as follows: Among them, W S is the weighting factor, that is, the weight of the benefits that subsystem i should receive from the whole system.
2. The electric, heat and gas integrated energy system using the collaborative optimization operation control method of claim 1 is characterized in that: include: Power grids, heat networks, natural gas networks, renewable energy systems, gas-fired thermal power plants, and carbon capture power plants; The renewable energy system includes wind power, photovoltaic power and battery energy storage; The gas-fired thermal power plant comprises: a combined heat and power unit CHP, a power-to-gas device P2G, a gas boiler GB, and thermal energy storage; The carbon capture power plant comprises: a thermal power unit, carbon capture and storage equipment; The wind power or photovoltaic power is transmitted to the power grid and battery energy storage respectively; The cogeneration unit CHP transmits electricity to the power grid, the heat network and the thermal energy storage respectively; the power-to-gas device P2G inputs electricity from the power grid, takes the carbon dioxide in the carbon capture and storage equipment as the gas source, and the generated natural gas is transmitted to the cogeneration unit CHP, the gas boiler GB and the natural gas network respectively; the gas source of the gas boiler GB is the natural gas network, and the heat is output to the thermal network or the thermal energy storage; the heat source of the thermal energy storage is the cogeneration unit CHP or the gas boiler GB, and the heat of the thermal energy storage is output to the thermal network; The electric energy of the thermal power unit is transmitted to the power grid, and the carbon dioxide of the thermal power unit is supplied to the carbon capture and storage equipment; the carbon capture and storage equipment inputs energy from the power grid, captures and stores the carbon dioxide, and supplies it to the power-to-gas equipment P2G.
Citation Information
Patent Citations
Smart energy network system and control method thereof
CN102236343A
Virtual power plant optimal scheduling method considering electricity-to-gas coordination
CN112232603A
Electric heat integrated energy system optimization scheduling method based on low-carbon target
CN113379121A
Combined decision method for power generation plans of multiple power sources, and storage medium
WO2018059096A1