Pipe clamp assembly and vehicle
By introducing the body clamping structure and the pipeline clamping structure into the pipe clamp assembly, and using designs such as slots and through holes, the problems of the limited application range of the existing pipe clamp assembly and the complex pipeline layout in the vehicle are solved, and a wide range of Serviceability and efficient assembly.
Patent Information
- Application Number
- CN202210762957.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-30
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2042-06-30
AI Technical Summary
The existing pipe clamp assembly can only be applied to positioning holes or projection welding studs, which has a limited scope of application. Moreover, the inclined arrangement of the pipelines in the vehicle affects the assembly cycle and increases the workload of design and development.
Design a pipe clamp assembly, which includes a body clamping structure and a pipeline clamping structure. By providing a first clamping slot and a second clamping slot on the installation part, it can adapt to two installation methods: positioning holes and projection welding studs, and Stable clamping is achieved through through holes and locking parts to meet the parallel and inclined layout requirements of pipelines.
The pipe clamp assembly is widely applicable and can be adapted to two installation methods: positioning holes and projection welding studs, simplifying the fixing and connection process of pipelines, reducing the workload of design and development, and improving assembly efficiency.
Smart Images

Figure CN115126937B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of vehicles, and in particular to a pipe clamp assembly and a vehicle. Background Art
[0002] Automobiles are equipped with pipelines that transfer various media between various functional parts to ensure that the components can achieve their proper functions and the vehicle can travel safely and smoothly. The pipelines in the vehicle are fixed to the vehicle body by pipe clamps to ensure the stability of the pipeline layout. Due to the differences in pipeline layout of different models, the fixing positions of pipe clamps are also different. Some pipe clamps are connected to the positioning holes on the vehicle body, and some pipe clamps are fixed to the convex welding studs on the vehicle body.
[0003] In the prior art, according to the different fixing matching forms of the pipe clamp and the vehicle body, pipe clamps matching the positioning hole structure and pipe clamps matching the projection welding studs are developed to adapt to different installation positions of the pipe clamp. That is, the pipe clamps in the prior art can only be applied to the positioning holes or projection welding studs, and the scope of application is limited. Summary of the invention
[0004] In view of this, the present invention aims to provide a pipe clamp assembly to solve the problems used in the prior art.
[0005] To achieve the above object, the technical solution of the present invention is achieved as follows:
[0006] A pipe clamp assembly, the pipe clamp assembly comprising a vehicle body clamping structure and a pipeline clamping structure, the vehicle body clamping structure comprising a mounting portion and a clamping portion, the pipeline clamping structure is used to fix the pipeline, and the vehicle body clamping structure is connected to the vehicle body through the clamping portion;
[0007] The clamping portion is connected to one end of the mounting portion, the clamping portion is used to be clamped in the positioning hole, and a receiving space for clamping the projection welding stud is provided inside the clamping portion;
[0008] At least one first card slot is provided on the mounting portion, and at least one second card slot is provided on the clamping portion. When the vehicle body clamping structure is connected to the positioning hole, the pipeline clamping structure is connected to the first card slot; when the vehicle body clamping structure is connected to the projection welding stud, the pipeline clamping structure is connected to the second card slot.
[0009] Optionally, the second clamping groove is arranged on the outer wall of the clamping portion, and the second clamping groove is arranged along the circumferential direction of the clamping portion.
[0010] Optionally, the first slot includes a first slot, the first slot is arranged on the outer wall of the mounting portion, and the first slot is arranged along the circumferential direction of the mounting portion, and the plane where the first slot is located is parallel to the second surface;
[0011] Wherein, the outer wall of the mounting portion is the surface between the first surface and the second surface.
[0012] Optionally, the first slot further includes a second slot, the second slot is arranged on the outer wall of the mounting portion, and the second slot is arranged along the circumferential direction of the mounting portion, and an angle is formed between a plane where the second slot is located and the second surface.
[0013] Optionally, in the direction from the mounting portion to the clamping portion, a through hole is provided on the mounting portion, the accommodating space is connected to the through hole, the inner wall of the accommodating space includes a first surface and a second surface relative to each other, locking members are provided on the first surface and the second surface, the accommodating space is used to accommodate the projected welding stud, and the locking member is used to clamp with the projected welding stud.
[0014] Optionally, in the direction from the mounting portion to the clamping portion, the size of the middle portion of the clamping portion is larger than the size of one end of the clamping portion close to the mounting portion, and the size of the middle portion of the clamping portion is larger than the size of one end of the clamping portion away from the mounting portion.
[0015] Optionally, the pipeline clamping structure includes a connecting portion and a fixing portion, the fixing portion is connected to the connecting portion, and the fixing portion includes a plurality of first accommodating cavities, and the first accommodating cavities are used to accommodate and fix the pipeline;
[0016] The connecting portion includes a first plate, a second plate, a third plate and a fourth plate, the first plate, the second bottom plate, the third plate and the fourth plate are connected in sequence, and the first plate, the second plate, the third plate and the fourth plate are enclosed to form a second accommodating cavity, the first plate is opposite to the third plate, the second plate and the fourth plate are both located between the first plate and the third plate, a card interface is provided on the second plate, the first card slot or the second card slot is engaged with the card interface, and part of the mounting portion is located in the second accommodating cavity;
[0017] Wherein, the first plate and / or the second plate are connected to the fixing portion.
[0018] Optionally, a mounting notch is provided on the card plate, the mounting notch is in communication with the card interface, and the mounting notch is used to avoid the card connection portion so that the card connection portion moves along the mounting notch to engage with the card interface.
[0019] Optionally, through openings are respectively provided on two opposite sides of the mounting notch, and the through openings are connected to the mounting notch. The size of the mounting notch is smaller than the size of the card interface. The through openings are used to enable inner walls on two opposite sides of the mounting notch to deform relative to the through openings when the clamping portion is clamped in the card interface, so that the clamping portion moves along the mounting notch and clamps with the card interface.
[0020] In an embodiment of the present invention, the pipe clamp assembly includes a vehicle body clamping structure and a pipeline clamping structure, the vehicle body clamping structure is connected to the pipeline clamping structure, the vehicle body clamping structure is used to connect to the vehicle body, and the pipeline clamping structure is used to fix the pipeline, so that the pipe clamp assembly can fix the pipeline through the pipeline clamping structure and be connected to the vehicle body through the vehicle body clamping structure. The vehicle body clamping structure includes a mounting portion and a clamping portion, the clamping portion is connected to one side of the mounting portion, a first clamping groove is provided on the mounting portion, a second clamping groove is provided on the clamping portion, and both the first clamping groove and the second clamping groove are used to connect to the pipeline clamping structure. When the pipeline clamping structure is connected to the first clamping slot, the clamping portion is located in the external space of the pipeline clamping structure, so that the clamping portion can be inserted into the positioning hole, so that the pipe clamp assembly can be connected to the positioning hole on the vehicle body; when the pipeline clamping structure is connected to the second clamping slot, part of the clamping portion is located in the external space of the pipeline clamping structure, and another part of the clamping portion is located in the external space of the pipeline clamping structure, so that the clamping portion can be sleeved on the projecting welding stud, so that the projecting welding stud is located in the accommodating space, so that the projecting welding stud can be clamped with the accommodating space, thereby realizing the connection between the pipe clamp assembly and the projecting welding stud on the vehicle body.
[0021] Therefore, the pipe clamp assembly provided in the embodiment of the present invention can accommodate and fix the pipe through the pipe clamping structure, and can achieve connection with the vehicle body through the vehicle body clamping structure. The vehicle body clamping structure is provided with a first clamping slot and a second clamping slot, and the pipe clamping structure is clamped with the first clamping slot or the second clamping slot, so that the vehicle body clamping structure can be connected to the vehicle body in different ways. Since the outer wall of the clamping part can be connected with the positioning hole on the vehicle body, and the first accommodating space of the clamping part can be connected with the projection welding stud, the clamping part can adapt to the two installation methods of the positioning hole and the projection welding stud, so that the pipe clamp assembly can adapt to the two installation methods of the positioning hole and the projection welding stud, and has a wide range of applications.
[0022] Another object of the present invention is to provide a vehicle to solve the problem in the prior art that the inclined arrangement of pipelines using connecting brackets in vehicles affects the assembly cycle and increases the workload of design and development.
[0023] To achieve the above object, the technical solution of the present invention is achieved as follows:
[0024] A vehicle comprises the pipe clamp assembly according to any one of the above embodiments; a positioning hole and a pipeline are provided on the vehicle, the pipe clamp assembly is connected to the positioning hole through the clamping portion, and the pipeline is fixed to the pipeline clamping structure so that the pipeline is fixed.
[0025] The advantages of the vehicle and the above-mentioned vehicle body clip-on structure over the prior art are the same, which will not be described in detail here. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the accompanying drawings:
[0027] Figure 1 A structural diagram of a pipe clamp assembly provided by an embodiment of the present invention;
[0028] Figure 2 A structural diagram of a vehicle body clamping structure provided by an embodiment of the present invention;
[0029] Figure 3 for Figure 2 Sectional view at AA in the middle;
[0030] Figure 4 A structural diagram of a pipeline clamping structure provided by an embodiment of the present invention;
[0031] Figure 5 A front view of a pipeline clamping structure provided by an embodiment of the present invention;
[0032] Figure 6 for Figure 5 Cross-section at the middle BB;
[0033] Figure 7 A structural diagram of a pipe clamping structure connected to a second slot provided by an embodiment of the present invention;
[0034] Figure 8 A structural diagram of a pipeline clamping structure connected to a second clamping groove provided in an embodiment of the present invention.
[0035] Description of reference numerals:
[0036] 100: pipe clamp assembly; 10: vehicle body clamping structure; 20: pipeline clamping structure; 11: mounting portion; 12: clamping portion; 111: first surface; 112: second surface; 113: first clamping slot; 114: second clamping slot; 1131: first slot; 1132: second slot; 115: accommodating space; 116: locking member; 117: through hole; 21: connecting portion; 22: fixing portion; 221: first accommodating cavity; 211: first plate; 212: second plate; 213: third plate; 214: fourth plate; 215: second accommodating cavity; 2121: clamping interface; 2122: mounting notch; 2123: through opening. DETAILED DESCRIPTION
[0037] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.
[0038] The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments.
[0039] like Figures 1 to 8 As shown, the pipe clamp assembly 100 includes a vehicle body clamping structure 10 and a pipeline clamping structure 20, the vehicle body clamping structure 10 includes a mounting portion 11 and a clamping portion 12, the pipeline clamping structure 20 is used to fix the pipeline, and the vehicle body clamping structure 10 is connected to the vehicle body through the clamping portion 12; the clamping portion 12 is connected to one end of the mounting portion 11, the clamping portion 12 is used to clamp in the positioning hole, and the interior of the clamping portion 12 is provided with a accommodating space 115 for clamping the projection welding stud; at least one first clamping groove 113 is provided on the mounting portion 11, and at least one second clamping groove 114 is provided on the clamping portion 12, when the vehicle body clamping structure 10 is connected to the positioning hole, the pipeline clamping structure 20 is connected to the first clamping groove 113; when the vehicle body clamping structure 10 is connected to the projection welding stud, the pipeline clamping structure 20 is connected to the second clamping groove 114.
[0040] In the embodiment of the present invention, the pipe clamp assembly 100 includes a vehicle body clamping structure 10 and a pipeline clamping structure 20, the vehicle body clamping structure 10 is connected to the pipeline clamping structure 20, the vehicle body clamping structure 10 is used to connect to the vehicle body, and the pipeline clamping structure 20 is used to fix the pipeline, so that the pipe clamp assembly 100 can fix the pipeline through the pipeline clamping structure and be connected to the vehicle body through the vehicle body clamping structure 10. The vehicle body clamping structure 10 includes a mounting portion 11 and a clamping portion 12, the clamping portion 12 is connected to one side of the mounting portion 11, the mounting portion 11 is provided with a first clamping groove 113, the clamping portion 12 is provided with a second clamping groove 114, and the first clamping groove 113 and the second clamping groove 114 are both used to connect with the pipeline clamping structure 20. When the pipe clamping structure 20 is connected to the first clamping groove 113, the clamping portion 12 is located in the external space of the pipe clamping structure 20, so that the clamping portion 12 can be inserted into the positioning hole, so that the pipe clamp assembly 100 can be connected to the positioning hole on the vehicle body; when the pipe clamping structure 20 is connected to the second clamping groove 114, part of the clamping portion 12 is located in the external space of the pipe clamping structure 20, and another part of the clamping portion 12 is located in the external space of the pipe clamping structure 20, so that the clamping portion 12 can be sleeved on the projection welding stud, so that the projection welding stud is located in the accommodating space 115, so that the projection welding stud can be clamped with the accommodating space 115, thereby realizing the connection between the pipe clamp assembly 100 and the projection welding stud on the vehicle body.
[0041] Therefore, the pipe clamp assembly 100 provided in the embodiment of the present invention can accommodate and fix the pipe through the pipe clamping structure, and can be connected to the vehicle body through the vehicle body clamping structure 10. The vehicle body clamping structure 10 is provided with a first clamping groove 113 and a second clamping groove 114, and the pipe clamping structure 20 is clamped with the first clamping groove 113 or the second clamping groove 114, so that the vehicle body clamping structure 10 can be connected to the vehicle body in different ways. Since the outer wall of the clamping member can be connected to the positioning hole on the vehicle body, and the first accommodating space 115 of the clamping member can be connected to the projection welding stud, the clamping member can adapt to the two installation methods of the positioning hole and the projection welding stud, so that the pipe clamp assembly 100 can adapt to the two installation methods of the positioning hole and the projection welding stud, and has a wide range of applications.
[0042] It should be noted that the number of the first card slots 113 and the second card slots 114 can be greater than 1, that is, a plurality of first card slots 113 are provided on the mounting portion 11, and a plurality of second card slots 114 are provided on the clamping portion 12, so that when the pipeline clamping structure 20 is connected to the mounting portion 11, it can be connected to one of the plurality of first card slots 113, that is, there are multiple connection positions between the pipeline clamping structure 20 and the mounting portion 11; when the pipeline clamping structure 20 is connected to the clamping portion 12, it can be connected to one of the plurality of second card slots 114, that is, there are also multiple connection positions between the pipeline clamping structure 20 and the clamping portion 12, so that the user can select a suitable first card slot 113 or second card slot 114 for connection according to needs.
[0043] In addition, in some embodiments, such as 1, Figure 2 , Figure 3 as well as Figure 8 As shown, the second clamping groove 114 can be arranged on the outer wall of the clamping portion 12 , and the second clamping groove 114 is arranged along the circumferential direction of the clamping portion 12 .
[0044] The second clamping groove 114 is provided on the outer wall of the mounting portion 11, so the pipeline clamping structure 20 can be connected with the second clamping groove 114 on the mounting portion 11. When the pipeline clamping structure 20 is clamped with the second clamping groove 114, the vehicle body clamping structure 10 can be connected with the projection welding stud.
[0045] In addition, in some embodiments, Figure 2 , Figure 3 As shown, the first slot 113 may include a first slot 1131, which is arranged on the outer wall of the mounting portion 11, and the first slot 1131 is arranged along the circumferential direction of the mounting portion 11, wherein the surface of the mounting portion 11 away from the clamping portion 12 is the first surface 111, and the surface of the mounting portion 11 away from the clamping portion is the second surface 112, the plane where the first slot 1131 is located is parallel to the second surface 112, and the outer wall of the mounting portion 11 is the surface between the first surface 111 and the second surface 112.
[0046] The first clamping groove 113 includes a first slot 1131, which is arranged on the outer wall of the mounting portion 11 and arranged along the circumferential direction of the mounting portion 11, so that the pipeline clamping structure 20 can be connected with the first slot 1131 on the clamping portion 12. When the pipeline clamping structure 20 is clamped with the first slot 1131, the vehicle body clamping structure 10 can be connected with the positioning hole.
[0047] In addition, in some embodiments, Figure 2 , Figure 3As shown, the first slot 113 may further include a second slot 1132 , which is disposed on the outer wall of the mounting portion 11 and along the circumferential direction of the mounting portion 11 , and an angle is formed between the plane where the second slot 1132 is located and the second surface 112 .
[0048] The first clamping groove 113 also includes a second slot 1132, which is arranged on the outer wall of the mounting portion 11, and is arranged along the circumferential direction of the mounting portion 11, and there is an angle between the plane where the second slot 1132 is located and the second surface 112, so there is an angle between the plane where the first slot 1131 is located and the plane where the second slot 1132 is located, so when the pipeline clamping structure 20 is clamped with the first slot 1131 and the second slot 1132, the position of the pipeline clamping structure 20 is different. When the pipeline clamping structure 20 is clamped with the first slot 1131, the pipeline clamping structure 20 is parallel to the surface of the vehicle, and when the pipeline clamping structure 20 is clamped with the second slot 1132, the pipeline clamping structure 20 has an angle with the surface of the vehicle, and then the pipeline in the pipeline clamping structure 20 also has two positions, that is, the pipeline is parallel to the surface of the vehicle or has an angle with the surface of the vehicle.
[0049] Therefore, the pipe clamp assembly 100 provided in the embodiment of the present invention can also meet the situation where some pipelines need to be arranged tilted.
[0050] It should be noted that the angle between the orientation of the plane where the second groove 1132 is located and the second surface 112 can be set according to usage requirements. For example, the angle between the plane where the second groove 1132 is located and the second surface 112 can be 30°, 40°, 50°, etc. The angle value of the angle between the plane where the second groove 1132 is located and the second surface 112 is not specifically limited in the embodiments of the present invention.
[0051] It should also be noted that there may be multiple second grooves 1132, and the angles between the planes where the multiple second grooves 1132 are located and the second surface 112 may be different, so that the multi-pipeline clamping structure 20 can be clamped with different second grooves 1132 to make the angles of the pipeline clamping structure 20 relative to the second surface 112 different, thereby making the inclination degree of the pipeline relative to the vehicle body different.
[0052] In addition, the first surface 111 may also have an angle with the second surface 112. For example, the angle between the first surface 111 and the second surface 112 may be the same as the angle between the orientation of the notch of the first slot 1131 and the second surface 112. Alternatively, the angle between the first surface 111 and the second surface 112 may be different from the angle between the orientation of the notch of the first slot 1131 and the second surface 112. Of course, the first surface 111 may be parallel to the second surface 112. The positional relationship between the first surface 111 and the second surface 112 is not specifically limited in the embodiment of the present invention.
[0053] In addition, in some embodiments, Figure 3 As shown, in the direction from the mounting portion 11 to the clamping portion 12, a through hole 117 may be provided on the mounting portion 11, the accommodating space 115 is connected to the through hole 117, the inner wall of the accommodating space 115 includes a first surface and a second surface relative to each other, locking members 116 are provided on the first surface and the second surface, the accommodating space 115 is used to accommodate the projecting welding stud, and the locking member 116 is used to clamp with the projecting welding stud.
[0054] The inner wall of the accommodation space 115 includes a first surface and a second surface opposite to each other, and locking members 116 are provided on both the first surface and the second surface, so that the projection welding stud can be clamped by the locking members 116 on the first surface and the second surface of the through hole 117, so that the clamping portion 12 can be connected to the projection welding stud. A through hole 117 is provided on the mounting portion 11, and the through hole 117 is connected to the accommodation space 115, so that when the vehicle body clamping structure 10 is connected to the projection welding stud, the projection welding stud can pass through the accommodation space 115 and then through the through hole 117, so that a longer projection welding stud can also be clamped by the vehicle body clamping structure 10.
[0055] It should be noted that the locking member 116 can be a locking blade or a boss. When the locking member 116 is a locking blade, in the direction from the mounting portion 11 to the clamping portion 12, the locking blade on the first mounting surface and the locking blade on the second mounting surface are staggered, and the locking blade is inclined in the direction toward the mounting portion 11, the projection welding stud can accommodate the space 115 and squeeze the locking blade, and the locking blade presses the projection welding stud tightly to prevent the clamping member from detaching from the projection welding stud.
[0056] Since the locking blades on the first mounting surface and the locking blades on the second mounting surface are staggered, the locking blades on the first mounting surface and the locking blades on the second mounting surface are at different clamping positions. The locking blades on the first mounting surface are clamped on one side of the projecting weld stud, and the locking blades on the second mounting surface are clamped on the other side of the projecting weld stud. The projecting weld stud is subjected to the force of the locking blades on both sides, so that the force on the projecting weld stud can be more uniform. Accordingly, the force applied to the clamping part by the projecting weld stud is more uniform, so that the connection between the locking blade and the projecting weld stud can be more reliable.
[0057] It should be noted that the locking blade can be elastic. When the fixing part is installed toward the projecting weld stud, the projecting weld stud can squeeze the locking blade, causing the locking blade to deform. When the projecting weld stud is completely in the accommodating space 115, that is, the projecting weld stud no longer moves relative to the accommodating space 115, the locking blade can restore its deformation and press the projecting weld stud tightly, so that the vehicle body clamping structure 10 can be clamped with the projecting weld stud.
[0058] It should also be noted that since the locking blade can also be provided with a notch, when the locking blade abuts against the projection welding stud, the notch on the locking blade abuts against the thread on the projection welding stud. The contact area between the notch and the projection welding stud is larger, and compared with a locking blade without a notch, the notch abuts against the projection welding stud, so that the locking blade can be more reliably clamped to the projection welding stud.
[0059] In addition, in some embodiments, Figure 2 As shown, in the direction from the mounting portion 11 to the clamping portion 12, the size of the middle portion of the clamping portion 12 can be larger than the size of one end of the clamping portion 12 close to the mounting portion 11, and the size of the middle portion of the clamping portion 12 can be larger than the size of one end of the clamping portion 12 away from the mounting portion 11.
[0060] The size of the middle part of the clip is larger than the size of the end of the clip close to the fixing part, and the size of the middle part of the clip is also larger than the size of the end of the clip away from the fixing part, so that the end of the clip away from the fixing part can guide the connection between the clip and the positioning hole, making it easier for the clip to align with the positioning hole and be inserted.
[0061] In addition, in some embodiments, the pipeline clamping structure 20 may include a connecting portion 21 and a fixing portion 22, the fixing portion 22 is connected to the connecting portion 21, the fixing portion 22 includes a plurality of first accommodating cavities 221, the first accommodating cavities 221 are used to accommodate and fix the pipeline; the connecting portion 21 includes a first plate 211, a second plate 212, a third plate 213 and a fourth plate 214, the first plate 211, the second bottom plate, the third plate 213 and the fourth plate 214 are connected in sequence, and the first plate 211, the second plate 212, The third plate 213 and the fourth plate 214 enclose a second accommodating cavity 215, the first plate 211 and the third plate 213 are positioned opposite to each other, the second plate 212 and the fourth plate 214 are both located between the first plate 211 and the third plate 213, a card interface 2121 is provided on the second plate 212, the first card slot 113 or the second card slot 114 is engaged with the card interface 2121, and part of the mounting portion 11 is located in the second accommodating cavity 215; wherein the first plate 211 and / or the second plate 212 are connected to the fixing portion 22.
[0062] The pipeline clamping structure 20 includes a connecting portion 21 and a fixing portion 22. The fixing portion 22 includes a plurality of first accommodating cavities 221. The pipeline is located in the first accommodating cavities 221 so that the pipeline can be fixed by the pipeline clamping structure 20. The connecting portion 21 includes a first plate 211, a second plate 212, a third plate 213 and a fourth plate 214. The first plate 211, the second plate 212, the third plate 213 and the fourth plate 214 are sequentially connected to form a second accommodating cavity 215. The second plate 212 is provided with a clamping interface 2121. Therefore, the pipeline clamping structure 20 can be clamped with the mounting portion 11 through the clamping interface 2121, and part of the mounting portion 11 is located in the second accommodating cavity 215, so that the connection between the pipeline clamping structure 20 and the vehicle body clamping structure 10 can be achieved.
[0063] In the case where the pipeline clamping structure 20 is connected to the vehicle body clamping structure 10 through the mounting portion 11, the pipeline clamping structure 20 is clamped with the first clamping groove 113 on the mounting portion 11 through the clamping interface 2121, and the clamping portion 12 and part of the mounting portion 11 are located in the second accommodating cavity 215, so that the pipeline clamping structure 20 can be connected to the vehicle body clamping structure 10. In the case where the pipeline clamping structure 20 is connected to the vehicle body clamping structure 10 through the clamping portion 12, the pipeline clamping structure 20 is clamped with the second clamping groove 114 on the clamping portion 12 through the clamping interface 2121, and part of the clamping portion 12 is located in the second accommodating cavity 215, so that the pipeline clamping structure 20 can be connected to the vehicle body clamping structure 10.
[0064] It should be noted that an opening may also be provided on the fourth plate 214, so that when the pipe clamping structure 20 is connected to the vehicle body clamping structure 10, and the vehicle body clamping structure 10 is connected to the projected welding stud, the projected welding stud on the vehicle body may pass through the vehicle body clamping structure 10 through the through hole 117. In the case where the projected welding stud is long, the projected welding stud may also pass through the pipe clamping structure 20 through the opening, thereby avoiding the situation where the pipe clamping structure 20 cannot be used to fix the pipe at the longer projected welding stud.
[0065] In addition, in some embodiments, Figure 4 , Figure 6 As shown, the card plate may be provided with an installation notch 2122 , which is connected to the card interface 2121 , and is used to avoid the card portion 12 so that the card portion 12 moves along the installation notch 2122 and is engaged with the card interface 2121 .
[0066] The clamping plate is also provided with a mounting notch 2122, which is in communication with the clamping interface 2121, so that when the pipeline clamping structure 20 is connected to the pipeline clamping structure 20 through the first slot 1131, that is, when the mounting portion 11 is connected to the pipeline clamping structure 20 through the clamping interface 2121, the mounting notch 2122 can avoid the mounting portion 11, so that the mounting portion 11 can move along the mounting notch 2122, and then the mounting portion 11 can enter the clamping interface 2121 through the mounting notch 2122. When the pipeline clamping structure 20 is connected to the vehicle body clamping structure 10 through the second clamping slot 114, the clamping portion 12 is connected to the pipeline clamping structure 20 through the clamping interface 2121, and the mounting notch 2122 can avoid the clamping portion 12, so that the clamping portion 12 can move along the mounting notch 2122, and then the clamping portion 12 can enter the clamping interface 2121 through the mounting notch 2122.
[0067] In addition, the card interface 2121 can be connected to the mounting portion 11 in different directions. When the card interface 2121 is connected to the mounting portion 11 in different directions and the position of the vehicle body clamping structure 10 remains unchanged, the pipeline clamping structure 20 can be oriented in different directions, so that the pipelines in the pipeline clamping structure 20 have different directions. For example, when the card interface 2121 is connected to the mounting portion 11 toward the third surface, the fifth surface and the sixth surface are respectively oriented toward the first plate 211 and the third plate 213. At this time, the extension direction of the pipeline clamping structure 20 is the direction from the fifth surface to the sixth surface, and the direction of the pipeline is the direction from the third surface to the fourth surface; when the card interface 2121 is connected to the mounting portion 11 toward the fifth surface, the third surface and the fourth surface are respectively oriented toward the first plate 211 and the third plate 213. At this time, the extension direction of the pipeline clamping structure 20 is the direction from the third surface to the fourth surface, and the direction of the pipeline is the direction from the fifth surface to the sixth surface. Among them, the third surface, the fourth surface, the fifth surface and the sixth surface are located between the first surface 111 and the second surface 112, and the third surface is opposite to the fourth surface, and the fifth surface is opposite to the sixth surface. The extension direction of the pipeline clamping structure 20 is the direction from the third plate 213 to the fourth plate 214.
[0068] In addition, in some embodiments, Figure 4 , Figure 6 As shown, the opposite sides of the mounting notch 2122 may be respectively provided with through openings 2123, and the through openings 2123 are connected to the mounting notch 2122. The size of the mounting notch 2122 is smaller than the size of the card interface 2121. The through openings 2123 are used to enable the inner walls on the opposite sides of the mounting notch 2122 to be deformed relative to the through openings 2123 when the card-connecting portion 12 is card-connected in the card interface 2121, so that the card-connecting portion 12 moves along the mounting notch 2122 and is card-connected with the card interface 2121.
[0069] Through openings 2123 are respectively provided on the opposite sides of the installation notch 2122, and the through openings 2123 are connected to the installation notch 2122. When the pipeline clamping structure 20 is connected to the vehicle body clamping structure 10 through the first clamping groove 113, the installation part 11 is clamped with the clamping interface 2121, and the installation part 11 (the groove wall of the first clamping groove 113) squeezes the installation notch 2122. The inner walls on the opposite sides of the installation notch 2122 can be deformed relative to the through openings 2123, so that the size of the installation notch 2122 is increased, so that the installation part 11 can pass through the installation notch 2122. When the installation part 11 is clamped with the clamping interface 2121, the installation notch 2122 recovers its deformation, so that the size of the installation notch 2122 is reduced, thereby preventing the installation part 11 from falling out of the installation notch 2122.
[0070] When the pipeline clamping structure 20 is connected to the vehicle body clamping structure 10 through the second clamping groove 114, that is, the clamping part 12 is clamped with the clamping interface 2121, the clamping part 12 (the groove wall of the second clamping groove 114) squeezes the installation notch 2122, and the inner walls on the opposite sides of the installation notch 2122 can be deformed relative to the through-portion 2123, so that the size of the installation notch 2122 is increased, so that the clamping part 12 can pass through the installation notch 2122. When the clamping part 12 is clamped with the clamping interface 2121, the installation notch 2122 recovers its deformation, so that the size of the installation notch 2122 is reduced, thereby preventing the clamping part 12 from escaping from the installation notch 2122.
[0071] It should be noted that the installation notch 2122 may be elastic, or the connection between the installation notch 2122 and the through opening 2123 may be elastic, so as to meet the deformation requirements of the two opposite sides of the installation notch 2122 .
[0072] In the embodiment of the present invention, the pipe clamp assembly 100 includes a vehicle body clamping structure 10 and a pipeline clamping structure 20, the vehicle body clamping structure 10 is connected to the pipeline clamping structure 20, the vehicle body clamping structure 10 is used to connect to the vehicle body, and the pipeline clamping structure 20 is used to fix the pipeline, so that the pipe clamp assembly 100 can fix the pipeline through the pipeline clamping structure and be connected to the vehicle body through the vehicle body clamping structure 10. The vehicle body clamping structure 10 includes a mounting portion 11 and a clamping portion 12, the clamping portion 12 is connected to one side of the mounting portion 11, the mounting portion 11 is provided with a first clamping groove 113, the clamping portion 12 is provided with a second clamping groove 114, and the first clamping groove 113 and the second clamping groove 114 are both used to connect with the pipeline clamping structure 20. When the pipe clamping structure 20 is connected to the first clamping groove 113, the clamping portion 12 is located in the external space of the pipe clamping structure 20, so that the clamping portion 12 can be inserted into the positioning hole, so that the pipe clamp assembly 100 can be connected to the positioning hole on the vehicle body; when the pipe clamping structure 20 is connected to the second clamping groove 114, part of the clamping portion 12 is located in the external space of the pipe clamping structure 20, and another part of the clamping portion 12 is located in the external space of the pipe clamping structure 20, so that the clamping portion 12 can be sleeved on the projection welding stud, so that the projection welding stud is located in the accommodating space 115, so that the projection welding stud can be clamped with the accommodating space 115, thereby realizing the connection between the pipe clamp assembly 100 and the projection welding stud on the vehicle body.
[0073] Therefore, the pipe clamp assembly 100 provided in the embodiment of the present invention can accommodate and fix the pipe through the pipe clamping structure, and can be connected to the vehicle body through the vehicle body clamping structure 10. The vehicle body clamping structure 10 is provided with a first clamping groove 113 and a second clamping groove 114, and the pipe clamping structure 20 is clamped with the first clamping groove 113 or the second clamping groove 114, so that the vehicle body clamping structure 10 can be connected to the vehicle body in different ways. Since the outer wall of the clamping member can be connected to the positioning hole on the vehicle body, and the first accommodating space 115 of the clamping member can be connected to the projection welding stud, the clamping member can adapt to the two installation methods of the positioning hole and the projection welding stud, so that the pipe clamp assembly 100 can adapt to the two installation methods of the positioning hole and the projection welding stud, and has a wide range of applications.
[0074] An embodiment of the present invention provides a vehicle, which includes the pipe clamp assembly 100 in the above embodiment; a positioning hole and a pipeline are provided on the vehicle, the pipe clamp assembly 100 is connected to the positioning hole through a clamping portion 12, and the pipeline is fixed to the pipeline clamping structure 20 to fix the pipeline.
[0075] The vehicle is provided with a positioning hole and a pipeline, and the pipe clamp assembly 100 can be connected to the positioning hole through the clamping portion 12, and the pipeline is fixed through the pipeline clamping structure 20. There are two clamping modes between the pipeline clamping structure 20 and the mounting portion 11 of the vehicle body clamping structure 10, namely, the pipeline clamping structure 20 is clamped with the mounting portion 11 through the first slot 1131, and the pipeline clamping structure 20 is clamped with the mounting portion 11 through the second slot 1132. These two clamping modes can make the pipeline clamping structure 20 have two angles relative to the mounting portion 11, which can meet the two requirements of the pipeline being arranged parallel to the vehicle body and the pipeline being arranged obliquely relative to the vehicle body. The installation and fixing are simpler, more convenient, more efficient, and can also avoid the use of other additional components, reducing the workload of the staff in design and development.
[0076] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A pipe clamp assembly, characterized in that: The pipe clamp assembly includes a vehicle body clamping structure and a pipeline clamping structure, wherein the vehicle body clamping structure includes a mounting portion and a clamping portion, the pipeline clamping structure is used to fix the pipeline, and the vehicle body clamping structure is connected to the vehicle body through the clamping portion; The clamping portion is connected to one end of the mounting portion, the clamping portion is used to be clamped in the positioning hole, and a receiving space for clamping the projection welding stud is provided inside the clamping portion; The mounting portion is provided with at least one first slot, and the clamping portion is provided with at least one second slot. When the vehicle body clamping structure is connected to the positioning hole, the pipeline clamping structure is connected to the first slot; when the vehicle body clamping structure is connected to the projection welding stud, the pipeline clamping structure is connected to the second slot. When the pipeline clamping structure is connected to the first clamping slot, the clamping portion is located in the external space of the pipeline clamping structure; when the pipeline clamping structure is connected to the second clamping slot, part of the clamping portion is located in the external space of the pipeline clamping structure.
2. The pipe clamp assembly according to claim 1, characterized in that: The second clamping groove is arranged on the outer wall of the mounting portion, and the second clamping groove is arranged along the circumferential direction of the clamping portion.
3. The pipe clamp assembly according to claim 1, characterized in that: The first slot includes a first slot, the first slot is arranged on the outer wall of the mounting portion, and the first slot is arranged along the circumferential direction of the mounting portion. Among them, the surface of the mounting part away from the clamping part is the first surface, the surface of the mounting part away from the clamping part is the second surface, the plane where the first groove is located is parallel to the second surface, and the outer wall of the mounting part is the surface between the first surface and the second surface.
4. The pipe clamp assembly according to claim 3, characterized in that: The first slot also includes a second slot, which is disposed on the outer wall of the mounting portion and along the circumferential direction of the mounting portion. An angle is formed between a plane where the second slot is located and the second surface.
5. The pipe clamp assembly according to claim 1, characterized in that: In the direction from the mounting portion to the clamping portion, a through hole is provided on the mounting portion, the accommodating space is communicated with the through hole, the inner wall of the accommodating space includes a first surface and a second surface relative to each other, locking pieces are provided on the first surface and the second surface, the accommodating space is used to accommodate the projection welding stud, and the locking piece is used to clamp with the projection welding stud.
6. The pipe clamp assembly according to claim 1, characterized in that: In the direction from the mounting portion to the clamping portion, the size of the middle portion of the clamping portion is larger than the size of one end of the clamping portion close to the mounting portion, and the size of the middle portion of the clamping portion is larger than the size of one end of the clamping portion away from the mounting portion.
7. The pipe clamp assembly according to claim 1, characterized in that: The pipeline clamping structure includes a connecting portion and a fixing portion, the fixing portion is connected to the connecting portion, and the fixing portion includes a plurality of first accommodating cavities, and the first accommodating cavities are used to accommodate and fix the pipeline; The connecting portion includes a first plate, a second plate, a third plate and a fourth plate, the first plate, the second plate, the third plate and the fourth plate are connected in sequence, and the first plate, the second plate, the third plate and the fourth plate enclose a second accommodating cavity, the first plate and the third plate are opposite to each other, the second plate and the fourth plate are both located between the first plate and the third plate, a card interface is provided on the second plate, the first card slot or the second card slot is engaged with the card interface, and part of the mounting portion is located in the second accommodating cavity; Wherein, the first plate and / or the second plate are connected to the fixing portion.
8. The pipe clamp assembly according to claim 7, characterized in that: The second plate is provided with a mounting notch, the mounting notch is in communication with the card interface, and the mounting notch is used to avoid the engaging portion, so that the engaging portion moves along the mounting notch and engages with the card interface.
9. The pipe clamp assembly according to claim 8, characterized in that: Through openings are respectively provided on the opposite sides of the installation notch, and the through openings are connected to the installation notch. The size of the installation notch is smaller than the size of the card interface. The through openings are used to enable the inner walls on the opposite sides of the installation notch to deform relative to the through openings when the card-connecting part is card-connected in the card interface, so that the card-connecting part moves along the installation notch and card-connects with the card interface.
10. A vehicle, characterized in that: The vehicle comprises a pipe clamp assembly as claimed in any one of claims 1 to 9; The vehicle is provided with a positioning hole and a pipeline, the pipe clamp assembly is connected to the positioning hole through the clamping portion, and the pipeline is fixed to the pipeline clamping structure so that the pipeline is fixed.