A construction power system and its use method
By adopting a construction power system with split management authority and dynamic cross authority at the construction site, the mixed use and traceability problems in temporary power use management at the construction site are solved, and the accuracy of the division and recording of power use permissions is achieved, ensuring the construction site smooth power management and clear responsibilities.
Patent Information
- Application Number
- CN202111485489.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-07
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2041-12-07
AI Technical Summary
Due to the large number of personnel, large mobility of personnel, serious cross-operation, many types of power equipment and poor working environment, the temporary power use is unscientific arrangement, unreasonable installation and irregular operation, resulting in difficulty in power use management, especially in the The chaos in electricity usage records between packages is difficult to manage.
The construction power system adopts a divided management authority and dynamic cross-authorization system. Through the authority verification device and power processing module, the power usage authority of each subcontract is divided, and the cross-construction without reporting is restricted, and temporary power usage grace is provided to ensure power usage records. accuracy and traceability.
It effectively avoids the mixed use of electricity usage rights between subcontracts, ensures the accuracy and traceability of electricity usage records, limits the problems to the end to the end, and avoids the difficult-to-trace problems caused by cross-construction.
Smart Images

Figure CN114298660B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of construction site management, and in particular to a construction power system and a use method thereof. Background Art
[0002] During the construction process, the amount of electricity used for construction and various electrical devices and electrical construction machinery is also increasing. However, the construction site has the characteristics of a large number of construction personnel, high personnel mobility, serious cross-operation, many types of electrical equipment, poor working environment, and temporary use. The temporary electricity layout at the construction site is unscientific, the installation is unreasonable, and the operation is not standardized. This has caused great difficulties in the management of temporary electricity at the construction site. Among them, the problems of random connection and mixed use of various subcontractors are relatively serious. The existing construction management system mostly considers the allocation of various resources at the construction site, and pays less attention to the cross-problems of existing projects.
[0003] Therefore, a construction power system is needed to solve the above problems. Summary of the invention
[0004] The present invention aims to solve the problem that the temporary power supply layout at the construction site is unscientific, the installation is unreasonable, and the operation is irregular, which causes great difficulties for the management of temporary power supply at the construction site. The present invention provides a construction power supply system and an evaluation method thereof, and solves the above problems by adopting the method of split management authority and dynamic cross authority.
[0005] The present invention provides a construction power consumption system, comprising a construction general meter, at least one first sub-meter, at least one second sub-meter and a power consumption processing module, wherein the power consumption processing module is respectively connected to the construction general meter, the first sub-meter and the second sub-meter signals, the first sub-meter is connected to at least one second sub-meter, the construction general meter is connected to at least one first sub-meter, the first sub-meter and the second sub-meter are provided with authority verification devices, the authentication level of the authority verification device of the first sub-meter is higher than the authentication level of the authority verification device of the second sub-meter, and the power consumption processing module is used to collect the power consumption of each meter head and control the current power consumption authority of each meter at the same time.
[0006] The first sub-meter permission lock and the second sub-meter permission lock are set to separate the permissions of managers and users. At the same time, by limiting the first permission lock, the power usage permissions of each subcontractor are not interoperable, avoiding the problem of mixed power usage without reporting and recording, and solving the problem of chaotic and difficult to manage power usage records between subcontractors from the root. At the same time, the problems caused by individuals are limited to the end to the greatest extent possible, avoiding the difficulty in tracing problems caused by cross-construction.
[0007] In a construction power supply system described in the present invention, as a preferred mode, the verification authority of the second sub-meter is a sub-authority of the verification authority of the first sub-meter, and the power supply authority of the second sub-meter is subordinate to the unique power supply authority of the first sub-meter.
[0008] A construction power system described in the present invention, as a preferred embodiment, the power consumption processing module includes a project creation module, a power consumption record module, an authority authentication module, and a temporary power allocation module. The project creation module is data-connected to the authority authentication module and the temporary power allocation module, the authority authentication module is data-connected to the temporary power allocation module, the power consumption record module is data-connected to the temporary power allocation module, the power consumption record module is connected to the construction general table, the first sub-table and the second sub-table, and the authority authentication module is connected to the first sub-table and the second sub-table.
[0009] A construction power system described in the present invention, as a preferred mode, a project creation module is used to create the ownership relationship and authority tolerance relationship of each electricity meter in the project, the power consumption recording module is used to record the power consumption under each authority, the authority authentication module is used to issue usage authority to the authority verification device of each first sub-meter and the authority verification device of the second sub-meter according to the ownership relationship created by the project creation module, and the temporary power allocation module is used to adjust the power consumption tolerance relationship between each authority according to the power consumption under each authority recorded by the power recording module.
[0010] After dividing the electricity usage rights through the electricity processing module, cross-construction issues are taken into consideration, unreported cross-construction is restricted, and a certain amount of margin is given for emergency issues.
[0011] In a construction power system described in the present invention, as a preferred mode, the power usage tolerance relationship is the scope and amount of power that can be used across geographically adjacent construction authorities.
[0012] The present invention provides a method for using a construction power system, comprising the following steps:
[0013] S1. Divide the construction site into several construction areas according to the location of the first sub-table in the construction site;
[0014] S2. Enter the construction area and estimated power consumption of each subcontractor into the project creation module according to the actual situation, and determine the subcontractor to which the first submeter and the second submeter in each construction area belong;
[0015] S3, the authority authentication module calls the subcontracting units to which the first sub-meters and the second sub-meters in the project creation module belong, generates regular electricity usage permissions, and issues regular electricity usage permissions that can be authenticated by the sub-meters to each first sub-meter;
[0016] S4. The temporary power allocation module retrieves the locations of adjacent areas belonging to different subcontractors in the project creation module, and authorizes the authorized temporary power use rights of the adjacent areas for each submeter in the above area. The temporary power use power Q2 is the estimated power consumption Q1 within the time threshold T of a single construction area of the subcontractor multiplied by 1 plus the power use wide coefficient a;
[0017] S5. Issue the second sub-meter usage rights to the user according to the subcontracting unit, and issue the first sub-meter usage rights to the manager;
[0018] S6, the first sub-meter verifies whether the first sub-meter usage authority is the regular power usage authority or temporary power usage authority of the sub-meter. If so, proceed to step S7; otherwise, the construction area that receives the first sub-meter usage authority grants the first sub-meter usage authority a temporary power usage authority for a time threshold T;
[0019] S7, determine the type of the first sub-meter usage authority, if it is a regular power usage authority, connect the electricity to the second sub-meters currently connected to the first sub-meter; if it is a temporary power usage authority, issue the usage authority of the total amount of temporary power usage authority electricity Q2 to the second sub-meters currently connected to the first sub-meter;
[0020] S8, the second sub-meter verifies whether the use rights of the second sub-meter belong to the same sub-contracting unit as the use rights issued by the connected first sub-meter, if so, the second sub-meter supplies power; otherwise, the terminal temporary power threshold Q3 is provided to the electrical appliance, and the sub-contracting unit information of the second sub-meter is provided to the project creation module;
[0021] S9, the electricity consumption recording module records the electricity consumption within the time threshold T, and counts the total electricity consumption of each sub-meter under each subcontracting unit;
[0022] S10, the project creation module detects whether there is a subcontractor outside the construction area whose usage times exceed the temporary usage times threshold X within the time threshold T. If so, the subcontractor in the construction area whose usage times exceed the temporary usage times threshold X is granted temporary power usage rights for a period of time threshold T, and proceeds to step S11; otherwise, proceeds to step S11;
[0023] S11, according to the historical records of actual power consumption under the use rights of each first sub-meter in each construction area, and the average value of the usage within the time threshold T, the average usage is assigned to the estimated power consumption Q1 within the time threshold T;
[0024] S12, detecting whether the project creation module receives a project end signal, if yes, proceeding to step S13; otherwise, proceeding to step S4;
[0025] S13. Export the total electricity consumption and records.
[0026] The beneficial effects of the present invention are as follows:
[0027] (1) By dividing the construction area, the authority of each area is issued according to the user, and the basic authority division of electricity use is realized, which avoids the difficulty in distinguishing the actual usage of each user when reading the meter due to the mixed use of electricity in large-scale construction, resulting in subsequent disputes;
[0028] (2) Use floating temporary power authorization for each intersection area based on actual power consumption to meet some necessary out-of-zone construction problems in the area while avoiding unreasonable pre-set area ranges;
[0029] (3) By not communicating with each other between the first sub-meter usage rights, the cross-use of electricity must be known to at least the user and the regional manager to avoid problems that cannot be traced;
[0030] (4) The authority of the second sub-table is issued through the first sub-table, so that when cross-construction occurs, if there are problems such as irregular operations, the problems can be traced back to the responsible person, avoiding the problem that cannot be traced back to the end after cross-construction;
[0031] (5) The electricity consumption record module, the authority authentication module and the temporary electricity allocation module simultaneously restrict and record electricity consumption, so that electricity consumption can be vertically traced. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 This is a schematic diagram of a construction power system;
[0033] Figure 2 This is a schematic diagram of a power processing module for a construction power system;
[0034] Figure 3 The present invention is a flow chart of the use method of a construction power system.
[0035] Reference numerals:
[0036] 1. Construction general table; 2. First sub-table; 3. Second sub-table; 4. Electricity consumption processing module; 41. Project creation module; 42. Electricity consumption record module; 43. Authority authentication module; 44. Temporary electricity allocation module. DETAILED DESCRIPTION
[0037] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0038] Example 1
[0039] like Figure 1As shown, a conventional railway turnout status assessment system includes a construction general table 1, at least one first sub-table 2, at least one second sub-table 3 and a power consumption processing module 4. The power consumption processing module 4 is respectively connected to the construction general table 1, the first sub-table 2 and the second sub-table 3 by signal. The first sub-table 2 is connected to at least one second sub-table 3, and the construction general table 1 is connected to at least one first sub-table 2. The first sub-table 2 and the second sub-table 3 are provided with an authority verification device. The authentication level of the authority verification device of the first sub-table 2 is higher than the authentication level of the authority verification device of the second sub-table 3. The power consumption processing module 4 is used to collect the power consumption of each table head and control the current power consumption authority of each table. The verification authority of the second sub-table 3 is a sub-authority of the verification authority of the first sub-table 2, and the power consumption authority of the second sub-table 3 is under the unique power consumption authority of the first sub-table 2.
[0040] like Figure 2 As shown, the electricity consumption processing module 4 includes a project creation module 41, a electricity consumption record module 42, an authority authentication module 43 and a temporary electricity allocation module 44. The project creation module 41 is data-connected to the authority authentication module 43 and the temporary electricity allocation module 44. The authority authentication module 43 is data-connected to the temporary electricity allocation module 44. The electricity consumption record module 42 is data-connected to the temporary electricity allocation module 44. The electricity consumption record module 42 is connected to the construction general table 1, the first sub-table 2 and the second sub-table 3. The authority authentication module 43 is connected to the first sub-table 2 and the second sub-table 3.
[0041] The project creation module 41 is used to create the ownership relationship and permission tolerance relationship of each meter in the project, the power consumption record module 42 is used to record the power consumption under each permission, the permission authentication module 43 is used to issue the use permission to the permission verification device of each first sub-meter 2 and the permission verification device of the second sub-meter 3 according to the ownership relationship created by the project creation module 41, and the temporary power allocation module 44 is used to adjust the power consumption tolerance relationship between each permission according to the power consumption under each permission recorded by the power consumption record module. The power consumption tolerance relationship is the scope and power consumption of cross-permission power consumption between construction permissions adjacent to each other in geographical location.
[0042] like Figure 3 As shown, the method of using the construction power system includes the following steps:
[0043] S1. Divide the construction site into several construction areas according to the position of the first sub-table 2 in the construction site;
[0044] S2. Enter the construction area and estimated power consumption of each subcontractor into the project creation module 41 according to the actual situation, and determine the subcontractor to which the first sub-meter 2 and the second sub-meter 3 in each construction area belong;
[0045] S3, the authority authentication module 43 retrieves the subcontracting units to which each of the first sub-table 2 and the second sub-table 3 in the project creation module 41 belongs, generates regular electricity usage authority, and issues the regular electricity usage authority that can be authenticated by this sub-table to each of the first sub-table 2;
[0046] S4. The temporary power allocation module retrieves the locations of adjacent areas belonging to different subcontracting units in the project creation module 41, and authorizes the authorized temporary power use rights of the adjacent areas for each submeter in the above area. The temporary power use power Q2 is the estimated power consumption Q1 within the time threshold T of a single construction area of the subcontracting unit multiplied by 1 plus the power use wide coefficient a;
[0047] S5. Issue the use rights of the second sub-table 3 to the user according to the sub-contracting unit, and issue the use rights of the first sub-table 2 to the manager;
[0048] S6, the first sub-meter 2 verifies whether the use authority of the first sub-meter 2 is the regular power use authority or temporary power use authority of the sub-meter. If so, proceed to step S7; otherwise, the construction area that receives the use authority of the first sub-meter 2 grants the use authority of the first sub-meter 2 a temporary power use authority for a time threshold T;
[0049] S7, determine the type of the first sub-meter 2 usage authority, if it is a regular power usage authority, the electricity is sent to each second sub-meter 3 currently connected to the first sub-meter 2; if it is a temporary power usage authority, issue the usage authority of the temporary power usage authority electricity Q2 to each second sub-meter 3 currently connected to the first sub-meter 2;
[0050] S8, the second sub-meter 3 verifies whether the use permission of the second sub-meter 3 belongs to the same sub-contracting unit as the use permission issued by the connected first sub-meter 2, if so, the second sub-meter 3 supplies power; otherwise, the terminal temporary power threshold Q3 is provided to the electrical appliance, and the sub-contracting unit information of the second sub-meter 3 is provided to the project creation module 41;
[0051] S9, the electricity consumption recording module 42 records the electricity consumption within the time threshold T, and counts the total electricity consumption of each sub-meter under each subcontracting unit;
[0052] S10, the project creation module 41 detects whether there is a subcontractor outside the construction area whose usage times exceed the temporary usage times threshold value X within the time threshold value T. If so, the subcontractor in the construction area whose usage times exceed the temporary usage times threshold value X is granted a temporary power usage right for a period of time threshold value T, and proceeds to step S11; otherwise, proceeds to step S11;
[0053] S11, according to the historical records of actual power consumption under the use rights of each first sub-meter 2 in each construction area, and the average usage within the time threshold T, the average usage is assigned to the estimated power consumption Q1 within the time threshold T;
[0054] S12, detecting whether the project creation module 41 receives a project end signal, if yes, proceeding to step S13; otherwise, proceeding to step S4;
[0055] S13. Export the total electricity consumption and records.
[0056] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A construction power system, characterized in that: The invention comprises a construction general table (1), at least one first sub-table (2), at least one second sub-table (3) and a power consumption processing module (4), wherein the power consumption processing module (4) is respectively connected to the construction general table (1), the first sub-table (2) and the second sub-table (3) by signals, the first sub-table (2) is connected to at least one second sub-table (3), the construction general table (1) is connected to at least one first sub-table (2), the first sub-table (2) and the second sub-table (3) are provided with authority verification devices, the authentication level of the authority verification device of the first sub-table (2) is higher than the authentication level of the authority verification device of the second sub-table (3), and the power consumption processing module (4) is used to collect the power consumption of each meter head and control the current power consumption authority of each meter; The power consumption processing module (4) comprises a project creation module (41), a power consumption recording module (42), an authority authentication module (43) and a temporary power distribution module (44); the project creation module (41) is data-connected to the authority authentication module (43) and the temporary power distribution module (44); the authority authentication module (43) is data-connected to the temporary power distribution module (44); the power consumption recording module (42) is data-connected to the temporary power distribution module (44); the power consumption recording module (42) is connected to the construction general table (1), the first sub-table (2) and the second sub-table (3); and the authority authentication module (43) is connected to the first sub-table (2) and the second sub-table (3); The method for using the construction power system comprises the following steps: S1. Divide the construction site into several construction areas according to the location of the first sub-table (2) in the construction site; S2. Enter the construction area and estimated power consumption of each subcontracting unit into the project creation module (41) according to the actual situation, and determine the subcontracting unit to which the first sub-meter (2) and the second sub-meter (3) in each construction area belong; S3, the authority authentication module (43) retrieves the subcontracting units to which the first sub-meters (2) and the second sub-meters (3) belong in the project creation module (41), generates regular electricity usage permissions, and issues regular electricity usage permissions that can be authenticated by the sub-meters to each of the first sub-meters (2); S4, the temporary power allocation module retrieves the locations of adjacent areas belonging to different subcontracting units in the project creation module (41), and authorizes the authorized temporary power use rights of the adjacent areas for each submeter in the above area, and the temporary power use power Q2 is the estimated power consumption Q1 within the time threshold T of a single construction area of the subcontracting unit multiplied by 1 plus the power consumption wide coefficient a; S5. Issue the second sub-table (3) usage rights to the user according to the sub-contracting unit, and issue the first sub-table (2) usage rights to the administrator; S6, the first sub-meter (2) verifies whether the use authority of the first sub-meter (2) is the regular power use authority or the temporary power use authority of the sub-meter, and if so, proceeds to step S7; otherwise, the construction area that receives the use authority of the first sub-meter (2) grants the first sub-meter (2) a temporary power use authority for a time threshold T; S7, determining the type of the usage authority of the first sub-meter (2); if it is a regular power usage authority, the electricity is sent to each second sub-meter (3) currently connected to the first sub-meter (2); if it is a temporary power usage authority, issuing a usage authority of the temporary power usage authority power quantity Q2 to each second sub-meter (3) currently connected to the first sub-meter (2); S8, the second sub-meter (3) verifies whether the use rights of the second sub-meter (3) belong to the same sub-contracting unit as the use rights issued by the connected first sub-meter (2); if so, the second sub-meter (3) supplies power; otherwise, the terminal temporary power threshold Q3 is provided to the electrical appliance, and the sub-contracting unit information of the second sub-meter (3) is provided to the project creation module (41); S9, the electricity consumption recording module (42) records the electricity consumption within the time threshold T, and counts the total electricity consumption of each sub-meter under each sub-contracting unit; S10, the project creation module (41) detects whether there is a subcontractor outside the construction area whose usage times exceed the temporary usage times threshold value X within the time threshold value T, if so, granting the subcontractor in the construction area whose usage times exceed the temporary usage times threshold value X temporary power usage rights for the time threshold value T, and proceeding to step S11; otherwise, proceeding to step S11; S11, according to the historical records of actual power consumption under the use rights of each of the first sub-meters (2) in each construction area, and the average power consumption within the time threshold T, the average power consumption is assigned to the estimated power consumption Q1 within the time threshold T; S12, detecting whether the project creation module (41) receives a project end signal, if yes, proceeding to step S13; otherwise, proceeding to step S4; S13. Export the total electricity consumption and records.
2. A construction power system according to claim 1, characterized in that: The verification authority of the second sub-meter (3) is a sub-authority of the verification authority of the first sub-meter (2), and the electricity usage authority of the second sub-meter (3) is attached to the unique electricity usage authority of the first sub-meter (2).
3. A construction power system according to claim 1, characterized in that: The project creation module (41) is used to create the ownership relationship and authority tolerance relationship of each electric meter in the project; the power consumption recording module (42) is used to record the power consumption under each authority; the authority authentication module (43) is used to issue the use authority to the authority verification device of each first sub-meter (2) and the authority verification device of the second sub-meter (3) according to the ownership relationship created by the project creation module (41); and the temporary power allocation module (44) is used to adjust the power consumption tolerance relationship between each authority according to the power consumption under each authority recorded by the power consumption recording module.
4. A construction power system according to claim 3, characterized in that: The electricity usage tolerance relationship refers to the scope and amount of electricity that can be used across construction authorities that are adjacent in geographical location.