A system for comprehensive treatment of roof old empty water
By comprehensively utilizing multiple drainage systems, the problem of underwater discharge of roof empty water in deep coal mining has been solved, and effective release and overall regulation of roof empty water has been achieved, ensuring safe and efficient production of coal mining, especially in the multi-dimensional world Under the conditions of coal mining, the risk of underground water incursions is reduced.
Patent Information
- Application Number
- CN202210485925.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-05-06
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2042-05-06
AI Technical Summary
In the mining of deep coal, the underwater discharge of the roof panel threatens safe and efficient mining, especially under the conditions of multi-layer coal mining, the existing methods have poor applicability to long-distance coal seams, making it difficult to effectively control the roof panel, resulting in underground water bursts. The risk of accidents is high.
Adopt the comprehensive management of the old air-water system on the roof, including the ground permanent drainage system of the underground water tank, the ground drilling through goaf underground drainage system, the ground drilling through goaf direct drainage system, the ground large-size pumping well drainage system and the old mine The permanent drainage system on the ground of the drainage silo can effectively release and overall control of the old empty water on the roof to ensure safe underground production.
The effective discharge of old empty water in super-large reserves has been achieved, the risk of underground water inrush accidents has been reduced, and the safe and efficient production of coal mining has been ensured. Especially under the geological conditions of the dual-system coal seam, it has effectively reduced the risk of roof water inrush.
Smart Images

Figure CN114687796B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of water hazard control in coal mines, and in particular relates to a system for comprehensively controlling old water in roof. Background Art
[0002] With the large-scale mining of coal in my country, shallow coal resources are close to exhaustion, and coal mining has gradually entered the deep. After shallow coal mining, a large number of goafs are formed. Groundwater enters the goafs through water-conducting fissures. The remaining coal in the goafs will also produce a large amount of harmful gases, resulting in the threat of leakage of old goaf water from roof mining during deep coal mining, which seriously restricts the safe and efficient mining of coal. In order to ensure the safe mining of the lower coal seam, it is necessary to discharge the old goaf water from the roof to ensure the rapid and safe recovery of the lower working face. Therefore, a system for comprehensive management of old goaf water from the roof is proposed, which can discharge the old goaf water to a safe place in time, ensure that the mine and working face do not leak a large amount of old goaf water from the roof, and avoid the occurrence of safety accidents. It has important practical significance for the management of roof water in multi-layer coal mining in my country.
[0003] The patent with application number 201810250858.1 discloses a method for accurate exploration and release of old goaf water in mines based on underground beam directional drilling. It points out that the approximate spatial range of the old goaf area is delineated by geophysical exploration methods to guide the drilling design, and then the specific location of the old goaf area is ascertained by the main hole of the beam directional drilling, and then the specific spatial parameters and water filling conditions of the old goaf area are ascertained by vertical branch holes, axial branch holes and transverse branch holes, and the old goaf water is drained. The method of this patent has great applicability to close-range coal seams, but has poor applicability to long-range coal seams, especially the lower coal seam to be mined is far away from the goaf, and there are multiple layers of goaf above it, and the amount of water in the upper goaf is large. Therefore, it is urgent to design a system for comprehensive management of old goaf water in the roof, drain the old goaf water in the roof in advance, avoid underground sudden accidents, and achieve safe and efficient production in mines. Summary of the invention
[0004] In order to solve the deficiencies in the prior art, the present invention provides a system for comprehensively controlling old empty water on the roof; the system can realize the discharge of an extremely large amount of old empty water and can perform overall regulation on the drainage system, thus eliminating the occurrence of old empty water leakage disasters at the root and effectively ensuring safe production underground.
[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions: a system for comprehensively treating old empty water in the roof, including a permanent ground drainage system for underground water tanks, a ground drilling hole penetrating the underground water discharge system of the goaf, a ground drilling hole penetrating the goaf direct drainage system, a ground large-aperture pumping well drainage system and a permanent ground drainage system for underground water tanks in old mines;
[0006] The underground water tank ground permanent drainage system discharges the mine production and the old empty water discharged to the mine's central water tank through the mine's original pumping and drainage pipelines. The central water tank is located under the extra-thick coal seam. The water stored in the central water tank is pumped to the ground by pumping;
[0007] The underground water discharge system of the ground drilling through the goaf is to connect multiple goafs through a borehole. The drilling rig is arranged at a suitable location on the ground, and a borehole is drilled through the upper goaf to the lower extra-thick coal seam. The first drainage pipe is laid in the extra-thick coal seam tunnel to discharge the water released from the goaf underground into the central water tank by gravity.
[0008] The ground-drilled-hole direct drainage system through the goaf is to arrange pumping holes and drainage holes vertically downward on the ground, and the lower ends of the pumping holes and drainage holes extend into the temporary water tank underground. The second drainage pipe is arranged in the tunnel of the extra-thick coal seam. The old water in the goaf of each layer can flow through the drill holes to the temporary water tank underground, and then the water storage pump of the temporary water tank is discharged to the ground through the pumping holes;
[0009] The ground large-aperture pumping well drainage system is to build a pumping and drainage pump station on the ground, drill a large-aperture pumping and drainage borehole vertically downward, and the lower end of the pumping and drainage borehole extends into the goaf area adjacent to the ground. The pumping and drainage pump station directly pumps the old goaf water in the goaf area adjacent to the ground to the ground;
[0010] The permanent ground drainage system of the old mine's underground water tank reuses the original space of the old mine's central water tank, builds a drainage pumping station on the ground, and uses a thousand-meter directional drilling rig to drill a through borehole between the goaf and the old mine's central water tank, and drains the old water in the goaf to the old mine's central water tank by gravity, and then constructs a permanent drainage borehole, the lower end of the drainage borehole is connected to the old mine's central water tank, and the stored water in the old mine's central water tank is pumped to the ground.
[0011] The permanent ground drainage system of the underground water tank operates uninterruptedly during the mine production process. When the pump discharge capacity is exceeded, other drainage systems are activated.
[0012] The underground water drainage system of the ground drilling through the goaf area has a casing with a filter screen inserted into the drilling section of the upper goaf to prevent the casing from being blocked by gravel particles carried by the old goaf water during its downward flow; a 10-20m casing is lowered in the location of the extremely thick coal seam to prevent the surrounding rocks from gradually breaking due to long-term water flow and causing roof collapse.
[0013] When constructing the drainage boreholes of the direct drainage system that penetrates the goaf through the ground, a casing with a filter screen is installed at the goaf to prevent the casing from being blocked by gravel particles carried by the old goaf water during its downward flow. A 10-20m casing is lowered at the end hole position of the extra-thick coal seam to prevent the surrounding rocks from being gradually destroyed by long-term water flow. During the construction of the pumping borehole, a casing is installed in the pumping hole to prevent the hole from collapsing and a pumping pipeline is arranged in the casing to ensure the effective pumping effect of the pumping borehole.
[0014] When constructing a permanent drainage borehole in the permanent ground drainage system of the old mine's underground water tank, a casing is set in the entire drainage borehole, and a pumping pipeline is set in the middle of the casing to pump out the water stored in the old mine's central water tank through the pumping pipeline.
[0015] Adopting the above technical scheme, the present invention comprehensively utilizes the above five drainage systems, including the underground water tank ground permanent drainage system, the ground drilling through the goaf underground drainage system, the ground drilling through the goaf direct drainage system, the ground large-aperture pumping well drainage system, and the old mine underground water tank ground permanent drainage system. The present invention uses the geological conditions of dual-system coal seam mining to pump out the old empty water at different positions of the overlying Jurassic system in the most economical and effective way, reducing the risk of water inrush from the top of the Carboniferous coal seam mining, and ensuring the safety and efficiency of mining in the Carboniferous extra-thick coal seam. It can effectively drain the upper old empty water, avoid the leakage of old empty water in the extra-thick coal seam mining, and avoid large-scale water inrush accidents in mines. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the structural position of the present invention. DETAILED DESCRIPTION
[0017] like Figure 1 As shown, a system for comprehensively treating old empty water in the roof of the present invention comprises a permanent ground drainage system for underground water tanks, a ground drilling hole penetrating the underground water discharge system of the goaf, a ground drilling hole penetrating the goaf direct drainage system, a ground large-aperture pumping well drainage system and a permanent ground drainage system for underground water tanks in old mines;
[0018] The underground water tank ground permanent drainage system discharges the mine production and the old empty water discharged to the mine's central water tank through the mine's original pumping and drainage pipelines. The central water tank is located under the extra-thick coal seam. The water stored in the central water tank is pumped to the ground by pumping;
[0019] The underground water discharge system of the ground drilling through the goaf is to connect multiple goafs through a borehole. The drilling rig is arranged at a suitable location on the ground, and a borehole is drilled through the upper goaf to the lower extra-thick coal seam. The first drainage pipe is laid in the extra-thick coal seam tunnel to discharge the water released from the goaf underground into the central water tank by gravity.
[0020] The ground-drilled-hole direct drainage system through the goaf is to arrange pumping holes and drainage holes vertically downward on the ground, and the lower ends of the pumping holes and drainage holes extend into the temporary water tank underground. The second drainage pipe is arranged in the tunnel of the extra-thick coal seam. The old water in the goaf of each layer can flow through the drill holes to the temporary water tank underground, and then the water storage pump of the temporary water tank is discharged to the ground through the pumping holes;
[0021] The ground large-aperture pumping well drainage system is to build a pumping and drainage pump station on the ground, drill a large-aperture pumping and drainage borehole vertically downward, and the lower end of the pumping and drainage borehole extends into the goaf area adjacent to the ground. The pumping and drainage pump station directly pumps the old goaf water in the goaf area adjacent to the ground to the ground;
[0022] The permanent ground drainage system of the old mine's underground water tank reuses the original space of the old mine's central water tank, builds a drainage pumping station on the ground, and uses a thousand-meter directional drilling rig to drill a through borehole between the goaf and the old mine's central water tank, and drains the old water in the goaf to the old mine's central water tank by gravity, and then constructs a permanent drainage borehole, the lower end of the drainage borehole is connected to the old mine's central water tank, and the stored water in the old mine's central water tank is pumped to the ground.
[0023] The permanent ground drainage system of the underground water tank operates uninterruptedly during the mine production process. When the pump discharge capacity is exceeded, other drainage systems are activated.
[0024] The underground water drainage system of the ground drilling through the goaf area has a casing with a filter screen inserted into the drilling section of the upper goaf to prevent the casing from being blocked by gravel particles carried by the old goaf water during its downward flow; a 10-20m casing is lowered in the location of the extremely thick coal seam to prevent the surrounding rocks from gradually breaking due to long-term water flow and causing roof collapse.
[0025] When constructing the drainage boreholes of the direct drainage system that penetrates the goaf through the ground, a casing with a filter screen is installed at the goaf to prevent the casing from being blocked by gravel particles carried by the old goaf water during its downward flow. A 10-20m casing is lowered at the end hole position of the extra-thick coal seam to prevent the surrounding rocks from being gradually destroyed by long-term water flow. During the construction of the pumping borehole, a casing is installed in the pumping hole to prevent the hole from collapsing and a pumping pipeline is arranged in the casing to ensure the effective pumping effect of the pumping borehole.
[0026] When constructing a permanent drainage borehole in the permanent ground drainage system of the old mine's underground water tank, a casing is set in the entire drainage borehole, and a pumping pipeline is set in the middle of the casing to pump out the water stored in the old mine's central water tank through the pumping pipeline.
[0027] This embodiment does not impose any formal limitation on the shape, material, structure, etc. of the present invention. Any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention shall fall within the protection scope of the technical solution of the present invention.
Claims
1. A system for comprehensive treatment of roof old empty water, characterized by: It includes the ground permanent drainage system for underground water tanks, the ground drilling through the goaf underground water discharge system, the ground drilling through the goaf direct drainage system, the ground large-aperture pumping well drainage system and the ground permanent drainage system for underground water tanks in old mines; The underground water tank ground permanent drainage system discharges the mine production and the old empty water discharged to the mine's central water tank through the mine's original pumping and drainage pipelines. The central water tank is located under the extra-thick coal seam. The water stored in the central water tank is pumped to the ground by pumping; The underground water discharge system of the ground drilling through the goaf is to connect multiple goafs through a borehole. The drilling rig is arranged at a suitable location on the ground, and a borehole is drilled through the upper goaf to the lower extra-thick coal seam. The first drainage pipe is laid in the extra-thick coal seam tunnel to discharge the water released from the goaf underground into the central water tank by gravity. The ground-drilled-hole direct drainage system through the goaf is to arrange pumping holes and drainage holes vertically downward on the ground, and the lower ends of the pumping holes and drainage holes extend into the temporary water tank underground. The second drainage pipe is arranged in the tunnel of the extra-thick coal seam. The old water in the goaf of each layer can flow through the drill holes to the temporary water tank underground, and then the water storage pump of the temporary water tank is discharged to the ground through the pumping holes; The ground large-aperture pumping well drainage system is to build a pumping and drainage pump station on the ground, drill a large-aperture pumping and drainage borehole vertically downward, and the lower end of the pumping and drainage borehole extends into the goaf area adjacent to the ground. The pumping and drainage pump station directly pumps the old goaf water in the goaf area adjacent to the ground to the ground; The permanent ground drainage system of the old mine's underground water tank reuses the original space of the old mine's central water tank, builds a drainage pumping station on the ground, and uses a thousand-meter directional drilling rig to drill a through borehole between the goaf and the old mine's central water tank, and drains the old water in the goaf to the old mine's central water tank by gravity, and then constructs a permanent drainage borehole, the lower end of the drainage borehole is connected to the old mine's central water tank, and the stored water in the old mine's central water tank is pumped to the ground.
2. A system for comprehensive treatment of roof old empty water according to claim 1, characterized in that: The permanent ground drainage system of the underground water tank operates uninterruptedly during the mine production process. When the pump discharge capacity is exceeded, other drainage systems are activated.
3. The system for comprehensive treatment of roof old empty water according to claim 1 is characterized by: The underground water drainage system of the ground drilling through the goaf area has a casing with a filter screen inserted into the drilling section of the upper goaf to prevent the casing from being blocked by gravel particles carried by the old goaf water during its downward flow; a 10-20m casing is lowered in the location of the extremely thick coal seam to prevent the surrounding rocks from gradually breaking due to long-term water flow and causing roof collapse.
4. The system for comprehensive treatment of roof old empty water according to claim 1 is characterized by: When constructing the drainage boreholes of the direct drainage system that penetrates the goaf through the ground, a casing with a filter screen is installed at the goaf to prevent the casing from being blocked by gravel particles carried by the old goaf water during its downward flow. A 10-20m casing is lowered at the end hole position of the extra-thick coal seam to prevent the surrounding rocks from being gradually destroyed by long-term water flow. During the construction of the pumping borehole, a casing is installed in the pumping hole to prevent the hole from collapsing and a pumping pipeline is arranged in the casing to ensure the effective pumping effect of the pumping borehole.
5. The system for comprehensive treatment of roof old empty water according to claim 1 is characterized by: When constructing a permanent drainage borehole in the permanent ground drainage system of the old mine's underground water tank, a casing is set in the entire drainage borehole, and a pumping pipeline is set in the middle of the casing to pump out the water stored in the old mine's central water tank through the pumping pipeline.
Citation Information
Patent Citations
Intelligent early warning system and early warning method for goaf water discharge for close coal seam mining
CN107939449A
Mine gob area accurate prospecting and releasing method based on underground beam-shaped directional drilling
CN108468566A
Prevention and treatment method for goaf water under condition of repeated mining of thick seam upper slices destructed by minitype coal mines
CN111140279A
Directional drilling and troubleshooting method for goaf of small coal mine along coal seam
CN113250613A
Method for cooperatively draining roof separation water and mining coal-measure gas
WO2020113870A1